CN110837671A - Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery - Google Patents

Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery
Download PDF

Info

Publication number
CN110837671A
CN110837671ACN201911060463.6ACN201911060463ACN110837671ACN 110837671 ACN110837671 ACN 110837671ACN 201911060463 ACN201911060463 ACN 201911060463ACN 110837671 ACN110837671 ACN 110837671A
Authority
CN
China
Prior art keywords
planning
engineering
pipe
urban underground
layout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911060463.6A
Other languages
Chinese (zh)
Inventor
陈宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu I-Front Science & Technology Co Ltd
Original Assignee
Jiangsu I-Front Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu I-Front Science & Technology Co LtdfiledCriticalJiangsu I-Front Science & Technology Co Ltd
Priority to CN201911060463.6ApriorityCriticalpatent/CN110837671A/en
Publication of CN110837671ApublicationCriticalpatent/CN110837671A/en
Pendinglegal-statusCriticalCurrent

Links

Images

Classifications

Landscapes

Abstract

The invention belongs to the technical field of urban underground comprehensive pipe gallery pipeline planning, and particularly relates to a method for quickly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery, which comprises the following steps of S1: present situation analysis knows information such as city utility tunnel' S scale size, overall arrangement and frame to carry out the analysis summary to the problem that city utility tunnel faces, establish preliminary data analysis model, S2: and integrating the solution according to the conclusion and the solution obtained in the step S1, and performing reasonable planning and layout, wherein the step S3: planning a drawing, planning an engineering pipeline comprehensive overall planning plan and an engineering pipeline comprehensive road standard cross-sectional drawing, S4: and (6) testing and analyzing. The invention enhances the analysis of the current situation of the urban underground comprehensive pipe gallery, leads the analysis to be more thorough, optimizes the planning and the reasonability of the layout simultaneously, leads the layout to be neat and uniform, solves the problem of disordered layout and improves the planning efficiency.

Description

Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery
Technical Field
The invention relates to the technical field of pipeline planning of urban underground comprehensive pipe galleries, in particular to a method for quickly planning and configuring engineering pipelines of the urban underground comprehensive pipe galleries.
Background
The utility tunnel is an underground urban pipeline utility tunnel, namely, a tunnel space is built underground in a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special access hole, a lifting hole and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, the utility tunnel is an important infrastructure for guaranteeing urban operation, and a perfect planning method needs to be formulated before the engineering pipelines are laid.
The existing engineering pipelines have the problems that the current situation analysis is not comprehensive and thorough enough and the layout is messy during planning, so that the planning scheme is not reasonable enough, and the pipelines are in conflict with each other, so that the planning efficiency is influenced, and the improvement is needed.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery, and solves the problems that the existing engineering pipelines are not thorough to the current situation analysis and the layout is messy, so that the planning efficiency is influenced.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery comprises the following steps:
s1: the current situation analysis is used for knowing the information such as the scale size, the layout and the frame of the urban underground comprehensive pipe gallery, analyzing and summarizing the problems faced by the urban underground comprehensive pipe gallery and establishing a preliminary data analysis model.
S2: according to the conclusion and the solution obtained by the S1, the solution is integrated and reasonably planned and arranged.
S3: planning drawing, planning engineering pipeline comprehensive planning plan and engineering pipeline comprehensive road standard cross section.
S4: and testing and analyzing, namely testing, simulating and analyzing the planning layout and the planning drawing, and evaluating feasibility and completeness.
S5: based on the results of the test analysis, the specification implementation is confirmed.
As a preferred technical scheme of the invention, the planning layout comprises the steps of analyzing the rationality of various trunk pipes, determining the trends and routing and plane arrangement positions of the various trunk pipes, determining the specific positions of the trunk pipelines of the key planning nodes and proposing modification suggestions of related professional engineering pipelines.
In a preferred embodiment of the present invention, in the step S3, the plan view of the integrated total plan of the engineering pipelines is a road network map with terrain and land, and the plan layout of the integrated engineering pipelines, the main engineering facilities, the flood banks, the flood ditches and other facilities is shown, and the position of each cross section of the road is shown.
As a preferred technical solution of the present invention, in the step S3, the standard cross-sectional diagram of the engineering pipeline comprehensive road needs to indicate the position of the engineering pipeline determined by comprehensive planning on the base diagram of the corresponding cross-section of the road, and mark the standard cross-sectional number of the road.
As a preferred technical solution of the present invention, in the step S2, the planning layout needs to follow the principle that a pressure pipe allows a self-flowing pipe, a small-diameter pipe allows a large-diameter pipe, a flexible pipe allows a non-flexible pipe, a temporary pipe allows a permanent pipe, a branch pipe allows a main pipe and a small-engineering-quantity pipe allows a large-engineering-quantity pipe.
As a preferred technical solution of the present invention, the arrangement order of the pipeline in the planning implementation scheme is preferably power cable, telecommunication cable, gas distribution, water supply and distribution, heating power main line, gas transmission, water supply and transmission, rainwater drainage, and sewage drainage.
(III) advantageous effects
Compared with the prior art, the invention provides a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery, which has the following beneficial effects:
this city utility tunnel's engineering pipeline configuration method that plans fast, through strengthening the understanding to city utility tunnel each side information to and analyzing main pipe rationality and trend etc. follow pipeline layout prior principle and arrangement order, strengthened the analysis to city utility tunnel current situation, make the analysis more thorough, optimize simultaneously planning and layout rationality, make the overall arrangement neatly rule, solved the disorderly problem of overall arrangement, improved planning efficiency.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
In the figure: 1. analyzing the current situation; 2. planning a layout; 3. planning a drawing; 4. testing and analyzing; 5. the implementation is specified.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1, the present invention provides the following technical solutions: a method for rapidly planning and configuring engineering pipelines of an urban underground comprehensive pipe gallery comprises the following steps of S1:current situation analysis 1 is known information such as the scale size, overall arrangement and the frame of city utility tunnel to carry out the analysis summary to the problem that city utility tunnel faces, establish preliminary data analysis model.
S2: according to the conclusion and the solution obtained by S1, the solution is integrated and thelayout 2 is reasonably planned.
S3: and planning adrawing 3, planning a comprehensive overall planning plan of the engineering pipeline and a standard cross-sectional drawing of the comprehensive road of the engineering pipeline.
S4: and 4, testing and analyzing 4, namely testing, simulating and analyzing theplanning layout 2 and the planning drawing 3, and evaluating feasibility and completeness.
S5: from the results obtained in test analysis 4,specification embodiment 5 was confirmed.
Specifically, theplanning layout 2 comprises the steps of analyzing the rationality of various trunk pipes, determining the trends and routing and plane arrangement positions of the various trunk pipes, determining the specific positions of the trunk pipelines of the key planning nodes and proposing modification suggestions of related professional engineering pipelines.
Specifically, in step S3, the comprehensive plan view of the engineering pipelines needs to show the plan layout of the comprehensive engineering pipelines, the main engineering facilities, the flood banks, the flood ditches and other facilities on the road network map with the terrain and the land, and show the positions of the cross sections of the roads.
Specifically, in step S3, the engineering pipeline integrated road standard cross section map needs to indicate the position of the engineering pipeline in the road determined by the integrated planning on the road corresponding cross section base map, and mark the road standard cross section number.
Specifically, in step S2, thelayout 2 needs to follow the principle that a pressure pipe allows a self-flowing pipe, a small pipe allows a large-diameter pipe, a flexible pipe allows a non-bending pipe, a temporary pipe allows a permanent pipe, a branch pipe allows a main pipe, and a small-engineering-quantity pipe allows a large-engineering-quantity pipe.
Specifically, the arrangement order of the pipeline in the planning embodiment 6 is preferably power cable, telecommunication cable, gas distribution, water supply and distribution, heating power main line, gas transmission, water supply and transmission, rainwater drainage and sewage drainage.
Through strengthening the scale size to city utility tunnel, the understanding of information such as frame and overall arrangement, and to the main pipe rationality, trend and plane arrangement position etc. carry out the analysis, optimize the detailed degree of sign of engineering pipeline comprehensive planning plane map and engineering pipeline comprehensive road standard cross section map, follow pipeline arrangement priority principle and arrangement order, the analysis to city utility tunnel current situation has been strengthened, make the analysis more thorough, optimize planning and overall arrangement rationality simultaneously, make the overall arrangement neatly rule, the problem in disorder of overall arrangement has been solved, planning efficiency is improved, the realization is to the quick planning configuration of utility tunnel pipeline.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

CN201911060463.6A2019-11-012019-11-01Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe galleryPendingCN110837671A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201911060463.6ACN110837671A (en)2019-11-012019-11-01Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201911060463.6ACN110837671A (en)2019-11-012019-11-01Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery

Publications (1)

Publication NumberPublication Date
CN110837671Atrue CN110837671A (en)2020-02-25

Family

ID=69575884

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201911060463.6APendingCN110837671A (en)2019-11-012019-11-01Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery

Country Status (1)

CountryLink
CN (1)CN110837671A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111550604A (en)*2020-05-222020-08-18江苏普莱宁城市规划设计有限公司Pipeline detection method of directional director
CN112668910A (en)*2020-12-312021-04-16深圳市昊源建设监理有限公司Intelligent management and control method and system for whole-process construction engineering for building supervision
CN112767224A (en)*2021-01-132021-05-07厦门市建筑科学研究院有限公司Image processing method and system
CN114218629A (en)*2021-11-032022-03-22哈工大(张家口)工业技术研究院Urban underground pipe gallery system and big data analysis method
CN116451332A (en)*2023-06-202023-07-18中国铁路设计集团有限公司Quick processing method for main pipe of comprehensive pipeline

Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN106202825A (en)*2016-07-292016-12-07上海宝冶集团有限公司Underground pipe gallery method for designing based on BIM
CN106600134A (en)*2016-12-082017-04-26中冶京诚工程技术有限公司Line selection analysis method for urban comprehensive pipe gallery planning system
JP2018073377A (en)*2016-11-042018-05-10台湾國際物業管理顧問有限公司Application system of total sensing positioning technique based on 3d information model
CN109509132A (en)*2018-11-232019-03-22上海宝冶集团南京建筑有限公司A kind of city integrated infrastructure method based on BIM+GIS

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN106202825A (en)*2016-07-292016-12-07上海宝冶集团有限公司Underground pipe gallery method for designing based on BIM
JP2018073377A (en)*2016-11-042018-05-10台湾國際物業管理顧問有限公司Application system of total sensing positioning technique based on 3d information model
CN106600134A (en)*2016-12-082017-04-26中冶京诚工程技术有限公司Line selection analysis method for urban comprehensive pipe gallery planning system
CN109509132A (en)*2018-11-232019-03-22上海宝冶集团南京建筑有限公司A kind of city integrated infrastructure method based on BIM+GIS

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭涛: "《长沙高铁新城综合管廊工程总体设计浅析》", 《城市道桥与防洪》*

Cited By (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111550604A (en)*2020-05-222020-08-18江苏普莱宁城市规划设计有限公司Pipeline detection method of directional director
CN112668910A (en)*2020-12-312021-04-16深圳市昊源建设监理有限公司Intelligent management and control method and system for whole-process construction engineering for building supervision
CN112767224A (en)*2021-01-132021-05-07厦门市建筑科学研究院有限公司Image processing method and system
CN112767224B (en)*2021-01-132023-09-29厦门市建筑科学研究院有限公司Image processing method and system
CN114218629A (en)*2021-11-032022-03-22哈工大(张家口)工业技术研究院Urban underground pipe gallery system and big data analysis method
CN114218629B (en)*2021-11-032024-12-10哈工大(张家口)工业技术研究院 Urban underground pipe gallery system and big data analysis method
CN116451332A (en)*2023-06-202023-07-18中国铁路设计集团有限公司Quick processing method for main pipe of comprehensive pipeline
CN116451332B (en)*2023-06-202023-10-27中国铁路设计集团有限公司Quick processing method for main pipe of comprehensive pipeline

Similar Documents

PublicationPublication DateTitle
CN110837671A (en)Rapid planning and configuration method for engineering pipelines of urban underground comprehensive pipe gallery
CN107301482A (en)A kind of power distribution network medium-voltage line paths planning method based on city integrated piping lane
CN102760255B (en) Underground power grid data management and power grid planning system and management method
CN110889160A (en)Municipal pipeline construction method based on BIM technology
CN106530391A (en)GIS-based urban underground cable three-dimensional design method
CN110717226A (en) A layout planning method of regional integrated energy system considering topological characteristics of energy network
CN113255090B (en)Method for determining oil product search path in crude oil pipe network based on graph theory
CN104767642A (en)ODN line distribution management method and system based on GIS platform
CN109086923A (en)Power distribution network line planning method and system, computer equipment and medium
CN113944887A (en)Pipe network monitoring and tracing method, system, equipment and medium based on directed graph traversal
CN107893231B (en) Protection method and buried system for limiting corrosion of buried metal pipeline by DC grounding electrode
CN113704936A (en)Cable path multi-objective optimization method considering channel capacity and turning radius constraints
CN116091035A (en)Intelligent monitoring and point distribution system and method for urban drainage
CN108122047A (en)A kind of planing method of five in one formula underground electric pipeline
CN119299320A (en) Dedicated line access path planning method, device, equipment, medium and program product
CN119476668A (en) Optical cable routing method, device and electronic equipment
CN108074043B (en) A planning method for supporting power grid of urban integrated pipe gallery
CN118798454A (en) Optical cable path planning method and device, readable storage medium, and program product
CN111339227A (en) A method for evaluating the rationality of power supply scheme based on GIS
CN102314536B (en)Analyzing method for shortest available path of underground pipe network cable based on power grid model
CN108536934A (en)The underground electric infrastructure method judged with geology
CN102624539B (en)Multilevel relativity bearing type automatic mapping method for electric power communication network
CN113239440B (en)Path layout method of comprehensive pipe rack, and method and device for processing abnormality of comprehensive pipe rack
CN117993129B (en)Communication pipeline planning collaborative analysis method and system based on 5G communication
CN116681215B (en)Urban gas pipeline gridding minimum management unit division method

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication

Application publication date:20200225

RJ01Rejection of invention patent application after publication

[8]ページ先頭

©2009-2025 Movatter.jp