
技术领域technical field
本发明涉及电力系统运行与控制领域,具体涉及一种基于数模仿真的安全稳定控制装置测试方法。The invention relates to the field of power system operation and control, in particular to a method for testing a safety and stability control device based on digital simulation.
背景技术Background technique
作为电力系统第二道防线的重要组成部分,安全稳定控制装置在提高系统稳定性、保障电力系统安全运行方面具有重要的作用。安全稳定控制装置能够正确动作对电力系统运行可靠性至关重要,若出现安全稳定控制装置拒动、误动等情况,可能会对系统供电的可靠性造成影响,甚至导致局部电网停电事故的发生。As an important part of the second line of defense of the power system, the safety and stability control device plays an important role in improving the system stability and ensuring the safe operation of the power system. The correct operation of the safety and stability control device is crucial to the reliability of the power system operation. If the safety and stability control device refuses to operate or malfunctions, it may affect the reliability of the power supply of the system, and even lead to the occurrence of local power grid blackouts. .
由于安全稳定控制装置的重要性,亟需开展安全稳定控制装置的全面测试方法研究,以验证安全稳定控制装置能否可靠动作。Due to the importance of the safety and stability control device, it is urgent to carry out a comprehensive test method research of the safety and stability control device to verify whether the safety and stability control device can operate reliably.
发明内容SUMMARY OF THE INVENTION
本发明为了克服以上技术的不足,提供了一种实现对安全稳定控制装置功能及其动作可靠性全面检测的方法。In order to overcome the deficiencies of the above technologies, the present invention provides a method for realizing comprehensive detection of the function of the safety and stability control device and its operational reliability.
本发明克服其技术问题所采用的技术方案是:The technical scheme adopted by the present invention to overcome its technical problems is:
一种基于数模仿真的安全稳定控制装置测试方法,包括如下步骤:A method for testing a safety and stability control device based on digital simulation, comprising the following steps:
a)建立ADPSS数模仿真系统,在ADPSS软件中搭建适用于安全稳定控制装置的数模仿真测试模型;a) Establish the ADPSS digital-analog simulation system, and build a digital-analog simulation test model suitable for the safety and stability control device in the ADPSS software;
b)检测在安全稳定控制装置上查看电压、电流、功率参数与数模仿真测试模型中电压、电流、功率参数是否一致;b) Check whether the voltage, current and power parameters on the safety and stability control device are consistent with the voltage, current and power parameters in the digital-analog simulation test model;
c)模拟安全稳定控制装置PT、CT二次回路断线,检测安全稳定控制装置告警信息是否正确报送;c) Simulate the disconnection of the PT and CT secondary circuits of the safety and stability control device, and check whether the alarm information of the safety and stability control device is correctly reported;
d)如果两个安全稳定控制装置具备远方功能,则两套安全稳定控制装置的通道压板均投入情况下检测两个安全稳定控制装置是否报警、两个安全稳定控制装置压板投退不一致情况下检测两个安全稳定控制装置是否报警以及两个安全稳定控制装置压板均退出情况下检测两个安全稳定控制装置是否报警;d) If the two safety and stability control devices have remote functions, check whether the two safety and stability control devices give an alarm when the channel pressure plates of the two sets of safety and stability control devices are put into operation, and detect when the two safety and stability control device pressure plates are inconsistent in switching on and off. Check whether the two safety and stability control devices give an alarm and check whether the two safety and stability control devices alarm when the pressure plates of the two safety and stability control devices are withdrawn;
e)安全稳定控制装置在夏季定制条件下检测项目为:e) The test items of the safety and stability control device under the customized conditions in summer are:
e-1)退出装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值但潮流方向不满足规定的方向,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-1) Exit the device function pressure plate, adjust the method in the calculation data, make the equipment exceed the summer overload action current fixed value, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the summer value If the overload action current is set but the direction of the power flow does not meet the specified direction, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the device exceeds the summer overload action current set value and the device is operated after one round. If the current does not reach the fixed value of the summer overload action current and the direction of the power flow meets the specified direction, check whether the safety and stability control device operates;
e-2)投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流达到夏季过载动作电流定值,设备经二轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-2) Put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the summer overload action current constant value and the current reaches the summer overload action current constant value after one round of operation, and the current does not reach the summer overload action current value after two rounds of action In summer, the overload action current has a fixed value and the direction of the power flow meets the specified direction, and the safety and stability control device is checked for action;
e-3)投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流达到夏季过载动作电流定值,设备经二轮动作后电流达到夏季过载动作电流定值,设备经三轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-3) Put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the summer overload operating current value and the current reaches the summer overload operating current value after one round of operation, and the equipment reaches the summer overload operating current value after two rounds of operation. Overload action current fixed value, after three rounds of operation, the current of the equipment does not reach the summer overload action current fixed value and the direction of the power flow meets the specified direction, and check whether the safety and stability control device operates;
e-4)投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流达到夏季过载动作电流定值,设备经二轮动作后电流达到夏季过载动作电流定值,设备经三轮动作后电流达到夏季过载动作电流定值,设备经四轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-4) Put in the functional pressure plate of the device, and adjust the method in the calculation data, so that the equipment exceeds the fixed value of summer overload operation current and the current of the equipment reaches the fixed value of summer overload operation current after one round of operation, and the current of the equipment reaches the summer overload operation current after two rounds of operation. The overload action current setting value, the current of the equipment reaches the summer overload action current setting value after three rounds of operation, the current does not reach the summer overload action current setting value after the equipment operates four rounds, and the direction of the power flow meets the specified direction, check whether the safety and stability control device is action;
f)安全稳定控制装置在冬季定制条件下检测项目为:f) The test items of the safety and stability control device under customized conditions in winter are:
f-1)退出装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值但潮流方向不满足规定的方向,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-1) Exit the device function pressure plate, adjust the method in the calculation data, make the equipment exceed the winter overload action current fixed value, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the winter time If the overload action current is set but the direction of the power flow does not meet the specified direction, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the device exceeds the winter overload action current set value and the device operates after one cycle. If the current does not reach the fixed value of the overload action current in winter and the direction of the power flow meets the specified direction, check whether the safety and stability control device operates;
f-2)投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流达到冬季过载动作电流定值,设备经二轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-2) Put in the functional pressure plate of the device, and adjust the method in the calculation data so that the equipment exceeds the set value of the winter overload action current and the current reaches the set value of the winter overload action current after one round of operation, and the current of the equipment does not reach the set value after two rounds of action In winter, when the overload action current is fixed and the direction of the power flow meets the specified direction, check whether the safety and stability control device operates;
f-3) 投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流达到冬季过载动作电流定值,设备经二轮动作后电流达到冬季过载动作电流定值,设备经三轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-3) Put in the functional pressure plate of the device, and adjust the method in the calculation data, so that the equipment exceeds the fixed value of the overload operating current in winter and the current reaches the fixed value of the overload operating current in winter after one round of operation, and the current reaches the winter overload operating current after two rounds of operation. Overload action current fixed value, after three rounds of operation, the current of the equipment does not reach the winter overload action current fixed value and the flow direction meets the specified direction, and check whether the safety and stability control device operates;
f-4)投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流达到冬季过载动作电流定值,设备经二轮动作后电流达到冬季过载动作电流定值,设备经三轮动作后电流达到冬季过载动作电流定值,设备经四轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-4) Put in the functional pressure plate of the device, and adjust the method in the calculation data, so that the equipment exceeds the set value of the overload action current in winter and the current reaches the set value of the overload action current in winter after one cycle of operation, and the current reaches the set value of winter overload action after two cycles of action. The overload action current setting value, the current of the equipment reaches the winter overload action current setting value after three rounds of operation, the current does not reach the winter overload action current setting value after four rounds of operation, and the flow direction meets the specified direction, check whether the safety and stability control device is action;
g)当夏季和冬季定值切换时,在投入冬季定值压板情况下,在计算数据中调整方式,使设备超过夏季过载动作电流定值、未达到冬季过载动作电流定值且潮流方向满足规定的方向,重复步骤e),检测安全稳定控制装置是否动作,再退出冬季定值压板,重复步骤e),检测安全稳定控制装置在总功能压板投入或退出情况下发生过载后是否动作。g) When the summer and winter fixed values are switched, and the winter fixed value pressure plate is put into use, adjust the method in the calculation data so that the equipment exceeds the summer overload operating current fixed value, does not reach the winter overload operating current fixed value, and the flow direction meets the regulations direction, repeat step e) to check whether the safety and stability control device operates, then exit the winter fixed-value pressure plate, repeat step e), and detect whether the safety and stability control device operates after overload occurs when the general function pressure plate is turned on or out.
进一步的,步骤a)中ADPSS等数模仿真系统由安装有ADPSS软件的服务器、物理接口箱、功率放大器组成,物理接口箱提供模拟量输入/输出通道、开关量输入/输出通道,安全稳定控制装置通过物理接口箱与服务器进行开关量的信息交互,安全稳定控制装置通过功率放大器与物理接口箱和服务器进行模拟量交互。Further, in step a), the digital-analog simulation system such as ADPSS is composed of a server installed with ADPSS software, a physical interface box, and a power amplifier, and the physical interface box provides analog input/output channels, switch input/output channels, safe and stable control The device exchanges information with the server through the physical interface box, and the safety and stability control device exchanges the analog amount with the physical interface box and the server through the power amplifier.
进一步的,步骤d)中两个安全稳定控制装置均按正常方式投入压板时,检测在两个安全稳定控制装置上交互的信息是否一致,依次检测通道压板退出、过载功能压板退出、总功能压板退出及物理通道收发断开情况下检测在两个安全稳定控制装置上交互的信息。Further, in step d), when the two safety and stability control devices are put into the pressure plate in the normal way, it is detected whether the information exchanged on the two safety and stability control devices is consistent, and the exit of the channel pressure plate, the exit of the overload function pressure plate, and the total function pressure plate are detected in turn. Information exchanged between two security and stability control devices is detected in the case of exit and physical channel transmission and reception disconnection.
本发明的有益效果是:结合安全稳定控制装置的特性及具体应用场景,基于ADPSS等数模仿真平台,定制化搭建适用于安全稳定控制装置的整套数模仿真测试模型;研究制定适用于安全稳定控制装置的数模仿真测试方案和测试内容,实现对安全稳定控制装置功能逻辑及其动作可靠性的全面检测;本发明的方法,基于ADPSS等数模仿真测试平台及其测试模型,实现了安全稳定控制装置一般性检测项目、功能逻辑检测项目等全面的装置检测过程,有利于提高安全稳定控制装置的可靠性,促进电力系统安全稳定运行。The beneficial effects of the invention are: combining the characteristics and specific application scenarios of the safety and stability control device, and based on the digital-analog simulation platform such as ADPSS, a complete set of digital-analog simulation test models suitable for the safety and stability control device can be customized to build; The digital-analog simulation test scheme and test content of the control device realize comprehensive detection of the function logic and action reliability of the safety and stability control device; the method of the present invention, based on the digital-analog simulation test platform such as ADPSS and its test model, realizes the safety and reliability of the control device. The comprehensive device testing process, such as general testing items and functional logic testing items for stability control devices, is conducive to improving the reliability of the safety and stability control devices and promoting the safe and stable operation of the power system.
附图说明Description of drawings
图1为本发明的方法流程图。FIG. 1 is a flow chart of the method of the present invention.
具体实施方式Detailed ways
下面结合附图1对本发明做进一步说明。The present invention will be further described below in conjunction with FIG. 1 .
一种基于数模仿真的安全稳定控制装置测试方法,包括如下步骤:A method for testing a safety and stability control device based on digital simulation, comprising the following steps:
a)建立ADPSS数模仿真系统,在ADPSS软件中搭建适用于安全稳定控制装置的数模仿真测试模型;a) Establish the ADPSS digital-analog simulation system, and build a digital-analog simulation test model suitable for the safety and stability control device in the ADPSS software;
b)检测在安全稳定控制装置上查看电压、电流、功率参数与数模仿真测试模型中电压、电流、功率参数是否一致;b) Check whether the voltage, current and power parameters on the safety and stability control device are consistent with the voltage, current and power parameters in the digital-analog simulation test model;
c)模拟安全稳定控制装置PT、CT二次回路断线,检测安全稳定控制装置告警信息是否正确报送;c) Simulate the disconnection of the PT and CT secondary circuits of the safety and stability control device, and check whether the alarm information of the safety and stability control device is correctly reported;
d)如果两个安全稳定控制装置具备远方功能,则两套安全稳定控制装置的通道压板均投入情况下检测两个安全稳定控制装置是否报警、两个安全稳定控制装置压板投退不一致情况下检测两个安全稳定控制装置是否报警以及两个安全稳定控制装置压板均退出情况下检测两个安全稳定控制装置是否报警;d) If the two safety and stability control devices have remote functions, check whether the two safety and stability control devices give an alarm when the channel pressure plates of the two sets of safety and stability control devices are put into operation, and detect when the two safety and stability control device pressure plates are inconsistent in switching on and off. Check whether the two safety and stability control devices give an alarm and check whether the two safety and stability control devices alarm when the pressure plates of the two safety and stability control devices are withdrawn;
e)安全稳定控制装置在夏季定制条件下检测项目为:e) The test items of the safety and stability control device under the customized conditions in summer are:
e-1)退出装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值但潮流方向不满足规定的方向,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-1) Exit the device function pressure plate, adjust the method in the calculation data, make the equipment exceed the summer overload action current fixed value, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the summer value If the overload action current is set but the direction of the power flow does not meet the specified direction, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the device exceeds the summer overload action current set value and the device is operated after one round. If the current does not reach the fixed value of the summer overload action current and the direction of the power flow meets the specified direction, check whether the safety and stability control device operates;
e-2)投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流达到夏季过载动作电流定值,设备经二轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-2) Put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the summer overload action current constant value and the current reaches the summer overload action current constant value after one round of operation, and the current does not reach the summer overload action current value after two rounds of action In summer, the overload action current has a fixed value and the direction of the power flow meets the specified direction, and the safety and stability control device is checked for action;
e-3)投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流达到夏季过载动作电流定值,设备经二轮动作后电流达到夏季过载动作电流定值,设备经三轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-3) Put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the summer overload operating current value and the current reaches the summer overload operating current value after one round of operation, and the equipment reaches the summer overload operating current value after two rounds of operation. Overload action current fixed value, after three rounds of operation, the current of the equipment does not reach the summer overload action current fixed value and the direction of the power flow meets the specified direction, and check whether the safety and stability control device operates;
e-4)投入装置功能压板,在计算数据中调整方式,使设备超过夏季过载动作电流定值且设备经一轮动作后电流达到夏季过载动作电流定值,设备经二轮动作后电流达到夏季过载动作电流定值,设备经三轮动作后电流达到夏季过载动作电流定值,设备经四轮动作后电流未达到夏季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;e-4) Put in the functional pressure plate of the device, and adjust the method in the calculation data, so that the equipment exceeds the fixed value of summer overload operation current and the current of the equipment reaches the fixed value of summer overload operation current after one round of operation, and the current of the equipment reaches the summer overload operation current after two rounds of operation. The overload action current setting value, the current of the equipment reaches the summer overload action current setting value after three rounds of operation, the current does not reach the summer overload action current setting value after the equipment operates four rounds, and the direction of the power flow meets the specified direction, check whether the safety and stability control device is action;
冬季定值条件下的检测项目与夏季定值条件的基本相同。夏、冬季定值切换方面,在投入冬季定值压板情况下,调整计算数据的方式,使得设备超过夏季过载动作电流定值、未达到冬季过载动作电流定值,潮流方向满足规定的方向,检测装置是否动作;再退出冬季定值压板,重复上述计算。此外,需要检测安全稳定控制装置在总功能压板投入/退出情况下发生过载后是否动作。具体的安全稳定控制装置在冬季定制条件下检测项目为:The test items under the winter fixed value conditions are basically the same as the summer fixed value conditions. In terms of summer and winter fixed value switching, when the winter fixed value pressure plate is used, adjust the method of calculating data so that the equipment exceeds the summer overload operating current fixed value, but does not reach the winter overload operating current fixed value, and the flow direction meets the specified direction. Whether the device works; then exit the winter fixed-value pressure plate, and repeat the above calculation. In addition, it is necessary to detect whether the safety and stability control device operates after the overload occurs when the general function pressure plate is turned on/off. The specific safety and stability control device testing items under customized conditions in winter are:
f-1)退出装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值但潮流方向不满足规定的方向,检测安全稳定控制装置是否动作,投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-1) Exit the device function pressure plate, adjust the method in the calculation data, make the equipment exceed the winter overload action current fixed value, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the equipment exceeds the winter time If the overload action current is set but the direction of the power flow does not meet the specified direction, check whether the safety and stability control device operates, put in the device function pressure plate, and adjust the method in the calculation data, so that the device exceeds the winter overload action current set value and the device operates after one cycle. If the current does not reach the fixed value of the overload action current in winter and the direction of the power flow meets the specified direction, check whether the safety and stability control device operates;
f-2)投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流达到冬季过载动作电流定值,设备经二轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-2) Put in the functional pressure plate of the device, and adjust the method in the calculation data so that the equipment exceeds the set value of the winter overload action current and the current reaches the set value of the winter overload action current after one round of operation, and the current of the equipment does not reach the set value after two rounds of action In winter, when the overload action current is fixed and the direction of the power flow meets the specified direction, check whether the safety and stability control device operates;
f-3)投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流达到冬季过载动作电流定值,设备经二轮动作后电流达到冬季过载动作电流定值,设备经三轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-3) Put in the functional pressure plate of the device, and adjust the method in the calculation data, so that the equipment exceeds the fixed value of the overload operating current in winter, and the current of the equipment reaches the fixed value of the overload operating current in winter after one round of operation, and the current of the equipment reaches the fixed value of winter overload operation after two rounds of operation. Overload action current fixed value, after three rounds of operation, the current of the equipment does not reach the winter overload action current fixed value and the flow direction meets the specified direction, and check whether the safety and stability control device operates;
f-4)投入装置功能压板,在计算数据中调整方式,使设备超过冬季过载动作电流定值且设备经一轮动作后电流达到冬季过载动作电流定值,设备经二轮动作后电流达到冬季过载动作电流定值,设备经三轮动作后电流达到冬季过载动作电流定值,设备经四轮动作后电流未达到冬季过载动作电流定值且潮流方向满足规定的方向,检测安全稳定控制装置是否动作;f-4) Put in the functional pressure plate of the device, and adjust the method in the calculation data, so that the equipment exceeds the set value of the overload action current in winter and the current reaches the set value of the overload action current in winter after one cycle of operation, and the current reaches the set value of winter overload action after two cycles of action. The overload action current setting value, the current of the equipment reaches the winter overload action current setting value after three rounds of operation, the current does not reach the winter overload action current setting value after four rounds of operation, and the flow direction meets the specified direction, check whether the safety and stability control device is action;
g)当夏季和冬季定值切换时,在投入冬季定值压板情况下,在计算数据中调整方式,使设备超过夏季过载动作电流定值、未达到冬季过载动作电流定值且潮流方向满足规定的方向,重复步骤e),检测安全稳定控制装置是否动作,再退出冬季定值压板,重复步骤e),检测安全稳定控制装置在总功能压板投入或退出情况下发生过载后是否动作。g) When the summer and winter fixed values are switched, and the winter fixed value pressure plate is put into use, adjust the method in the calculation data so that the equipment exceeds the summer overload operating current fixed value, does not reach the winter overload operating current fixed value, and the flow direction meets the regulations direction, repeat step e) to check whether the safety and stability control device operates, then exit the winter fixed-value pressure plate, repeat step e), and detect whether the safety and stability control device operates after overload occurs when the general function pressure plate is turned on or out.
结合安全稳定控制装置的特性及具体应用场景,基于ADPSS等数模仿真平台,定制化搭建适用于安全稳定控制装置的整套数模仿真测试模型;研究制定适用于安全稳定控制装置的数模仿真测试方案和测试内容,实现对安全稳定控制装置功能逻辑及其动作可靠性的全面检测;本发明的方法,基于ADPSS等数模仿真测试平台及其测试模型,实现了安全稳定控制装置一般性检测项目、功能逻辑检测项目等全面的装置检测过程,有利于提高安全稳定控制装置的可靠性,促进电力系统安全稳定运行。Combined with the characteristics and specific application scenarios of the safety and stability control device, based on the digital-analog simulation platform such as ADPSS, a complete set of digital-analog simulation test models suitable for the safety and stability control device are customized; research and formulate the digital-analog simulation test suitable for the safety and stability control device. The scheme and test content realize the comprehensive detection of the functional logic of the safety and stability control device and its action reliability; the method of the present invention realizes the general inspection items of the safety and stability control device based on the digital-analog simulation test platform such as ADPSS and its test model. , functional logic testing items and other comprehensive device testing process, which is conducive to improving the reliability of the safety and stability control device, and promoting the safe and stable operation of the power system.
步骤a)中ADPSS等数模仿真系统由安装有ADPSS软件的服务器、物理接口箱、功率放大器组成,物理接口箱提供模拟量输入/输出通道、开关量输入/输出通道,安全稳定控制装置通过物理接口箱与服务器进行开关量的信息交互,安全稳定控制装置通过功率放大器与物理接口箱和服务器进行模拟量交互。In step a), the ADPSS and other digital-analog simulation systems are composed of a server installed with ADPSS software, a physical interface box, and a power amplifier. The physical interface box provides analog input/output channels and switch input/output channels. The interface box and the server exchange information on switching quantities, and the safety and stability control device exchanges analog quantities with the physical interface box and the server through the power amplifier.
步骤d)中两个安全稳定控制装置均按正常方式投入压板时,检测在两个安全稳定控制装置上交互的信息是否一致,依次检测通道压板退出、过载功能压板退出、总功能压板退出及物理通道收发断开情况下检测在两个安全稳定控制装置上交互的信息。In step d), when the two safety and stability control devices are put into the pressure plate in the normal way, check whether the information exchanged on the two safety and stability control devices is consistent, and sequentially detect the exit of the channel pressure plate, the exit of the overload function pressure plate, the exit of the total function pressure plate, and the physical function. Detects the information exchanged on the two security and stability control devices when the channel is disconnected.
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, the The technical solutions described in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110916664.2ACN113671934B (en) | 2021-08-11 | 2021-08-11 | A test method for real safety and stability control device based on digital simulation |
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110916664.2ACN113671934B (en) | 2021-08-11 | 2021-08-11 | A test method for real safety and stability control device based on digital simulation |
| Publication Number | Publication Date |
|---|---|
| CN113671934A CN113671934A (en) | 2021-11-19 |
| CN113671934Btrue CN113671934B (en) | 2022-08-12 |
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110916664.2AActiveCN113671934B (en) | 2021-08-11 | 2021-08-11 | A test method for real safety and stability control device based on digital simulation |
| Country | Link |
|---|---|
| CN (1) | CN113671934B (en) |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109038566A (en)* | 2018-08-16 | 2018-12-18 | 国电南瑞科技股份有限公司 | A kind of power system security stabilization control device is when being worth tactful exploitativeness appraisal procedure |
| CN111414310A (en)* | 2020-04-01 | 2020-07-14 | 国网新疆电力有限公司电力科学研究院 | Test method and system for power grid security and stability control device with automatic generation of test cases |
| CN112180759A (en)* | 2020-09-16 | 2021-01-05 | 国网新疆电力有限公司电力科学研究院 | Virtual simulation closed-loop testing system and method for power grid security and stability control device |
| CN112394708A (en)* | 2020-10-30 | 2021-02-23 | 国网新疆电力有限公司电力科学研究院 | Intelligent Internet of things management virtual test method for power grid safety and stability control system |
| CN112448387A (en)* | 2020-10-22 | 2021-03-05 | 贵州电网有限责任公司电力调度控制中心 | Power system safety and stability control simulation method and system |
| CN112531745A (en)* | 2020-12-08 | 2021-03-19 | 国网山东省电力公司电力科学研究院 | Power system frequency safety prevention control optimization method |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2962265T3 (en)* | 2015-11-30 | 2024-03-18 | Nextracker Llc | Systems and methods to automatically plan and execute in-situ tests on electrical and mechanical systems |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109038566A (en)* | 2018-08-16 | 2018-12-18 | 国电南瑞科技股份有限公司 | A kind of power system security stabilization control device is when being worth tactful exploitativeness appraisal procedure |
| CN111414310A (en)* | 2020-04-01 | 2020-07-14 | 国网新疆电力有限公司电力科学研究院 | Test method and system for power grid security and stability control device with automatic generation of test cases |
| CN112180759A (en)* | 2020-09-16 | 2021-01-05 | 国网新疆电力有限公司电力科学研究院 | Virtual simulation closed-loop testing system and method for power grid security and stability control device |
| CN112448387A (en)* | 2020-10-22 | 2021-03-05 | 贵州电网有限责任公司电力调度控制中心 | Power system safety and stability control simulation method and system |
| CN112394708A (en)* | 2020-10-30 | 2021-02-23 | 国网新疆电力有限公司电力科学研究院 | Intelligent Internet of things management virtual test method for power grid safety and stability control system |
| CN112531745A (en)* | 2020-12-08 | 2021-03-19 | 国网山东省电力公司电力科学研究院 | Power system frequency safety prevention control optimization method |
| Title |
|---|
| "电网安全稳定控制系统当值策略可实施评估方法";王胜明 等;《电力系统自动化》;20191025;第43卷(第24期);第126-133页* |
| Publication number | Publication date |
|---|---|
| CN113671934A (en) | 2021-11-19 |
| Publication | Publication Date | Title |
|---|---|---|
| CN111262346B (en) | Integrated automatic acceptance system and method for transformer substation | |
| CN105978152B (en) | A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging | |
| CN202533519U (en) | Fully automatic closed loop test system of protective relaying device | |
| CN106329730A (en) | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system | |
| CN107085159A (en) | GOOSE input point-to-point automatic test method based on CCD file | |
| CN108306753A (en) | Simulator, test method and the system of a kind of Ith area data communication network shutdown | |
| CN111552271A (en) | A systematic test method for regional stability control and joint debugging | |
| CN114785681B (en) | Automatic checking and accepting system and method for monitoring information of transformer substation on-line equipment | |
| CN106527394A (en) | ECPS (Electric Cyber-Physical System) cascading fault risk assessment method of considering multiple information factors | |
| CN109031980A (en) | Simulation test method and system of valve control device based on FPGA | |
| CN104269090A (en) | Simulation system and method for electricity consumption information acquisition terminal round control switch | |
| CN109217472A (en) | A kind of monitoring information verification automated closed-loop joint debugging method | |
| CN114019284A (en) | A new generation main station access substation monitoring information checking system and method | |
| CN104750095A (en) | Regulation and control center routing inspection testing system and method | |
| CN110212532B (en) | Portable power grid dispatching automation simulation verification system | |
| CN103457955B (en) | The migration data verification method of electric power scheduling automatization system | |
| CN113671934B (en) | A test method for real safety and stability control device based on digital simulation | |
| CN115800530A (en) | Background automatic point aligning method for in-station automatic debugging device of transformer substation | |
| CN107976598B (en) | Test method for loss of SOE signal after line failure in smart substation | |
| CN105405334A (en) | Power distribution automation system and simulation method | |
| CN118034252A (en) | A substation one-button sequential control simulation test system and test method | |
| CN105119367A (en) | Digital spare power automatic switching simulation method based on dynamic topology | |
| CN115800531A (en) | Portable in-station automatic debugging device of transformer substation | |
| CN106841842A (en) | The method of testing and device in the empty loop of secondary device | |
| CN113295952B (en) | Intelligent distributed FA function test method, system and storage medium |
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |