Horizontal well development method of natural gas hydrate
Download PDF

Info

Publication number
CN114075950B
CN114075950BCN202010847072.5ACN202010847072ACN114075950BCN 114075950 BCN114075950 BCN 114075950BCN 202010847072 ACN202010847072 ACN 202010847072ACN 114075950 BCN114075950 BCN 114075950B
Authority
CN
China
Prior art keywords
well
reservoir
horizontal
natural gas
gas hydrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010847072.5A
Other languages
Chinese (zh)
Other versions
CN114075950A (en
Inventor
贺甲元
李小龙
王海波
张乐
岑学齐
杨立红
柴国兴
陈旭东
王烽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Exploration and Production Research Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Exploration and Production Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Exploration and Production Research InstitutefiledCriticalChina Petroleum and Chemical Corp
Priority to CN202010847072.5ApriorityCriticalpatent/CN114075950B/en
Publication of CN114075950ApublicationCriticalpatent/CN114075950A/en
Application grantedgrantedCritical
Publication of CN114075950BpublicationCriticalpatent/CN114075950B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The invention discloses a horizontal well development method for natural gas hydrate, which comprises the following steps: drilling a horizontal well in an upper portion of a natural gas hydrate reservoir, the horizontal section of the horizontal well being tracked a distance from the reservoir that approximates each other but does not cause disturbance of the reservoir; windowing two sides of a horizontal section of the horizontal well, drilling a preset number of lateral radial wells, pouring concrete into the lateral radial wells, and forming an artificial framework loaded on a lower interlayer of the reservoir after the concrete is solidified; windowing the lower part of the horizontal well, and drilling a vertical radial well to drill through the whole reservoir; and backfilling the production area after the development of the natural gas hydrate in the production area is completed. The invention provides a systematic technical method integrating reservoir pretreatment, exploitation and backfill after exploitation, which realizes the increase of the frame strength of a reservoir rock body by forming an artificial skeleton in the reservoir.

Description

Horizontal well development method of natural gas hydrate
Technical Field
The invention belongs to the field of oil and gas reservoir development, and particularly relates to a horizontal well development method of natural gas hydrate.
Background
Natural gas hydrate is a novel unconventional resource, and is a white crystalline compound formed by hydrocarbon gases such as methane and the like and water under the conditions of high pressure and low temperature, and the white crystalline compound is also called as 'combustible ice'. Typically a unit volume of natural gas hydrate decomposition can produce 164-180 units volumes of methane gas. Natural gas hydrate resources are mainly distributed in deep water areas with 300-3000 m water depths of coastal continental frames such as North Freeze soil zones, indian ocean, pacific ocean, north ocean, atlantic ocean and the like, and the initial estimated resource amount is nearly hundreds times of that of conventional oil and gas, wherein about 95% of the resources are stored in the deep sea areas.
In a non-diagenetic reservoir or a reservoir with insufficient rock mass frame strength, the method of mining first and backfilling is unable to effectively reduce the risk of reservoir collapse and is not feasible, and no matter in ocean or frozen soil environment, geological phenomena such as landslide caused by stratum collapse will cause serious consequences. Thus, there is a need for a pretreatment technique for reservoirs that reduces the risk of collapse of the reservoir prior to development, enabling efficient use of the reservoir.
Disclosure of Invention
One of the technical problems to be solved by the invention is to provide a horizontal well development method of natural gas hydrate for preventing formation collapse.
In order to solve the above technical problems, an embodiment of the present application provides a method for developing a horizontal well of a natural gas hydrate, including: drilling a horizontal well in an upper portion of a natural gas hydrate reservoir, the horizontal section of the horizontal well being tracked a distance from the reservoir that approximates each other but does not cause disturbance of the reservoir; windowing two sides of a horizontal section of the horizontal well, drilling a preset number of lateral radial wells, pouring concrete into the lateral radial wells, and forming an artificial framework loaded on a lower interlayer of the reservoir after the concrete is solidified; windowing the lower part of the horizontal well, and drilling a vertical radial well to drill through the whole reservoir; and backfilling the production area after the development of the natural gas hydrate in the production area is completed.
In one embodiment, a lateral radial well is drilled using a hydraulic jet technique, with the initial jet position being set at a laterally horizontal downward angle to ensure that the hydraulic jet drill bit remains drilling in a diagonally downward direction.
In one embodiment, in the process of drilling the lateral radial well, assuming that the reservoir thickness is h, drilling of the lateral radial well is completed when the hydraulic jet drill bit penetration reaches Acos-1 alpha x h, wherein A is a redundancy multiple and alpha is a set angle of the jet initial position.
In one embodiment, the set angle α of the initial position of the jet is 45 ° and the redundancy is 1.5 times.
In one embodiment, the well spacing of lateral radial wells drilled in the horizontal section is determined based on the degree of stability of the reservoir.
In one embodiment, if the reservoir rock formation skeleton is high in strength and high in stability, increasing the well spacing of the radial wells; if the reservoir bed skeleton is low in strength or has no bed skeleton at all, the stability is poor, and the well spacing of the radial wells is reduced.
In one embodiment, the radial wells have a well spacing in the range of 50m to 100m when the reservoir rock matrix is strong and stable.
In one embodiment, the radial wells have a well spacing in the range of 10m to 20m when the reservoir skeleton is low in strength or completely free of the formation skeleton and poor in stability.
In one embodiment, when well group development is employed, the well group is laid out in a well row or nine-point layout such that the artificial skeletons formed by the lateral radial wells of each individual well are intersected.
In one embodiment, the horizontal trajectory of the horizontal well is in the range of 10m to 20m from the reservoir.
One or more embodiments of the above-described solution may have the following advantages or benefits compared to the prior art:
based on the defects of the prior art, the embodiment of the invention provides a systematic method integrating reservoir pretreatment, exploitation and backfill after exploitation, which increases the strength of a reservoir rock frame by forming an artificial skeleton in the reservoir, and meanwhile, the disturbance of the process of forming the artificial skeleton on the reservoir is small and the risk is low. When the well group is adopted for large-scale development, the artificial skeleton forms an artificial support system of the system, so that the effective development of the reservoir is realized, and the collapse risk of the reservoir is effectively reduced.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. The objectives and other advantages of the invention may be realized and attained by the structure and/or process particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
The accompanying drawings are included to provide a further understanding of the technical aspects or prior art of the present application and constitute a part of this specification. The drawings, which are used to illustrate the technical solution of the present application, together with the embodiments of the present application, but do not limit the technical solution of the present application.
FIG. 1 is a schematic diagram of a horizontal well drilled in an upper portion of a reservoir according to an embodiment of the present application.
Fig. 2 is a schematic diagram of drilling a radial well on both sides of a horizontal section of a horizontal well according to an embodiment of the present application, wherein fig. 2 (a) is a front view and fig. 2 (b) is a side view.
Fig. 3 is a schematic diagram of drilling a radial well at the bottom of a horizontal well according to an embodiment of the present application, wherein fig. 3 (a) is a front view and fig. 3 (b) is a top view.
FIG. 4 is a schematic illustration of lateral radial well crossover as horizontal well string development proceeds in accordance with an embodiment of the present application. (side view)
Fig. 5 is a schematic diagram of a horizontal well group of a well pattern layout according to an embodiment of the present application.
Fig. 6 is a schematic diagram of a horizontal well group of a nine-point well group layout according to an embodiment of the present application.
Fig. 7 is a flow chart of a horizontal well development method for natural gas hydrate according to an embodiment of the present application.
Reference numerals in the drawings are as follows: (1) surface layer (sea or earth floating layer); (2) a cap layer on top of the reservoir; (3) a natural gas hydrate reservoir; (4) a barrier layer at the lower portion of the reservoir; (5) a horizontal well; (6) a lateral radial well; (7) a vertical radial well; (8) a region that can be safely developed; (9) a well platform.
Front view: a view from the axial cross-sectional direction of the vertical wellbore.
Top view: a view from the wellhead direction.
Side view: seen in the axial cross-sectional direction common to the vertical and horizontal bores.
Detailed Description
The following will describe embodiments of the present invention in detail with reference to the drawings and examples, thereby solving the technical problems by applying technical means to the present invention, and realizing the corresponding technical effects can be fully understood and implemented accordingly. The embodiments and the features in the embodiments can be combined with each other under the condition of no conflict, and the formed technical schemes are all within the protection scope of the invention.
The inventors of the present application have studied the prior art to find that: at present, the technical schemes such as various development methods or devices aiming at natural gas hydrate are mainly focused on specific development modes, and are still specific process modes of main stream ideas such as a pressure reduction mode, a temperature rising mode, a replacement mode, a solid crushing mode and the like, wherein only one mode of backfilling formation defect caused by exploitation is adopted, and the operability of the method is yet to be demonstrated. For example, in the first prior art, the stability of a near-well zone reservoir is improved by forming foam mortar jet grouting piles around the well, and the efficacy thereof is focused on the stability of the well wall for a single well; in the second existing technical scheme, three fluids are sequentially introduced through an injection well group, so that the replacement of natural gas in a reservoir is realized, and simultaneously, the defect formed by the production of the natural gas is backfilled in real time; in the third prior art, the vertical well is used as the core, the radial well is drilled on the upper and lower parts of the reservoir respectively, the displacement and the replacement circulation exploitation of the radial well on the upper and lower parts of the reservoir in the same vertical well are realized through two loops of an oil pipe and a sleeve, and meanwhile, the stability of the well wall is realized by means of a concrete well cementation process; in the fourth prior art, the exploitation and backfilling are sequentially carried out according to the preset working procedures in a mode of cooperative production of well groups, so that the utilization of the reservoir is realized, and meanwhile, the stability of the reservoir is ensured; in the fifth prior art, foam cement is sprayed in the lateral direction to form a honeycomb structure after a horizontal well is drilled in a reservoir to provide support for the horizontal well and a stratum, so that well wall stability is realized; in the sixth technical scheme, the small well hole is drilled in the lateral direction of the vertical well to obtain larger reservoir contact area, and meanwhile, the sand screen is carried into the small well hole to realize sand prevention, so that the development effect is effectively improved. However, in a reservoir with insufficient strength of a non-diagenetic reservoir or a rock mass frame, the method of mining first and then backfilling cannot effectively reduce the risk of reservoir collapse and is not feasible, and geological phenomena such as landslide caused by stratum collapse can have serious consequences no matter in a marine or frozen soil environment.
Fig. 7 is a flow chart of a method of horizontal well development of natural gas hydrate according to an embodiment of the present invention. The steps of the embodiments of the present application are described below with reference to fig. 7.
As shown in fig. 7, in step S110, a horizontal well is drilled in an upper portion of the natural gas hydrate reservoir, wherein a trajectory of a horizontal section of the horizontal well is brought close to the reservoir in distance from each other, but does not cause disturbance of the reservoir.
FIG. 1 is a schematic diagram of a horizontal well drilled in an upper portion of a reservoir according to an embodiment of the present application. As shown in fig. 1, a horizontal well (5) is drilled in the upper part of the natural gas hydrate reservoir (3), the horizontal well (5) penetrating the surface layer (1) (sea or earth-float layer) into the upper cover layer (2) of the reservoir, the horizontal section track of the horizontal well being as close as possible to the reservoir (3) but not causing disturbance of the reservoir (3), preferably the horizontal track of the horizontal well is at a distance in the range of 10m to 20m from the reservoir.
In step S120, windows are opened on both sides of the horizontal section of the horizontal well, a preset number of lateral radial wells are drilled, concrete is poured into the lateral radial wells, and after the concrete is solidified, an artificial skeleton carried on the interlayer at the lower part of the reservoir is formed. In one embodiment, a lateral radial well is drilled using a hydraulic jet technique, with the initial jet position being set at a laterally horizontal downward angle to ensure that the hydraulic jet drill bit remains drilling in a diagonally downward direction.
In the process of drilling a lateral radial well, assuming that the reservoir thickness is h, when the hydraulic jet drill bit penetration reaches Acos-1 And drilling the lateral radial well is completed at alpha×h, wherein A is a redundancy factor, and alpha is a set angle of the initial position of the jet. For example, in the above example, when the set angle α downhole in the lateral horizontal direction is 45 °, then when the hydraulic jet drill head penetration reaches cos-1 At 45 DEG x h the bit is considered to reach the bottom compartment, considering 1.5 times redundancy, when the bit penetration reaches 1.5 x cos-1 Drilling of radial wells is completed at 45 ° x h, i.e., l=2.12 x h.
Because of the circulating pressure existing in the drilling process of the drill bit, the natural gas hydrate cannot change in phase state, so that effective support can be formed for the drilled radial well bore. When the radial well drilling is finished, the hydraulic jet drill bit is retracted and concrete can be injected through the jet drill bit, so that the radial well drilled by the hydraulic jet drill bit is filled with concrete after the hydraulic jet drill bit is successfully retracted. And plugging the layer in the horizontal well, lifting the working tool to drill the upper radial well, and sequentially circulating until the whole section of the horizontal well finishes the drilling and concrete filling of the lateral radial well, and waiting for the concrete to be completely solidified. The reason that the radial well construction is carried out on a certain layer is that the layer needs to be plugged is as follows: the horizontal section of the horizontal well is divided into a plurality of layer sections from the toe end to the heel end, only a single layer section can be constructed at a time, and the construction is sequentially carried out according to the construction sequence from the toe end to the heel end, and the working tool is gradually lifted. After lifting, the constructed interval is required to be plugged and isolated because the radial well exists, otherwise, the construction of the upper interval is easy to release pressure, so that the progress cannot be smoothly progressed, and the plugging and isolation of the constructed interval is generally realized by carrying a bottom packer through a continuous oil pipe.
The well spacing of the lateral radial wells drilled in the horizontal section is determined by the stability of the reservoir. If the reservoir stratum skeleton has higher strength and higher stability, the well spacing of the radial wells can be properly increased, for example, the well spacing range is set to be 50-100 m; if the reservoir stratum skeleton strength is lower or the stratum skeleton is not present at all and the stability is poor, the well spacing of the radial well is properly reduced, for example, the well spacing range is set to be 10-20 m. It will be readily appreciated that the well spacing of the lateral radial wells may be designed according to the circumstances and is not limited to the two examples described above.
Fig. 2 is a schematic diagram of drilling a radial well on both sides of a horizontal section of a horizontal well according to an embodiment of the present application, wherein fig. 2 (a) on the left side is a front view, and fig. 2 (b) on the right side is a side view. As shown in fig. 2 (a), a plurality of lateral radial wells (6) are drilled on both sides of the horizontal section, the radial wells being spaced apart in the horizontal direction, the lateral radial wells (6) penetrating the natural gas hydrate reservoir (3) and entering the barrier (4) in the lower part of the reservoir. From the side view of fig. 2 (b), after the concrete has been fully set, an artificial skeleton (supporting structure) consisting of lateral radial wells (6) is formed in the reservoir, which can effectively support the reservoir above, and a safe production zone (8) is formed below the artificial skeleton.
In step S130, a vertical radial well is drilled to drill through the entire reservoir by windowing the lower portion of the horizontal well.
As shown in fig. 3 (a), a vertical radial well (7) is drilled in the lower part of the horizontal well (e.g. the lower part of the horizontal section), and the vertical radial well (7) is drilled through the whole reservoir (3) and into the barrier (4) in the lower part of the reservoir. At the moment, the horizontal well (5) is communicated with the production area (8) through the vertical radial well (7), so that natural gas hydrate can be produced. The end result of drilling a radial well at the bottom of a horizontal well may also be referred to as the top view shown in fig. 3 (b).
In step S140, after the development of the natural gas hydrate of the production zone is completed, the production zone is backfilled.
Specifically, after the development of the mining area is finished, backfilling is carried out on the mining area, so that collapse caused by failure of the later-stage artificial framework is avoided.
In addition, the steps S110 to S140 are directed to development of a single well, and in other embodiments, well group layout may be performed based on development of a single well.
As shown in fig. 4, which shows a side view of a well group of a plurality of individual wells, each individual well has a horizontal section drilled with a plurality of lateral radial wells, and the artificial skeletons of these lateral radial wells intersect. According to research, when the artificial frameworks formed by the lateral radial wells are crossed, the supporting effect of the whole reservoir is improved, and the risk of stratum collapse is further reduced. In a preferred example, a well-array layout as shown in fig. 5 in plan view can be selected when well-array layout is performed, and this well-array layout method can improve the utilization degree of the reservoir, namely, the recovery rate, on the one hand, and can form good support for the whole reservoir through the cross-type layout of the well array on the other hand. Further, a nine-point layout may be provided as shown in fig. 6 in a plan view, and as shown in fig. 6, eight additional wells may be uniformly distributed around the circumference of the nine-point layout when any single well is used as a center well. Nine-point methods are more compact than well string type well placement. Through the layout, the whole cross type support of the reservoir can be realized, and meanwhile, the recovery ratio or the exploitation effect can be ensured.
In summary, the embodiment of the invention can bring the following technical effects: (1) The traditional well drilling is stopped at the cover layer at the upper part of the reservoir, meanwhile, the water jet technology is adopted at the bottom of the well to drill obliquely downwards, the whole reservoir is drilled, compared with the traditional well drilling, the method has the advantages that the disturbance to the reservoir is small, the probability of unstable reservoir is small, and the overall construction risk is low; (2) The radial well drilled through the reservoir is filled with concrete while the hydraulic jet drill bit is recovered, and after the radial well is solidified, a frame structure borne on a lower interlayer of the reservoir, namely an artificial skeleton is formed, so that on one hand, the integral strength of the reservoir is improved, the collapse risk of the reservoir is reduced, on the other hand, a safe production area is formed at the lower part covered by the artificial skeleton, the defect formed by the lower production area is supported by the artificial skeleton, and meanwhile, the supported load is transferred to the lower interlayer, so that time is created for backfilling after production; (3) When the well group is used for development, the artificial frameworks formed by the single wells are staggered, so that the overall stability of the reservoir is further improved, the range of a safe production area is enlarged, and the production degree and economic benefit are improved.
It is to be understood that the disclosed embodiments are not limited to the specific structures, process steps, etc. disclosed herein, but are intended to extend to equivalents of these features as would be understood by one of ordinary skill in the relevant arts. It is also to be understood that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting.
Reference in the specification to "one embodiment" or "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment of the invention. Thus, the appearances of the phrase "one embodiment" or "an embodiment" in various places throughout this specification are not necessarily all referring to the same embodiment.
Although the embodiments of the present invention are disclosed above, the embodiments are only used for the convenience of understanding the present invention, and are not intended to limit the present invention. Any person skilled in the art can make any modification and variation in form and detail without departing from the spirit and scope of the present disclosure, but the scope of the present disclosure is still subject to the scope of the appended claims.

Claims (8)

CN202010847072.5A2020-08-212020-08-21Horizontal well development method of natural gas hydrateActiveCN114075950B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202010847072.5ACN114075950B (en)2020-08-212020-08-21Horizontal well development method of natural gas hydrate

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202010847072.5ACN114075950B (en)2020-08-212020-08-21Horizontal well development method of natural gas hydrate

Publications (2)

Publication NumberPublication Date
CN114075950A CN114075950A (en)2022-02-22
CN114075950Btrue CN114075950B (en)2024-04-09

Family

ID=80282436

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202010847072.5AActiveCN114075950B (en)2020-08-212020-08-21Horizontal well development method of natural gas hydrate

Country Status (1)

CountryLink
CN (1)CN114075950B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN114622903B (en)*2020-12-142025-04-22中国石油化工股份有限公司 Ground collapse experimental device and simulation method

Citations (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
RU2072037C1 (en)*1992-06-221997-01-20Государственная горная академия УкраиныMethod for backfilling worked out space in underground gasification of solid fuel
US6209644B1 (en)*1999-03-292001-04-03Weatherford Lamb, Inc.Assembly and method for forming a seal in a junction of a multilateral well bore
CN106087997A (en)*2016-07-262016-11-09中铁建大桥工程局集团第五工程有限公司A kind of high latitude, high and cold Permafrost Area drilled pile construction engineering method
CN106761587A (en)*2016-11-182017-05-31青岛海洋地质研究所Ocean aleuritic texture reservoir gas hydrates multiple-limb hole finite sand control recovery method
CN108590739A (en)*2018-04-112018-09-28中国平煤神马能源化工集团有限责任公司A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN109630076A (en)*2018-12-172019-04-16吉林大学A kind of method of radially horizontal well and decompression heat injection unitized production gas hydrates
CN109707349A (en)*2018-12-062019-05-03青岛海洋地质研究所 Integrated drilling and completion method for multi-branch hole mining of shale silt hydrate
CN109736769A (en)*2019-01-152019-05-10中国矿业大学 A system and method for horizontal branch well pattern exploitation of natural gas hydrate in permafrost layer
CN109882134A (en)*2019-04-122019-06-14中国地质科学院勘探技术研究所A kind of non-diagenesis gas hydrates drilling method in sea area
CN110029968A (en)*2019-04-082019-07-19中国石油大学(华东)For drilling through hydrate Microdrilling and the quickly device and working method of complete well
CN110863800A (en)*2018-08-272020-03-06中国石油化工股份有限公司Single-well closed development method for hot dry rock
CN111173480A (en)*2018-11-122020-05-19中国石油化工股份有限公司Natural gas hydrate exploitation method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US7104320B2 (en)*2003-12-042006-09-12Halliburton Energy Services, Inc.Method of optimizing production of gas from subterranean formations
CA2966494A1 (en)*2014-11-202016-05-26Apache CorporationMethod for drilling and fracture treating multiple wellbores

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
RU2072037C1 (en)*1992-06-221997-01-20Государственная горная академия УкраиныMethod for backfilling worked out space in underground gasification of solid fuel
US6209644B1 (en)*1999-03-292001-04-03Weatherford Lamb, Inc.Assembly and method for forming a seal in a junction of a multilateral well bore
CN106087997A (en)*2016-07-262016-11-09中铁建大桥工程局集团第五工程有限公司A kind of high latitude, high and cold Permafrost Area drilled pile construction engineering method
CN106761587A (en)*2016-11-182017-05-31青岛海洋地质研究所Ocean aleuritic texture reservoir gas hydrates multiple-limb hole finite sand control recovery method
CN108590739A (en)*2018-04-112018-09-28中国平煤神马能源化工集团有限责任公司A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN110863800A (en)*2018-08-272020-03-06中国石油化工股份有限公司Single-well closed development method for hot dry rock
CN111173480A (en)*2018-11-122020-05-19中国石油化工股份有限公司Natural gas hydrate exploitation method
CN109707349A (en)*2018-12-062019-05-03青岛海洋地质研究所 Integrated drilling and completion method for multi-branch hole mining of shale silt hydrate
CN109630076A (en)*2018-12-172019-04-16吉林大学A kind of method of radially horizontal well and decompression heat injection unitized production gas hydrates
CN109736769A (en)*2019-01-152019-05-10中国矿业大学 A system and method for horizontal branch well pattern exploitation of natural gas hydrate in permafrost layer
CN110029968A (en)*2019-04-082019-07-19中国石油大学(华东)For drilling through hydrate Microdrilling and the quickly device and working method of complete well
CN109882134A (en)*2019-04-122019-06-14中国地质科学院勘探技术研究所A kind of non-diagenesis gas hydrates drilling method in sea area

Also Published As

Publication numberPublication date
CN114075950A (en)2022-02-22

Similar Documents

PublicationPublication DateTitle
CN102852546B (en)Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area
CN102392677A (en)Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN113175325A (en)Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection
CN106285617A (en)Gas water horizontal well completion method
CN108678722B (en) A multi-well combined dry hot rock artificial thermal storage construction system and construction method
CN108590595A (en)A method of it is exploited using F type well groups non-at lithotype gas hydrates
CN106050234A (en)Construction technique for protecting underground water in coal mining process
CN110306965A (en) A kind of stimulation method for coalbed methane low-yield well area
CN109505578B (en)Repeated fracturing method for realizing lateral residual oil potential excavation of crack of ultra-low permeability oil reservoir old well
CN213838602U (en)Artificial heat storage building system for group-hole dry hot rock
CN115182713B (en) A three-dimensional development method for shale reservoirs with three-dimensional horizontal well combustion and explosive close-cutting
CN114075950B (en)Horizontal well development method of natural gas hydrate
CN111648748A (en) A method for in-situ heating and depressurization exploitation of marine natural gas hydrate with stable formation
CN114075949B (en)Vertical well development method of natural gas hydrate
CN115853488A (en)Multistage fracturing method for reducing cracking pressure of dry hot rock reservoir by using supercritical water
LI et al.Challenges and countermeasures in salt cavern underground storage in China—from “Jintan mode” to “XX mode”
CN116696304A (en)Reservoir transformation method for directional fracturing grouting of marine natural gas hydrate
CN102797448A (en)Retreating sectional type hydraulic cracking method
CN215444034U (en)Well pattern structure for natural gas hydrate exploitation
CN116220633A (en)Injection and production system, injection and production method and construction method for shallow thick oil
CN203334956U (en)Multi-branch horizontal well system suitable for coalbed methane of uniclinal structure
RU2616016C1 (en)Recovery method for solid carbonate reservoirs
CN102913206B (en)Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs
CN114622903B (en) Ground collapse experimental device and simulation method
CN218880866U (en) A suspension foot support system under the condition of broken bedrock in soil-rock binary foundation pit

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp