CN111222226A - EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle - Google Patents

EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle
Download PDF

Info

Publication number
CN111222226A
CN111222226ACN201911357106.6ACN201911357106ACN111222226ACN 111222226 ACN111222226 ACN 111222226ACN 201911357106 ACN201911357106 ACN 201911357106ACN 111222226 ACN111222226 ACN 111222226A
Authority
CN
China
Prior art keywords
model
graph
ems
gis
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911357106.6A
Other languages
Chinese (zh)
Other versions
CN111222226B (en
Inventor
朱文
吴争荣
刘沛林
邓大为
周华锋
胡荣
方文崇
夏伟
张昆
王义昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Digital Grid Technology Guangdong Co ltd
China Southern Power Grid Co Ltd
Southern Power Grid Digital Grid Research Institute Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Southern Power Grid Digital Grid Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, Southern Power Grid Digital Grid Research Institute Co LtdfiledCriticalChina Southern Power Grid Co Ltd
Priority to CN201911357106.6ApriorityCriticalpatent/CN111222226B/en
Publication of CN111222226ApublicationCriticalpatent/CN111222226A/en
Application grantedgrantedCritical
Publication of CN111222226BpublicationCriticalpatent/CN111222226B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Classifications

Landscapes

Abstract

The invention discloses a system for converting and accessing an EMS (energy management system) to a GIS (geographic information System) model based on a scheduling application visual angle, which is an intermediate system for converting and accessing a primary wiring diagram of a power transformation of a main network scheduling system to a GIS platform, and comprises a diagram module updating detection assembly, an EMS data access and cache assembly, a data conversion and mapping assembly and a boundary splicing assembly; the data conversion and mapping component is used for performing matching conversion on the updated graph-model file downloaded by the EMS data access and cache component and the GIS platform model object, and converting the updated graph-model file into GIS platform graph-model data; and the boundary splicing component is used for splicing the GIS platform graph-mode data into the boundary of the GIS platform. The method realizes the access of the substation transformer model of the automatic main network dispatching automation main station based on the GIS platform, and is expanded from 'managing and displaying the power grid data based on the internal primitive' to 'supporting the management and the display of the power grid data of a third party' and simultaneously carrying out the analysis, the verification, the conversion and the model creation of heterogeneous graph model data.

Description

EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle
Technical Field
The invention relates to the technical field of power grid dispatching systems, in particular to a system and a method for converting and accessing EMS (energy management system) to a GIS (geographic information system) model based on a dispatching application visual angle.
Background
The power grid GIS platform is used as a maintenance inlet of power grid resources, the topology and the functional position of a distribution network are maintained, distribution network graphic model data are pushed to a distribution network automation system by taking a feeder line as a unit in a CIM + SVG mode in the distribution network electronic transfer stage, and the distribution network graphic model is also used for production operation specialties to perform distribution network line fault simulation, distribution network analysis and other purposes.
However, the graph-model data in the transformer substation is mainly represented in the form of a primary wiring diagram of the transformer substation and is not maintained in a power grid GIS platform. The major network scheduling major is an important consumer of the power transformation primary graph, a data maintenance entrance of the power transformation primary graph model is provided in a major network scheduling system, applications such as scheduling operation monitoring and operation ticket generation are carried out based on the power transformation primary wiring diagram, the data quality requirements of a scheduling department on the power transformation graph model are very strict, and the major network scheduling power transformation primary graph is more reliable and credible as a data source of the power transformation graph model from the aspects of business habits and data credibility.
Disclosure of Invention
In one aspect of the invention, a conversion and access system from EMS to GIS model based on scheduling application view angle is provided. The technical scheme of the invention is as follows:
a conversion and access system from EMS to GIS model based on scheduling application visual angle is an intermediate system for converting a primary wiring diagram of a main network scheduling system transformer and accessing a GIS platform, and comprises a diagram model updating detection component, an EMS data access and cache component, a data conversion and mapping component and a boundary splicing component; the graph model updating detection component is used for updating and verifying the local graph model file and the updated graph model file uploaded by the main network scheduling system; the EMS data access and cache component is used for downloading an updated graph model file uploaded by the main network scheduling system and updating a local graph model file; the data conversion and mapping component is used for performing matching conversion on the updated graph-model file downloaded by the EMS data access and cache component and the GIS platform model object, and converting the updated graph-model file into GIS platform graph-model data; and the boundary splicing component is used for splicing the GIS platform graph-mode data into the boundary of the GIS platform.
As a further illustration of the present invention, the system and the host scheduling system perform data transmission via the FTP server.
In another aspect of the present invention, a method for converting and accessing an EMS into a GIS model based on a scheduling application view is provided, where the method specifically includes the following steps:
100. and (3) updating and checking a graph model: the graph model update detection component updates and checks the graph model file uploaded by the main network scheduling system to judge whether the graph model file is updated by the main network scheduling system, and if the graph model file is updated, the graph model update detection component registers update change and informs the EMS data access and cache component to execute step 101.
101. EMS data access and caching: after receiving the change notification of the graph mode updating detection component, the EMS data access and cache component downloads the corresponding latest updated graph mode file and updates the local graph mode file as the reference of the next graph mode updating check;
102. data conversion and mapping: the data conversion and mapping component carries out mapping conversion on the latest updated local graph-model file according to an EMS-GIS model mapping table and converts the latest updated local graph-model file into GIS platform graph-model data;
103. splicing graph model boundaries; and the converted GIS platform power transformation pattern module data is subjected to boundary splicing with a GIS platform power transmission and distribution pattern module by the boundary splicing component.
As a further illustration, in step 100, the graph model update detection component performs update verification on the graph model file uploaded by the main network scheduling system at a specified time period.
Further, in step 100, the graph model update detection component performs update verification by comparing the file names of the local graph model file and the updated graph model file.
Further, in the step 102, the ID of the graph-model object is corresponding to the local graph-model, if the ID does not correspond to the local graph-model object, the graph-model object is regarded as a new device, the GIS graph-model is locally added, and the graph-model ID of the EMS graph-model object is recorded for incremental updating, if the ID can correspond to the local graph-model object, the graph-model object is regarded as an updating device, and the attribute of the local graph-model is updated based on the EMS graph-model.
Further, in step 103, the boundary splicing component completes the boundary device correspondence and topology splicing through the running number on the outgoing line switch.
Further, the operation number is a unique number in the same substation.
The present invention also provides a computer-readable medium having stored thereon a computer program, which is executed by a computer or a processor, to implement the above-described method for converting and accessing EMS to a GIS model based on a scheduling application view.
The invention has the beneficial effects that:
the method realizes the access of the substation transformer model of the automatic main network dispatching automation main station based on the GIS platform, and is expanded from 'managing and displaying the power grid data based on the internal primitive' to 'supporting the management and the display of the power grid data of a third party' and simultaneously carrying out the analysis, the verification, the conversion and the model creation of heterogeneous graph model data.
Drawings
FIG. 1 is a block diagram of the present invention based on the conversion and access of an EMS to a GIS model from a scheduling application perspective;
fig. 2 is a flowchart of the method for converting and accessing EMS into GIS model based on scheduling application view according to the present invention.
Detailed Description
Example (b):
the embodiments of the present invention will be described in detail with reference to the accompanying drawings, and it is to be understood that the described embodiments are merely a part of the embodiments of the invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", "first", "second", etc. indicate orientations or positional or sequential relationships based on those shown in the drawings, and are only for convenience in describing and simplifying the present invention, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
The invention relates to a conversion and access system from EMS (energy management system) to a GIS (geographic information System) model based on a scheduling application visual angle, which is an intermediate system for converting a primary wiring diagram of a power transformation of a main network scheduling system and accessing a GIS platform, and comprises a diagram module updating detection assembly, an EMS data access and cache assembly, a data conversion and mapping assembly and a boundary splicing assembly; the graph model updating detection component is used for updating and verifying the local graph model file and the updated graph model file uploaded by the main network scheduling system; the EMS data access and cache component is used for downloading an updated graph model file uploaded by the main network scheduling system and updating a local graph model file; the data conversion and mapping component is used for performing matching conversion on the updated graph-model file downloaded by the EMS data access and cache component and the GIS platform model object, and converting the updated graph-model file into GIS platform graph-model data; and the boundary splicing component is used for splicing the GIS platform graph-mode data into the boundary of the GIS platform.
Specifically, referring to the structural schematic block diagram of fig. 1, in this embodiment, the EMS-to-GIS model conversion and access system based on the scheduling application view performs data transmission with the main network scheduling system through the FTP server.
And a graph model updating and checking component: and the graph model updating and checking component checks whether the graph model file uploaded to the FTP server by the main network scheduling system is updated or not by taking the appointed time period as a unit according to the actual situation, and if the graph model file is updated, the EMS data access and cache component is notified.
EMS data access and cache assembly: and downloading the updated graph model data from the FTP by taking the transformer substation as a unit, forming a cache in the local server, and registering the change.
Data conversion and mapping component: matching and converting the graph model file on the buffer pool server and the GIS platform model object through a preset model matching relation into GIS platform graph model data, wherein a typical model matching corresponding table is as follows:
Figure BDA0002336226560000031
Figure BDA0002336226560000041
a boundary splicing component: a topological splicing point exists between a power transformation primary wiring diagram accessed from a main network scheduling system and a GIS platform storage power transmission and distribution network data model, the splicing point is a line outgoing switch, and the boundary splicing component completes boundary equipment correspondence and topological splicing through an operation number on the outgoing switch.
In this embodiment, the method for performing EMS-to-GIS model conversion and access based on the scheduling application view by using the system specifically includes the following steps:
100. and (3) updating and checking a graph model: and the graph model updating detection component updates and checks the graph model file uploaded by the main network scheduling system in a specified time period so as to judge whether the main network scheduling system updates the graph model file. In practical application, the master network scheduling system may upload the updated graph-model file to the FTP server, and the uploaded graph-model file is named in a structural manner of "name of local city, name of substation, and update time of file". The graph model updating and checking component extracts a local graph model file named by 'the name of a local city office + the name of a transformer substation + the file updating time', compares the local graph model file with a file on the FTP server, wherein the file is the same as the 'the name of the local city office + the name of the transformer substation', if the 'the file updating time' is later than that of the local graph model file, the local graph model file is considered to be old, and the graph model updating and checking component registers updating change and informs the EMS data access and cache component to execute the step 101.
101. EMS data access and caching: after the EMS data access and cache component receives the change notice of the graph mode update detection component, downloading a graph mode file corresponding to the latest update on the FTP server, and updating a local graph mode file to be used as the reference for the next graph mode update check;
102. data conversion and mapping: the data conversion and mapping component carries out mapping conversion on the latest updated local graph model file according to an EMS-GIS model mapping table, converts the latest updated local graph model file into GIS platform graph model data, and carries out ID correspondence on a graph model object and a local graph model, if the IDs do not correspond, the new equipment is considered to be added, the GIS graph model is locally added, the graph model ID of the EMS graph model object is recorded for incremental updating, if the IDs can correspond, the equipment is considered to be updated, and the local graph model attribute is updated by taking the EMS graph model as the standard;
103. splicing graph model boundaries; the converted GIS platform power transformation pattern data is subjected to boundary splicing with a GIS platform power transmission and distribution pattern by the boundary splicing component; the line outgoing switch is used as a maintenance boundary of a primary graph and a power transmission and distribution graph model of a transformer substation, maintenance is carried out in an EMS model and a GIS model, matching is carried out in an EMS graph model access stage according to the principle that an operation number in the same transformer substation is unique, boundary splicing with a GIS platform power transmission and distribution graph model is completed, and conversion and access from the EMS model to the GIS model are achieved.
As can be seen from the above flow chart, the present invention should also include a computer readable medium, on which a computer program is stored, where the program is executed by a computer or a processor included in the system to implement the above method for converting and accessing EMS to GIS model based on scheduling application view.
The foregoing is illustrative of the preferred embodiments of the present invention only and is not to be construed as limiting the claims. The invention is not limited to the above embodiments, the specific construction of which allows variations, and in any case variations, which are within the scope of the invention as defined in the independent claims.

Claims (9)

1. The utility model provides a conversion and access system based on dispatch application visual angle EMS to GIS model, for the intermediate system of the first wiring diagram conversion of major network scheduling system transformer and access GIS platform which characterized in that: the system comprises a graph model updating detection component, an EMS data access and cache component, a data conversion and mapping component and a boundary splicing component; the graph model updating detection component is used for updating and verifying the local graph model file and the updated graph model file uploaded by the main network scheduling system; the EMS data access and cache component is used for downloading an updated graph model file uploaded by the main network scheduling system and updating a local graph model file; the data conversion and mapping component is used for performing matching conversion on the updated graph-model file downloaded by the EMS data access and cache component and the GIS platform model object, and converting the updated graph-model file into GIS platform graph-model data; and the boundary splicing component is used for splicing the GIS platform graph-mode data into the boundary of the GIS platform.
2. The EMS to GIS model based conversion and access system for scheduling application perspectives according to claim 1, characterized in that: the system, the main network scheduling system and the GIS platform carry out data interaction and incremental updating in a cross-domain model adaptation mode.
3. A method for converting and accessing EMS into GIS model based on scheduling application view, using the system of claim 1 or 2, comprising the steps of:
100. and (3) updating and checking a graph model: the graph model update detection component updates and checks the graph model file uploaded by the main network scheduling system to judge whether the graph model file is updated by the main network scheduling system, and if the graph model file is updated, the graph model update detection component registers update change and informs the EMS data access and cache component to execute step 101.
101. EMS data access and caching: after receiving the change notification of the graph mode updating detection component, the EMS data access and cache component downloads the corresponding latest updated graph mode file and updates the local graph mode file as the reference of the next graph mode updating check;
102. data conversion and mapping: the data conversion and mapping component carries out mapping conversion on the latest updated local graph-model file according to an EMS-GIS model mapping table and converts the latest updated local graph-model file into GIS platform graph-model data;
103. splicing graph model boundaries; and the converted GIS platform power transformation pattern module data is subjected to boundary splicing with a GIS platform power transmission and distribution pattern module by the boundary splicing component.
4. The method for EMS to GIS model conversion and access based on scheduling application view of claim 3, wherein: in step 100, the graph model updating detection component updates and verifies the graph model file uploaded by the main network scheduling system in a specified time period.
5. The method for EMS to GIS model conversion and access based on scheduling application view of claim 3, wherein: in step 100, the graph model updating and detecting component performs updating and checking by comparing the file names of the local graph model file and the updated graph model file.
6. The method for EMS to GIS model conversion and access based on scheduling application view of claim 3, wherein: the step 102 includes performing ID correspondence on the graph model object in the local graph model, if the ID does not correspond to the local graph model, the graph model object is regarded as a newly added device, the GIS graph model is locally newly added, and the graph model ID of the EMS graph model object is recorded for incremental updating, if the ID can correspond to the local graph model object, the graph model object is regarded as an updated device, and the attribute of the local graph model is updated based on the EMS graph model.
7. The method for EMS to GIS model conversion and access based on scheduling application view of claim 3, wherein: in step 103, the boundary splicing component completes the boundary device correspondence and topology splicing through the running number on the outgoing switch.
8. The method for EMS to GIS model conversion and access based on scheduling application view of claim 7, wherein: the operation number is a unique number in the same transformer substation.
9. A computer-readable medium having a computer program stored thereon, characterized in that: the program being executable by a computer or processor to implement a method as claimed in any one of claims 3 to 8.
CN201911357106.6A2019-12-252019-12-25Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angleActiveCN111222226B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201911357106.6ACN111222226B (en)2019-12-252019-12-25Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angle

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201911357106.6ACN111222226B (en)2019-12-252019-12-25Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angle

Publications (2)

Publication NumberPublication Date
CN111222226Atrue CN111222226A (en)2020-06-02
CN111222226B CN111222226B (en)2023-06-23

Family

ID=70832121

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201911357106.6AActiveCN111222226B (en)2019-12-252019-12-25Conversion and access system and method from EMS (energy management system) to GIS (geographic information system) model based on scheduling application view angle

Country Status (1)

CountryLink
CN (1)CN111222226B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111884337A (en)*2020-07-162020-11-03广东电网有限责任公司Method for carrying out configuration management on switching parameters of power distribution network
CN111950977A (en)*2020-07-282020-11-17中国南方电网有限责任公司Data interaction system and method from power transmission machine account of information system to scheduling master station
CN111950978A (en)*2020-07-282020-11-17中国南方电网有限责任公司Incremental updating system and method for scheduling master station transformation diagram model to information system
CN112150096A (en)*2020-07-282020-12-29中国南方电网有限责任公司System and method for generating equipment ledger hierarchical tree from EMS substation graph model
CN113343044A (en)*2021-07-082021-09-03南方电网数字电网研究院有限公司Method and system for splicing CIM graph model and distribution line based on transformer substation
CN113392491A (en)*2021-07-082021-09-14南方电网数字电网研究院有限公司Data quality verification system and method for transmission, transformation and distribution splicing

Citations (17)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US5214757A (en)*1990-08-071993-05-25Georesearch, Inc.Interactive automated mapping system
JP2004334573A (en)*2003-05-082004-11-25Hitachi Ltd GIS system and data exchange method between GIS system and CAD system
CN101751426A (en)*2008-12-112010-06-23北京市电力公司Method and device for realizing information sharing between SCADA and GIS
CN102185383A (en)*2011-05-162011-09-14广东电网公司深圳供电局Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System)
CN102509511A (en)*2011-11-252012-06-20武汉大学Rapid map making system based on GIS (Geographic Information System) data
CN102593954A (en)*2012-03-012012-07-18宁波电业局Power grid model constructing and updating method and device based on distribution network automation system
CN103440321A (en)*2013-08-302013-12-11天津市测绘院Geographic information data integration method based on drafting data and GIS data
CN103872681A (en)*2014-03-252014-06-18国家电网公司Online real-time loop closing method based on integration of major network and distribution network
CN103955789A (en)*2014-04-182014-07-30国电南瑞科技股份有限公司Power supply path analysis method based on allocation-used integrated model
CN104377819A (en)*2014-11-152015-02-25国网河南省电力公司开封供电公司Flow control method for distribution network
CN104463715A (en)*2014-12-292015-03-25国网甘肃省电力公司武威供电公司Pattern and model verifying method of distribution automation master station system and geographical information system
CN104598110A (en)*2015-01-122015-05-06中国南方电网有限责任公司Ultra-large scale power transmission network tidal current diagram dynamic viewport displaying method
CN104616207A (en)*2015-01-272015-05-13中国科学院计算机网络信息中心Power grid topological visualization system and power grid topological visualization method
CN106910143A (en)*2017-03-302017-06-30广东电网有限责任公司中山供电局 Multi-version control method and system for distribution network graph model
US20170286449A1 (en)*2016-04-012017-10-05US-ANALYTICS Solutions Group, LLCSystem for Connecting Computer Dashboards with Geographic Information Systems
CN108988333A (en)*2018-08-032018-12-11广东电网有限责任公司Electric network fault statistical method
CN109947859A (en)*2017-08-252019-06-28南方电网科学研究院有限责任公司 Distribution network drawing modeling method, system, storage medium and computer equipment

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US5214757A (en)*1990-08-071993-05-25Georesearch, Inc.Interactive automated mapping system
JP2004334573A (en)*2003-05-082004-11-25Hitachi Ltd GIS system and data exchange method between GIS system and CAD system
CN101751426A (en)*2008-12-112010-06-23北京市电力公司Method and device for realizing information sharing between SCADA and GIS
CN102185383A (en)*2011-05-162011-09-14广东电网公司深圳供电局Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System)
CN102509511A (en)*2011-11-252012-06-20武汉大学Rapid map making system based on GIS (Geographic Information System) data
CN102593954A (en)*2012-03-012012-07-18宁波电业局Power grid model constructing and updating method and device based on distribution network automation system
CN103440321A (en)*2013-08-302013-12-11天津市测绘院Geographic information data integration method based on drafting data and GIS data
WO2015143846A1 (en)*2014-03-252015-10-01国家电网公司Online real-time loop closing method based on integration of main network and distribution network
CN103872681A (en)*2014-03-252014-06-18国家电网公司Online real-time loop closing method based on integration of major network and distribution network
CN103955789A (en)*2014-04-182014-07-30国电南瑞科技股份有限公司Power supply path analysis method based on allocation-used integrated model
CN104377819A (en)*2014-11-152015-02-25国网河南省电力公司开封供电公司Flow control method for distribution network
CN104463715A (en)*2014-12-292015-03-25国网甘肃省电力公司武威供电公司Pattern and model verifying method of distribution automation master station system and geographical information system
CN104598110A (en)*2015-01-122015-05-06中国南方电网有限责任公司Ultra-large scale power transmission network tidal current diagram dynamic viewport displaying method
CN104616207A (en)*2015-01-272015-05-13中国科学院计算机网络信息中心Power grid topological visualization system and power grid topological visualization method
US20170286449A1 (en)*2016-04-012017-10-05US-ANALYTICS Solutions Group, LLCSystem for Connecting Computer Dashboards with Geographic Information Systems
CN106910143A (en)*2017-03-302017-06-30广东电网有限责任公司中山供电局 Multi-version control method and system for distribution network graph model
CN109947859A (en)*2017-08-252019-06-28南方电网科学研究院有限责任公司 Distribution network drawing modeling method, system, storage medium and computer equipment
CN108988333A (en)*2018-08-032018-12-11广东电网有限责任公司Electric network fault statistical method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李韦冰;: "采用CIM模型的配电自动化系统信息共享"*

Cited By (9)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111884337A (en)*2020-07-162020-11-03广东电网有限责任公司Method for carrying out configuration management on switching parameters of power distribution network
CN111950977A (en)*2020-07-282020-11-17中国南方电网有限责任公司Data interaction system and method from power transmission machine account of information system to scheduling master station
CN111950978A (en)*2020-07-282020-11-17中国南方电网有限责任公司Incremental updating system and method for scheduling master station transformation diagram model to information system
CN112150096A (en)*2020-07-282020-12-29中国南方电网有限责任公司System and method for generating equipment ledger hierarchical tree from EMS substation graph model
CN111950978B (en)*2020-07-282023-06-23中国南方电网有限责任公司Incremental updating system and method from scheduling master station electrorheological model to informatization system
CN112150096B (en)*2020-07-282023-10-03中国南方电网有限责任公司Equipment ledger hierarchical tree system and method generated from EMS substation graph model
CN111950977B (en)*2020-07-282023-11-21中国南方电网有限责任公司Data interaction system and method for information system radio station account to dispatching master station
CN113343044A (en)*2021-07-082021-09-03南方电网数字电网研究院有限公司Method and system for splicing CIM graph model and distribution line based on transformer substation
CN113392491A (en)*2021-07-082021-09-14南方电网数字电网研究院有限公司Data quality verification system and method for transmission, transformation and distribution splicing

Also Published As

Publication numberPublication date
CN111222226B (en)2023-06-23

Similar Documents

PublicationPublication DateTitle
CN111222226A (en)EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle
CN101944770B (en)Communication implementation method of virtual station grade IED mode between primary station and substation in fault information system 61850
CN109710669B (en)Method for improving accuracy of full power grid model data based on check rule base
CN108805424A (en)The intelligent inspection system and method for automatic push examined in determination based on location information
CN111159897B (en)Target optimization method and device based on system modeling application
CN114398567B (en) A multi-temporal power grid topology data management method, device and computer equipment
CN108038332B (en)On-line graph model rapid generation method for future-state power grid
CN109829028A (en)A kind of electric power data management system based on normal address
CN102306165A (en)Ship electronic chart data multi-platform shared service device and construction method thereof
CN104104146B (en)Large power grid transformation equipment online monitoring data model establishing method
CN106646110A (en)Low-voltage distribution network fault positioning system based on GIS and Petri technologies
CN103455662B (en)Pollution area distributed plotting system and method
CN112150096A (en)System and method for generating equipment ledger hierarchical tree from EMS substation graph model
CN110032552B (en) Standardized system and method for online update based on equipment change information and scheduling
CN109656589A (en)A kind of secondary equipment of intelligent converting station software harnesses method and system
WO2019056564A1 (en)Power distribution network fault repair system data sharing method for information exchange bus based on iec 61968 standards
CN111711695A (en)Distributed equipment management system based on cloud platform
CN117472922A (en) A graph-digital-analog consistency verification method, system and terminal for power grid equipment assets
CN106779178A (en)The client householder method that a kind of Electric Power Network Planning equipment topological data is set up
CN113407172A (en)Distribution cloud master station-based automatic platform area graph display system and method
CN111857015B (en)Power transmission and transformation cloud intelligent controller
CN103632233B (en)A kind of electric power enterprise electrical measurement practical management system of specialty
CN111209359A (en)EMS transformer graph model access GIS platform icon self-adaption system and method
CN112685359B (en)D5000 measurement data offline integration method and system suitable for mode scheduling
CN110659060A (en)In-place distributed FA configuration rapid configuration method and system

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant
CP03Change of name, title or address

Address after:No.11 Kexiang Road, Science City, Guangzhou, Guangdong 510670

Patentee after:CHINA SOUTHERN POWER GRID Co.,Ltd.

Country or region after:Zhong Guo

Patentee after:Southern Power Grid Digital Grid Research Institute Co.,Ltd.

Address before:No.11 Kexiang Road, Science City, Guangzhou, Guangdong 510670

Patentee before:CHINA SOUTHERN POWER GRID Co.,Ltd.

Country or region before:Zhong Guo

Patentee before:Southern Power Grid Digital Grid Research Institute Co.,Ltd.

CP03Change of name, title or address
TR01Transfer of patent right

Effective date of registration:20240319

Address after:Full Floor 14, Unit 3, Building 2, No. 11, Middle Spectra Road, Huangpu District, Guangzhou, Guangdong 510700

Patentee after:China Southern Power Grid Digital Grid Technology (Guangdong) Co.,Ltd.

Country or region after:Zhong Guo

Address before:No.11 Kexiang Road, Science City, Guangzhou, Guangdong 510670

Patentee before:CHINA SOUTHERN POWER GRID Co.,Ltd.

Country or region before:Zhong Guo

Patentee before:Southern Power Grid Digital Grid Research Institute Co.,Ltd.

TR01Transfer of patent right

[8]ページ先頭