Movatterモバイル変換


[0]ホーム

URL:


CN114386870A - Block chain public service system based on digital block - Google Patents

Block chain public service system based on digital block
Download PDF

Info

Publication number
CN114386870A
CN114386870ACN202210054335.6ACN202210054335ACN114386870ACN 114386870 ACN114386870 ACN 114386870ACN 202210054335 ACN202210054335 ACN 202210054335ACN 114386870 ACN114386870 ACN 114386870A
Authority
CN
China
Prior art keywords
module
fitness
user
facility
aging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210054335.6A
Other languages
Chinese (zh)
Inventor
孙根妹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to CN202210054335.6ApriorityCriticalpatent/CN114386870A/en
Publication of CN114386870ApublicationCriticalpatent/CN114386870A/en
Pendinglegal-statusCriticalCurrent

Links

Images

Classifications

Landscapes

Abstract

The invention discloses a digital block-based block chain public service system, which comprises an information collection module, an aging analysis module and a maintenance reminding module, wherein the information collection module is electrically connected with the aging analysis module, the information collection module is used for collecting user information of a fitness activity area, the aging analysis module is used for analyzing the aging degree of fitness facilities according to the number of people and time of fitness activities, the maintenance reminding module is used for reminding public service workers to maintain the seriously aged fitness facilities, the information collection module comprises a meteorological module, a face recognition module and an information storage module, the aging analysis module comprises a abandonment degree calculation module, a damage degree calculation module and a loss degree calculation module, the maintenance reminding module comprises a judgment module and an arrangement module, and the arrangement module is electrically connected with a data storage module, the invention has the characteristic of calculating the aging degree of the fitness facility according to the use condition of the user.

Description

Translated fromChinese
一种基于数字区块的区块链公共服务系统A blockchain public service system based on digital blocks

技术领域technical field

本发明涉及公共服务技术领域,具体为一种基于数字区块的区块链公共服务系统。The invention relates to the technical field of public services, in particular to a blockchain public service system based on digital blocks.

背景技术Background technique

在当今社会,人们的健身意识逐渐加强,因此近年来很多小区和公园新建了许多健身设施,供人们日常的健身娱乐活动。In today's society, people's fitness awareness is gradually strengthened, so in recent years, many new fitness facilities have been built in many communities and parks for people's daily fitness and entertainment activities.

但是这些健身设施因为人们的使用操作不当,在日积月累的损耗中变得破旧,逐渐成了摆设,这些没有及时维护的健身设施不仅占用大量的空地,而且打乱了人们的日常健身节奏,如何对这些健身设施进行维护成了城市建设中的新难题。因此,设计可以根据活动人群的数量和使用时间判断健身设施老化程度的一种基于数字区块的区块链公共服务系统是很有必要的。However, these fitness facilities have become dilapidated due to the accumulation of wear and tear due to people's improper use and operation, and gradually become decorations. These fitness facilities that are not maintained in time not only occupy a lot of open space, but also disrupt people's daily fitness rhythm. The maintenance of these fitness facilities has become a new problem in urban construction. Therefore, it is necessary to design a blockchain public service system based on digital blocks that can judge the aging degree of fitness facilities according to the number of active people and the time of use.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种基于数字区块的区块链公共服务系统,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a blockchain public service system based on digital blocks to solve the problems raised in the above background technology.

为了解决上述技术问题,本发明提供如下技术方案:一种基于数字区块的区块链公共服务系统,包括信息收集模块、老化分析模块和维护提醒模块,所述信息收集模块与老化分析模块电连接,所述信息收集模块用于收集健身活动区域的用户信息,所述老化分析模块用于根据健身活动的人数和时间分析健身设施的老化程度,所述维护提醒模块用于提醒公共服务工作人员对老化严重的健身设施进行维护。In order to solve the above technical problems, the present invention provides the following technical solutions: a digital block-based blockchain public service system, including an information collection module, an aging analysis module and a maintenance reminder module, the information collection module and the aging analysis module are electrically connected to each other. Connected, the information collection module is used to collect user information in the fitness activity area, the aging analysis module is used to analyze the aging degree of fitness facilities according to the number of people and the time of fitness activities, and the maintenance reminder module is used to remind public service workers. Maintenance of aging fitness facilities.

根据上述技术方案,所述信息收集模块包括气象模块,人脸识别模块和信息存储模块,所述老化分析模块包括废弃度计算模块、损坏度计算模块和损耗度计算模块,所述维护提醒模块包括判断模块和排列模块,所述排列模块和数据存储模块电连接;According to the above technical solution, the information collection module includes a meteorological module, a face recognition module and an information storage module, the aging analysis module includes a waste calculation module, a damage calculation module and a loss calculation module, and the maintenance reminder module includes a judgment module and an arrangement module, the arrangement module and the data storage module are electrically connected;

所述气象模块用于收集当天的气象信息,所述人脸识别模块用于收集进入健身活动区域的用户人脸信息,所述数据存储模块用于存储数据,所述废弃度计算模块用于根据健身活动区域的用户数量计算健身设施的废弃程度,所述损坏度计算模块用于根据用户在健身活动区域的活动时间计算用户对健身设施的损坏程度,所述损耗度计算模块用于计算健身设施在日常使用中的损耗情况,所述判断模块用于根据健身设施的老化分析结果判断是否需要维护,所述排列模块用于对健身设施老化程度的分析结果进行排序。The weather module is used to collect the weather information of the day, the face recognition module is used to collect the face information of users entering the fitness activity area, the data storage module is used to store data, and the waste calculation module is used to The number of users in the fitness activity area is used to calculate the degree of abandonment of the fitness facility. The damage degree calculation module is used to calculate the degree of damage to the fitness facility by the user according to the user's activity time in the fitness activity area. The loss degree calculation module is used to calculate the fitness facility. In the case of wear and tear in daily use, the judging module is used for judging whether maintenance is required according to the aging analysis result of the fitness facility, and the ranking module is used for sorting the analysis result of the aging degree of the fitness facility.

根据上述技术方案,所述公共服务系统的具体工作过程包括以下步骤:According to the above technical solution, the specific working process of the public service system includes the following steps:

S1、在某区域建造新的健身设施后,将气象模块和人脸识别模块安装于该健身活动区域,信息收集模块收集该活动区域的气象信息和用户信息;S1. After building a new fitness facility in a certain area, install the weather module and the face recognition module in the fitness activity area, and the information collection module collects the weather information and user information of the activity area;

S2、当有用户进入该活动区域使用健身设施时,人脸识别模块收集用户的人脸信息,记录用户数量,并通过每天前往该活动区域的用户数量变化计算该健身设施废弃值F;S2. When a user enters the activity area to use the fitness facility, the face recognition module collects the user's face information, records the number of users, and calculates the fitness facility abandonment value F by changing the number of users who go to the activity area every day;

S3、人脸识别模块收集用户人脸信息后将人脸信息上传至数据存储模块,对该位用户的身份进行记录,损坏度计算模块记录每一位用户的使用健身设施时间,并根据用户对健身设施使用时间的变化计算用户对健身设施的损坏值S;S3. After collecting the user's face information, the face recognition module uploads the face information to the data storage module, records the identity of the user, and the damage degree calculation module records the use time of each user's fitness facilities, and according to the user's opinion Calculate the user's damage value S to the fitness facility based on the change in the use time of the fitness facility;

S4、损耗度计算模块计算健身设施在日常使用中的损耗值H,并将这些数据上传至数据存储模块,老化分析模块根据计算结果计算出健身器材的老化程度;S4, the loss degree calculation module calculates the loss value H of the fitness equipment in daily use, and uploads these data to the data storage module, and the aging analysis module calculates the aging degree of the fitness equipment according to the calculation result;

S5、提醒模块根据老化计算模块的计算结果提醒公共服务维护人员对健身设施进行维护。S5, the reminding module reminds the public service maintenance personnel to maintain the fitness facility according to the calculation result of the aging calculation module.

根据上述技术方案,所述人脸识别模块包括人脸检测单元和人脸比对单元,所述人脸检测单元用于检测人脸,所述人脸比对单元用于验证用户身份,所述废弃度计算模块包括计数单元,所述计数单元用于记录用户数量,上述步骤S2中废弃度计算模块的具体工作过程包括以下步骤:According to the above technical solution, the face recognition module includes a face detection unit and a face comparison unit, the face detection unit is used for detecting a human face, the face comparison unit is used for verifying the user identity, the The abandonment degree calculation module includes a counting unit, and the counting unit is used to record the number of users. The specific working process of the abandonment degree calculation module in the above step S2 includes the following steps:

S2-1、在健身设施建造完成后,当有用户进入健身活动区域时,人脸检测单元检测出用户的人脸信息,并将人脸信息上传至数据存储模块;S2-1. After the construction of the fitness facility is completed, when a user enters the fitness activity area, the face detection unit detects the user's face information, and uploads the face information to the data storage module;

S2-2、气象模块监测当天健身区域的气候特点,判断当日是否为降水气候,若出现降水天气计数单元不工作,若当日不为降水气候,计数单元记录检测单元检测出的人脸信息数量,即当日进入健身活动区域的用户数量n;S2-2. The meteorological module monitors the climate characteristics of the fitness area on the day to determine whether the day is a precipitation climate. If the precipitation weather occurs, the counting unit does not work. If the day is not a precipitation climate, the counting unit records the number of face information detected by the detection unit. That is, the number of users who entered the fitness activity area on the day n;

S2-3、计数单元统计健身设施新建后采样天数为M天内平均每天的活动人群数量

Figure BDA0003475795320000031
其中i为天数,i=1,2,3,......,M;废弃度计算模块根据每日活动的人群数量变化计算出健身设施的废弃程度F,具体为:S2-3. The counting unit counts the number of active people in the average daily activity in M days after the fitness facility is newly built.
Figure BDA0003475795320000031
where i is the number of days, i=1, 2, 3, ......, M; the abandonment degree calculation module calculates the abandonment degree F of the fitness facility according to the change in the number of people in daily activities, specifically:

Figure BDA0003475795320000032
Figure BDA0003475795320000032

其中I为当日距健身设施新建完成日期的天数,式中天数I不包括气象模块监测出的降水日。Wherein I is the number of days from the completion date of the new fitness facility on the current day, and the number of days I in the formula does not include the precipitation days monitored by the meteorological module.

根据上述技术方案,所述损坏度计算模块包括计时单元,所述计时单元用于记录用户使用健身设施的时间,上述步骤S3中损坏度计算模块的具体工作过程包括以下步骤:According to the above technical solution, the damage degree calculation module includes a timing unit, and the timing unit is used to record the time when the user uses the fitness facility. The specific working process of the damage degree calculation module in the above step S3 includes the following steps:

S3-1、当用户进入健身活动区域时,人脸检测单元检测人脸信息并上传至数据存储模块;S3-1. When the user enters the fitness activity area, the face detection unit detects the face information and uploads it to the data storage module;

S3-2、人脸比对单元对活动区域内的群众人脸信息进行比对,计时模块记录该用户人脸出现在该健身活动区域的时间t,即每个用户在健身活动区域使用健身设施的时间为tj,j=1,2,3,......,n;S3-2. The face comparison unit compares the face information of the masses in the activity area, and the timing module records the time t when the user's face appears in the fitness activity area, that is, each user uses fitness facilities in the fitness activity area The time is tj , j=1,2,3,...,n;

S3-3、损坏度计算模块计算用户每天平均的停留时间

Figure BDA0003475795320000041
损坏度计算模块根据每个用户在健身活动区域的停留时间计算用户对健身设施的损坏程度S,具体为:S3-3. The damage degree calculation module calculates the daily average stay time of the user
Figure BDA0003475795320000041
The damage degree calculation module calculates the damage degree S of the user to the fitness facility according to the stay time of each user in the fitness activity area, specifically:

Figure BDA0003475795320000042
Figure BDA0003475795320000042

其中T0为健身设施新建M天内活动人群的各用户平均每天停留时间,具体为

Figure BDA0003475795320000043
Among them, T0 is the average daily stay time of each user of the active crowd within M days of the newly built fitness facility, specifically:
Figure BDA0003475795320000043

根据上述技术方案,上述步骤S4中损耗度计算模块根据健身器材的使用时间计算损耗程度H,具体为:According to the above technical solution, the loss degree calculation module in the above step S4 calculates the loss degree H according to the use time of the fitness equipment, specifically:

H=Kμ-I×Ti×niH=Kμ -I×Ti ×ni

其中K为气象模块统计出的降水天数,μ为经验参数,与通过降水天数计算健身设施的损耗程度有关,并将计算结果上传至数据存储模块。Among them, K is the number of precipitation days counted by the meteorological module, and μ is an empirical parameter, which is related to the calculation of the loss of fitness facilities through the number of precipitation days, and the calculation results are uploaded to the data storage module.

根据上述技术方案,所述老化分析模块根据数据存储模块中的计算结果分析健身设施的老化程度Y,健身设施的老化程度与废弃值F和用户损坏值S成正比关系,具体为:Y=(F+S)×H,并将计算结果上传至数据存储模块。According to the above technical solution, the aging analysis module analyzes the aging degree Y of the fitness facility according to the calculation result in the data storage module, and the aging degree of the fitness facility is proportional to the waste value F and the user damage value S, specifically: Y=( F+S)×H, and upload the calculation result to the data storage module.

根据上述技术方案,上述步骤S5中提醒模块的具体工作过程包括以下步骤:According to the above technical solution, the specific working process of the reminder module in the above step S5 includes the following steps:

S5-1、判断模块访问数据存储模块的设施老化计算结果,判断该设施的老化程度Y是否大于系统预设值Y0,若大于则判断模块判断该活动区域的设施老化严重需要维护,并将结果上传至排列模块;S5-1. The judging module accesses the facility aging calculation result of the data storage module, and judges whether the aging degree Y of the facility is greater than the system preset value Y0 , if it is greater, the judging module judges that the facility in the active area is seriously aged and needs maintenance, and assigns The result is uploaded to the arrangement module;

S5-2、排列模块对各需要对健身设施维护的健身活动区域进行排列,排列优先级与设施的老化程度和使用人数有关,具体为L=Y×N0,排列模块对各区域优先级值L由大至小排列,提醒模块按顺序向维护人员发出维护提醒。S5-2. The arrangement module arranges each fitness activity area that needs to be maintained for the fitness facility. The arrangement priority is related to the aging degree of the facility and the number of users, specifically L=Y×N0 . The arrangement module arranges the priority value of each area. L is arranged from large to small, and the reminder module sends maintenance reminders to maintenance personnel in sequence.

根据上述技术方案,所述提醒模块还包括定位单元,所述定位单元用于向维护人员发送需要维修区域的位置信息。According to the above technical solution, the reminding module further includes a positioning unit, and the positioning unit is configured to send the position information of the maintenance area to the maintenance personnel.

根据上述技术方案,所述公共服务系统包括复位单元,所述复位单元用于维护人员完成对健身设施的维护工作后重新记录用户数据。According to the above technical solution, the public service system includes a reset unit, and the reset unit is used for the maintenance personnel to re-record user data after completing the maintenance work on the fitness facility.

与现有技术相比,本发明所达到的有益效果是:本发明根据健身活动区域的人群数量和停留时间计算健身设施的老化程度,精确的向维护人员发出维护提醒,满足了群众的健身需求,解决了健身设施维护困难的问题。Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention calculates the aging degree of the fitness facility according to the number of people in the fitness activity area and the stay time, accurately issues maintenance reminders to maintenance personnel, and satisfies the fitness needs of the masses. , to solve the problem of difficult maintenance of fitness facilities.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention. In the attached image:

图1是本发明的系统模块示意图。FIG. 1 is a schematic diagram of a system module of the present invention.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

请参阅图1,本发明提供技术方案:一种基于数字区块的区块链公共服务系统,包括信息收集模块、老化分析模块和维护提醒模块,信息收集模块与老化分析模块电连接,信息收集模块用于收集健身活动区域的用户信息,老化分析模块用于根据健身活动的人数和时间分析健身设施的老化程度,维护提醒模块用于提醒公共服务工作人员对老化严重的健身设施进行维护;Please refer to FIG. 1, the present invention provides a technical solution: a digital block-based blockchain public service system, including an information collection module, an aging analysis module and a maintenance reminder module, the information collection module is electrically connected to the aging analysis module, and the information collection module The module is used to collect user information in the fitness activity area, the aging analysis module is used to analyze the aging degree of fitness facilities according to the number and time of fitness activities, and the maintenance reminder module is used to remind public service staff to maintain seriously aging fitness facilities;

信息收集模块包括气象模块,人脸识别模块和信息存储模块,老化分析模块包括废弃度计算模块、损坏度计算模块和损耗度计算模块,维护提醒模块包括判断模块和排列模块,排列模块和数据存储模块电连接;The information collection module includes a meteorological module, a face recognition module and an information storage module, the aging analysis module includes a waste calculation module, a damage calculation module and a loss calculation module, and the maintenance reminder module includes a judgment module and an arrangement module, and an arrangement module and data storage. module electrical connection;

气象模块用于收集当天的气象信息,人脸识别模块用于收集进入健身活动区域的用户人脸信息,数据存储模块用于存储数据,废弃度计算模块用于根据健身活动区域的用户数量计算健身设施的废弃程度,损坏度计算模块用于根据用户在健身活动区域的活动时间计算用户对健身设施的损坏程度,损耗度计算模块用于计算健身设施在日常使用中的损耗情况,判断模块用于根据健身设施的老化分析结果判断是否需要维护,排列模块用于对健身设施老化程度的分析结果进行排序;The weather module is used to collect the weather information of the day, the face recognition module is used to collect the face information of users entering the fitness activity area, the data storage module is used to store the data, and the waste calculation module is used to calculate the fitness based on the number of users in the fitness activity area. The degree of abandonment of the facility, the damage degree calculation module is used to calculate the degree of damage to the fitness facility by the user according to the user's activity time in the fitness activity area, the wastage degree calculation module is used to calculate the loss of fitness facilities in daily use, and the judgment module is used for According to the aging analysis results of the fitness facilities, it is judged whether maintenance is required, and the arrangement module is used to sort the analysis results of the aging degree of the fitness facilities;

公共服务系统的具体工作过程包括以下步骤:The specific working process of the public service system includes the following steps:

S1、在某区域建造新的健身设施后,将气象模块和人脸识别模块安装于该健身活动区域,信息收集模块收集该活动区域的气象信息和用户信息;S1. After building a new fitness facility in a certain area, install the weather module and the face recognition module in the fitness activity area, and the information collection module collects the weather information and user information of the activity area;

S2、当有用户进入该活动区域使用健身设施时,人脸识别模块收集用户的人脸信息,记录用户数量,并通过每天前往该活动区域的用户数量变化计算该健身设施废弃值F,每天前往健身活动区域的人越少,F值越小,判断该区域的健身设施老化程度严重,导致用户不愿前往,需要及时维护;S2. When a user enters the activity area to use the fitness facility, the face recognition module collects the user's face information, records the number of users, and calculates the fitness facility abandonment value F through the change in the number of users who visit the activity area every day. The fewer people there are in the fitness activity area, the smaller the F value is. It is judged that the fitness facilities in this area are seriously aging, which makes users reluctant to go and needs to be maintained in time;

S3、人脸识别模块收集用户人脸信息后将人脸信息上传至数据存储模块,对该位用户的身份进行记录,损坏度计算模块记录每一位用户的使用健身设施时间,并根据用户对健身设施使用时间的变化计算用户对健身设施的损坏值S,用户的使用时间越少,S值越小,判断健身设施的正常功能出现损坏,需要及时维护,满足人们正常使用健身设施的需求;S3. After collecting the user's face information, the face recognition module uploads the face information to the data storage module, records the identity of the user, and the damage degree calculation module records the use time of each user's fitness facilities, and according to the user's opinion The change in the use time of the fitness facility calculates the user's damage value S to the fitness facility. The less the user's usage time is, the smaller the S value is. It is judged that the normal function of the fitness facility is damaged and needs to be maintained in time to meet the needs of people to use the fitness facility normally;

S4、损耗度计算模块计算健身设施在日常使用中的损耗值H,并将这些数据上传至数据存储模块,老化分析模块根据计算结果计算出健身器材的老化程度,计算健身设施的正常老化情况;S4, the loss degree calculation module calculates the loss value H of the fitness facility in daily use, and uploads the data to the data storage module, and the aging analysis module calculates the aging degree of the fitness equipment according to the calculation result, and calculates the normal aging of the fitness facility;

S5、提醒模块根据老化计算模块的计算结果提醒公共服务维护人员对健身设施进行维护,及时维护保证满足人们的健身需要;S5, the reminder module reminds the public service maintenance personnel to maintain the fitness facility according to the calculation result of the aging calculation module, and the timely maintenance ensures that people's fitness needs are met;

人脸识别模块包括人脸检测单元和人脸比对单元,人脸检测单元用于检测人脸,人脸比对单元用于验证用户身份,废弃度计算模块包括计数单元,计数单元用于记录用户数量,上述步骤S2中废弃度计算模块的具体工作过程包括以下步骤:The face recognition module includes a face detection unit and a face comparison unit. The face detection unit is used to detect faces, and the face comparison unit is used to verify user identity. The number of users, the specific working process of the abandonment degree calculation module in the above step S2 includes the following steps:

S2-1、在健身设施建造完成后,当有用户进入健身活动区域时,人脸检测单元检测出用户的人脸信息,并将人脸信息上传至数据存储模块;S2-1. After the construction of the fitness facility is completed, when a user enters the fitness activity area, the face detection unit detects the user's face information, and uploads the face information to the data storage module;

S2-2、气象模块监测当天健身区域的气候特点,判断当日是否为降水气候,若出现降水天气计数单元不工作,若当日不为降水气候,计数单元记录检测单元检测出的人脸信息数量,即当日进入健身活动区域的用户数量n,排除天气因素对健身人群的干扰;S2-2. The meteorological module monitors the climate characteristics of the fitness area on the day to determine whether the day is a precipitation climate. If the precipitation weather occurs, the counting unit does not work. If the day is not a precipitation climate, the counting unit records the number of face information detected by the detection unit. That is, the number n of users entering the fitness activity area on the day, excluding the interference of weather factors on the fitness crowd;

S2-3、计数单元统计健身设施新建后采样天数为M天内平均每天的活动人群数量

Figure BDA0003475795320000071
其中i为天数,i=1,2,3,......,M;废弃度计算模块根据每日活动的人群数量变化计算出健身设施的废弃程度F,具体为:S2-3. The counting unit counts the number of active people in the average daily activity in M days after the fitness facility is newly built.
Figure BDA0003475795320000071
where i is the number of days, i=1, 2, 3, ......, M; the abandonment degree calculation module calculates the abandonment degree F of the fitness facility according to the change in the number of people in daily activities, specifically:

Figure BDA0003475795320000072
Figure BDA0003475795320000072

其中I为当日距健身设施新建完成日期的天数,式中天数I不包括气象模块监测出的降水日,当每天前往健身活动区域的人越少,F值越小,判断该区域的健身设施老化程度严重,导致用户不愿前往,需要及时维护;Among them, I is the number of days from the completion date of the new fitness facility on the current day, and the number of days in the formula I does not include the precipitation days monitored by the meteorological module. When there are fewer people going to the fitness activity area every day, the F value is smaller, and it is judged that the fitness facilities in this area are aging. The severity is so serious that users are reluctant to go, and timely maintenance is required;

损坏度计算模块包括计时单元,计时单元用于记录用户使用健身设施的时间,上述步骤S3中损坏度计算模块的具体工作过程包括以下步骤:The damage degree calculation module includes a timing unit, and the timing unit is used to record the time when the user uses the fitness facility. The specific working process of the damage degree calculation module in the above step S3 includes the following steps:

S3-1、当用户进入健身活动区域时,人脸检测单元检测人脸信息并上传至数据存储模块;S3-1. When the user enters the fitness activity area, the face detection unit detects the face information and uploads it to the data storage module;

S3-2、人脸比对单元对活动区域内的群众人脸信息进行比对,计时模块记录该用户人脸出现在该健身活动区域的时间t,即每个用户在健身活动区域使用健身设施的时间为tj,j=1,2,3,......,n;S3-2. The face comparison unit compares the face information of the masses in the activity area, and the timing module records the time t when the user's face appears in the fitness activity area, that is, each user uses fitness facilities in the fitness activity area The time is tj , j=1,2,3,...,n;

S3-3、损坏度计算模块计算用户每天平均的停留时间

Figure BDA0003475795320000081
损坏度计算模块根据每个用户在健身活动区域的停留时间计算用户对健身设施的损坏程度S,具体为:S3-3. The damage degree calculation module calculates the daily average stay time of the user
Figure BDA0003475795320000081
The damage degree calculation module calculates the damage degree S of the user to the fitness facility according to the stay time of each user in the fitness activity area, specifically:

Figure BDA0003475795320000082
Figure BDA0003475795320000082

其中T0为健身设施新建M天内活动人群的各用户平均每天停留时间,具体为

Figure BDA0003475795320000083
用户的使用时间越少,S值越小,判断健身设施的正常功能出现损坏,需要及时维护,满足人们正常使用健身设施的需求;Among them, T0 is the average daily stay time of each user of the active crowd within M days of the newly built fitness facility, specifically:
Figure BDA0003475795320000083
The less the user's usage time is, the smaller the S value is. It is judged that the normal function of the fitness facility is damaged and needs to be maintained in time to meet the needs of people to use the fitness facility normally;

上述步骤S4中损耗度计算模块根据健身器材的使用时间计算损耗程度H,具体为:In the above-mentioned step S4, the loss degree calculation module calculates the loss degree H according to the use time of the fitness equipment, specifically:

H=Kμ-I×Ti×niH=Kμ -I×Ti ×ni

其中K为气象模块统计出的降水天数,μ为经验参数,与通过降水天数计算健身设施的损耗程度有关,并将计算结果上传至数据存储模块;Among them, K is the number of precipitation days counted by the meteorological module, and μ is an empirical parameter, which is related to the calculation of the loss of fitness facilities through the number of precipitation days, and the calculation results are uploaded to the data storage module;

老化分析模块根据数据存储模块中的计算结果分析健身设施的老化程度Y,健身设施的老化程度与废弃值F和用户损坏值S成正比关系,具体为:Y=(F+S)×H,并将计算结果上传至数据存储模块;The aging analysis module analyzes the aging degree Y of the fitness facility according to the calculation result in the data storage module. The aging degree of the fitness facility is proportional to the waste value F and the user damage value S, specifically: Y=(F+S)×H, And upload the calculation results to the data storage module;

上述步骤S5中提醒模块的具体工作过程包括以下步骤:The specific working process of the reminder module in the above step S5 includes the following steps:

S5-1、判断模块访问数据存储模块的设施老化计算结果,判断该设施的老化程度Y是否大于系统预设值Y0,若大于则判断模块判断该活动区域的设施老化严重需要维护,并将结果上传至排列模块;S5-1. The judging module accesses the facility aging calculation result of the data storage module, and judges whether the aging degree Y of the facility is greater than the system preset value Y0 , if it is greater, the judging module judges that the facility in the active area is seriously aged and needs maintenance, and assigns The result is uploaded to the arrangement module;

S5-2、排列模块对各需要对健身设施维护的健身活动区域进行排列,排列优先级与设施的老化程度和使用人数有关,具体为L=Y×N0,排列模块对各区域优先级值L由大至小排列,提醒模块按顺序向维护人员发出维护提醒,维护优先级以老化程度重,受损人数多的区域为先,尽可能的满足人们的需要;S5-2. The arrangement module arranges each fitness activity area that needs to be maintained for the fitness facility. The arrangement priority is related to the aging degree of the facility and the number of users, specifically L=Y×N0 . The arrangement module arranges the priority value of each area. L is arranged from large to small, and the reminder module sends maintenance reminders to the maintenance personnel in order. The maintenance priority is the area with the most aging degree and the large number of damaged people, so as to meet the needs of people as much as possible;

提醒模块还包括定位单元,定位单元用于向维护人员发送需要维修区域的位置信息;The reminder module further includes a positioning unit, and the positioning unit is used to send the position information of the maintenance area to the maintenance personnel;

公共服务系统包括复位单元,复位单元用于维护人员完成对健身设施的维护工作后重新记录用户数据。The public service system includes a reset unit, and the reset unit is used for re-recording user data after maintenance personnel complete the maintenance work on the fitness facility.

实施例:某区域的健身器材刚建设完成,在健身设施正常使用时,每天的健身人群数量T0=100人,活动人群的各用户平均每天停留时间T0=1h,一年后健身使用人数不断下降,计数模块记录每天的活动人数,此时健身设施的荒废值F=0.7,健身设施的损坏度S=0.5,气象模块记录雨水天气为K=30天,则此时健身设施的损耗值H=10,老化分析模块计算该区域健身设施的老化程度Y=12,此时大于系统预设值Y0=10,系统判断需要维护,此时另一区域的健身人群T0=150人,老化程度Y=11,系统将两个区域的优先级进行排序,区域一计算结果L1=1200,区域二计算结果L2=1650,因此区域二的优先级更高,维护人员将优先前往区域二对健身设施进行维护工作。Example: The construction of fitness equipment in a certain area has just been completed. When the fitness facilities are in normal use, the number of fitness people T0 = 100 people per day, the average daily stay time of each user in the active group is T0 = 1h, and the number of fitness users after one year The number of active people every day is recorded by the counting module. At this time, the waste value of fitness facilities is F=0.7, the damage degree of fitness facilities is S=0.5, and the weather module records rainy weather as K=30 days. At this time, the loss value of fitness facilities is H=10, the aging analysis module calculates the aging degree of the fitness facilities in this area Y=12, at this time, it is greater than the system preset value Y0 =10, the system judges that maintenance is required, at this time, the fitness crowd in another area is T0 =150 people, The aging degree is Y=11. The system sorts the priorities of the two areas. The calculation result of area 1 is L1 = 1200, and the calculation result of area 2 is L2 = 1650. Therefore, the priority of area 2 is higher, and maintenance personnel will go to the area first. 2. Maintenance of fitness facilities.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, the The technical solutions described in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (10)

1. The utility model provides a public service system of block chain based on digit block, includes information collection module, ageing analysis module and maintenance and reminds the module, the information collection module is connected its characterized in that with ageing analysis module electricity: the information collection module is used for collecting user information of a fitness activity area, the aging analysis module is used for analyzing the aging degree of the fitness facilities according to the number of people and time of the fitness activity, and the maintenance reminding module is used for reminding public service staff to maintain the seriously aged fitness facilities.
2. A digital block based block chain common service system according to claim 1, wherein: the information collection module comprises a meteorological module, a face recognition module and an information storage module, the aging analysis module comprises a abandonment degree calculation module, a damage degree calculation module and a loss degree calculation module, the maintenance reminding module comprises a judgment module and an arrangement module, and the arrangement module is electrically connected with the data storage module;
the weather module is used for collecting weather information of the day, the face recognition module is used for collecting user face information entering a body-building activity area, the data storage module is used for storing data, the abandonment calculation module is used for calculating the abandonment degree of the body-building facility according to the user number of the body-building activity area, the damage degree calculation module is used for calculating the damage degree of the user to the body-building facility according to the activity time of the user in the body-building activity area, the damage degree calculation module is used for calculating the loss condition of the body-building facility in daily use, the judgment module is used for judging whether maintenance is needed according to the aging analysis result of the body-building facility, and the arrangement module is used for sequencing the analysis result of the aging degree of the body-building facility.
3. A digital block based block chain common service system according to claim 2, wherein: the specific working process of the public service system comprises the following steps:
s1, after a new body-building facility is built in a certain area, a weather module and a face recognition module are installed in the body-building activity area, and an information collection module collects weather information and user information of the activity area;
s2, when a user enters the activity area to use the fitness facility, the face recognition module collects face information of the user, records the number of the users, and calculates the abandonment value F of the fitness facility through the change of the number of the users going to the activity area every day;
s3, the face recognition module uploads the face information to the data storage module after collecting the face information of the user, the identity of the user is recorded, the damage degree calculation module records the time of using the fitness facility of each user, and the damage value S of the user to the fitness facility is calculated according to the change of the use time of the fitness facility by the user;
s4, the loss calculation module calculates the loss value H of the fitness facility in daily use and uploads the data to the data storage module, and the aging analysis module calculates the aging degree of the fitness equipment according to the calculation result;
and S5, the reminding module reminds public service maintenance personnel to maintain the fitness facilities according to the calculation result of the aging calculation module.
4. A digital block based block chain common service system according to claim 3, wherein: the face recognition module includes face detection unit and face comparison unit, face detection unit is used for detecting the face, the face comparison unit is used for verifying user 'S identity, abandonment degree calculation module is including the count unit, the count unit is used for recording user' S quantity, and the concrete working process of abandonment degree calculation module in above-mentioned step S2 includes following step:
s2-1, after the body-building facility is built, when a user enters a body-building activity area, the face detection unit detects face information of the user and uploads the face information to the data storage module;
s2-2, the weather module monitors weather characteristics of the fitness area on the same day, whether the weather is precipitation weather or not is judged, if the weather is precipitation weather, the counting unit does not work, and if the weather is not precipitation weather, the counting unit records the number of the face information detected by the detection unit, namely the number n of the users entering the fitness activity area on the same day;
s2-3, counting the number of the active people in the M days as the average number of the sampling days after the body-building facility is built
Figure FDA0003475795310000021
Wherein i is the number of days, i 1,2, 3. The abandonment degree calculation module calculates the abandonment degree F of the body-building facility according to the change of the number of people who move about every day, and specifically is:
Figure FDA0003475795310000031
wherein I is the number of days from the new building completion date of the body-building facility, and the number of days I does not include the precipitation day monitored by the weather module.
5. A digital block based block chain common service system according to claim 4, wherein: the damage degree calculation module comprises a timing unit for recording the time of the user using the exercise facility, and the specific working process of the damage degree calculation module in the step S3 comprises the following steps:
s3-1, when the user enters the body-building activity area, the face detection unit detects the face information and uploads the face information to the data storage module;
s3-2, the face comparison unit compares the face information of the crowd in the activity area, and the timing module records the time t when the face of the user appears in the fitness activity area, namely the time t when each user uses fitness facilities in the fitness activity area is tj,j=1,2,3,......,n;
S3-3, calculating the average residence time of the user per day by the damage calculating module
Figure FDA0003475795310000032
The damage degree calculation module is used for building body according to each userCalculating the damage degree S of the user to the fitness facility by the stay time of the activity area, specifically:
Figure FDA0003475795310000033
wherein T is0The method is characterized in that the average daily stay time of each user of the active crowd within M days is newly built for the body-building facility, specifically
Figure FDA0003475795310000034
6. A digital block based block chain common service system according to claim 5, wherein: the loss degree calculation module in the step S4 calculates the loss degree H according to the use time of the fitness equipment, specifically:
H=Kμ-I×Ti×ni
k is the number of days of precipitation counted by the weather module, mu is an experience parameter, is related to the degree of wear of the fitness facility calculated by the number of days of precipitation, and uploads the calculation result to the data storage module.
7. A digital block based block chain common service system according to claim 6, wherein: the aging analysis module analyzes the aging degree Y of the fitness facility according to the calculation result in the data storage module, and the aging degree of the fitness facility is in a direct proportion relation with the abandonment value F and the user damage value S, and specifically comprises the following steps: and Y is (F + S) multiplied by H, and the calculation result is uploaded to the data storage module.
8. A digital block based block chain common service system according to claim 7, wherein: the specific working process of the reminding module in the step S5 includes the following steps:
s5-1, the judging module accesses the aging calculation result of the facility of the data storage module and judges whether the aging degree Y of the facility is larger than the preset value Y of the system0If the aging rate is larger than the preset aging rate, the judgment module judges that the equipment in the activity area is seriously aged and needs maintenance, and uploads the result to the arrangement module;
s5-2, arranging each body-building activity area needing body-building facility maintenance by an arranging module, wherein the arranging priority is related to the aging degree and the number of people using the facility, and specifically L is Y multiplied by N0The arrangement module arranges the priority values L of the areas from large to small, and the reminding module sends maintenance reminding to maintenance personnel in sequence.
9. A digital block based block chain common service system according to claim 8, wherein: the reminding module further comprises a positioning unit, and the positioning unit is used for sending position information of an area needing to be repaired to maintenance personnel.
10. A digital block based block chain common service system according to claim 9, wherein: the public service system comprises a reset unit, and the reset unit is used for recording user data again after maintenance personnel complete maintenance work on the fitness facility.
CN202210054335.6A2022-01-182022-01-18Block chain public service system based on digital blockPendingCN114386870A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202210054335.6ACN114386870A (en)2022-01-182022-01-18Block chain public service system based on digital block

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202210054335.6ACN114386870A (en)2022-01-182022-01-18Block chain public service system based on digital block

Publications (1)

Publication NumberPublication Date
CN114386870Atrue CN114386870A (en)2022-04-22

Family

ID=81204384

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202210054335.6APendingCN114386870A (en)2022-01-182022-01-18Block chain public service system based on digital block

Country Status (1)

CountryLink
CN (1)CN114386870A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN117521901A (en)*2023-11-152024-02-06广东红旗体育用品有限公司System and method for statistical analysis of exercise fitness data of exercise places
CN117860937A (en)*2022-11-152024-04-12南通恒益电子有限公司Dust removal system for automobile electronic controller die production

Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN109284838A (en)*2018-10-102019-01-29安徽省鹏徽物业管理有限公司A kind of communal facility damage warning system based on estate management
CN110956289A (en)*2019-12-162020-04-03深圳市元征科技股份有限公司Recommendation method and device for device use mode
CN113485592A (en)*2021-06-182021-10-08浪潮卓数大数据产业发展有限公司Barrier-free service method, device and medium based on mobile terminal
CN113868677A (en)*2021-09-042021-12-31苏州拓翰聚科技有限公司 A distributed blockchain information technology verification system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN109284838A (en)*2018-10-102019-01-29安徽省鹏徽物业管理有限公司A kind of communal facility damage warning system based on estate management
CN110956289A (en)*2019-12-162020-04-03深圳市元征科技股份有限公司Recommendation method and device for device use mode
CN113485592A (en)*2021-06-182021-10-08浪潮卓数大数据产业发展有限公司Barrier-free service method, device and medium based on mobile terminal
CN113868677A (en)*2021-09-042021-12-31苏州拓翰聚科技有限公司 A distributed blockchain information technology verification system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN117860937A (en)*2022-11-152024-04-12南通恒益电子有限公司Dust removal system for automobile electronic controller die production
CN117521901A (en)*2023-11-152024-02-06广东红旗体育用品有限公司System and method for statistical analysis of exercise fitness data of exercise places
CN117521901B (en)*2023-11-152024-05-31广东红旗体育用品有限公司System and method for statistical analysis of exercise fitness data of exercise places

Similar Documents

PublicationPublication DateTitle
CN103617568B (en)Setting method for abnormal data determination threshold in steady-state power quality early-warning mechanism
CN112561352B (en) A kind of rail transit signal system health assessment method and assessment device
CN114386870A (en)Block chain public service system based on digital block
CN106154209A (en)Electrical energy meter fault Forecasting Methodology based on decision Tree algorithms
CN115231410A (en)Elevator periodic maintenance, monitoring and management cloud system based on intellectualization
CN117474319A (en) A risk assessment method and system for power systems
CN111582209A (en) A method for supervising abnormal behavior of construction workers on infrastructure construction site
CN103455855A (en)Intermittent electricity stealing prevention detecting method based on electricity consumption information data analysis
CN117039850B (en) Abnormal power consumption analysis method and system based on spatiotemporal features
CN106452931A (en)Monitoring index, domain value discovery method, domain value adjusting method and automatic monitoring system
CN112036725A (en)Electric energy meter fault identification method
CN113177647A (en)Operation and maintenance big data analysis system and method based on power transformation equipment
CN120194770A (en) An intelligent environmental monitoring system based on the Internet of Things
CN114881305B (en)Canteen prediction early warning system and prediction method thereof
CN115545240A (en) A method, system, equipment and medium for diagnosing abnormal line loss in a low-voltage distribution network platform area
CN117668700B (en)Hospital comprehensive energy boundary identification method and system based on online change point detection
CN113610830A (en)Detection system and method for lightning arrester
CN118886333A (en) A bridge maintenance intelligent decision-making method and system
CN118941007A (en) A municipal management and maintenance system based on the Internet of Things
CN116756505B (en)Photovoltaic equipment intelligent management system and method based on big data
CN118444014A (en)Platform power failure event detection method based on dual-mode communication intelligent ammeter
CN117455181A (en) An intelligent enterprise management system
CN113850422B (en)Method for quickly searching line loss points of platform area based on multiple nonlinear regression or/and parallel vectors
CN115718872A (en)Abnormal electricity utilization analysis method for transformer district users based on historical data
CN110555623B (en) Method and device for screening main influencing factors of daily operation efficiency of power distribution equipment

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20220422


[8]ページ先頭

©2009-2025 Movatter.jp