CN113404534A - Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well - Google Patents

Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well
Download PDF

Info

Publication number
CN113404534A
CN113404534ACN202110770986.0ACN202110770986ACN113404534ACN 113404534 ACN113404534 ACN 113404534ACN 202110770986 ACN202110770986 ACN 202110770986ACN 113404534 ACN113404534 ACN 113404534A
Authority
CN
China
Prior art keywords
fracturing
well
horizontal
section
horizontal section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110770986.0A
Other languages
Chinese (zh)
Other versions
CN113404534B (en
Inventor
贺海鸿
马小辉
吕大钊
王冰
王东杰
朱刚亮
尹传平
郭凯璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Binchangmengcun Mining Co ltd
Original Assignee
Shaanxi Binchangmengcun Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Binchangmengcun Mining Co ltdfiledCriticalShaanxi Binchangmengcun Mining Co ltd
Priority to CN202110770986.0ApriorityCriticalpatent/CN113404534B/en
Publication of CN113404534ApublicationCriticalpatent/CN113404534A/en
Application grantedgrantedCritical
Publication of CN113404534BpublicationCriticalpatent/CN113404534B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Classifications

Landscapes

Abstract

The invention discloses a method for preventing rock burst by staged fracturing of an L-shaped ground horizontal well, which comprises the following steps of: determining a fracturing layer position and a fracturing interval; constructing an L-shaped horizontal well vertical section on the ground, and embedding a sleeve to fix a well wall; starting deflecting at a design point A and extending to a fracturing layer, and starting constructing a horizontal section of the 1# well when drilling to the horizontal direction; adopting a retreating type fracturing 1# well horizontal section; plugging a deflecting section of the 1# well, then extending the vertical well, beginning reverse deflecting at a position which is not less than 10m below a design point A and extending to a fracturing layer, and beginning construction of a 2# well horizontal section when drilling to the horizontal direction; and adopting a retreating type fracturing 2# well horizontal section. According to the invention, the high-pressure hydraulic staged fracturing is carried out on the hard and difficult-to-collapse rock stratum covered on the coal face, so that the rock stratum is regularly collapsed, the rock stratum large-area suspended ceiling suddenly strides and falls to induce the rock burst of the coal face, and the safe and efficient mining of a mine is realized.

Description

Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well
Technical Field
The invention belongs to the technical field of coal face impact disaster prevention and control methods, and particularly relates to a method for preventing rock burst by staged fracturing of an L-shaped ground horizontal well.
Background
Rock burst is one of the main disasters faced by coal mining of deep mines, is getting more and more intense in China in recent years, and causes immeasurable loss to mines and personnel. According to statistics, the roof type rock burst of the deep mine coal face accounts for more than three quarters of the accidents of the roof type rock burst of the coal face, the main inducing factors of the roof type rock burst of the coal face are that large dynamic load is generated by sudden falling of a large-area suspended roof of a hard thick rock layer above a coal seam roof, and the high static load of a superposed working face induces the roof type rock burst of the coal face, so that how to avoid the large-area suspended roof of the hard roof of the coal face becomes the main research direction for solving the roof type rock burst.
Disclosure of Invention
The invention aims to provide a method for preventing rock burst by staged fracturing of an L-shaped ground horizontal well, which solves the problem that rock burst of a coal face is induced by sudden falling of a large-area suspended ceiling of a hard top plate of the existing coal face.
The technical scheme adopted by the invention is as follows: a method for preventing rock burst of an L-shaped ground horizontal well by staged fracturing comprises the following steps:
step 1, determining a fracturing position and a fracturing distance;
step 2, constructing an L-shaped horizontal well vertical section on the ground, and embedding a sleeve to fix a well wall;
step 3, starting deflecting at a design point A and extending to a fracturing layer, and starting constructing a horizontal section of the 1# well when drilling to the horizontal direction;
step 4, adopting a retreating type fracturing 1# well horizontal section;
step 5, after fracturing of the horizontal section of the 1# well is completed, plugging the deflecting section of the 1# well, then extending the vertical well, beginning reverse deflecting at a position which is not less than 10m below a design point A and extending to a fracturing layer, and beginning construction of the horizontal section of the 2# well when drilling to the horizontal direction;
and 6, adopting a retreating type fracturing 2# well horizontal section.
The present invention is also characterized in that,
in the step 1, a key layer of a coal face is determined according to a mine geological comprehensive histogram, three-zone observation of an adjacent working face, theoretical calculation and numerical simulation, a direct caving layer is determined according to the mine geological comprehensive histogram, a microseismic event and a seismic source position, and then a rock stratum between the key layer and the direct caving layer is selected to be determined as a fracturing layer.
In the step 1, the caving step of a rock stratum above a coal layer top plate of the coal face is determined according to the number of microseismic events and the working resistance of a hydraulic support of the working face, and the fracturing step is determined to be 1/2-1/3 of the caving step.
The step 4 specifically comprises the following steps:
4.1, ejecting 4-6 cluster perforations around the hole wall by using a perforating bullet at a fracturing position;
4.2, arranging 2 bridge plugs in the range of 20-50 m before and after the shower hole for plugging;
4.3, injecting high-pressure water into the 2 bridge plugs, and performing 360-degree fracturing on the high-pressure water through a perforation;
and 4.4, after fracturing one section, repeating the steps 4.1-4.3 at the next fracturing position until fracturing the horizontal section of the 1# well.
The retreating type fracturing mode of the 2# well horizontal section is the same as that of the 1# well horizontal section.
The invention has the beneficial effects that: the invention discloses a method for preventing rock burst by staged fracturing of an L-shaped ground horizontal well, which is characterized in that high-pressure hydraulic staged fracturing is carried out on a hard and difficult-to-collapse rock stratum covered on a coal face to enable the rock stratum to collapse regularly, so that the rock stratum large-area suspended ceiling suddenly strides and falls to avoid inducing the rock burst of the coal face, and the safe and efficient mining of a mine is realized.
Drawings
FIG. 1 is an implementation state diagram of a method for preventing rock burst by staged fracturing of an L-shaped ground horizontal well according to the invention;
FIG. 2 is a local state diagram of a deflecting section in the method for preventing and treating rock burst by staged fracturing of an L-shaped ground horizontal well.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
The invention provides a method for preventing and controlling rock burst by staged fracturing of an L-shaped horizontal well on ground, which comprises the following steps as shown in figures 1 and 2:
step 1, determining a key layer of a coal face through a mine geological comprehensive histogram, three-zone observation (a caving zone, a fissure zone and a bending subsidence zone) of an adjacent working face, theoretical calculation and numerical simulation, determining a direct caving layer according to the mine geological comprehensive histogram, a microseismic event and a seismic source position, and then selecting a hard thick rock stratum between the key layer and the direct caving layer to determine the hard thick rock stratum as a fracturing layer; determining the caving step of a hard thick rock layer above a coal layer top plate of a coal face according to the number of microseismic events and the working resistance of a hydraulic support of the working face, wherein the fracturing step is determined to be 1/2-1/3 of the caving step;
step 2, finishing a road surface, erecting a derrick, constructing an L-shaped horizontal well vertical section on the ground, and embedding a sleeve to fix a well wall to prevent underground water from invading the well wall;
step 3, after the construction of the vertical shaft section is finished, the deviation is started at a design point A, the drill bit is accurately controlled to accurately drill along the deviation making section by utilizing the comprehensive geological guiding drilling technology, the horizontal drilling is continued according to the length of the designed horizontal section after the horizontal landing of the target rock stratum fracturing section, and the construction of the horizontal section of the No. 1 well is started;
and 4, after the horizontal section construction of the 1# well is completed, performing staged fracturing on the target rock stratum by using high-pressure water. The hydraulic fracturing adopts a retreating type, and specifically comprises the following steps:
4.1, ejecting 4-6 cluster perforations around the hole wall by using a perforating bullet at a fracturing position;
4.2, arranging 2 bridge plugs for plugging within the range of 20-50 m (based on the fracture spacing not exceeding) before and after the shower hole;
4.3, injecting high-pressure water into the 2 bridge plugs, and performing 360-degree fracturing on the high-pressure water through a perforation;
4.4, after fracturing one section, repeating the steps 4.1-4.3 at the next fracturing position until fracturing the horizontal section of the 1# well;
step 5, after fracturing of the horizontal section of the 1# well is completed, plugging the deflecting section of the 1# well, then extending the vertical well, beginning reverse deflecting at a position which is not less than 10m below a design point A and extending to a fracturing layer, and beginning construction of the horizontal section of the 2# well in the same way as the 1# well when drilling to the horizontal direction;
and 6, after the construction of the horizontal section of the 2# well is finished, repeating the step 4 and fracturing the horizontal section of the 2# well in a retreating mode until all the horizontal sections of the 2# well are fractured.
Through the mode, the method for preventing rock burst through staged fracturing of the L-shaped ground horizontal well disclosed by the invention has the advantages that the rock stratum which is covered on the coal face and hard and difficult to collapse is subjected to high-pressure hydraulic staged fracturing, so that the rock stratum is regularly collapsed, the rock stratum is prevented from suddenly striding over a large area of a suspended roof to induce the rock burst of the coal face, and the safe and efficient mining of a mine is realized. Still possess following characteristics:
1. all the equipment related by the invention is on the ground, and compared with underground construction, the size, power and number of the equipment are not limited, and the construction can be better, faster and more economic.
2. Compared with conventional blasting pressure relief, the hydraulic fracturing is safer.
3. The dual-purpose vertical shaft has the advantages that the dual-purpose vertical shaft is realized, 2L-shaped horizontal wells in different directions are constructed by repeatedly utilizing the vertical shaft section, and the economical efficiency is better.

Claims (5)

CN202110770986.0A2021-07-072021-07-07Method for preventing rock burst by staged fracturing of L-shaped ground horizontal wellActiveCN113404534B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202110770986.0ACN113404534B (en)2021-07-072021-07-07Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202110770986.0ACN113404534B (en)2021-07-072021-07-07Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well

Publications (2)

Publication NumberPublication Date
CN113404534Atrue CN113404534A (en)2021-09-17
CN113404534B CN113404534B (en)2023-05-02

Family

ID=77685581

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202110770986.0AActiveCN113404534B (en)2021-07-072021-07-07Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well

Country Status (1)

CountryLink
CN (1)CN113404534B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN113847083A (en)*2021-10-282021-12-28重庆大学 A method for controlling rock burst in high-level, huge-thick and hard roof area
CN114382453A (en)*2021-11-292022-04-22陕西彬长孟村矿业有限公司Staged fracturing process for horizontal ground well for preventing and treating coal mine rock burst
CN115030718A (en)*2022-04-262022-09-09重庆大学Method for preventing and controlling impact mine pressure of thick and hard rock stratum through regional hydraulic fracturing
CN115288654A (en)*2022-07-282022-11-04陕西彬长孟村矿业有限公司Method for relieving pressure and preventing rock burst in blasting of ground horizontal well

Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN105807312A (en)*2016-03-152016-07-27大连理工大学Coal mine roof rock mass vertical zone determination method based on micro-seismic monitoring
US20190003258A1 (en)*2015-12-182019-01-03Modern Wellbore Solutions Ltd.Tool Assembly and Process for Drilling Branched or Multilateral Wells with Whip-Stock
CN109505577A (en)*2018-11-122019-03-22重庆科技学院Hot dry rock recovery method
CN111520119A (en)*2020-04-282020-08-11中煤科工集团西安研究院有限公司Method for efficiently extracting coal bed gas by staged fracturing of large-spacing thin coal seam group multi-bottom horizontal well
CN112855087A (en)*2021-03-222021-05-28河北佐和佑石油技术发展有限公司Coal bed gas horizontal well system transformation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20190003258A1 (en)*2015-12-182019-01-03Modern Wellbore Solutions Ltd.Tool Assembly and Process for Drilling Branched or Multilateral Wells with Whip-Stock
CN105807312A (en)*2016-03-152016-07-27大连理工大学Coal mine roof rock mass vertical zone determination method based on micro-seismic monitoring
CN109505577A (en)*2018-11-122019-03-22重庆科技学院Hot dry rock recovery method
CN111520119A (en)*2020-04-282020-08-11中煤科工集团西安研究院有限公司Method for efficiently extracting coal bed gas by staged fracturing of large-spacing thin coal seam group multi-bottom horizontal well
CN112855087A (en)*2021-03-222021-05-28河北佐和佑石油技术发展有限公司Coal bed gas horizontal well system transformation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN113847083A (en)*2021-10-282021-12-28重庆大学 A method for controlling rock burst in high-level, huge-thick and hard roof area
CN113847083B (en)*2021-10-282024-03-01重庆大学Control method for rock burst of high-level huge-thickness hard top plate area
CN114382453A (en)*2021-11-292022-04-22陕西彬长孟村矿业有限公司Staged fracturing process for horizontal ground well for preventing and treating coal mine rock burst
CN115030718A (en)*2022-04-262022-09-09重庆大学Method for preventing and controlling impact mine pressure of thick and hard rock stratum through regional hydraulic fracturing
CN115288654A (en)*2022-07-282022-11-04陕西彬长孟村矿业有限公司Method for relieving pressure and preventing rock burst in blasting of ground horizontal well

Also Published As

Publication numberPublication date
CN113404534B (en)2023-05-02

Similar Documents

PublicationPublication DateTitle
CN113404535B (en)Method for preventing rock burst by hydraulic fracturing of coal mine underground
CN110939442B (en)Method for treating rock burst by pressure relief source in ground fracturing area
CN113404534B (en)Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well
CN112593936B (en)Advanced comprehensive control method for multi-disaster area of deep mine
CN112780340B (en)Method for preventing rock burst in advance in underground coal mine area
CN112879011B (en)Method for controlling height of water guide crack zone by hard overburden rock pre-cracking weakening under aquifer
WO2023273091A1 (en)Method for preventing and controlling rock bursts in development roadway group
CN106869966B (en)A kind of method for blocking of absciss layer water supply source
CN114294046B (en)Coal mine area full-coverage underground three-dimensional extraction method
AU2021106168A4 (en)High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN102080518A (en)Method for extracting gas from coal seam roof complex branched well
CN105971662A (en)Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing
CN114856564A (en)Rock burst coal seam roadway anti-scour pressure-relief tunneling method
CN104763398A (en)Mining method for deformed coal coalbed methane for V-shaped well bottom plate auxiliary layer
CN111827878B (en)Method for quickly and accurately probing hidden water inrush channel of coal seam floor
CN114893161B (en)Multi-layer position directional drilling joint arrangement method
CN115788435A (en)System and method for preventing rock burst in coal mine from up and down in three-dimensional manner
CN108343418A (en)The method for controlling Affected areas by mining from earth's surface directional hydraulic fracturing presplitting basement rock
CN113323715A (en)Hard roof strong mine pressure and goaf gas disaster cooperative treatment method
CN113107589B (en)Advanced pre-drainage method for coal seam roof aquifer ground
CN114673497A (en)Suspended roof treatment method based on hard roof direction control cracking
CN113847083A (en) A method for controlling rock burst in high-level, huge-thick and hard roof area
CN117759243A (en)Technical method for preventing and controlling strong mine pressure by combining well and land with hydraulic pre-cracked coal seam hard roof
CN115898423A (en) A method for a thousand-meter horizontal drilling, fracturing, roof cutting, pressure relief and roadway protection and reducing the width of coal pillars
CN118030167B (en) A drilling method suitable for gas extraction and anti-blowout pressure relief

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp