CN113469840A - Intelligent management system for pile foundation construction - Google Patents

Intelligent management system for pile foundation construction
Download PDF

Info

Publication number
CN113469840A
CN113469840ACN202110666764.4ACN202110666764ACN113469840ACN 113469840 ACN113469840 ACN 113469840ACN 202110666764 ACN202110666764 ACN 202110666764ACN 113469840 ACN113469840 ACN 113469840A
Authority
CN
China
Prior art keywords
management
project
pile foundation
construction
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110666764.4A
Other languages
Chinese (zh)
Inventor
吕阳洋
蒋永前
薛聪
牛美峰
刘海平
饶猛
张祖国
郭增卿
易神州
刘强
徐政峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huadong Construction Engineering Co Ltd
Original Assignee
Zhejiang Huadong Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huadong Construction Engineering Co LtdfiledCriticalZhejiang Huadong Construction Engineering Co Ltd
Priority to CN202110666764.4ApriorityCriticalpatent/CN113469840A/en
Publication of CN113469840ApublicationCriticalpatent/CN113469840A/en
Pendinglegal-statusCriticalCurrent

Links

Images

Classifications

Landscapes

Abstract

Translated fromChinese

本发明提供桩基施工智慧化管理系统,包括运行环境、数据存储层、服务层和应用层;所述运行环境采用云环境进行部署;所述数据存储层主要包括桩基数据库、人机物料数据库、GIS数据库以及GPS数据库,所述GIS数据库存储系统跟地理信息相关的数据,所述GPS数据库存储车辆运输、设备GPS位置等数据;所述服务层基于SOA服务架构,面向应用层提供Restful接口服务;所述应用层包括桩基施工智慧化管理WEB平台、桩基施工APP以及供应商供应管理微信小程序,与用户实现交互。本发明实现各专业人员高效和紧密的业务协同,强化和规范工程项目的业务管理;突破了以往工程项目单一化管理的信息孤岛现状,使得系统实用性大大加强。

Figure 202110666764

The invention provides an intelligent management system for pile foundation construction, including an operation environment, a data storage layer, a service layer and an application layer; the operation environment is deployed in a cloud environment; the data storage layer mainly includes a pile foundation database and a human-machine material database , GIS database and GPS database, the GIS database stores data related to geographic information, the GPS database stores data such as vehicle transportation, equipment GPS location; the service layer is based on SOA service architecture, and provides Restful interface services for the application layer The application layer includes a pile foundation construction intelligent management WEB platform, a pile foundation construction APP and a supplier supply management WeChat applet, which can interact with users. The invention realizes the efficient and close business collaboration of various professionals, strengthens and standardizes the business management of engineering projects; breaks through the existing information island status of single management of engineering projects in the past, and greatly enhances the practicability of the system.

Figure 202110666764

Description

Intelligent management system for pile foundation construction
Technical Field
The invention relates to the technical field of pile foundation engineering, in particular to an intelligent management system for pile foundation construction.
Background
The pile foundation is composed of a pile and a pile cap, and the construction method of the pile is divided into two categories of precast pile and cast-in-place pile; the pile driving method is selected according to engineering geological conditions, the type, section, length, site environment and design requirements of the pile are also considered, however, with the fact that the regional span of a construction project is larger and larger, the surrounding large environment changes constantly, project participation members are distributed more and more widely, project departments and superior units cannot master required project data information timely through traditional means, the efficiency of uploading and issuing the data information is low, and the safety and the timeliness are poor.
Therefore, a special construction project (pile foundation project) needs an intelligent management system for pile foundation construction to realize information integration in the implementation process of the pile foundation project, promote effective information sharing and application, and realize business collaboration and supervision, thereby improving the management efficiency of the project.
Through retrieval, chinese patent application No. CN201310403968.4 discloses a shield tunnel construction management system based on BIM, which includes: the system comprises an RFID tag, an RFID reader-writer and a BIM model system which are arranged on a tunnel segment; the RFID reader-writer is used for writing segment coding information into the RFID tag and reading the segment coding information from the RFID tag; the BIM model system is used for acquiring segment coding information read by the RFID reader, calling a BIM model corresponding to the tunnel segment, binding corresponding segment basic information, associating various data sources recorded in the segment construction process with the BIM model, and realizing simulation of the shield tunnel construction process through the BIM model system through real-time data synchronization operation; although the system can monitor and analyze the construction condition and the environment, the system has poor interactivity and relatively single information, and is not suitable for large-scale and multiparty cooperative engineering.
Disclosure of Invention
The invention aims to provide an intelligent management system for pile foundation construction, aiming at the defects in the prior art.
Therefore, the above purpose of the invention is realized by the following technical scheme:
the intelligent management system for the pile foundation construction comprises an operating environment, a data storage layer, a service layer and an application layer, wherein a system platform of the intelligent management system for the pile foundation construction adopts a Windows Server;
the operating environment is deployed by adopting a cloud environment and comprises a cloud PolarDB server, an ECS server, an RDS server and OSS cloud storage;
the data storage layer mainly comprises a pile foundation database, a man-machine material database, a GIS database and a GPS database, wherein the GIS database stores data related to geographic information of a system, and the GPS database stores data such as vehicle transportation, equipment GPS position and the like;
the service layer is based on an SOA service architecture and provides Restful interface service for the application layer;
the application layer comprises a pile foundation construction intelligent management WEB platform, a pile foundation construction APP and a supplier supply management wechat applet, and interaction with a user is finally realized through a Viewmodel and a View layer based on an MVVM front end framework.
While adopting the technical scheme, the invention can also adopt or combine the following technical scheme:
as a preferred technical scheme of the invention: the GIS map service in the GIS database adopts a sky map, the GIS database and the GPS database adopt MySQL databases provided by cloud, the scripting language adopts JavaScript, and a B/S system structure is adopted.
As a preferred technical scheme of the invention: pile foundation construction intelligent management WEB platform includes: the system comprises a home page, a man-machine management module, an organization management module, a project management module, an authority management module, a system log management module, a big story management module, a pile foundation map module, a data query and statistics module, an engineering data management and output module, a construction data report module and the like.
As a preferred technical scheme of the invention: the man-machine management mother module in the intelligent management WEB platform for pile foundation construction is mainly divided into a personnel team management submodule, a personnel entering and leaving management submodule, a mechanical entering and leaving management submodule, a face recognition equipment management submodule, a face recognition record management submodule and a mechanical two-dimensional code management submodule; the project management master module comprises submodules of project information maintenance management, project two-dimensional map configuration, project transport vehicle configuration, construction plan filling and the like.
As a preferred technical scheme of the invention: the pile foundation map shows the geographical condition of the project area, the project construction range and the distribution condition of all pile foundations in a two-dimensional electronic map mode, and simultaneously displays the current geographical position and the vehicle transportation track of the transportation vehicle participating in the project in real time; the method comprises the steps that a pile foundation map calls a satellite image map and a traffic map according to geographical position information configured by a project management function, a project construction range is displayed in a red line mode, and all pile foundation position icons of project design are displayed on the map in a default mode; pile foundation position icon is interactive design, and the content includes the basic information of this pile foundation, and basic information includes: pile foundation number, pile body type, pile foundation pile diameter, design hole depth and drilling machine type; the pile position icons are displayed in different colors (green, yellow, red) based on different types of piles and construction progress.
As a preferred technical scheme of the invention: the data query and statistics female module comprises a foundation pile engineering quantity query and statistics sub-module, a material management standing book sub-module, a mechanical equipment management standing book sub-module and a total engineering progress statistics sub-module; the total project progress statistics submodule counts the planned completion amount and the actual completion amount of the foundation piles of different pile foundation types of each project in each time period (such as a month) in a mode of an engineering progress S curve graph.
As a preferred technical scheme of the invention: the pile foundation construction APP comprises female modules such as a home page, project information, material management, foundation pile management, progress management, quality and safety civilized construction, an address list, data query statistics, a personal center and system monitoring; the project information master module comprises sub-modules of project overview, personnel management, mechanical equipment management and the like; the material management female module comprises sub-modules of material supply, material acceptance and warehousing, material ex-warehouse and utilization and the like; the foundation pile management female module comprises submodules for foundation pile process acquisition, process acceptance, foundation pile detection and the like; the progress management female module comprises submodules such as foundation pile image progress, construction log, construction progress and the like; the data query and statistics female module comprises sub-modules of construction image progress, material statistics, mechanical equipment statistics, foundation pile data, foundation pile detection data and the like.
As a preferred technical scheme of the invention: the project profiles include information such as project names, project profiles, major quantities, start dates, completion dates, construction units, design units, supervision units, construction units, general contract units, and the like.
As a preferred technical scheme of the invention: the personnel management submodule specifically comprises the following actions:
and (3) registration of personnel information: personnel are before the approach, and construction management personnel register before the approach through the project department, the personnel information that need fill in, personnel information contains: name, gender, identity card number, household registration address, work, team and mobile phone number; personal information can also be directly read through identification card identification;
printing a card: after personnel information registration is completed, the worker cards are uniformly printed by the project department, and the worker card information comprises: name, work kind, sex, age, personnel two-dimensional code sign, the work tablet is divided into 4 according to the working property difference, includes: department of project, supervision, construction team personnel, general workers;
people enter and leave the field: when people enter and leave the field, construction team managers or gate guard personnel scan the two-dimensional codes on the staff cards through an attendance machine, namely, the people enter and leave the field;
the pile foundation construction APP provides daily and historical worker type configuration conditions and attendance conditions for project management personnel.
As a preferred technical scheme of the invention: in the mechanical equipment management submodule, the specific implementation mode is as follows:
s1: the method comprises the following steps that a super-long standby GPS positioner is arranged, a two-dimensional code for identifying and distinguishing mechanical equipment and a magnet for stabilizing the positioner are fixed on the positioner, and the positioner sends positioning data to background monitoring service in a heartbeat package mode;
s2: before a machine enters a field, a manager registers information of mechanical equipment to be entered by a project department, wherein the information comprises equipment type, equipment name, equipment number, equipment code, driver name, driver contact way and driving license accessories;
s3: the method comprises the steps that a GPS locator is issued when equipment enters a field at a project entrance and exit, and managers or gate posts scan two-dimensional codes on the locator through mobile phone apps;
s4: after the mechanical equipment enters the field, the system acquires the use state and the use duration of the equipment according to the heartbeat positioning coordinate of the GPS positioner, and confirms the use condition of the mechanical equipment after the mechanical equipment enters the field by assisting in unscheduled inspection of the mechanical equipment;
s5: the equipment leaves the field, a GPS locator is recovered, and the two-dimensional code on the locator is scanned through mobile phone app to identify the equipment leaves the field;
s6: when the equipment leaves the field, but the GPS locator is not recovered, the system automatically alarms, and the red line of the project is used as an electronic fence for automatic analysis.
The invention provides an intelligent management system for basic construction, which has the following beneficial effects:
(1) the invention realizes the efficient and compact business cooperation of each professional, strengthens and standardizes the business management of the engineering project; the system is constructed, the information isolated island current situation of the prior engineering project simplification management is broken through, and the system practicability is greatly enhanced.
(2) The invention takes data information as the center, and the work responsibility and content of the project member are based on data management, thus realizing 'one-time input and multiple utilization', namely, each project member only needs to complete the work of itself, and the rapid flow of the service can be realized.
(3) The invention can be used as a multi-level software system and network information platform for construction site management, project remote monitoring, project multi-party cooperation, enterprise knowledge and information management and the like, can automatically generate data facing different subjects, and realizes informatization of various resources.
(4) The invention collects the data of each business link in the pile foundation construction process, and carries out classification, processing, arrangement and filing again, so that the data becomes complete and available records, a unified and open production data sharing platform is formed, data support and decision basis are provided for relevant departments such as construction management and the like, and reliable, accurate, timely and complete data guarantee is provided for advanced application of enterprise informatization construction.
(5) The invention can monitor each business link of pile foundation construction in a centralized way, truly reflects the construction process condition, enables managers at all levels to know and master the construction condition in time, accurately, comprehensively and intuitively, and further realizes unified command and centralized scheduling of the whole project construction process.
Drawings
Fig. 1 is an overall frame diagram of an intelligent management system for pile foundation construction according to the present invention.
Fig. 2 is a software functional block diagram of the intelligent management system for pile foundation construction according to the present invention.
Fig. 3 is an example diagram of a pile foundation map of the pile foundation construction intelligent management system provided by the invention.
Fig. 4 is an exemplary diagram of an engineering progress S-curve diagram of the intelligent management system for pile foundation construction according to the present invention.
Detailed Description
The invention is described in further detail with reference to the figures and specific embodiments.
As shown in fig. 1, fig. 1 is a general framework diagram of an intelligent management system for pile foundation construction according to the present invention. The intelligent management system for pile foundation construction comprises an operating environment, a data storage layer, a service layer and an application layer; the operating environment is deployed by adopting a cloud environment and comprises a cloud PolarDB server, an ECS server, an RDS server and OSS cloud storage; the data storage layer mainly comprises a pile foundation database, a man-machine material database, a GIS database and a GPS database, wherein the GIS database stores data related to geographic information of a system, and the GPS database stores data such as vehicle transportation, equipment GPS position and the like; the service layer is based on an SOA service architecture and provides Restful interface service for the application layer; the application layer comprises a pile foundation construction intelligent management WEB platform, a pile foundation construction APP and a supplier supply management wechat applet, and interaction is finally realized with a user through a Viewmodel and a View layer based on an MVVM front end framework.
In order to build a complete software system; referring to fig. 2 and table 1, fig. 2 is a software function module diagram of the intelligent management system for pile foundation construction provided by the present invention, and table 1 is a schematic table of platform service and operation environment of the intelligent management system for pile foundation construction provided by the present invention. The system platform of the intelligent management system for pile foundation construction adopts Windows Server, a GIS map service in a GIS database adopts a sky map, the GIS database and a GPS database both adopt MySQL databases provided by cloud, a scripting language adopts JavaScript, and a B/S system structure is adopted.
TABLE 1
Figure BDA0003117720670000061
The intelligent management WEB platform for pile foundation construction comprises a main module, a plurality of modules and a plurality of modules, wherein the main module comprises a homepage, a man-machine management module, an organization mechanism management module, a project management module, an authority management module, a system log management module, a big story management module, a pile foundation map module, a data query and statistics module, an engineering data management and output module, a construction data report module and the like;
the man-machine management mother module is mainly divided into a personnel team management submodule, a personnel entering and leaving management submodule, a mechanical entering and leaving management submodule, a face recognition equipment management submodule, a face recognition record management submodule and a mechanical two-dimensional code management submodule. The personnel team management submodule and the personnel field-entering and field-leaving management submodule are used for carrying out combined query on the basis of the name, time period, work type, sex, blood type and registrant of a construction team; respectively providing functions of adding, exporting Excel, editing, deleting, inquiring conditions, checking the two-dimensional code of the worker's card, printing the worker's card, adding the worker's type and checking the daily entering and leaving details of personnel; the mechanical entering and leaving management submodule provides functions of adding mechanical types in batches and checking daily entering and leaving details of the machines; the face recognition device management submodule and the face recognition record management submodule respectively carry out combined query based on the device name, the device state (online and offline) and the recognition time, and provide an editing function. And the mechanical two-dimensional code management submodule provides functions of condition query, deletion and batch printing. The project management master module comprises submodules of project information maintenance management, project two-dimensional map configuration, project transport vehicle configuration, construction plan filling and the like. The project two-dimensional map configuration submodule configures information such as a red line range, a project center position, a two-dimensional map source and the like of a project to realize the initialization of the geographic information data of the pile foundation distribution map; the project transportation vehicle configuration submodule is mainly used for carrying out unified management on the material transportation vehicle information of a supplier; providing a condition screening function, and positioning and checking historical tracks on a map by clicking a license plate; the construction plan filling sub-module mainly manages the monthly engineering monomers in the project. And providing functions of adding, editing, deleting and condition screening.
Fig. 3 is a diagram of an example of a pile foundation map of the intelligent management system for pile foundation construction according to the present invention. The pile foundation map shows the geographical condition of the project area, the project construction range and the distribution condition of all pile foundations in a two-dimensional electronic map mode, and simultaneously displays the current geographical position and the vehicle transportation track of the transportation vehicle participating in the project in real time; the method comprises the steps that a pile foundation map calls a satellite image map and a traffic map according to geographical position information configured by a project management function, a project construction range is displayed in a red line mode, and all pile foundation position icons of project design are displayed on the map in a default mode; pile foundation position icon is interactive design, and the content includes the basic information of this pile foundation, and basic information includes: pile foundation number, pile body type, pile foundation pile diameter, design hole depth and drilling machine type; the pile position icons are displayed in different colors (green, yellow, red) based on different types of piles and construction progress. The user can be according to the needs of bandwagon effect, show the pile foundation position with the mode of polymerization distribution when map scale is than littleer, show the pile foundation position with the form of different grade type icon after the map enlargies, the pile foundation serial number, click the basic information that this pile foundation can be looked over to every pile foundation position icon, the pile foundation map will show satellite image picture with the mode control on different picture layers, the pile foundation distribution map, the construction progress, mechanical equipment, haulage vehicle, can show and hide corresponding picture layer according to the use needs. The pile foundation map can show the construction image progress of each current pile foundation on the two-dimensional map. The pile foundation map also provides the functions of switching items and inquiring the map to position according to the pile foundation number.
Fig. 4 is a diagram illustrating an example of a project progress S-curve diagram of an intelligent management system for pile foundation construction according to the present invention. The data query and statistics female module comprises a foundation pile engineering quantity query and statistics sub-module, a material management standing book sub-module, a mechanical equipment management standing book sub-module and a total engineering progress statistics sub-module; the total project progress counting submodule counts the planned completion amount and the actual completion amount of foundation piles of different pile foundation types of each project in each time period (month) in a project progress S curve graph mode.
The pile foundation construction APP comprises female modules such as a home page, project information, material management, foundation pile management, progress management, quality and safety civilized construction, an address list, data query statistics, a personal center and system monitoring; the project information master module comprises sub-modules of project overview, personnel management, mechanical equipment management and the like; the material management female module comprises sub-modules of material supply, material acceptance and warehousing, material ex-warehouse and utilization and the like; the foundation pile management female module comprises submodules for foundation pile process acquisition, process acceptance, foundation pile detection and the like; the progress management female module comprises submodules such as foundation pile image progress, construction log, construction progress and the like; the data query and statistics female module comprises sub-modules of construction image progress, material statistics, mechanical equipment statistics, foundation pile data, foundation pile detection data and the like.
The project profiles include information such as project names, project profiles, major quantities, start dates, completion dates, construction units, design units, supervision units, construction units, general contract units, and the like.
The personnel management submodule specifically comprises the following actions:
and (3) registration of personnel information: personnel are before the approach, and construction management personnel register before the approach through the project department, the personnel information that need fill in, personnel information contains: name, gender, identity card number, household registration address, work, team and mobile phone number; personal information can also be directly read through identification card identification;
printing a card: after personnel information registration is completed, the worker cards are uniformly printed by the project department, and the worker card information comprises: name, work kind, sex, age, personnel two-dimensional code sign, the work tablet is divided into 4 kinds according to the working property difference, divide into: department of project, supervision, construction team personnel, general workers;
people enter and leave the field: when people enter and leave the field, construction team managers or gate guard personnel scan the two-dimensional codes on the staff cards through an attendance machine, namely, the people enter and leave the field;
the pile foundation construction APP provides daily and historical worker type configuration and attendance checking conditions for project management workers.
In the mechanical equipment management submodule, the specific implementation mode is as follows:
s1: the method comprises the following steps that a super-long standby GPS positioner is arranged, a two-dimensional code for identifying and distinguishing mechanical equipment and a magnet for stabilizing the positioner are fixed on the positioner, and the positioner sends positioning data to background monitoring service in a heartbeat package mode;
s2: before a machine enters a field, a manager registers information of mechanical equipment to be entered by a project department, wherein the information comprises equipment type, equipment name, equipment number, equipment code, driver name, driver contact way and driving license accessories;
s3: the method comprises the steps that a GPS locator is issued when equipment enters a field at a project entrance and exit, and managers or gate posts scan two-dimensional codes on the locator through mobile phone apps;
s4: after the mechanical equipment enters the field, the system acquires the use state and the use duration of the equipment according to the heartbeat positioning coordinate of the GPS positioner, and confirms the use condition of the mechanical equipment after the mechanical equipment enters the field by assisting in unscheduled inspection of the mechanical equipment;
s5: the equipment leaves the field, a GPS locator is recovered, and the two-dimensional code on the locator is scanned through mobile phone app to identify the equipment leaves the field;
s6: when the equipment leaves the field, but the GPS locator is not recovered, the system automatically alarms, and the red line of the project is used as an electronic fence for automatic analysis.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be able to cover the technical scope of the present invention and the equivalent alternatives or modifications according to the technical solution and the inventive concept of the present invention within the technical scope of the present invention.

Claims (10)

1. Pile foundation construction intellectuality management system, pile foundation construction intellectuality management system includes operational environment, data storage layer, service layer and application layer, its characterized in that: the system platform of the intelligent management system for pile foundation construction adopts Windows Server;
the operating environment is deployed by adopting a cloud environment and comprises a cloud PolarDB server, an ECS server, an RDS server and OSS cloud storage;
the data storage layer mainly comprises a pile foundation database, a man-machine material database, a GIS database and a GPS database, wherein the GIS database stores data related to geographic information of a system, and the GPS database stores vehicle transportation and equipment GPS position data;
the service layer is based on an SOA service architecture and provides Restful interface service for the application layer;
the application layer comprises a pile foundation construction intelligent management WEB platform, a pile foundation construction APP and a supplier supply management wechat applet, and interaction with a user is finally realized through a Viewmodel and a View layer based on an MVVM front end framework.
2. The intelligent management system for pile foundation construction according to claim 1, wherein: the GIS map service in the GIS database adopts a sky map, the GIS database and the GPS database adopt MySQL databases provided by cloud, the scripting language adopts JavaScript, and a B/S system structure is adopted.
3. The intelligent management system for pile foundation construction according to claim 1, wherein: pile foundation construction intelligent management WEB platform includes: the system comprises a home page, a man-machine management module, an organization management module, a project management module, an authority management module, a system log management module, a big note management module, a pile foundation map module, a data query and statistics module, an engineering data management module, an output module and a construction data report module.
4. The intelligent management system for pile foundation construction according to claim 3, wherein: the man-machine management mother module in the intelligent management WEB platform for pile foundation construction is mainly divided into a personnel team management submodule, a personnel entering and leaving management submodule, a mechanical entering and leaving management submodule, a face recognition equipment management submodule, a face recognition record management submodule and a mechanical two-dimensional code management submodule; the project management master module comprises project information maintenance management, project two-dimensional map configuration, project transport vehicle configuration and construction plan filling sub-modules.
5. The intelligent management system for pile foundation construction according to claim 3, wherein: the pile foundation map shows the geographical condition of the project area, the project construction range and the distribution condition of all pile foundations in a two-dimensional electronic map mode, and simultaneously displays the current geographical position and the vehicle transportation track of the transportation vehicle participating in the project in real time; the method comprises the steps that a pile foundation map calls a satellite image map and a traffic map according to geographical position information configured by a project management function, a project construction range is displayed in a red line mode, and all pile foundation position icons of project design are displayed on the map in a default mode; pile foundation position icon is interactive design, and the content includes the basic information of this pile foundation, and basic information includes: pile foundation number, pile body type, pile foundation pile diameter, design hole depth and drilling machine type; the pile foundation position icons are displayed in different colors based on different types of pile foundations and construction progress.
6. The intelligent management system for pile foundation construction according to claim 3, wherein: the data query and statistics female module comprises a foundation pile engineering quantity query and statistics sub-module, a material management standing book sub-module, a mechanical equipment management standing book sub-module and a total engineering progress statistics sub-module; and the total project progress counting submodule counts the planned completion amount and the actual completion amount of the foundation piles under different pile foundation types of each project in each time period in a project progress S curve graph mode.
7. The intelligent management system for pile foundation construction according to claim 1, wherein: the pile foundation construction APP comprises a home page, project information, material management, foundation pile management, progress management, quality and safety civilized construction, an address list, data query statistics, a personal center and a system monitoring female module; the project information master module comprises project overview, personnel management and mechanical equipment management sub-modules; the material management female module comprises a material supply submodule, a material acceptance and warehousing submodule and a material ex-warehouse and utilization submodule; the foundation pile management female module comprises a foundation pile process acquisition and process acceptance and foundation pile detection submodule; the progress management female module comprises a foundation pile image progress, a construction log and a construction progress sub-module; the data query and statistics female module comprises sub-modules of construction image progress, material statistics, mechanical equipment statistics, foundation pile data and foundation pile detection data.
8. The intelligent management system for pile foundation construction according to claim 7, wherein: the project profile includes project name, project profile, major project amount, start date, completion date, construction unit, design unit, supervision unit, construction unit, general contract unit information.
9. The intelligent management system for pile foundation construction according to claim 7, wherein: the personnel management submodule specifically comprises the following actions:
and (3) registration of personnel information: personnel are before the approach, and construction management personnel register before the approach through the project department, the personnel information that need fill in, personnel information contains: name, gender, identity card number, household registration address, work, team and mobile phone number; personal information can also be directly read through identification card identification;
printing a card: after personnel information registration is completed, the worker cards are uniformly printed by the project department, and the worker card information comprises: name, work kind, sex, age, personnel two-dimensional code sign, the work tablet is divided into 4 according to the working property difference, includes: department of project, supervision, construction team personnel, general workers;
people enter and leave the field: when people enter and leave the field, construction team managers or gate guard personnel scan the two-dimensional codes on the staff cards through an attendance machine, namely, the people enter and leave the field;
the pile foundation construction APP provides daily and historical worker type configuration conditions and attendance conditions for project management personnel.
10. The intelligent management system for pile foundation construction according to claim 7, wherein: in the mechanical equipment management submodule, the specific implementation mode is as follows:
s1: the method comprises the following steps that a super-long standby GPS positioner is arranged, a two-dimensional code for identifying and distinguishing mechanical equipment and a magnet for stabilizing the positioner are fixed on the positioner, and the positioner sends positioning data to background monitoring service in a heartbeat package mode;
s2: before a machine enters a field, a manager registers information of mechanical equipment to be entered by a project department, wherein the information comprises equipment type, equipment name, equipment number, equipment code, driver name, driver contact way and driving license accessories;
s3: the method comprises the steps that a GPS locator is issued when equipment enters a field at a project entrance and exit, and managers or gate posts scan two-dimensional codes on the locator through mobile phone apps;
s4: after the mechanical equipment enters the field, the system acquires the use state and the use duration of the equipment according to the heartbeat positioning coordinate of the GPS positioner, and confirms the use condition of the mechanical equipment after the mechanical equipment enters the field by assisting in unscheduled inspection of the mechanical equipment;
s5: the equipment leaves the field, a GPS locator is recovered, and the two-dimensional code on the locator is scanned through mobile phone app to identify the equipment leaves the field;
s6: when the equipment leaves the field, but the GPS locator is not recovered, the system automatically alarms, and the red line of the project is used as an electronic fence for automatic analysis.
CN202110666764.4A2021-06-162021-06-16Intelligent management system for pile foundation constructionPendingCN113469840A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202110666764.4ACN113469840A (en)2021-06-162021-06-16Intelligent management system for pile foundation construction

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202110666764.4ACN113469840A (en)2021-06-162021-06-16Intelligent management system for pile foundation construction

Publications (1)

Publication NumberPublication Date
CN113469840Atrue CN113469840A (en)2021-10-01

Family

ID=77870052

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202110666764.4APendingCN113469840A (en)2021-06-162021-06-16Intelligent management system for pile foundation construction

Country Status (1)

CountryLink
CN (1)CN113469840A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN114331377A (en)*2021-12-302022-04-12中铁二局集团电务工程有限公司Project management system for counting by point location engineering quantity list
CN114723364A (en)*2022-04-012022-07-08上海巨鲲科技有限公司 Supervision method of foundation pit steel support turnover

Citations (26)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
KR20000030457A (en)*2000-03-022000-06-05김헌출Method and System to Display the Project's Management of Construction by Internet
JP2006283294A (en)*2005-03-312006-10-19Geotop Corp Pile construction management method and pile construction management system
US20130253968A1 (en)*2012-03-262013-09-26David Frederick MartinezFacility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
CN106572000A (en)*2016-10-292017-04-19中国十七冶集团有限公司WeChat official account platform-based construction site quality and safety management method
CN206279568U (en)*2016-12-132017-06-27上海岩联工程技术有限公司A kind of intelligent pile detection device
KR20170142671A (en)*2016-06-202017-12-28주식회사 이지큐Method of and system for on-line construction management based on cloud
CN107688910A (en)*2017-09-072018-02-13殷伟A kind of rotary drilling rig construction management platform
JP2018145713A (en)*2017-03-072018-09-20大成建設株式会社 Pile construction data management system
CN108932586A (en)*2018-06-282018-12-04南京绿新能源研究院有限公司EPC Project cooperation operation management system
CN109064716A (en)*2018-08-202018-12-21山东润智能科技有限公司A kind of monitoring of hospital's charging pile security stereo cloud platform, system and method
CN109472548A (en)*2018-10-182019-03-15南京天辰礼达电子科技有限公司A kind of CFG pile foundation digitlization construction management plateform system
CN110130347A (en)*2019-04-302019-08-16福建路港(集团)有限公司Intelligent positioning guiding device, method, project management method for pile foundation construction
CN110276530A (en)*2019-05-312019-09-24江苏普信达智能交通有限公司A kind of intelligent engineering operation and maintenance supervising method
CN110689214A (en)*2018-07-082020-01-14国网湖南省电力有限公司物资公司Material supply intelligent collection management control platform
CN111047285A (en)*2019-11-292020-04-21国网辽宁省电力有限公司朝阳供电公司 Engineering project management system based on mobile "Internet +"
CN111144836A (en)*2019-12-122020-05-12中建八局第二建设有限公司Smart building integrated collaborative big data platform
CN111210199A (en)*2020-01-032020-05-29广西路桥工程集团有限公司Bridge prefab BIM information management system
CN111401746A (en)*2020-03-172020-07-10中交第一航务工程局有限公司Intelligent construction site informatization management system
CN111444568A (en)*2020-03-272020-07-24北京中交京纬公路造价技术有限公司Engineering monitoring BIM cooperative platform based on Internet of things
CN111709614A (en)*2020-05-272020-09-25中国电建集团华东勘测设计研究院有限公司 A seven-step quality management method for pile foundation based on BIM model
CN112150336A (en)*2020-10-272020-12-29揭阳市嵘途环保设备工程有限公司Environment-friendly service system based on WeChat applet
CN112163746A (en)*2020-09-182021-01-01华航环境发展有限公司Building engineering project management system based on BIM and GIS
CN112328666A (en)*2019-11-262021-02-05海南发控智慧环境建设集团有限公司 A smart building supervision operation and maintenance system based on cloud platform technology
CN112465309A (en)*2020-11-112021-03-09鼎旺天成科技(青岛)有限公司Visual construction management and control system and implementation method thereof
CN112529426A (en)*2020-12-152021-03-19乐筑科技发展有限公司Digital collaborative supervision platform system based on building construction full-industry chain
CN112712300A (en)*2021-02-032021-04-27浙江交工集团股份有限公司BIM + GIS construction project management system based on B/S information system

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
KR20000030457A (en)*2000-03-022000-06-05김헌출Method and System to Display the Project's Management of Construction by Internet
JP2006283294A (en)*2005-03-312006-10-19Geotop Corp Pile construction management method and pile construction management system
US20130253968A1 (en)*2012-03-262013-09-26David Frederick MartinezFacility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
KR20170142671A (en)*2016-06-202017-12-28주식회사 이지큐Method of and system for on-line construction management based on cloud
CN106572000A (en)*2016-10-292017-04-19中国十七冶集团有限公司WeChat official account platform-based construction site quality and safety management method
CN206279568U (en)*2016-12-132017-06-27上海岩联工程技术有限公司A kind of intelligent pile detection device
JP2018145713A (en)*2017-03-072018-09-20大成建設株式会社 Pile construction data management system
CN107688910A (en)*2017-09-072018-02-13殷伟A kind of rotary drilling rig construction management platform
CN108932586A (en)*2018-06-282018-12-04南京绿新能源研究院有限公司EPC Project cooperation operation management system
CN110689214A (en)*2018-07-082020-01-14国网湖南省电力有限公司物资公司Material supply intelligent collection management control platform
CN109064716A (en)*2018-08-202018-12-21山东润智能科技有限公司A kind of monitoring of hospital's charging pile security stereo cloud platform, system and method
CN109472548A (en)*2018-10-182019-03-15南京天辰礼达电子科技有限公司A kind of CFG pile foundation digitlization construction management plateform system
CN110130347A (en)*2019-04-302019-08-16福建路港(集团)有限公司Intelligent positioning guiding device, method, project management method for pile foundation construction
CN110276530A (en)*2019-05-312019-09-24江苏普信达智能交通有限公司A kind of intelligent engineering operation and maintenance supervising method
CN112328666A (en)*2019-11-262021-02-05海南发控智慧环境建设集团有限公司 A smart building supervision operation and maintenance system based on cloud platform technology
CN111047285A (en)*2019-11-292020-04-21国网辽宁省电力有限公司朝阳供电公司 Engineering project management system based on mobile "Internet +"
CN111144836A (en)*2019-12-122020-05-12中建八局第二建设有限公司Smart building integrated collaborative big data platform
CN111210199A (en)*2020-01-032020-05-29广西路桥工程集团有限公司Bridge prefab BIM information management system
CN111401746A (en)*2020-03-172020-07-10中交第一航务工程局有限公司Intelligent construction site informatization management system
CN111444568A (en)*2020-03-272020-07-24北京中交京纬公路造价技术有限公司Engineering monitoring BIM cooperative platform based on Internet of things
CN111709614A (en)*2020-05-272020-09-25中国电建集团华东勘测设计研究院有限公司 A seven-step quality management method for pile foundation based on BIM model
CN112163746A (en)*2020-09-182021-01-01华航环境发展有限公司Building engineering project management system based on BIM and GIS
CN112150336A (en)*2020-10-272020-12-29揭阳市嵘途环保设备工程有限公司Environment-friendly service system based on WeChat applet
CN112465309A (en)*2020-11-112021-03-09鼎旺天成科技(青岛)有限公司Visual construction management and control system and implementation method thereof
CN112529426A (en)*2020-12-152021-03-19乐筑科技发展有限公司Digital collaborative supervision platform system based on building construction full-industry chain
CN112712300A (en)*2021-02-032021-04-27浙江交工集团股份有限公司BIM + GIS construction project management system based on B/S information system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN114331377A (en)*2021-12-302022-04-12中铁二局集团电务工程有限公司Project management system for counting by point location engineering quantity list
CN114723364A (en)*2022-04-012022-07-08上海巨鲲科技有限公司 Supervision method of foundation pit steel support turnover

Similar Documents

PublicationPublication DateTitle
CN110796570B (en)Intelligent text travel system
CN111598379B (en)Project management method, platform, device, computer equipment and storage medium
CN111814240B (en)Highway engineering farmer management system based on BIM technology
CN110276530A (en)A kind of intelligent engineering operation and maintenance supervising method
CN106408173A (en)Quality random inspection execution process supervision system
CN109739834A (en)A kind of science and technology item intelligent declaration system based on cloud computing
CN111813770B (en)Data model construction method and device and computer readable storage medium
CN105260857A (en)Intelligent management system and method thereof for rural migrant workers
CN104572615A (en)Method and system for on-line case investigation processing
CN113379370A (en)Segment production informatization management system
CN114841662A (en) Infrastructure project management and control method, device, computer equipment and storage medium
CN208888869U (en) A safety management and control platform for outsourced construction teams based on Internet +
CN113469840A (en)Intelligent management system for pile foundation construction
CN106447156A (en)Attendance management method and system
CN113761852B (en)Army security personnel evidence-holding on-duty data management system, management method and terminal
CN108154340A (en)Prefabricated component informationization management system based on BIM cloud platforms
CN107222523A (en)Data processing method, the device and system of terminal
CN108241966A (en)A kind of use system suitable for technological project management
CN117197343A (en)Intelligent building site system for power transformation engineering
CN111738595A (en)Intelligent engineering monitoring management system based on big data
CN114331387A (en) Cultural relic intelligent integrated business management system
WO2019085246A1 (en)Shift management system, and method for same
CN113506636A (en) A population research and scientific research system integrating standardized design, implementation and management
Latif et al.Development of Student Face Recognition Attendance System
DharsonoInformation System Design on Project Supervision Related to Quality Control Effectiveness Using Android-Based Smartphone Applications

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20211001


[8]ページ先頭

©2009-2025 Movatter.jp