CN110335173A - Based on BIM construction management platform and comprehensive monitoring system - Google Patents

Based on BIM construction management platform and comprehensive monitoring system
Download PDF

Info

Publication number
CN110335173A
CN110335173ACN201910606997.8ACN201910606997ACN110335173ACN 110335173 ACN110335173 ACN 110335173ACN 201910606997 ACN201910606997 ACN 201910606997ACN 110335173 ACN110335173 ACN 110335173A
Authority
CN
China
Prior art keywords
module
accident
information
monitoring system
receives
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910606997.8A
Other languages
Chinese (zh)
Inventor
石超
程杰
李双美
许城瑜
刘普前
常顺
李苗
辛柱桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co LtdfiledCriticalChina Railway 25th Bureau Group Co Ltd
Priority to CN201910606997.8ApriorityCriticalpatent/CN110335173A/en
Publication of CN110335173ApublicationCriticalpatent/CN110335173A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

The invention discloses one kind to be based on BIM construction management platform and comprehensive monitoring system, belongs to the technical field of construction management system comprising general pipeline platform and total monitoring system;General pipeline platform includes three-dimensional modeling module for storing total memory module of information, establishing threedimensional model by BIM technology, to the device distribution module of threedimensional model tagging equipment position, the progress update module for obtaining current threedimensional model, for establishing the group of emergency management and rescue group establishes module and accident alarming module for issuing alarm signal and threedimensional model;Total monitoring system includes for uploading the information completion module of engineering information, the accident uploading module for the equipment uploading module of uploading device information and for uploading accident information, the present invention have can effectively improve rescue efficiency, emergency management and rescue group is set rapidly to carry out sufficient preparation, the effect of loss caused by reduction accident for rescue.

Description

Based on BIM construction management platform and comprehensive monitoring system
Technical field
The present invention relates to the technical field of construction management system, more particularly, to one kind based on BIM construction management platform andComprehensive monitoring system.
Background technique
BIM is the common Engineering software of present construction industry at present, and BIM refers to Building Information Model, be architecture,The new tool of engineering science and civil engineering.What Building Information Model or one word of Information The Nation implements Safety Manufacture Li-cense model were created by Autodesk.It isTo describe those based on 3-D graphic, object orientation, the related computer aided design of architecture.The core of BIM is by buildingVirtual architectural engineering threedimensional model is found, using digitizing technique, is provided for this model complete, consistent with actual conditionsArchitectural engineering information bank.The information bank not only includes geological information, professional attributes and the status information for describing building member, alsoContain the status information in non-component object (such as space, motor behavior).It include the three-dimensional mould of architectural engineering information by thisType substantially increases the Information Integration degree of architectural engineering, so that the relevant benefit side for construction-engineering project provides oneA engineering information exchange and shared platform.
The prior art can refer to the Chinese invention patent that application notification number is CN105976094A, and it discloses one kind to be based onThe tunnel device management of BIM construction management platform and fee calculation procedure collect the relevant information of tunnel device therefor, comb firstCost of equipment classification and cost subject are managed out, and carries out customized development on BIM construction management platform;Secondly, typing tunnel is setStandby relevant information, is screened according to equipment source, exports corresponding statement of equipment;Again, taking according to different tunnel devicesThe expense generated with subject, every kind of equipment this month of typing, and export the single machine usage charges report of relevant device;Finally, in single machineOn the basis of usage charges, calculate the project all devices using total expense, and export corresponding equipment and use total expense report.Work as tunnelWhen road facility information occurs to update or change, by manual intervention, the facility information in BIM construction management platform can be synchronized moreNewly, scientific and rational decision-making foundation is provided for project tunnel device management.
It is also very must for the management of safety that prior art among the above, which has the following deficiencies: in the construction process,The content wanted, but project under construction is carried out all being difficult in the system of safety management at present does for the concrete scene of constructionCareful safety management out, BIM is capable of providing the threedimensional model of construction, and can constantly update model, mesh with construction speedBefore lack a kind of three-dimensional Safety Management system that can be made based on threedimensional model of constructing.
Summary of the invention
The object of the present invention is to provide one kind to be based on BIM construction management platform and comprehensive monitoring system, can effectively improveRescue efficiency enables emergency management and rescue group rapidly to carry out sufficient preparation for rescue, loses caused by reduction accident.
Above-mentioned technical purpose of the invention has the technical scheme that
One kind being based on BIM construction management platform and comprehensive monitoring system, including general pipeline platform and total monitoring system;
General pipeline platform includes total memory module, three-dimensional modeling module, device distribution module, progress update module, group's foundationModule and accident alarming module;
Total memory module is for storing the information received;
The three-dimensional modeling module establishes the threedimensional model of construction overall process and by three-dimensional model transmitting to always depositing by BIM technologyStorage module is stored;
The device distribution module receiving device is distributed three-dimensional coordinate and calls the threedimensional model of total memory module storage, equipment pointThreedimensional model after label marking arrangement position and is sent to by cloth module in the three-dimensional model according to device distribution three-dimensional coordinateProgress update module;
The progress update module receives engineering information and is handled according to engineering information the threedimensional model received, obtainsCurrent schedules threedimensional model is simultaneously sent to memory module and is stored;
The group establishes module and receives group member's contact details of extraneous input and be sent to group member's contact detailsTotal memory module;
The accident alarming module calls memory module after accident alarming module receives accident information in response to accident informationThen the current schedules threedimensional model of storage sends alarm signal, current schedules threedimensional model and accident to emergency management and rescue groupInformation;
Total monitoring system includes information completion module, equipment uploading module and accident uploading module;
The information completion module receives the engineering information of extraneous input and engineering information is sent to progress update module;
The equipment uploading module receives the device distribution three-dimensional coordinate of extraneous input and is sent to device distribution three-dimensional coordinateDevice distribution module;
The accident uploading module receives the accident information of extraneous input and is sent to accident alarming module.
By using above scheme, general pipeline platform can obtain the threedimensional model of construction by BIM technology, and construction is existingAnyone of field can send accident information to general pipeline platform by total monitoring system, and general pipeline platform receives accident letterAccident information and threedimensional model with device distribution can be sent to emergency management and rescue group after breath, enable emergency management and rescue groupEnough concrete conditions for recognizing construction site rapidly, so that emergency management and rescue group makes most detailed rescue party with most fast speedCase is simultaneously implemented, and rescue efficiency can be effectively improved, and so that emergency management and rescue group is rapidly carried out sufficient preparation for rescue, subtractsIt is lost caused by few accident.
The present invention is further arranged to: total monitoring system further includes alarm feedback module, and the alarm feedback module receivesAlarm signal, current schedules threedimensional model and the accident information of the transmission of accident alarming module are simultaneously shown.
By using above scheme, site operation personnel can receive the information that general pipeline platform is sent back to, and be convenient for constructorMember is saved oneself at the scene or emergency processing.
The present invention is further arranged to: total monitoring system further includes spot sampling module, the spot sampling module acquisitionImage information is simultaneously sent to total memory module and stored by the image information of construction site.
By using above scheme, user can recall the image information of the scene of the accident by total memory module to obtain thingTherefore field condition when occurring.
The present invention is further arranged to: total monitoring system further includes handling of goods and materials module, the handling of goods and materials module storageThere is blank goods and materials report, handling of goods and materials module receives in extraneous input material information and the goods and materials report that fills in the blanks and forms current objectReport is provided, current goods and materials report is sent to total memory module and stored by handling of goods and materials module.
By using above scheme, special messenger can be assigned to be responsible for safeguarding that relief goods, regular or each rescue action are all rightRelief goods are checked, and total monitoring system forms current goods and materials report and is sent to general pipeline platform and stored, convenient for pipeReason personnel check and understand relief goods inventories.
The present invention is further arranged to: general pipeline platform further includes regular reminding module, and the regular reminding module is equipped withPreset time simultaneously carries out timing at any time, and handling of goods and materials module sends to regular reminding module while sending current goods and materials report and signsTo signal, regular reminding module receives register signal after reset timing time, when regular reminding module timing reaches defaultBetween when, regular reminding module to handling of goods and materials module send alarm.
By using above scheme, regular reminding module can remind the personnel of maintenance relief goods to regularly send report,Guarantee that relief goods can be in real time in the state of preparing use.
The present invention is further arranged to: total monitoring system further includes the condition of a disaster judgment module, and the condition of a disaster judgment module receivesThe accident information of accident uploading module output, the condition of a disaster judgment module judge whether that fire or personnel, which occurs, hurts according to accident informationIt dies, the condition of a disaster judgment module exports fire alarm signal when a fire, and when casualties occurs, the condition of a disaster judgment module is exportedMedical alarm signal;
The emergency communication module receives the fire alarm signal and medical alarm signal of the condition of a disaster judgment module output, when urgent logicalNews module receives and issues alarm of fires to 119 after fire alarm signal, when emergency communication module receives medical alarm signalBackward 120 issue medical alert.
By using above scheme, the accident information that total monitoring system can be uploaded automatically according to Field Force judges calamityFeelings issue aid request to 119 or 120, to be rescued at the first time.
The present invention is further arranged to: accident alarming module sends alarm signal, current schedules three to emergency communication moduleDimension module and accident information, emergency communication module by alarm signal, current schedules threedimensional model and accident information be sent to 119 or120。
By using above scheme, enable 119 and 120 to obtain detailed accident information at the first time, is convenient for 119 Hes120 are prepared and are unfolded to rescue.
The present invention is further arranged to: accident information includes traffic injury time, classification, place, related facility, contact personName and phone.
By using above scheme, traffic injury time and classification are convenient for the condition of a disaster judgment module to judge accident situation, placeAccident spot, name of contact person and phone are quickly found out convenient for rescue people according to threedimensional model convenient for rescue personnel with related facilityMember contacts specific personnel to inquire accident situation.
The present invention is further arranged to: total monitoring system further includes power-off control module, the power-off control module connectionAccident information is sent to power-off control module by the IGBT circuit in all power distribution cabinets in construction site, accident uploading module, is brokenElectric control module receives the related facility read after accident information in accident information, and power-off control module controls related facilityIGBT circuit breaker.
By using above scheme, total monitoring system can cut off accident by IGBT circuit safety when accident occurs and setStandby power supply prevents personnel from getting an electric shock or electric spark explosion occur, avoids the occurrence of second accident or aggravate accident, can effectively mentionThe safety of height construction.
The present invention is further arranged to: general pipeline platform further includes module, weather monitoring module and the tune of putting on record put on record of meeting an urgent needUse module;
Emergency module of putting on record receives the emergency of extraneous input and puts on record and emergency is put on record and be sent to total memory module and depositStorage;
The weather monitoring module obtains the weather information of relevant weather website sending, gas of the weather monitoring module to acquisition in real timeImage information is judged, when weather information does not meet construction reference, the output of weather monitoring module has the meteorology of weather informationSignal;
The calling module of putting on record receives accident information and meteorologic signal, when calling module of putting on record receives accident information or meteorologyWhen signal, calls the emergency of total memory module storage to put on record according to the accident information and meteorologic signal that receive and shown.
By using above scheme, administrative staff may be implemented typing emergency and put on record, accident or boisterous occurringWhen general pipeline platform automatic Display emergency put on record, convenient for administrative staff's quick decision emergency put on record.
In conclusion the invention has the following advantages:
1. general pipeline platform can obtain the threedimensional model of construction by BIM technology, anyone of construction site can lead toIt crosses total monitoring system and sends accident information to general pipeline platform, general pipeline platform can be by accident information after receiving accident informationIt is sent to emergency management and rescue group with the threedimensional model with device distribution, emergency management and rescue group is enable to recognize that construction is existing rapidlyThe concrete condition of field can be effective so that emergency management and rescue group makes most detailed rescue method with most fast speed and implementsRescue efficiency is improved, so that emergency management and rescue group is rapidly carried out sufficient preparation for rescue, is lost caused by reduction accident;
2. the accident information that total monitoring system can be uploaded automatically according to Field Force judges the condition of a disaster, issues and rescue to 119 or 120Request is helped, to be rescued at the first time;
3. total monitoring system can cut off the power supply of accident equipment when accident occurs by IGBT circuit safety, personnel are preventedIt gets an electric shock or electric spark explosion occurs, avoid the occurrence of second accident or aggravate accident, the safety of construction can be effectively improved.
Detailed description of the invention
Fig. 1 is the overall system diagram of embodiment;
Fig. 2 is the system block diagram of prominent spot sampling module and handling of goods and materials module in embodiment;
Fig. 3 is the system block diagram of prominent the condition of a disaster judgment module in embodiment;
Fig. 4 is that prominent emergency is put on record the system block diagram of module and calling module of putting on record in embodiment.
In figure, 1, general pipeline platform;11, total memory module;12, three-dimensional modeling module;13, group establishes module;14, it setsStandby distribution module;15, progress update module;16, accident alarming module;17, emergency is put on record module;18, put on record calling module;19, weather monitoring module;2, total monitoring system;21, equipment uploading module;22, information completion module;23, accident uploading module;24, alarm feedback module;25, spot sampling module;26, handling of goods and materials module;261, regular reminding module;27, the condition of a disaster judgesModule;271, emergency communication module;272, power-off control module.
Specific embodiment
Embodiment: one kind being based on BIM construction management platform and comprehensive monitoring system, as shown in Figure 1, including general pipeline platform1 and total monitoring system 2.General pipeline platform 1 includes total memory module 11, three-dimensional modeling module 12, device distribution module 14, progressUpdate module 15, group establish module 13 and accident alarming module 16.Total monitoring system 2 includes information completion module 22, equipmentUploading module 21, accident uploading module 23 and alarm feedback module 24.
As shown in Figure 1, total memory module 11 is for storing the information received.Three-dimensional modeling module 12 passes through BIM technologyIt establishes the threedimensional model of construction overall process and stores three-dimensional model transmitting to total memory module 11.
As shown in Figure 1, equipment uploading module 21 receives the device distribution three-dimensional coordinate of extraneous input and by device distribution threeDimension coordinate is sent to device distribution module 14.14 receiving device of device distribution module distribution three-dimensional coordinate simultaneously calls total memory moduleThe threedimensional models of 11 storages, marking arrangement position is simultaneously in the three-dimensional model according to device distribution three-dimensional coordinate for device distribution module 14Threedimensional model after label is sent to progress update module 15.
As shown in Figure 1, information completion module 22 receives the engineering information of extraneous input and engineering information is sent to progressUpdate module 15.Progress update module 15 receive engineering information and according to engineering information to the threedimensional model received atReason obtains current schedules threedimensional model and is sent to memory module and is stored.
It receives group member's contact details of extraneous input as shown in Figure 1, group establishes module 13 and joins group memberIt is that information is sent to total memory module 11.Accident uploading module 23 receives the accident information of extraneous input and is sent to accident alarmingModule 16.Accident information includes traffic injury time, classification, place, related facility, name of contact person and phone.Accident alarmingModule 16 calls working as memory module storage to advance in response to accident information after accident alarming module 16 receives accident informationThreedimensional model is spent, then sends alarm signal, current schedules threedimensional model and accident information to emergency management and rescue group.General pipeline is pattedPlatform 1 can obtain the threedimensional model of construction by BIM technology, and anyone of construction site can pass through total monitoring system 2Accident information is sent Xiang general pipeline platform 1, general pipeline platform 1 can be by accident information and with equipment after receiving accident informationThe threedimensional model of distribution is sent to emergency management and rescue group, and emergency management and rescue group is enable to recognize the specific feelings of construction site rapidlyCondition can effectively improve rescue effect so that emergency management and rescue group makes most detailed rescue method with most fast speed and implementsRate enables emergency management and rescue group rapidly to carry out sufficient preparation for rescue, loses caused by reduction accident.
As shown in Figure 1, alarm feedback module 24 receives alarm signal, the current schedules three-dimensional that accident alarming module 16 is sentModel and accident information are simultaneously shown.Site operation personnel can receive the information that general pipeline platform 1 is sent back to, and be convenient for constructorMember is saved oneself at the scene or emergency processing.
As shown in Fig. 2, general control system further includes spot sampling module 25, handling of goods and materials module 26 and regular reminding module261.Spot sampling module 25 acquires the image information of construction site and image information is sent to total memory module 11 and depositsStorage.User can recall the image information of the scene of the accident by total memory module 11 to obtain field condition when accident occurs.
As shown in Fig. 2, handling of goods and materials module 26 is stored with blank goods and materials report, handling of goods and materials module 26 receives extraneous inputCurrent goods and materials report is formed in material information and the goods and materials report that fills in the blanks, handling of goods and materials module 26 sends current goods and materials reportIt is stored to total memory module 11.Regular reminding module 261 is equipped with preset time and carries out timing, handling of goods and materials module at any timeSignal of registering is sent to regular reminding module 261 while 26 transmission current goods and materials report.Regular reminding module 261 receives labelTiming time is reset after to signal, when regular 261 timing of reminding module reaches preset time, regular reminding module 261 is to objectIt provides management module 26 and sends alarm.Special messenger can be assigned to be responsible for safeguarding relief goods, regular or each rescue action is all to rescueGoods and materials are checked.It is checked convenient for administrative staff and understands relief goods inventories.
As shown in figure 3, general control system further includes the condition of a disaster judgment module 27, emergency communication module 271 and power-off control mouldBlock 272.The condition of a disaster judgment module 27 receives the accident information that accident uploading module 23 exports, and the condition of a disaster judgment module 27 is believed according to accidentBreath judges whether that fire or casualties occurs.The condition of a disaster judgment module 27 exports fire alarm signal when a fire;Work as hairThe condition of a disaster judgment module 27 exports medical alarm signal when raw casualties.Accident alarming module 16 is sent out to emergency communication module 271Send alarm signal, current schedules threedimensional model and accident information.Emergency communication module 271 receives what the condition of a disaster judgment module 27 exportedFire alarm signal and medical alarm signal.Fire is issued to 119 after emergency communication module 271 receives fire alarm signalAlarm, alarm signal, current schedules threedimensional model and accident information;When emergency communication module 271 receives medical alarm signalBackward 120 issue medical alert, alarm signal, current schedules threedimensional model and accident information.
As shown in figure 4, general pipeline platform 1 further includes that emergency puts on record and module 17, weather monitoring module 19 and puts on record and call mouldBlock 18.Emergency module 17 of putting on record receives the emergency of extraneous input and puts on record and emergency is put on record and be sent to total memory module 11 and depositStorage.Weather monitoring module 19 obtains the weather information that relevant weather website issues, the gas of 19 pairs of weather monitoring module acquisitions in real timeImage information is judged.When weather information does not meet construction reference, the output of weather monitoring module 19 has the gas of weather informationPicture signals.Calling module 18 of putting on record receives accident information and meteorologic signal, when calling module 18 of putting on record receive accident information orWhen meteorologic signal, puts on record and carry out according to the emergency that the accident information and meteorologic signal that receive call total memory module 11 to storeDisplay.Administrative staff may be implemented typing emergency and put on record, and general pipeline platform 1 is opened up automatically when there is accident or bad weatherShow that emergency is put on record, puts on record convenient for administrative staff's quick decision emergency.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to thisRange, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention itIt is interior.

Claims (10)

CN201910606997.8A2019-07-062019-07-06Based on BIM construction management platform and comprehensive monitoring systemPendingCN110335173A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201910606997.8ACN110335173A (en)2019-07-062019-07-06Based on BIM construction management platform and comprehensive monitoring system

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201910606997.8ACN110335173A (en)2019-07-062019-07-06Based on BIM construction management platform and comprehensive monitoring system

Publications (1)

Publication NumberPublication Date
CN110335173Atrue CN110335173A (en)2019-10-15

Family

ID=68143246

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201910606997.8APendingCN110335173A (en)2019-07-062019-07-06Based on BIM construction management platform and comprehensive monitoring system

Country Status (1)

CountryLink
CN (1)CN110335173A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111007881A (en)*2019-11-252020-04-14重庆建工机电安装工程有限公司BIM-based rail transit electromechanical installation engineering system and method
CN111369018A (en)*2020-03-022020-07-03广州晟能电子科技有限公司Alarm correlation method of comprehensive operation and maintenance management platform

Citations (9)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20120066178A1 (en)*2010-03-092012-03-15Vela Systems, Inc.Systems and methods for construction field management and operations with building information modeling
US20130155058A1 (en)*2011-12-142013-06-20The Board Of Trustees Of The University Of IllinoisFour-dimensional augmented reality models for interactive visualization and automated construction progress monitoring
CN103985007A (en)*2014-05-042014-08-13兰州交通大学Railway emergency rescue command system
CN105719051A (en)*2016-01-132016-06-29天津中科智能识别产业技术研究院有限公司Disaster rescue transport vehicle management scheduling system
CN108520342A (en)*2018-03-232018-09-11中建三局第建设工程有限责任公司 BIM-based IoT platform management method and system
CN108537463A (en)*2018-04-202018-09-14中铁四局集团第三建设有限公司Cast-in-place bridge supporting system construction monitoring system and method based on BIM
CN108732979A (en)*2018-05-152018-11-02浙江大学A kind of construction safety managing and control system based on BIM technology
CN108830462A (en)*2018-05-252018-11-16中建三局安装工程有限公司A kind of pipe gallery wisdom operation management platform and method
CN109635381A (en)*2018-11-272019-04-16中冶京诚工程技术有限公司Method and device for managing pipeline entering of comprehensive pipe rack

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20120066178A1 (en)*2010-03-092012-03-15Vela Systems, Inc.Systems and methods for construction field management and operations with building information modeling
US20130155058A1 (en)*2011-12-142013-06-20The Board Of Trustees Of The University Of IllinoisFour-dimensional augmented reality models for interactive visualization and automated construction progress monitoring
CN103985007A (en)*2014-05-042014-08-13兰州交通大学Railway emergency rescue command system
CN105719051A (en)*2016-01-132016-06-29天津中科智能识别产业技术研究院有限公司Disaster rescue transport vehicle management scheduling system
CN108520342A (en)*2018-03-232018-09-11中建三局第建设工程有限责任公司 BIM-based IoT platform management method and system
CN108537463A (en)*2018-04-202018-09-14中铁四局集团第三建设有限公司Cast-in-place bridge supporting system construction monitoring system and method based on BIM
CN108732979A (en)*2018-05-152018-11-02浙江大学A kind of construction safety managing and control system based on BIM technology
CN108830462A (en)*2018-05-252018-11-16中建三局安装工程有限公司A kind of pipe gallery wisdom operation management platform and method
CN109635381A (en)*2018-11-272019-04-16中冶京诚工程技术有限公司Method and device for managing pipeline entering of comprehensive pipe rack

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
俞晓 等: "BIM技术在临江深基坑监测中的应用研究", 《施工技术》*
包胜 等: "BIM技术在施工进度管理中的应用", 《项目管理技术》*
杨国平 等: "基于BIM的基坑施工任务监管云平台", 《土木建筑工程信息技术》*

Cited By (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111007881A (en)*2019-11-252020-04-14重庆建工机电安装工程有限公司BIM-based rail transit electromechanical installation engineering system and method
CN111007881B (en)*2019-11-252023-04-11重庆建工机电安装工程有限公司BIM-based rail transit electromechanical installation engineering system and method
CN111369018A (en)*2020-03-022020-07-03广州晟能电子科技有限公司Alarm correlation method of comprehensive operation and maintenance management platform

Similar Documents

PublicationPublication DateTitle
CN109447480A (en)A kind of road and bridge engineering equipment safety monitoring system and method based on BIM+GIS modeling
CN106408861B (en)A kind of station monitoring early-warning system
CN204069358U (en)Constructing tunnel personnel positioning management system
CN114186834A (en)Smart city system
CN106844531A (en)A kind of flood control command based on grid studies and judges system
CN106815439A (en) Municipal engineering construction monitoring method and system based on building information model
CN107832533A (en)A kind of real-time monitoring and displaying method and system of transformer station based on three-dimensional information model
CN101872446A (en) Fire emergency response method based on 3D digital city
CN107146024A (en) Three-dimensional dynamic safety management method for the whole process of construction enterprises
CN103700031A (en)Electric power warning information publishing method in regulation and control integration mode
CN103558827A (en)Mine emergency command communication and management information system
CN104243612B (en)A kind of water conservancy construction personal security ensures information management system and method
CN106331633A (en) A method and system for displaying and quickly accessing multiple monitoring resources
CN110232089A (en)A kind of three-dimensional city electric service command centre data visualization method
CN114943472A (en) An operation safety supervision system applied in a substation
CN104038952A (en)Emergency prediction method and system
TWM607740U (en)Smart construction site management equipment
CN110335173A (en)Based on BIM construction management platform and comprehensive monitoring system
CN115563341A (en)Spatial video field for electric power operation violation identification and intelligent data processing system and method thereof
CN110430246A (en) Infrastructure safety management and control system
CN116052300A (en)Digital twinning-based power inspection system and method
CN109977066B (en) Territorial smart emergency delivery machine
CN115424212B (en) A Violation Identification System and Its Application in Electric Work Site
CN116645045A (en)Intelligent equipment-based power production operation management method and system
CN104967695A (en)Mine emergency rescue command information generation and transmission system and method

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20191015