Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe galleryTechnical Field
The invention relates to the technical field of pipeline planning of urban underground comprehensive pipe galleries, in particular to a method for quickly planning and configuring engineering pipelines of the urban underground comprehensive pipe galleries.
Background
The utility tunnel is an underground urban pipeline utility tunnel, namely, a tunnel space is built underground in a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special access hole, a lifting hole and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, the utility tunnel is an important infrastructure for guaranteeing urban operation, and a perfect planning method needs to be formulated before the engineering pipelines are laid.
The existing engineering pipelines have the problems that the current situation analysis is not comprehensive and thorough enough and the layout is messy during planning, so that the planning scheme is not reasonable enough, and the pipelines are in conflict with each other, so that the planning efficiency is influenced, and the improvement is needed.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery, and solves the problems that the existing engineering pipelines are not thorough to the current situation analysis and the layout is messy, so that the planning efficiency is influenced.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery comprises the following steps:
s1: the current situation analysis is used for knowing the information such as the scale size, the layout and the frame of the urban underground comprehensive pipe gallery, analyzing and summarizing the problems faced by the urban underground comprehensive pipe gallery and establishing a preliminary data analysis model.
S2: according to the conclusion and the solution obtained by the S1, the solution is integrated and reasonably planned and arranged.
S3: planning drawing, planning engineering pipeline comprehensive planning plan and engineering pipeline comprehensive road standard cross section.
S4: and testing and analyzing, namely testing, simulating and analyzing the planning layout and the planning drawing, and evaluating feasibility and completeness.
S5: based on the results of the test analysis, the specification implementation is confirmed.
As a preferred technical scheme of the invention, the planning layout comprises the steps of analyzing the rationality of various trunk pipes, determining the trends and routing and plane arrangement positions of the various trunk pipes, determining the specific positions of the trunk pipelines of the key planning nodes and proposing modification suggestions of related professional engineering pipelines.
In a preferred embodiment of the present invention, in the step S3, the plan view of the integrated total plan of the engineering pipelines is a road network map with terrain and land, and the plan layout of the integrated engineering pipelines, the main engineering facilities, the flood banks, the flood ditches and other facilities is shown, and the position of each cross section of the road is shown.
As a preferred technical solution of the present invention, in the step S3, the standard cross-sectional diagram of the engineering pipeline comprehensive road needs to indicate the position of the engineering pipeline determined by comprehensive planning on the base diagram of the corresponding cross-section of the road, and mark the standard cross-sectional number of the road.
As a preferred technical solution of the present invention, in the step S2, the planning layout needs to follow the principle that a pressure pipe allows a self-flowing pipe, a small-diameter pipe allows a large-diameter pipe, a flexible pipe allows a non-flexible pipe, a temporary pipe allows a permanent pipe, a branch pipe allows a main pipe and a small-engineering-quantity pipe allows a large-engineering-quantity pipe.
As a preferred technical solution of the present invention, the arrangement order of the pipeline in the planning implementation scheme is preferably power cable, telecommunication cable, gas distribution, water supply and distribution, heating power main line, gas transmission, water supply and transmission, rainwater drainage, and sewage drainage.
(III) advantageous effects
Compared with the prior art, the invention provides a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery, which has the following beneficial effects:
this city utility tunnel's engineering pipeline configuration method that plans fast, through strengthening the understanding to city utility tunnel each side information to and analyzing main pipe rationality and trend etc. follow pipeline layout prior principle and arrangement order, strengthened the analysis to city utility tunnel current situation, make the analysis more thorough, optimize simultaneously planning and layout rationality, make the overall arrangement neatly rule, solved the disorderly problem of overall arrangement, improved planning efficiency.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
In the figure: 1. analyzing the current situation; 2. planning a layout; 3. planning a drawing; 4. testing and analyzing; 5. the implementation is specified.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1, the present invention provides the following technical solutions: a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery comprises the following steps of S1:current situation analysis 1 is known information such as the scale size, overall arrangement and the frame of city utility tunnel to carry out the analysis summary to the problem that city utility tunnel faces, establish preliminary data analysis model.
S2: according to the conclusion and the solution obtained by S1, the solution is integrated and thelayout 2 is reasonably planned.
S3: and planning adrawing 3, planning a comprehensive overall planning plan of the engineering pipeline and a standard cross-sectional drawing of the comprehensive road of the engineering pipeline.
S4: and 4, testing and analyzing 4, namely testing, simulating and analyzing theplanning layout 2 and the planning drawing 3, and evaluating feasibility and completeness.
S5: from the results obtained in test analysis 4,specification embodiment 5 was confirmed.
Specifically, theplanning layout 2 comprises the steps of analyzing the rationality of various trunk pipes, determining the trends and routing and plane arrangement positions of the various trunk pipes, determining the specific positions of the trunk pipelines of the key planning nodes and proposing modification suggestions of related professional engineering pipelines.
Specifically, in step S3, the comprehensive plan view of the engineering pipelines needs to show the plan layout of the comprehensive engineering pipelines, the main engineering facilities, the flood banks, the flood ditches and other facilities on the road network map with the terrain and the land, and show the positions of the cross sections of the roads.
Specifically, in step S3, the engineering pipeline integrated road standard cross section map needs to indicate the position of the engineering pipeline in the road determined by the integrated planning on the road corresponding cross section base map, and mark the road standard cross section number.
Specifically, in step S2, thelayout 2 needs to follow the principle that a pressure pipe allows a self-flowing pipe, a small pipe allows a large-diameter pipe, a flexible pipe allows a non-bending pipe, a temporary pipe allows a permanent pipe, a branch pipe allows a main pipe, and a small-engineering-quantity pipe allows a large-engineering-quantity pipe.
Specifically, the arrangement order of the pipeline in the planning embodiment 6 is preferably power cable, telecommunication cable, gas distribution, water supply and distribution, heating power main line, gas transmission, water supply and transmission, rainwater drainage and sewage drainage.
Through strengthening the scale size to city utility tunnel, the understanding of information such as frame and overall arrangement, and to the main pipe rationality, trend and plane arrangement position etc. carry out the analysis, optimize the detailed degree of sign of engineering pipeline comprehensive planning plane map and engineering pipeline comprehensive road standard cross section map, follow pipeline arrangement priority principle and arrangement order, the analysis to city utility tunnel current situation has been strengthened, make the analysis more thorough, optimize planning and overall arrangement rationality simultaneously, make the overall arrangement neatly rule, the problem in disorder of overall arrangement has been solved, planning efficiency is improved, the realization is to the quick planning configuration of utility tunnel pipeline.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.