A detection and processing device for ice coating of transmission lines
Download PDF

Info

Publication number
CN111987679A
CN111987679ACN202010915411.9ACN202010915411ACN111987679ACN 111987679 ACN111987679 ACN 111987679ACN 202010915411 ACN202010915411 ACN 202010915411ACN 111987679 ACN111987679 ACN 111987679A
Authority
CN
China
Prior art keywords
power transmission
transmission line
generating mechanism
driving
transmission lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010915411.9A
Other languages
Chinese (zh)
Other versions
CN111987679B (en
Inventor
周继承
袁灼光
柏东辉
陈茂辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co LtdfiledCriticalGuangdong Power Grid Co Ltd
Priority to CN202010915411.9ApriorityCriticalpatent/CN111987679B/en
Publication of CN111987679ApublicationCriticalpatent/CN111987679A/en
Application grantedgrantedCritical
Publication of CN111987679BpublicationCriticalpatent/CN111987679B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Classifications

Landscapes

Abstract

Translated fromChinese

本发明公开了一种用于输电线路覆冰的检测处理装置,包括第一执行机构和第二执行机构,第一执行机构包括整形机构和振动发生机构,第二执行机构包括破冰机构和位移发生机构;振动发生机构用于在若干条输电线路上发生高频振动,位移发生机构用于驱动若干条输电线路发生周期性的向心移动。本发明在进行输电线路的覆冰清除时,采用第一执行机构进行输电线路的覆冰整形呈规则的圆柱状的预处理,再通过第二执行机构实现对圆柱状的覆冰进行最终的处理,在此过程中结合振动发生机构和位移发生机构对输电线路上,在振动发生机构和位移发生机构的作用和限制下,输电线路上产生的应力将从覆冰和输电线路的粘结表面有效的破坏输电线路上的覆冰。

Figure 202010915411

The present invention discloses a detection and processing device for ice coating of power transmission lines, comprising a first actuator and a second actuator, wherein the first actuator comprises a shaping mechanism and a vibration generating mechanism, and the second actuator comprises an ice-breaking mechanism and a displacement generating mechanism; the vibration generating mechanism is used to generate high-frequency vibrations on a plurality of power transmission lines, and the displacement generating mechanism is used to drive a plurality of power transmission lines to perform periodic centripetal movement. When removing ice coating from power transmission lines, the present invention uses the first actuator to perform pre-treatment of shaping the ice coating of the power transmission lines into a regular cylindrical shape, and then uses the second actuator to perform final treatment on the cylindrical ice coating, and in this process, the vibration generating mechanism and the displacement generating mechanism are combined on the power transmission lines, and under the action and restriction of the vibration generating mechanism and the displacement generating mechanism, the stress generated on the power transmission lines will effectively destroy the ice coating on the power transmission lines from the bonding surface between the ice coating and the power transmission lines.

Figure 202010915411

Description

Translated fromChinese
一种用于输电线路覆冰的检测处理装置A detection and processing device for ice coating of transmission lines

技术领域technical field

本发明涉及输电线路技术领域,具体涉及一种用于输电线路覆冰的检测处理装置。The invention relates to the technical field of power transmission lines, in particular to a detection and processing device for ice coating of power transmission lines.

背景技术Background technique

近年来随着城市和工业的不断发展,电力需求急剧增加,而水力、火力和原子能等大规模发电设备都远离城市。特别在中国“西电东送”、“北电南送”的格局下,高电压、大容量输电线建设成己成为输电网络发展的必然趋势。随着电力基础设施的不断建设,输电线路规模不断扩大,输电线路电压等级也越来越高,高压甚至超高压的远距离电力输送也正在逐步建设,我国电力工业已进入了以大机组、高电压、高自动化为特征的大电网时代,成为了关系国民经济与社会可持续发展的基础性行业和支柱性产业。In recent years, with the continuous development of cities and industries, the demand for electricity has increased dramatically, and large-scale power generation equipment such as hydropower, thermal power and atomic power are far away from cities. Especially under the pattern of "transmitting electricity from west to east" and "transmitting electricity from north to south", the construction of high-voltage and large-capacity transmission lines has become an inevitable trend in the development of power transmission networks. With the continuous construction of power infrastructure, the scale of transmission lines has been continuously expanded, the voltage level of transmission lines has become higher and higher, and high-voltage and even ultra-high-voltage long-distance power transmission is also being gradually built. The era of large power grids characterized by voltage and high automation has become a basic industry and a pillar industry related to the sustainable development of the national economy and society.

经济社会日益增强的电力依赖性,促使了电力供应安全的地位比以往任何时候都更加重要,其中电网是输送和分配电能的重要环节,然而,当前电网的现实情况是:重低温、雨雪、冰冻灾害天气经常给偏远地区和山区造成大面积停电事故,网架结构受到重破坏,在电网迎峰度冬期间受低温雨雪天气影响,输电线路的“微气象区”或其他区域,由于雾凇、雨凇形成导致输电线路导、地线覆冰后弧垂下降,造成地线与导线距离不足,引起导线对地线放电、导线覆冰后相间距离不足引起线路跳闸。The increasing dependence on electricity in the economy and society has made the status of power supply security more important than ever. The power grid is an important link in the transmission and distribution of electrical energy. However, the current reality of the power grid is: heavy low temperature, rain and snow, Freezing disasters often cause large-scale power outages in remote areas and mountainous areas, and the grid structure is severely damaged. During the peak winter period of the power grid, it is affected by low-temperature rain and snow weather, and the "micro-meteorological zone" or other areas of the transmission line are affected by the rime. The formation of rain scorpion causes the transmission line conductor and ground wire to sag after icing, resulting in insufficient distance between the ground wire and the wire, causing the wire to discharge to the ground wire, and the line tripping due to insufficient phase-to-phase distance after the wire is iced.

目前,输电线路去除覆冰的方法有很多种,但简单、有效的不多。常用的方法有加热融冰法,其除冰原理是使输电线路流过大电流,通过线路电阻发热升温融化覆冰,但这种方法必须先对输电线路进行断电处理,然后在覆冰段线路施加大电流的直线电流,通过线跳路本身的电阻发热,使覆冰现化,这种方法需要断电后才能操作,往往影响线路工作。在机械性除冰通过敲击和振动的方式上,而现有的机械性除冰的行驶小车,大多采用多组滚轮与输电线路结合,这种方式可能会在高频的机械性震动下滚轮和输电线路脱轨,同时在输电线路表面覆冰的情况下,滚轮与输电线路之间的滑动摩擦力较小,可能会影响滚轮的有效行驶。以往还有使用人工去除输电线路覆冰的方法,经观察发现除冰效果不好、效率不高,有时难以实施。At present, there are many methods for removing ice from transmission lines, but few are simple and effective. The commonly used method is the heating and melting ice method. The principle of deicing is to make the transmission line flow a large current and heat up through the line resistance to melt the ice. The line applies a high-current linear current, which generates heat through the resistance of the line jumper itself, so that the icing is realized. This method can only be operated after the power is cut off, which often affects the work of the line. In mechanical deicing by knocking and vibrating, most of the existing mechanical deicing trolleys use multiple sets of rollers combined with transmission lines. This method may cause the rollers to roll under high-frequency mechanical vibration. When the transmission line is derailed and the surface of the transmission line is covered with ice, the sliding friction between the roller and the transmission line is small, which may affect the effective running of the roller. In the past, there was also a method of manually removing ice from transmission lines. After observation, it was found that the deicing effect was not good, the efficiency was not high, and it was sometimes difficult to implement.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种用于输电线路覆冰的检测处理装置,以解决现有技术中热力型除冰热力型除冰需要使得输电线路处于不工作状态,施加过负荷的电流使得输电线路发热进而实现除冰,该种方式在影响输电线路的供电的同时除冰的效率也不是十分的理想,以及机械除冰的行驶小车的行驶弊端的技术问题。The purpose of the present invention is to provide a detection and processing device for icing of power transmission lines, so as to solve the need of thermal type deicing in the prior art to make the power transmission lines in a non-working state, and to apply an overloaded current to make the power transmission lines Deicing is achieved by generating heat. This method affects the power supply of the transmission line, and the deicing efficiency is not very ideal, and the technical problem of the driving drawbacks of the mechanical deicing trolley.

为解决上述技术问题,本发明具体提供下述技术方案:In order to solve the above-mentioned technical problems, the present invention specifically provides the following technical solutions:

一种用于输电线路覆冰的检测处理装置,包括均连接多条输电线路的第一执行机构和第二执行机构,且所述第二执行机构设置在所述第一执行机构的运动路径上,所述第一执行机构和第二执行机构通过导线电性连接;A detection and processing device for icing of power transmission lines, comprising a first actuator and a second actuator both connected to a plurality of power lines, and the second actuator is arranged on the movement path of the first actuator , the first actuator and the second actuator are electrically connected through wires;

所述第一执行机构包括:The first actuator includes:

整形机构,套装在每条输电线路上,且用于将输电线路上的覆冰沿周向切削成指定形状,并在所述的指定形状的表面沿轴向开设扭矩沟槽;A shaping mechanism, which is fitted on each power transmission line, and is used to cut the ice coating on the power transmission line into a specified shape in the circumferential direction, and set a torque groove along the axial direction on the surface of the specified shape;

振动发生机构,用于与每条输电线路接触并迫使输电线路发生振动;A vibration generating mechanism for contacting each transmission line and forcing the transmission line to vibrate;

多边壳体A,用于安装所述整形机构和所述振动发生机构;The polygonal housing A is used to install the shaping mechanism and the vibration generating mechanism;

所述第二执行机构包括:The second actuator includes:

破冰机构,套装在每条输电线路上,且用于对整形机构开设的扭矩沟槽施加切向扭矩力;The ice breaking mechanism is fitted on each transmission line and is used to apply tangential torque force to the torque groove opened by the shaping mechanism;

位移发生机构,用于连接多条输电线路,并使多条输电线路产生周期性的靠近和远离动作;The displacement generating mechanism is used to connect multiple transmission lines, and make the multiple transmission lines move towards and away periodically;

所述位移发生机构在所述振动发生机构迫使多条输电线路发生振动的状态下,牵引多条输电线路产生靠近动作,用于形成所述振动发生机构在多条输电线路上的产生的振动波的传递断点,将所述振动波截留在所述振动发生机构和位移发生机构之间的输电线路上;The displacement generating mechanism pulls a plurality of power transmission lines to generate an approaching action when the vibration generating mechanism forces a plurality of power transmission lines to vibrate, so as to form the vibration waves generated by the vibration generating mechanism on the plurality of power transmission lines The transmission breakpoint, the vibration wave is intercepted on the transmission line between the vibration generating mechanism and the displacement generating mechanism;

多边壳体B,用于安装所述破冰机构和位移发生机构。The polygonal housing B is used to install the ice breaking mechanism and the displacement generating mechanism.

作为本发明的一种优选方案,所述多边壳体A的拐角处铰接有用于连接输电线路的连接臂,所述连接臂上设置有能够套装在输电线路上的绝缘套管,所述整形机构设置在所述绝缘套管内;As a preferred solution of the present invention, a connecting arm for connecting the power transmission line is hinged at the corner of the polygonal housing A, and an insulating sleeve that can be fitted on the power transmission line is provided on the connecting arm, and the shaping mechanism arranged in the insulating sleeve;

所述整形机构包括安装在所述绝缘套管内的走线管,所述走线管的轴线方向的一端设置有第一驱动环轮,所述走线管的轴线方向的另一端转动连接有用于沿输电线路转动对冰进行切割的周向切削机构,所述第一驱动环轮与所述周向切削机构之间设置有用于带动所述驱动环轮和所述周向切削机构做同步圆周运动的主传动杆,所述主传动杆的顶部设置有铣刀头。The shaping mechanism includes a wiring tube installed in the insulating sleeve, one end of the wiring tube in the axial direction is provided with a first driving ring wheel, and the other end in the axial direction of the wiring tube is rotatably connected with a A circumferential cutting mechanism for cutting ice is rotated along the power transmission line, and a synchronous circular motion is arranged between the first driving ring wheel and the circumferential cutting mechanism for driving the driving ring wheel and the circumferential cutting mechanism to perform synchronous circular motion. The main transmission rod is provided with a milling cutter head on the top of the main transmission rod.

作为本发明的一种优选方案,所述振动发生机构包括安装在所述多边壳体A的几何中心的驱动电机,所述驱动电机的输出轴上连接有转轴,所述转轴上依次安装有传动轮和传动盘,且所述传动盘与所述转轴键连接,所述传动轮啮合所述主传动杆,所述传动盘的圆周上等间距连接有多个副振动杆,所述副振动杆在所述驱动电机的驱动下做撞击输电线路表面的往复运动;As a preferred solution of the present invention, the vibration generating mechanism includes a drive motor installed at the geometric center of the polygonal housing A, a rotating shaft is connected to the output shaft of the drive motor, and a transmission is sequentially installed on the rotating shaft A wheel and a transmission disc, and the transmission disc is connected with the shaft key, the transmission wheel engages the main transmission rod, the circumference of the transmission disc is connected with a plurality of auxiliary vibration rods at equal intervals, and the auxiliary vibration rods Under the drive of the drive motor, the reciprocating motion striking the surface of the transmission line is performed;

所述多边壳体A上安装有用于使所述传动盘与所述转轴脱离键连接的离合装置。A clutch device is installed on the polygonal housing A for disconnecting the transmission disc and the rotating shaft from the keyed connection.

作为本发明的一种优选方案,所述多边壳体B的拐角处铰接有用于连接输电线路的伸缩连接臂,所述伸缩连接臂上设置有能够套设在输电线路上的绝缘套座,所述绝缘套座内部通过短钢簧安装有内套管,所述内套管内套装有供输电线路穿过的转动内管,所述内套管中间周向设置有环形开槽;As a preferred solution of the present invention, a telescopic connecting arm for connecting the power transmission line is hinged at the corner of the polygonal shell B, and an insulating sleeve that can be sleeved on the power transmission line is provided on the telescopic connecting arm. An inner sleeve is installed inside the insulating sleeve seat through a short steel spring, the inner sleeve is sleeved with a rotating inner pipe for the transmission line to pass through, and an annular slot is arranged in the middle of the inner sleeve in the circumferential direction;

所述位移发生机构包括安装在所述多边壳体B的几何中心的位移电机,所述位移电机的输出轴上安装有绞盘,所述绞盘的圆周上等间距连接有多个绞索,所述绞索的一端活动连接在所述环形开槽内。The displacement generating mechanism includes a displacement motor installed at the geometric center of the polygonal housing B, a winch is installed on the output shaft of the displacement motor, and a plurality of nooses are connected at equal intervals on the circumference of the winch. One end is movably connected in the annular slot.

作为本发明的一种优选方案,所述周向切削机构包括转动连接在所述走线管上的转动环座,所述转动环座上等间距连接有多个角刀,所述转动环座的侧壁上设置有与所述主传动杆顶部啮合的锥齿轮。As a preferred solution of the present invention, the circumferential cutting mechanism includes a rotating ring seat that is rotatably connected to the cable duct, a plurality of corner knives are connected to the rotating ring seat at equal intervals, and the rotating ring seat A bevel gear meshing with the top of the main transmission rod is arranged on the side wall of the main transmission rod.

作为本发明的一种优选方案,所述第一执行机构还包括安装在所述多边壳体A上的与输电线路的滑动接触的超声发射模块,所述第二执行机构还包括安装在所述多边壳体B上与输电线路接触,接收所述超声发射模块发出的超声波的超声接收模块,以及用于数据分析的中控模块,所述中控模块电性连接所述超声波接收模块。As a preferred solution of the present invention, the first actuator further includes an ultrasonic transmitter module mounted on the polygonal housing A in sliding contact with the power transmission line, and the second actuator further includes an ultrasonic transmitter module mounted on the The polygon shell B is in contact with the power transmission line, an ultrasonic receiving module for receiving ultrasonic waves emitted by the ultrasonic transmitting module, and a central control module for data analysis, and the central control module is electrically connected to the ultrasonic receiving module.

作为本发明的一种优选方案,所述破冰机构包括安装在所述绝缘套座上的扭矩电机,以及设置在所述绝缘套座内部的齿环,所述齿环供输电线路穿过的内圈表面上设置有螺旋齿,所述齿环的里侧的绝缘套座内设置有第二驱动环轮,且所述扭矩电机的输出轴上安装有同时啮合所述第二驱动环轮和所述齿环的双面锥齿轮,所述齿环的前后两侧通过轴承转动连接在所述绝缘套座上。As a preferred solution of the present invention, the ice breaking mechanism includes a torque motor mounted on the insulating sleeve, and a toothed ring arranged inside the insulating sleeve, and the toothed ring is used for the transmission line to pass through the inner ring. The surface of the ring is provided with helical teeth, the insulating sleeve seat on the inner side of the gear ring is provided with a second driving ring wheel, and the output shaft of the torque motor is installed with a second driving ring wheel that simultaneously engages with the second driving ring wheel and all other gears. The double-sided bevel gear of the toothed ring, the front and rear sides of the toothed ring are rotatably connected to the insulating sleeve seat through bearings.

作为本发明的一种优选方案,所述连接臂上设置有与所述副振动杆的在所述驱动电机的驱动下做往复运动的动作相配合的导向槽,所述导向槽延伸至所述绝缘套管内。As a preferred solution of the present invention, the connecting arm is provided with a guide groove matched with the reciprocating motion of the auxiliary vibrating rod driven by the drive motor, and the guide groove extends to the inside the insulating sleeve.

作为本发明的一种优选方案,所述第一驱动环轮和所述第二驱动环轮内圈均设置有橡胶螺纹套,所述橡胶螺纹套的内部设置有与所述第一驱动环轮或所述第二驱动环轮一体成型的螺旋齿,且所述螺旋齿的每个齿与所述橡胶螺纹套的每个纹槽相对应。As a preferred solution of the present invention, both the first driving ring wheel and the inner ring of the second driving ring wheel are provided with a rubber threaded sleeve, and the inside of the rubber threaded sleeve is provided with the first driving ring wheel. Or the second driving ring wheel is an integrally formed helical tooth, and each tooth of the helical tooth corresponds to each groove of the rubber threaded sleeve.

本发明与现有技术相比较具有如下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

本发明在进行输电线路的覆冰清除时,采用第一执行机构进行输电线路的覆冰整形呈规则状的预处理,再通过第二执行机构实现对预处理后的覆冰进行最终的处理,在此过程中结合振动发生机构和位移发生机构对输电线路上,在振动发生机构和位移发生机构的作用和限制下,输电线路上产生的应力将从覆冰和输电线路的粘结表面有效的破坏输电线路上的覆冰。In the present invention, when the ice coating of the transmission line is removed, the first actuator is used to preprocess the ice coating of the transmission line in a regular shape, and then the second actuator is used to realize the final treatment of the pretreated ice coating. In this process, combined with the vibration generating mechanism and the displacement generating mechanism, on the transmission line, under the action and limitation of the vibration generating mechanism and the displacement generating mechanism, the stress generated on the transmission line will be effectively removed from the ice coating and the bonding surface of the transmission line. Destroy ice on power lines.

附图说明Description of drawings

为了更清楚地说明本发明的实施方式或现有技术中的技术方案,下面将对实施方式或现有技术描述中所需要使用的附图作简单地介绍。显而易见地,下面描述中的附图仅仅是示例性的,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图引伸获得其它的实施附图。In order to illustrate the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that are required to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only exemplary, and for those of ordinary skill in the art, other implementation drawings can also be obtained according to the extension of the drawings provided without creative efforts.

图1为本发明实施例提供覆冰检测及处理装置的结构示意图;FIG. 1 is a schematic structural diagram of an ice coating detection and processing device according to an embodiment of the present invention;

图2为本发明实施例提供安装有破冰机构的绝缘套座纵剖面的结构示意图;2 is a schematic structural diagram of a longitudinal section of an insulating sleeve seat provided with an ice breaking mechanism according to an embodiment of the present invention;

图3为本发明实施例提供安装有整形机构的绝缘套管纵剖面的结构示意图;3 is a schematic structural diagram of a longitudinal section of an insulating sleeve provided with a shaping mechanism according to an embodiment of the present invention;

图4为本发明实施例提供第一执行机构的外观结的构示意图;4 is a schematic structural diagram of an appearance structure of a first actuator provided by an embodiment of the present invention;

图5为本发明实施例提供第二执行机构的外观的结构示意图;FIG. 5 is a schematic structural diagram of the appearance of a second actuator according to an embodiment of the present invention;

图6为本发明实施例提供驱动电机的结构示意图;6 is a schematic structural diagram of a drive motor provided by an embodiment of the present invention;

图7为本发明实施例提供位移电机的结构示意图;7 is a schematic structural diagram of a displacement motor provided by an embodiment of the present invention;

图8为本发明实施例提供位移电机的结构示意图;8 is a schematic structural diagram of a displacement motor provided by an embodiment of the present invention;

图9为本发明实施例提供位第一驱动环轮或第二驱动环轮的结构示意图。FIG. 9 is a schematic structural diagram of a first driving ring wheel or a second driving ring wheel according to an embodiment of the present invention.

图中的标号分别表示如下:The symbols in the figure are as follows:

1-第一执行机构;2-第二执行机构;3-整形机构;4-破冰机构;5-振动发生机构;6-位移发生机构;7-多边壳体A;8-连接臂;9-绝缘套管;10-离合装置;11-多边壳体B;12-伸缩连接臂;13-绝缘套座;14-短钢簧;15-内套管;16-转动内管;17-环形开槽;18-超声发射模块;19-超声接收模块;20-中控模块;21-橡胶螺纹套;22-螺旋齿;1-First actuator; 2-Second actuator; 3-Shaping mechanism; 4-Ice breaking mechanism; 5-Vibration generating mechanism; 6-Displacement generating mechanism; 7-Polygon shell A; 8-Connecting arm; 9- Insulation sleeve; 10-Clutch device; 11-Multilateral housing B; 12-Telescopic connecting arm; 13-Insulation sleeve seat; 14-Short steel spring; 15-Inner sleeve; 16-Rotating inner tube; 17-Annular opening slot; 18-ultrasonic transmitting module; 19-ultrasonic receiving module; 20-central control module; 21-rubber threaded sleeve; 22-spiral teeth;

301-走线管;302-第一驱动环轮;303-周向切削机构;304-主传动杆;305-铣刀头;3031-转动环座;3032-角刀;3033-锥齿轮;301-line pipe; 302-first driving ring wheel; 303-circumferential cutting mechanism; 304-main transmission rod; 305-milling head; 3031-rotating ring seat; 3032-angle knife; 3033-bevel gear;

401-扭矩电机;402-齿环;403-螺旋齿;404-第二驱动环轮;405-双面锥齿轮;401-torque motor; 402-gear ring; 403-helix tooth; 404-second driving ring wheel; 405-double-sided bevel gear;

501-驱动电机;502-转轴;503-传动轮;504-传动盘;505-副震动杆;506-导向槽;501- drive motor; 502- shaft; 503- transmission wheel; 504- transmission disc; 505- auxiliary vibration rod; 506- guide groove;

601-位移电机;602-绞盘;603-绞索。601 - displacement motor; 602 - winch; 603 - noose.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

如图1至图8所示,本发明提供了一种用于输电线路覆冰的检测处理装置,包括均连接多条输电线路的第一执行机构1和第二执行机构2,且第二执行机构2设置在第一执行机构1的运动路径上,第一执行机构1和第二执行机构2通过导线电性连接;As shown in FIG. 1 to FIG. 8 , the present invention provides a detection and processing device for power transmission line icing, including afirst actuator 1 and asecond actuator 2 both connected to a plurality of power transmission lines, and the second actuator Themechanism 2 is arranged on the movement path of thefirst actuator 1, and thefirst actuator 1 and thesecond actuator 2 are electrically connected through wires;

第一执行机构1包括:Thefirst actuator 1 includes:

整形机构3,套装在每条输电线路上,且用于将输电线路上的覆冰沿周向切削成指定形状,并在的指定形状的表面沿轴向开设扭矩沟槽;Theshaping mechanism 3 is fitted on each transmission line, and is used for cutting the ice coating on the transmission line into a specified shape in the circumferential direction, and opening a torque groove along the axial direction on the surface of the specified shape;

振动发生机构5,用于与每条输电线路接触并迫使输电线路发生振动;The vibration generating mechanism 5 is used for contacting with each transmission line and forcing the transmission line to vibrate;

多边壳体A7,用于安装整形机构3和振动发生机构5;The polygonal shell A7 is used to install theshaping mechanism 3 and the vibration generating mechanism 5;

第二执行机构包括:The second executive body includes:

破冰机构4,套装在每条输电线路上,且用于对整形机构3开设的扭矩沟槽施加切向扭矩力;The ice breaking mechanism 4 is sleeved on each transmission line, and is used to apply a tangential torque force to the torque groove opened by theshaping mechanism 3;

位移发生机构6,用于连接多条输电线路,并使多条输电线路产生周期性的靠近和远离动作;Thedisplacement generating mechanism 6 is used to connect a plurality of power transmission lines, and make the plurality of power transmission lines generate periodic approach and distance actions;

位移发生机构6在振动发生机构5迫使多条输电线路发生振动的状态下,牵引多条输电线路产生靠近动作,用于形成振动发生机构5在多条输电线路上的产生的振动波的传递断点,将振动波截留在振动发生机构5和位移发生机构6之间的输电线路上;Thedisplacement generating mechanism 6 pulls a plurality of power transmission lines to generate an approaching action when the vibration generating mechanism 5 forces a plurality of power transmission lines to vibrate, so as to form a transmission interruption of the vibration waves generated by the vibration generating mechanism 5 on the multiple power transmission lines. point, the vibration wave is intercepted on the transmission line between the vibration generating mechanism 5 and thedisplacement generating mechanism 6;

多边壳体B11,用于安装破冰机构4和位移发生机构6。The polygonal housing B11 is used to install the ice breaking mechanism 4 and thedisplacement generating mechanism 6 .

其中,第一执行机构1和第二执行机构2具体的基础参考结构是现有的用于高压输电线路进行多条输电线路(本发明中是以四条输电线路为例)连接的间隔棒,且第一执行机构1和第二执行机构2的利用导线连接电源进行供电,导线可设计成可收卷的放线方式,用来跟随第一执行机构1和第二执行机构2在输电线路上的移动。The specific basic reference structure of thefirst actuator 1 and thesecond actuator 2 is an existing spacer bar used for connecting multiple transmission lines (four transmission lines are used as an example in the present invention) for high-voltage transmission lines, and Thefirst actuator 1 and thesecond actuator 2 use wires to connect to the power supply for power supply, and the wires can be designed in a retractable pay-off mode to follow the first andsecond actuators 1 and 2 on the transmission line. move.

由于在偏远以及高山地区,架设输电线路较为困难,并且在后期的输电线路的维护也是一个难题,重低温、雨雪、冰冻灾害天气经常使得偏远地区和山区造成大面积网架结构受到重破坏,由于偏远地区和山区的路况和环境限制,工作人员无法频繁的对线路进行维护以及对输电线路的覆冰进行清理,尤其是在跨越地形上,为此:Due to the difficulty in erecting transmission lines in remote and high mountain areas, and the maintenance of transmission lines in the later period is also a difficult problem, severe low temperature, rain and snow, and freezing disasters often cause large-scale grid structures in remote areas and mountainous areas. Due to the road conditions and environmental restrictions in remote areas and mountainous areas, the staff cannot frequently perform maintenance on the lines and clear the ice covering of the transmission lines, especially on the crossing terrain. To this end:

本发明的第一执行机构1和第二执行机构2通过导线电性连接,第一执行机构1包括整形机构3和振动发生机构5,第二执行机构包括破冰机构4和位移发生机构6。Thefirst actuator 1 and thesecond actuator 2 of the present invention are electrically connected by wires. Thefirst actuator 1 includes ashaping mechanism 3 and a vibration generating mechanism 5 , and the second actuator includes an ice breaking mechanism 4 and adisplacement generating mechanism 6 .

由于雾凇、雨凇以及风力、重力的多重因素的作用下,使得输电线路表面的覆冰并不是成规整的形状,而现有的输电线路的覆冰除冰方式包括热力型除冰和机械性除冰,热力型除冰需要使得输电线路处于不工作状态,施加过负荷的电流使得输电线路发热进而实现除冰,该种方式在影响输电线路的供电的同时除冰的效率也不是十分的理想。Due to the multiple factors of rime, rain, wind and gravity, the icing on the surface of the transmission line is not in a regular shape, and the existing methods of icing and deicing of transmission lines include thermal deicing and mechanical deicing. De-icing, thermal de-icing needs to keep the transmission line in a non-working state, and applying an overloaded current makes the transmission line heat up to achieve de-icing. This method affects the power supply of the transmission line and the efficiency of de-icing is not very ideal. .

在机械性除冰通过敲击和振动的方式上,而现有的机械性除冰的行驶小车,大多采用多组滚轮与输电线路结合,这种方式可能会在高频的机械性震动下滚轮和输电线路脱轨,同时在输电线路表面覆冰的情况下,滚轮与输电线路之间的滑动摩擦力较小,可能会影响滚轮的有效行驶;In mechanical deicing by knocking and vibrating, most of the existing mechanical deicing trolleys use multiple sets of rollers combined with transmission lines. This method may cause the rollers to roll under high-frequency mechanical vibration. When the transmission line is derailed, and the surface of the transmission line is covered with ice, the sliding friction between the roller and the transmission line is small, which may affect the effective running of the roller;

再者,采用产生高频振动的方式中,由于输电线路的长度较长,振动源在的振动波在输电线路上的传导会减弱,为此:Furthermore, in the method of generating high-frequency vibration, due to the long length of the transmission line, the conduction of the vibration wave from the vibration source on the transmission line will be weakened. For this reason:

本发明在对输电线路的覆冰的处理上,主要通过以下两个方面来实现:The present invention mainly realizes the following two aspects in the treatment of the icing of the transmission line:

首先,通过整形机构3将输电线路上的覆冰切削成指定形状,即通过整形机构3将输电线路上形成的不规则覆冰,切削成套在输电线路上的规则圆柱状,并在圆柱状的覆冰的表面沿轴向开设扭矩沟槽,破冰机构4用于对扭矩沟槽施加切向扭矩力,开设扭矩沟槽为破冰机构4提供施力点,进而完成对圆柱状的覆冰的削除,由于沿所述输电线路的径向开设扭矩沟槽,使得圆柱状的覆冰内部结构被破坏,从而能够轻易的除去覆冰。First, the ice coating on the transmission line is cut into a specified shape by theshaping mechanism 3, that is, the irregular ice coating formed on the transmission line is cut by theshaping mechanism 3, and the regular cylindrical shape that is set on the transmission line is cut into the cylindrical shape. The ice-covered surface is provided with a torque groove along the axial direction, the ice-breaking mechanism 4 is used to apply a tangential torque force to the torque groove, and the opening of the torque groove provides a force application point for the ice-breaking mechanism 4, thereby completing the removal of the cylindrical ice coating, Due to the opening of the torque grooves along the radial direction of the power transmission line, the internal structure of the cylindrical ice coating is destroyed, so that the ice coating can be easily removed.

其次,振动发生机构5用于在若干条输电线路上发生高频振动,位移发生机构6用于在振动发生机构5驱使输电线路发生高频振动的同时驱动若干条输电线路发生周期性的向心移动,位移发生机构6产生输电线路的向心移动形成振动发生机构5在输电线路上的振动传递的断点,将输电线路的高频振动截留在振动发生机构5和位移发生机构6之间的输电线路上。Secondly, the vibration generating mechanism 5 is used to generate high-frequency vibration on several transmission lines, and thedisplacement generating mechanism 6 is used to drive several transmission lines to generate periodic centripetal vibrations while the vibration generating mechanism 5 drives the transmission lines to generate high-frequency vibration. Movement, thedisplacement generating mechanism 6 produces the centripetal movement of the transmission line to form the breakpoint of the vibration transmission of the vibration generating mechanism 5 on the transmission line, and traps the high-frequency vibration of the transmission line in the gap between the vibration generating mechanism 5 and thedisplacement generating mechanism 6. on the transmission line.

现有的利用高频振动的方式进行覆冰的去除,由于覆冰内部与输电线路的粘接结构较为紧密,单纯的高频振动无法有效的去除,并且高频振动在传递的过程中能量消散也十分的明显。The existing high-frequency vibration method is used to remove the icing. Because the bonding structure between the inside of the icing and the transmission line is relatively close, the simple high-frequency vibration cannot be effectively removed, and the energy of the high-frequency vibration is dissipated during the transmission process. Also very obvious.

本发明中的振动发生机构5和位移发生机构6的其工作原理是,在第一执行机构1和第二执行机构2的间隔棒作用下,使多条输电线路之间的距离相同,而在输电线路的重力的影响下,第一执行机构1和第二执行机构2存在高度差,并且随着第一执行机构1和第二执行机构2之间的距离增大,第二执行机构2位于低势能区,而该处受到风力和气温的影响作用最大,输电线路的动态表征也较为明显。The working principle of the vibration generating mechanism 5 and thedisplacement generating mechanism 6 in the present invention is that, under the action of the spacer bars of thefirst actuator 1 and thesecond actuator 2, the distances between the plurality of transmission lines are the same, and the distance between the multiple transmission lines is the same. Under the influence of the gravity of the power transmission line, there is a height difference between thefirst actuator 1 and thesecond actuator 2, and as the distance between thefirst actuator 1 and thesecond actuator 2 increases, thesecond actuator 2 is located in the The low-potential energy region is most affected by wind and air temperature, and the dynamic characterization of the transmission line is also obvious.

为此,当振动发生机构5产生高频振动时,位移发生机构6在较为低势能区将多条输电线路向心拉动,其作用是,位移发生机构6在输电线路的某处施加径向的拉力,使得振动发生机构5产生的高频振动存在到达位移发生机构6处被抵消或者减弱,而这种抵消或者减弱将对沿输电线路的高频振动一个快速的反馈,使得振动发生机构5和位移发生机构6之间的输电线路的表面应力增大,进而提高震动发生机构5在该段输电线路上的作用效果;For this reason, when the vibration generating mechanism 5 generates high-frequency vibration, thedisplacement generating mechanism 6 pulls a plurality of transmission lines centripetally in the relatively low potential energy region. Pulling force, so that the high-frequency vibration generated by the vibration generating mechanism 5 is offset or weakened when it reaches thedisplacement generating mechanism 6, and this offset or weakening will give a fast feedback to the high-frequency vibration along the transmission line, so that the vibration generating mechanism 5 and the The surface stress of the transmission line between thedisplacement generating mechanisms 6 increases, thereby improving the effect of the vibration generating mechanism 5 on this section of the transmission line;

同时,高空输电线路在重力和风力的作用下出现摆动,而这种摆动在实际的过程中受到的影响因素较多,利用基于流体力学理论的典型覆冰导向-新月形覆冰导线气动特性分析模型的分析下可以得出,通过位移发生机构6拉动四个输电线路,在输电线路的铁塔对输电线路的拉力,使得该处的线路呈紧绷状态,而由于输电线路在此处的重力均向下,因此在输电线路受到任何攻角的风力时都会使多个输电线路以位移发生机构6的几何中心发生一定的自旋转动,而此时由于振动发生机构5较为靠近其自旋转动不够明显或不自旋转动,因此作用在振动发生机构5和位移发生机构6的作用和限制下,输电线路上产生的应力将从覆冰和输电线路的粘结表面破坏输电线路上的覆冰。At the same time, the high-altitude transmission line swings under the action of gravity and wind, and this swing is affected by many factors in the actual process. The aerodynamic characteristics of the typical ice-covered guide-crescent-shaped ice-covered wire based on the theory of fluid mechanics are used. According to the analysis of the analysis model, it can be concluded that the four transmission lines are pulled by thedisplacement generating mechanism 6, and the pulling force of the transmission line tower on the transmission line makes the line there tense, and due to the gravity of the transmission line here Therefore, when the transmission line is subjected to wind at any angle of attack, multiple transmission lines will rotate at the geometric center of thedisplacement generating mechanism 6 to a certain extent. At this time, because the vibration generating mechanism 5 is relatively close to its rotation It is not obvious enough or does not rotate, so under the action and limitation of the vibration generating mechanism 5 and thedisplacement generating mechanism 6, the stress generated on the transmission line will destroy the ice coating on the transmission line from the icing and the bonding surface of the transmission line. .

具体的:specific:

第一执行机构1还包括用于安装整形机构3和振动发生机构5的多边壳体A7,其中多边壳体A7的结构形状可根据实际的输电线路的根数来确定,并且多边壳体A7在考虑风阻等多种因素可以为球体,多边壳体A7的拐角处铰接有用于连接输电线路的连接臂8,连接臂8通过绝缘套管9套装在输电线路上,整形机构3同轴设置在绝缘套管9内。Thefirst actuator 1 also includes a polygonal housing A7 for installing theshaping mechanism 3 and the vibration generating mechanism 5, wherein the structural shape of the polygonal housing A7 can be determined according to the actual number of power transmission lines, and the polygonal housing A7 is in Considering various factors such as wind resistance, it can be a sphere. The corner of the polygonal shell A7 is hinged with a connectingarm 8 for connecting the transmission line. The connectingarm 8 is sheathed on the transmission line through an insulatingsleeve 9. inside thecasing 9.

整形机构3包括安装在绝缘套管9内的走线管301,供输电线路穿过,走线管301的一端设置有第一驱动环轮302,第一驱动环轮302的内圈与输电线路的表面接触,且第一驱动环轮302与所述输电线路的表面间隙配合,走线管301上转动连接有用于沿输电线路转动切割的周向切削机构303,第一驱动环轮302与周向切削机构303之间设置有驱动第一驱动环轮302和周向切削机构303做同步圆周运动的主传动杆304,主传动杆304的顶部设置有铣刀头305,通过铣刀头305在经过周向切削机构303后形成的圆柱状的表面形成沿轴向的扭矩沟槽。Theshaping mechanism 3 includes awiring tube 301 installed in the insulatingsleeve 9 for the transmission line to pass through. One end of thewiring tube 301 is provided with a firstdriving ring wheel 302, and the inner ring of the firstdriving ring wheel 302 is connected with the transmission line. and the firstdriving ring wheel 302 is in clearance fit with the surface of the power transmission line, thewire duct 301 is rotatably connected with acircumferential cutting mechanism 303 for rotating and cutting along the power transmission line, and the firstdriving ring wheel 302 is connected with the circumferential direction Amain transmission rod 304 that drives the firstdriving ring wheel 302 and thecircumferential cutting mechanism 303 to perform synchronous circular motion is arranged between thecutting mechanism 303. The top of themain transmission rod 304 is provided with amilling cutter head 305. The cylindrical surface formed after passing through thecircumferential cutting mechanism 303 forms a torque groove in the axial direction.

本发明中的整形机构3结构紧凑,完成预破冰效率高,能够同时完成,对输电线路上的覆冰的整形和开槽。Theshaping mechanism 3 in the present invention has a compact structure, has high pre-ice breaking efficiency, and can simultaneously complete the shaping and grooving of the ice coating on the transmission line.

振动发生机构5包括安装在多边壳体A7的几何中心的驱动电机501,驱动电机501的输出轴上连接有转轴502,转轴502上安装有传动轮503,以及键连接有传动盘504,多边壳体A7上安装有用于使传动盘504与转轴502脱离键连接的离合装置10,其中离合装置10的工作原理与老式汽车离合器触发工作原理相同,具体包括一个键连接在所述转轴502上的锥齿轮,以及套接在转轴上与所述锥齿轮转动连接的环形座,环形座铰接一个曲轴杆,曲轴杆的另一端连接驱动装置,驱动装置具体可以是液压伸缩杆或气压伸缩杆。The vibration generating mechanism 5 includes adrive motor 501 installed in the geometric center of the polygonal housing A7, the output shaft of thedrive motor 501 is connected with arotating shaft 502, atransmission wheel 503 is installed on therotating shaft 502, and atransmission disc 504 is connected with a key, and the polygonal casing is The body A7 is provided with aclutch device 10 for disengaging thetransmission disc 504 from theshaft 502. The working principle of theclutch device 10 is the same as that of the old-fashioned automobile clutch triggering, and it specifically includes a key connected to theshaft 502. A gear, and an annular seat sleeved on the rotating shaft and rotatably connected to the bevel gear, the annular seat is hinged to a crankshaft rod, and the other end of the crankshaft rod is connected to a driving device, which may be a hydraulic telescopic rod or a pneumatic telescopic rod.

在振动发生机构5工作时,离合装置10的驱动装置将环形座沿转轴502的轴向推动直至锥齿轮与传动盘504啮合,此时驱动电机501转动,带动传动盘504转动,此时驱动电机501的工作状态为周期性的正反转。When the vibration generating mechanism 5 is working, the driving device of theclutch device 10 pushes the annular seat along the axial direction of therotating shaft 502 until the bevel gear meshes with thetransmission disc 504, at this time, the drivingmotor 501 rotates and drives thetransmission disc 504 to rotate, at this time the driving motor The working state of 501 is periodic forward and reverse.

在对输电线路上的覆冰进行整形时,离合装置10工作使得锥齿轮脱离传动盘504,此时驱动单机501作单向转动,传动轮503驱动主传动杆304转动带动周向切削机构303转动,进行切削。When shaping the ice coating on the transmission line, theclutch device 10 works to make the bevel gear detach from thedrive plate 504, at this time, thesingle machine 501 is driven to rotate in one direction, and thedrive wheel 503 drives themain drive rod 304 to rotate to drive thecircumferential cutting mechanism 303 to rotate. , for cutting.

传动轮503啮合主传动杆304,传动盘504上环形连接有副振动杆505,副振动杆505在驱动电机501的驱动下做撞击输电线路表面的往复运动。Thetransmission wheel 503 engages themain transmission rod 304 , and thetransmission disc 504 is annularly connected with anauxiliary vibration rod 505 , which is driven by the drivingmotor 501 to reciprocate against the surface of the transmission line.

第二执行机构2包括用于安装破冰机构4和位移发生机构6的多边壳体B11,多边壳体B11的拐角处铰接有用于连接输电线路的伸缩连接臂12,伸缩连接臂12通过绝缘套座13连接输电线路,绝缘套座13内部通过短钢簧14同轴安装有内套管15,内套管15内套装有供输电线路穿过的转动内管16,内套管15中间设置有贯穿至转动内管16的环形开槽17。Thesecond actuator 2 includes a polygonal housing B11 for installing the ice breaking mechanism 4 and thedisplacement generating mechanism 6 . A telescopic connectingarm 12 for connecting the power transmission line is hinged at the corner of the polygonal housing B11 , and the telescopic connectingarm 12 passes through the insulating sleeve. 13 is connected to the transmission line, aninner sleeve 15 is coaxially installed in the insulatingsleeve base 13 through ashort steel spring 14, theinner sleeve 15 is sleeved with a rotatinginner tube 16 for the transmission line to pass through, and a through-through is arranged in the middle of theinner sleeve 15. to theannular slot 17 of the rotatinginner tube 16 .

位移发生机构6包括安装在多边壳体B11的几何中心的位移电机601,位移电机601的输出轴上安装有绞盘602,绞盘602的外圈等间距连接有绞索603,绞索603的一端活动连接位于环形开槽17内的转动内管16上,破冰机构4安装在内套管15端部的绝缘套座13内。Thedisplacement generating mechanism 6 includes adisplacement motor 601 installed in the geometric center of the polygonal housing B11, awinch 602 is installed on the output shaft of thedisplacement motor 601, and anoose 603 is connected to the outer ring of thewinch 602 at equal intervals, and one end of thenoose 603 is movably connected at the On the rotatinginner tube 16 in theannular slot 17 , the ice breaking mechanism 4 is installed in the insulatingsleeve seat 13 at the end of theinner sleeve 15 .

位移发生机构6在工作时,位移电机601驱动绞盘602转动,促使绞索603缠绕在绞盘602上,从而拉动转动内管16沿伸缩连接臂12的长度方向移动。When thedisplacement generating mechanism 6 is working, thedisplacement motor 601 drives thewinch 602 to rotate, so that thenoose 603 is wound on thewinch 602 , thereby pulling the rotatinginner tube 16 to move along the length direction of the telescopic connectingarm 12 .

其中伸缩连接臂具体可以为两段式滑轨结构。Specifically, the telescopic connecting arm may be a two-stage slide rail structure.

周向切削机构303包括转动连接在走线管301上的转动环座3031,转动环座3031上等间距连接有多个角刀3032,转动环座3031的侧壁上设置有与主传动杆304顶部啮合的锥齿轮3033。Thecircumferential cutting mechanism 303 includes arotating ring seat 3031 that is rotatably connected to thecabling tube 301. Therotating ring seat 3031 is connected with a plurality ofcorner knives 3032 at equal intervals. The side wall of therotating ring seat 3031 is provided with amain transmission rod 304. Topmeshing bevel gear 3033.

第一执行机构1还包括安装在多边壳体A7上的与输电线路的滑动接触的超声发射模块18,第二执行机构2还包括安装在多边壳体B11上与输电线路接触,接收超声发射模块18发出的超声波的超声接收模块19,以及用于数据分析的中控模块20,中控模块20电性连接超声波接收模块19。Thefirst actuator 1 further includes anultrasonic transmitter module 18 mounted on the polygonal housing A7 in sliding contact with the transmission line, and thesecond actuator 2 also includes an ultrasonic transmitter module mounted on the polygonal housing B11 in contact with the transmission line and receiving ultrasonic transmitters. Theultrasonic receiving module 19 for the ultrasonic waves emitted by 18 , and thecentral control module 20 for data analysis, thecentral control module 20 is electrically connected to theultrasonic receiving module 19 .

破冰机构4包括安装在绝缘套座13上的扭矩电机401,以及设置在绝缘套座13内部的齿环402,齿环402供输电线路穿过的内圈上螺旋设置有螺旋齿403,齿环402的背侧设置有第二驱动环轮404,且扭矩电机401的输出轴上安装有同时啮合第二驱动环轮404和齿环402的双面锥齿轮405,齿环402的前后两侧通过轴承转动连接在绝缘套座13上。The ice breaking mechanism 4 includes atorque motor 401 installed on the insulatingsleeve base 13, and agear ring 402 arranged inside the insulatingsleeve base 13. The inner ring of thegear ring 402 for the transmission line to pass through is spirally provided withhelical teeth 403. The back side of the 402 is provided with a seconddriving ring wheel 404, and the output shaft of thetorque motor 401 is installed with a double-sided bevel gear 405 that meshes with the seconddriving ring wheel 404 and thegear ring 402 at the same time, and the front and rear sides of thegear ring 402 pass through. The bearing is rotatably connected to the insulatingsleeve seat 13 .

输电线路从所述齿环402穿入,从内套管15中穿出,扭矩电机401在驱动齿环402转动,使得齿环内壁上的螺旋齿403以螺旋方式切入铣刀头305在圆柱覆冰上开设的开槽中。The power transmission line passes through thegear ring 402 and passes through theinner casing 15, and thetorque motor 401 drives thegear ring 402 to rotate, so that thehelical teeth 403 on the inner wall of the gear ring cut into themilling cutter head 305 in a helical manner in the cylindrical cover. Open the slot on ice.

连接臂8上设置有与副振动杆505的在驱动电机501的驱动下做往复运动的动作相配合的导向槽506,导向槽506延伸至绝缘套管9内,导向槽506的作用是限制副振动杆505的运动位置。The connectingarm 8 is provided with aguide groove 506 which is matched with the reciprocating motion of the auxiliary vibratingrod 505 under the drive of the drivingmotor 501. Theguide groove 506 extends into the insulatingsleeve 9, and the function of theguide groove 506 is to limit the auxiliary The movement position of thevibration rod 505 .

为了解决现有的机械性除冰的行驶小车在高频的机械性震动下滚轮和输电线路脱轨,同时在输电线路表面覆冰的情况下,滚轮与输电线路之间的滑动摩擦力较小,可能会出现打滑的问题,为此:In order to solve the problem that the existing mechanical deicing trolley is derailed from the roller and the transmission line under high-frequency mechanical vibration, and at the same time when the surface of the transmission line is covered with ice, the sliding friction between the roller and the transmission line is small. Slippage problems may occur, for this:

本发明中的第一驱动环轮302和第二驱动环轮404内圈均设置有橡胶螺纹套21,橡胶螺纹套21的纹槽能够在输电线路的表现形成吸附形式,橡胶螺纹套21的内部设置有与第一驱动环轮302或第二驱动环轮404一体成型的螺旋齿22,且螺旋齿22的每个齿与橡胶螺纹套21的每个纹槽相对应,而将螺旋齿22隐藏在橡胶螺纹套21中,一方面是提高橡胶螺纹套21在于输电线路表面接触受力变形后的接触点的刚性,另一方面则有效的保护输电线路表面。In the present invention, the inner rings of the firstdriving ring wheel 302 and the seconddriving ring wheel 404 are both provided with rubber threadedsleeves 21. The grooves of the rubber threadedsleeves 21 can form an adsorption form on the performance of the transmission line. Ahelical tooth 22 integrally formed with the firstdriving ring wheel 302 or the seconddriving ring wheel 404 is provided, and each tooth of thehelical tooth 22 corresponds to each groove of the rubber threadedsleeve 21, and thehelical tooth 22 is hidden In the rubber threadedsleeve 21 , on the one hand, the rigidity of the rubber threadedsleeve 21 at the contact point after the surface of the transmission line is contacted and deformed by force is improved, and on the other hand, the surface of the transmission line is effectively protected.

进一步地,本发明中的第一执行机构1和第二执行机构2在不使用时,可以直接作为输电线路的间隔棒,来替代原有的输电线路的间隔棒,在原有的输电线路的间隔棒的使用上,为了避免输电线路的多根输电电路在外力作用下相互摆动交叉,从而使用较多的间隔棒来对多根输电线路进行固定,并且在考虑相邻输电线路的电流影响以及输电线路的间隔固定位置,很大程度上限制了间隔棒的使用。Further, when thefirst actuator 1 and thesecond actuator 2 in the present invention are not in use, they can be directly used as the spacer bars of the transmission line to replace the original spacer bars of the transmission line. In the use of rods, in order to avoid the multiple transmission circuits of the transmission line swinging and crossing each other under the action of external force, more spacers are used to fix the multiple transmission lines, and the current influence of adjacent transmission lines and the transmission line are considered. The fixed position of the interval of the line limits the use of the spacer to a large extent.

以上实施例仅为本申请的示例性实施例,不用于限制本申请,本申请的保护范围由权利要求书限定。本领域技术人员可以在本申请的实质和保护范围内,对本申请做出各种修改或等同替换,这种修改或等同替换也应视为落在本申请的保护范围内。The above embodiments are only exemplary embodiments of the present application, and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art can make various modifications or equivalent replacements to the present application within the spirit and protection scope of the present application, and such modifications or equivalent replacements should also be regarded as falling within the protection scope of the present application.

Claims (9)

3. The detection and processing device for the icing of the power transmission line according to the claim 2, wherein the vibration generating mechanism (5) comprises a driving motor (501) installed at the geometric center of the polygonal shell A (7), a rotating shaft (502) is connected to the output shaft of the driving motor (501), a driving wheel (503) and a driving disc (504) are sequentially installed on the rotating shaft (502), the driving disc (504) is in key connection with the rotating shaft (502), the driving wheel (503) is meshed with the main driving rod (304), a plurality of secondary vibrating rods (505) are connected to the circumference of the driving disc (504) at equal intervals, and the secondary vibrating rods (505) do reciprocating motion of impacting the surface of the power transmission line under the driving of the driving motor (501);
7. The device for detecting and processing the ice coating on the power transmission line according to claim 4, wherein the ice breaking mechanism (4) comprises a torque motor (401) installed on the insulating sleeve seat (13) and a gear ring (402) arranged inside the insulating sleeve seat (13), spiral teeth (403) are arranged on the surface of an inner ring of the gear ring (402) through which the power transmission line passes, a second driving ring wheel (404) is arranged in the insulating sleeve seat (13) on the inner side of the gear ring (402), a double-sided bevel gear (405) which is meshed with the second driving ring wheel (404) and the gear ring (402) simultaneously is installed on an output shaft of the torque motor (401), and the front side and the rear side of the gear ring (402) are rotatably connected to the insulating sleeve seat (13) through bearings.
CN202010915411.9A2020-09-032020-09-03Detection processing device for icing of power transmission lineActiveCN111987679B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202010915411.9ACN111987679B (en)2020-09-032020-09-03Detection processing device for icing of power transmission line

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202010915411.9ACN111987679B (en)2020-09-032020-09-03Detection processing device for icing of power transmission line

Publications (2)

Publication NumberPublication Date
CN111987679Atrue CN111987679A (en)2020-11-24
CN111987679B CN111987679B (en)2021-05-14

Family

ID=73448021

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202010915411.9AActiveCN111987679B (en)2020-09-032020-09-03Detection processing device for icing of power transmission line

Country Status (1)

CountryLink
CN (1)CN111987679B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN112909874A (en)*2021-01-182021-06-04刘洪金Transmission line with icing detects structural design
CN114172104A (en)*2021-12-072022-03-11浙江东禾工程设计有限公司Movable ice and snow removing device for high-voltage line and control method thereof
CN114498519A (en)*2022-02-242022-05-13中北大学Composite deicing device for overhead transmission line
CN115183107A (en)*2022-08-032022-10-14武汉伊莱维特电力科技有限公司Supporting device for power transmission line icing monitoring equipment
CN115603229A (en)*2022-12-152023-01-13成都大学(Cn)Electric power transmission line erects and uses pretension support
CN115642555A (en)*2022-03-092023-01-24李荷泉Anti-icing and deicing device, spacer, system and anti-galloping system based on gravity center mutation
CN117134284A (en)*2023-09-192023-11-28国网安徽省电力有限公司明光市供电公司 A power grid ice clearing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JP3056042B2 (en)*1994-06-152000-06-26旭電機株式会社 Spacer and loose conductor gripper for spacer and overhead transmission line with galloping vibration prevented
CN201312099Y (en)*2008-12-012009-09-16四川电力试验研究院Quadripartition conductor intelligent de-icing device
CN205319662U (en)*2016-01-042016-06-15安徽理工大学Pair becomes interval electric wire deicing robot
CN205583615U (en)*2016-05-062016-09-14国网山东省电力公司青岛市黄岛区供电公司 A device for deicing and snowing high-voltage lines
CN106655060A (en)*2017-03-022017-05-10哈尔滨工程大学Deicing robot for four-cracking high-voltage power transmission line
CN110247358A (en)*2019-07-102019-09-17合肥安力电力工程有限公司A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JP3056042B2 (en)*1994-06-152000-06-26旭電機株式会社 Spacer and loose conductor gripper for spacer and overhead transmission line with galloping vibration prevented
CN201312099Y (en)*2008-12-012009-09-16四川电力试验研究院Quadripartition conductor intelligent de-icing device
CN205319662U (en)*2016-01-042016-06-15安徽理工大学Pair becomes interval electric wire deicing robot
CN205583615U (en)*2016-05-062016-09-14国网山东省电力公司青岛市黄岛区供电公司 A device for deicing and snowing high-voltage lines
CN106655060A (en)*2017-03-022017-05-10哈尔滨工程大学Deicing robot for four-cracking high-voltage power transmission line
CN110247358A (en)*2019-07-102019-09-17合肥安力电力工程有限公司A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer

Cited By (11)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN112909874A (en)*2021-01-182021-06-04刘洪金Transmission line with icing detects structural design
CN114172104A (en)*2021-12-072022-03-11浙江东禾工程设计有限公司Movable ice and snow removing device for high-voltage line and control method thereof
CN114172104B (en)*2021-12-072023-02-07山东联能电力设计有限公司Movable ice and snow removing device for high-voltage line and control method thereof
CN114498519A (en)*2022-02-242022-05-13中北大学Composite deicing device for overhead transmission line
CN114498519B (en)*2022-02-242023-07-04中北大学Composite deicing device for overhead transmission line
CN115642555A (en)*2022-03-092023-01-24李荷泉Anti-icing and deicing device, spacer, system and anti-galloping system based on gravity center mutation
CN115183107A (en)*2022-08-032022-10-14武汉伊莱维特电力科技有限公司Supporting device for power transmission line icing monitoring equipment
CN115603229A (en)*2022-12-152023-01-13成都大学(Cn)Electric power transmission line erects and uses pretension support
CN115603229B (en)*2022-12-152023-03-10成都大学 A kind of pre-tightening support for erecting electric transmission line
CN117134284A (en)*2023-09-192023-11-28国网安徽省电力有限公司明光市供电公司 A power grid ice clearing device
CN117134284B (en)*2023-09-192024-03-19国网安徽省电力有限公司明光市供电公司Ice cleaning device for electric power grid

Also Published As

Publication numberPublication date
CN111987679B (en)2021-05-14

Similar Documents

PublicationPublication DateTitle
CN111987679A (en) A detection and processing device for ice coating of transmission lines
CN202405724U (en)Deicing mechanism of deicing robot for high-tension lines
CN102255270A (en)Power transmission line cone cutter head milling and extrusion deicing method and apparatus thereof
CN205791403U (en)A kind of electric lines of force deicer
CN108767794A (en)A kind of cable winter defrosting device
CN201887410U (en)Knocking type high-tension wire deicer
CN214044955U (en)Cleaning and maintaining device for power transmission line
CN204089030U (en)Deicer for power transmission line
CN110518537B (en)Safety type snow removing equipment with wide application range for power supply system
CN107732846A (en)A kind of control system for outage pressure transmission line automatic deicer
CN103527077B (en)Downhole turbine motor plasma drilling tool
CN108599077B (en)Be used for high suitability defroster of outdoor power cable
CN105680398A (en)Electric deicing pickaxe and deicing method
CN104269774B (en)Deicer for power transmission line
CN118137408B (en)Ice-coating and electrified clearing equipment for power transmission line
CN209134031U (en) Intelligent De-icing System for Transmission Lines
CN109728560B (en)Deicing system for power transmission line
CN105958415A (en)Magnetic vibration type high-voltage line deicing robot
CN119582088A (en) Transmission line ice breaking device
CN202004410U (en)Rotary deicing device for power transmission line wire
CN108134358A (en)A kind of Split type power transmission line deicer of band detection barrier-jump function
CN109113570B (en)Hydraulic fracturing weakening hard top plate drilling device
CN112096567A (en)Power equipment with snow removing function
CN106300205B (en)A kind of electric power line deicer
CN107508236A (en)The portable automatic snow deicer of electromagnetic looped network cyclization cable

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp