| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911357106.6ACN111222226B (en) | 2019-12-25 | 2019-12-25 | Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angle |
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911357106.6ACN111222226B (en) | 2019-12-25 | 2019-12-25 | Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angle |
| Publication Number | Publication Date |
|---|---|
| CN111222226Atrue CN111222226A (en) | 2020-06-02 |
| CN111222226B CN111222226B (en) | 2023-06-23 |
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911357106.6AActiveCN111222226B (en) | 2019-12-25 | 2019-12-25 | Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angle |
| Country | Link |
|---|---|
| CN (1) | CN111222226B (en) |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111884337A (en)* | 2020-07-16 | 2020-11-03 | 广东电网有限责任公司 | Method for carrying out configuration management on switching parameters of power distribution network |
| CN111950977A (en)* | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Data interaction system and method from power transmission machine account of information system to scheduling master station |
| CN111950978A (en)* | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Incremental updating system and method for scheduling master station transformation diagram model to information system |
| CN112150096A (en)* | 2020-07-28 | 2020-12-29 | 中国南方电网有限责任公司 | System and method for generating equipment ledger hierarchical tree from EMS substation graph model |
| CN113343044A (en)* | 2021-07-08 | 2021-09-03 | 南方电网数字电网研究院有限公司 | Method and system for splicing CIM graph model and distribution line based on transformer substation |
| CN113392491A (en)* | 2021-07-08 | 2021-09-14 | 南方电网数字电网研究院有限公司 | Data quality verification system and method for transmission, transformation and distribution splicing |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5214757A (en)* | 1990-08-07 | 1993-05-25 | Georesearch, Inc. | Interactive automated mapping system |
| JP2004334573A (en)* | 2003-05-08 | 2004-11-25 | Hitachi Ltd | GIS system and data exchange method between GIS system and CAD system |
| CN101751426A (en)* | 2008-12-11 | 2010-06-23 | 北京市电力公司 | Method and device for realizing information sharing between SCADA and GIS |
| CN102185383A (en)* | 2011-05-16 | 2011-09-14 | 广东电网公司深圳供电局 | Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System) |
| CN102509511A (en)* | 2011-11-25 | 2012-06-20 | 武汉大学 | Rapid map making system based on GIS (Geographic Information System) data |
| CN102593954A (en)* | 2012-03-01 | 2012-07-18 | 宁波电业局 | Power grid model constructing and updating method and device based on distribution network automation system |
| CN103440321A (en)* | 2013-08-30 | 2013-12-11 | 天津市测绘院 | Geographic information data integration method based on drafting data and GIS data |
| CN103872681A (en)* | 2014-03-25 | 2014-06-18 | 国家电网公司 | Online real-time loop closing method based on integration of major network and distribution network |
| CN103955789A (en)* | 2014-04-18 | 2014-07-30 | 国电南瑞科技股份有限公司 | Power supply path analysis method based on allocation-used integrated model |
| CN104377819A (en)* | 2014-11-15 | 2015-02-25 | 国网河南省电力公司开封供电公司 | Flow control method for distribution network |
| CN104463715A (en)* | 2014-12-29 | 2015-03-25 | 国网甘肃省电力公司武威供电公司 | Pattern and model verifying method of distribution automation master station system and geographical information system |
| CN104598110A (en)* | 2015-01-12 | 2015-05-06 | 中国南方电网有限责任公司 | Ultra-large scale power transmission network tidal current diagram dynamic viewport displaying method |
| CN104616207A (en)* | 2015-01-27 | 2015-05-13 | 中国科学院计算机网络信息中心 | Power grid topological visualization system and power grid topological visualization method |
| CN106910143A (en)* | 2017-03-30 | 2017-06-30 | 广东电网有限责任公司中山供电局 | Multi-version control method and system for distribution network graph model |
| US20170286449A1 (en)* | 2016-04-01 | 2017-10-05 | US-ANALYTICS Solutions Group, LLC | System for Connecting Computer Dashboards with Geographic Information Systems |
| CN108988333A (en)* | 2018-08-03 | 2018-12-11 | 广东电网有限责任公司 | Electric network fault statistical method |
| CN109947859A (en)* | 2017-08-25 | 2019-06-28 | 南方电网科学研究院有限责任公司 | Distribution network drawing modeling method, system, storage medium and computer equipment |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5214757A (en)* | 1990-08-07 | 1993-05-25 | Georesearch, Inc. | Interactive automated mapping system |
| JP2004334573A (en)* | 2003-05-08 | 2004-11-25 | Hitachi Ltd | GIS system and data exchange method between GIS system and CAD system |
| CN101751426A (en)* | 2008-12-11 | 2010-06-23 | 北京市电力公司 | Method and device for realizing information sharing between SCADA and GIS |
| CN102185383A (en)* | 2011-05-16 | 2011-09-14 | 广东电网公司深圳供电局 | Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System) |
| CN102509511A (en)* | 2011-11-25 | 2012-06-20 | 武汉大学 | Rapid map making system based on GIS (Geographic Information System) data |
| CN102593954A (en)* | 2012-03-01 | 2012-07-18 | 宁波电业局 | Power grid model constructing and updating method and device based on distribution network automation system |
| CN103440321A (en)* | 2013-08-30 | 2013-12-11 | 天津市测绘院 | Geographic information data integration method based on drafting data and GIS data |
| WO2015143846A1 (en)* | 2014-03-25 | 2015-10-01 | 国家电网公司 | Online real-time loop closing method based on integration of main network and distribution network |
| CN103872681A (en)* | 2014-03-25 | 2014-06-18 | 国家电网公司 | Online real-time loop closing method based on integration of major network and distribution network |
| CN103955789A (en)* | 2014-04-18 | 2014-07-30 | 国电南瑞科技股份有限公司 | Power supply path analysis method based on allocation-used integrated model |
| CN104377819A (en)* | 2014-11-15 | 2015-02-25 | 国网河南省电力公司开封供电公司 | Flow control method for distribution network |
| CN104463715A (en)* | 2014-12-29 | 2015-03-25 | 国网甘肃省电力公司武威供电公司 | Pattern and model verifying method of distribution automation master station system and geographical information system |
| CN104598110A (en)* | 2015-01-12 | 2015-05-06 | 中国南方电网有限责任公司 | Ultra-large scale power transmission network tidal current diagram dynamic viewport displaying method |
| CN104616207A (en)* | 2015-01-27 | 2015-05-13 | 中国科学院计算机网络信息中心 | Power grid topological visualization system and power grid topological visualization method |
| US20170286449A1 (en)* | 2016-04-01 | 2017-10-05 | US-ANALYTICS Solutions Group, LLC | System for Connecting Computer Dashboards with Geographic Information Systems |
| CN106910143A (en)* | 2017-03-30 | 2017-06-30 | 广东电网有限责任公司中山供电局 | Multi-version control method and system for distribution network graph model |
| CN109947859A (en)* | 2017-08-25 | 2019-06-28 | 南方电网科学研究院有限责任公司 | Distribution network drawing modeling method, system, storage medium and computer equipment |
| CN108988333A (en)* | 2018-08-03 | 2018-12-11 | 广东电网有限责任公司 | Electric network fault statistical method |
| Title |
|---|
| 李韦冰;: "采用CIM模型的配电自动化系统信息共享"* |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111884337A (en)* | 2020-07-16 | 2020-11-03 | 广东电网有限责任公司 | Method for carrying out configuration management on switching parameters of power distribution network |
| CN111950977A (en)* | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Data interaction system and method from power transmission machine account of information system to scheduling master station |
| CN111950978A (en)* | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Incremental updating system and method for scheduling master station transformation diagram model to information system |
| CN112150096A (en)* | 2020-07-28 | 2020-12-29 | 中国南方电网有限责任公司 | System and method for generating equipment ledger hierarchical tree from EMS substation graph model |
| CN111950978B (en)* | 2020-07-28 | 2023-06-23 | 中国南方电网有限责任公司 | Incremental updating system and method from scheduling master station electrorheological model to informatization system |
| CN112150096B (en)* | 2020-07-28 | 2023-10-03 | 中国南方电网有限责任公司 | Equipment ledger hierarchical tree system and method generated from EMS substation graph model |
| CN111950977B (en)* | 2020-07-28 | 2023-11-21 | 中国南方电网有限责任公司 | Data interaction system and method for information system radio station account to dispatching master station |
| CN113343044A (en)* | 2021-07-08 | 2021-09-03 | 南方电网数字电网研究院有限公司 | Method and system for splicing CIM graph model and distribution line based on transformer substation |
| CN113392491A (en)* | 2021-07-08 | 2021-09-14 | 南方电网数字电网研究院有限公司 | Data quality verification system and method for transmission, transformation and distribution splicing |
| Publication number | Publication date |
|---|---|
| CN111222226B (en) | 2023-06-23 |
| Publication | Publication Date | Title |
|---|---|---|
| CN111222226A (en) | EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle | |
| CN101944770B (en) | Communication implementation method of virtual station grade IED mode between primary station and substation in fault information system 61850 | |
| CN109710669B (en) | Method for improving accuracy of full power grid model data based on check rule base | |
| CN108805424A (en) | The intelligent inspection system and method for automatic push examined in determination based on location information | |
| CN111159897B (en) | Target optimization method and device based on system modeling application | |
| CN114398567B (en) | A multi-temporal power grid topology data management method, device and computer equipment | |
| CN108038332B (en) | On-line graph model rapid generation method for future-state power grid | |
| CN109829028A (en) | A kind of electric power data management system based on normal address | |
| CN102306165A (en) | Ship electronic chart data multi-platform shared service device and construction method thereof | |
| CN104104146B (en) | Large power grid transformation equipment online monitoring data model establishing method | |
| CN106646110A (en) | Low-voltage distribution network fault positioning system based on GIS and Petri technologies | |
| CN103455662B (en) | Pollution area distributed plotting system and method | |
| CN112150096A (en) | System and method for generating equipment ledger hierarchical tree from EMS substation graph model | |
| CN110032552B (en) | Standardized system and method for online update based on equipment change information and scheduling | |
| CN109656589A (en) | A kind of secondary equipment of intelligent converting station software harnesses method and system | |
| WO2019056564A1 (en) | Power distribution network fault repair system data sharing method for information exchange bus based on iec 61968 standards | |
| CN111711695A (en) | Distributed equipment management system based on cloud platform | |
| CN117472922A (en) | A graph-digital-analog consistency verification method, system and terminal for power grid equipment assets | |
| CN106779178A (en) | The client householder method that a kind of Electric Power Network Planning equipment topological data is set up | |
| CN113407172A (en) | Distribution cloud master station-based automatic platform area graph display system and method | |
| CN111857015B (en) | Power transmission and transformation cloud intelligent controller | |
| CN103632233B (en) | A kind of electric power enterprise electrical measurement practical management system of specialty | |
| CN111209359A (en) | EMS transformer graph model access GIS platform icon self-adaption system and method | |
| CN112685359B (en) | D5000 measurement data offline integration method and system suitable for mode scheduling | |
| CN110659060A (en) | In-place distributed FA configuration rapid configuration method and system |
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | Address after:No.11 Kexiang Road, Science City, Guangzhou, Guangdong 510670 Patentee after:CHINA SOUTHERN POWER GRID Co.,Ltd. Country or region after:Zhong Guo Patentee after:Southern Power Grid Digital Grid Research Institute Co.,Ltd. Address before:No.11 Kexiang Road, Science City, Guangzhou, Guangdong 510670 Patentee before:CHINA SOUTHERN POWER GRID Co.,Ltd. Country or region before:Zhong Guo Patentee before:Southern Power Grid Digital Grid Research Institute Co.,Ltd. | |
| CP03 | Change of name, title or address | ||
| TR01 | Transfer of patent right | Effective date of registration:20240319 Address after:Full Floor 14, Unit 3, Building 2, No. 11, Middle Spectra Road, Huangpu District, Guangzhou, Guangdong 510700 Patentee after:China Southern Power Grid Digital Grid Technology (Guangdong) Co.,Ltd. Country or region after:Zhong Guo Address before:No.11 Kexiang Road, Science City, Guangzhou, Guangdong 510670 Patentee before:CHINA SOUTHERN POWER GRID Co.,Ltd. Country or region before:Zhong Guo Patentee before:Southern Power Grid Digital Grid Research Institute Co.,Ltd. | |
| TR01 | Transfer of patent right |