Summary of the invention
The object of the present invention is to provide one kind to be based on BIM construction management platform and comprehensive monitoring system, can effectively improveRescue efficiency enables emergency management and rescue group rapidly to carry out sufficient preparation for rescue, loses caused by reduction accident.
Above-mentioned technical purpose of the invention has the technical scheme that
One kind being based on BIM construction management platform and comprehensive monitoring system, including general pipeline platform and total monitoring system;
General pipeline platform includes total memory module, three-dimensional modeling module, device distribution module, progress update module, group's foundationModule and accident alarming module;
Total memory module is for storing the information received;
The three-dimensional modeling module establishes the threedimensional model of construction overall process and by three-dimensional model transmitting to always depositing by BIM technologyStorage module is stored;
The device distribution module receiving device is distributed three-dimensional coordinate and calls the threedimensional model of total memory module storage, equipment pointThreedimensional model after label marking arrangement position and is sent to by cloth module in the three-dimensional model according to device distribution three-dimensional coordinateProgress update module;
The progress update module receives engineering information and is handled according to engineering information the threedimensional model received, obtainsCurrent schedules threedimensional model is simultaneously sent to memory module and is stored;
The group establishes module and receives group member's contact details of extraneous input and be sent to group member's contact detailsTotal memory module;
The accident alarming module calls memory module after accident alarming module receives accident information in response to accident informationThen the current schedules threedimensional model of storage sends alarm signal, current schedules threedimensional model and accident to emergency management and rescue groupInformation;
Total monitoring system includes information completion module, equipment uploading module and accident uploading module;
The information completion module receives the engineering information of extraneous input and engineering information is sent to progress update module;
The equipment uploading module receives the device distribution three-dimensional coordinate of extraneous input and is sent to device distribution three-dimensional coordinateDevice distribution module;
The accident uploading module receives the accident information of extraneous input and is sent to accident alarming module.
By using above scheme, general pipeline platform can obtain the threedimensional model of construction by BIM technology, and construction is existingAnyone of field can send accident information to general pipeline platform by total monitoring system, and general pipeline platform receives accident letterAccident information and threedimensional model with device distribution can be sent to emergency management and rescue group after breath, enable emergency management and rescue groupEnough concrete conditions for recognizing construction site rapidly, so that emergency management and rescue group makes most detailed rescue party with most fast speedCase is simultaneously implemented, and rescue efficiency can be effectively improved, and so that emergency management and rescue group is rapidly carried out sufficient preparation for rescue, subtractsIt is lost caused by few accident.
The present invention is further arranged to: total monitoring system further includes alarm feedback module, and the alarm feedback module receivesAlarm signal, current schedules threedimensional model and the accident information of the transmission of accident alarming module are simultaneously shown.
By using above scheme, site operation personnel can receive the information that general pipeline platform is sent back to, and be convenient for constructorMember is saved oneself at the scene or emergency processing.
The present invention is further arranged to: total monitoring system further includes spot sampling module, the spot sampling module acquisitionImage information is simultaneously sent to total memory module and stored by the image information of construction site.
By using above scheme, user can recall the image information of the scene of the accident by total memory module to obtain thingTherefore field condition when occurring.
The present invention is further arranged to: total monitoring system further includes handling of goods and materials module, the handling of goods and materials module storageThere is blank goods and materials report, handling of goods and materials module receives in extraneous input material information and the goods and materials report that fills in the blanks and forms current objectReport is provided, current goods and materials report is sent to total memory module and stored by handling of goods and materials module.
By using above scheme, special messenger can be assigned to be responsible for safeguarding that relief goods, regular or each rescue action are all rightRelief goods are checked, and total monitoring system forms current goods and materials report and is sent to general pipeline platform and stored, convenient for pipeReason personnel check and understand relief goods inventories.
The present invention is further arranged to: general pipeline platform further includes regular reminding module, and the regular reminding module is equipped withPreset time simultaneously carries out timing at any time, and handling of goods and materials module sends to regular reminding module while sending current goods and materials report and signsTo signal, regular reminding module receives register signal after reset timing time, when regular reminding module timing reaches defaultBetween when, regular reminding module to handling of goods and materials module send alarm.
By using above scheme, regular reminding module can remind the personnel of maintenance relief goods to regularly send report,Guarantee that relief goods can be in real time in the state of preparing use.
The present invention is further arranged to: total monitoring system further includes the condition of a disaster judgment module, and the condition of a disaster judgment module receivesThe accident information of accident uploading module output, the condition of a disaster judgment module judge whether that fire or personnel, which occurs, hurts according to accident informationIt dies, the condition of a disaster judgment module exports fire alarm signal when a fire, and when casualties occurs, the condition of a disaster judgment module is exportedMedical alarm signal;
The emergency communication module receives the fire alarm signal and medical alarm signal of the condition of a disaster judgment module output, when urgent logicalNews module receives and issues alarm of fires to 119 after fire alarm signal, when emergency communication module receives medical alarm signalBackward 120 issue medical alert.
By using above scheme, the accident information that total monitoring system can be uploaded automatically according to Field Force judges calamityFeelings issue aid request to 119 or 120, to be rescued at the first time.
The present invention is further arranged to: accident alarming module sends alarm signal, current schedules three to emergency communication moduleDimension module and accident information, emergency communication module by alarm signal, current schedules threedimensional model and accident information be sent to 119 or120。
By using above scheme, enable 119 and 120 to obtain detailed accident information at the first time, is convenient for 119 Hes120 are prepared and are unfolded to rescue.
The present invention is further arranged to: accident information includes traffic injury time, classification, place, related facility, contact personName and phone.
By using above scheme, traffic injury time and classification are convenient for the condition of a disaster judgment module to judge accident situation, placeAccident spot, name of contact person and phone are quickly found out convenient for rescue people according to threedimensional model convenient for rescue personnel with related facilityMember contacts specific personnel to inquire accident situation.
The present invention is further arranged to: total monitoring system further includes power-off control module, the power-off control module connectionAccident information is sent to power-off control module by the IGBT circuit in all power distribution cabinets in construction site, accident uploading module, is brokenElectric control module receives the related facility read after accident information in accident information, and power-off control module controls related facilityIGBT circuit breaker.
By using above scheme, total monitoring system can cut off accident by IGBT circuit safety when accident occurs and setStandby power supply prevents personnel from getting an electric shock or electric spark explosion occur, avoids the occurrence of second accident or aggravate accident, can effectively mentionThe safety of height construction.
The present invention is further arranged to: general pipeline platform further includes module, weather monitoring module and the tune of putting on record put on record of meeting an urgent needUse module;
Emergency module of putting on record receives the emergency of extraneous input and puts on record and emergency is put on record and be sent to total memory module and depositStorage;
The weather monitoring module obtains the weather information of relevant weather website sending, gas of the weather monitoring module to acquisition in real timeImage information is judged, when weather information does not meet construction reference, the output of weather monitoring module has the meteorology of weather informationSignal;
The calling module of putting on record receives accident information and meteorologic signal, when calling module of putting on record receives accident information or meteorologyWhen signal, calls the emergency of total memory module storage to put on record according to the accident information and meteorologic signal that receive and shown.
By using above scheme, administrative staff may be implemented typing emergency and put on record, accident or boisterous occurringWhen general pipeline platform automatic Display emergency put on record, convenient for administrative staff's quick decision emergency put on record.
In conclusion the invention has the following advantages:
1. general pipeline platform can obtain the threedimensional model of construction by BIM technology, anyone of construction site can lead toIt crosses total monitoring system and sends accident information to general pipeline platform, general pipeline platform can be by accident information after receiving accident informationIt is sent to emergency management and rescue group with the threedimensional model with device distribution, emergency management and rescue group is enable to recognize that construction is existing rapidlyThe concrete condition of field can be effective so that emergency management and rescue group makes most detailed rescue method with most fast speed and implementsRescue efficiency is improved, so that emergency management and rescue group is rapidly carried out sufficient preparation for rescue, is lost caused by reduction accident;
2. the accident information that total monitoring system can be uploaded automatically according to Field Force judges the condition of a disaster, issues and rescue to 119 or 120Request is helped, to be rescued at the first time;
3. total monitoring system can cut off the power supply of accident equipment when accident occurs by IGBT circuit safety, personnel are preventedIt gets an electric shock or electric spark explosion occurs, avoid the occurrence of second accident or aggravate accident, the safety of construction can be effectively improved.
Embodiment: one kind being based on BIM construction management platform and comprehensive monitoring system, as shown in Figure 1, including general pipeline platform1 and total monitoring system 2.General pipeline platform 1 includes total memory module 11, three-dimensional modeling module 12, device distribution module 14, progressUpdate module 15, group establish module 13 and accident alarming module 16.Total monitoring system 2 includes information completion module 22, equipmentUploading module 21, accident uploading module 23 and alarm feedback module 24.
As shown in Figure 1, total memory module 11 is for storing the information received.Three-dimensional modeling module 12 passes through BIM technologyIt establishes the threedimensional model of construction overall process and stores three-dimensional model transmitting to total memory module 11.
As shown in Figure 1, equipment uploading module 21 receives the device distribution three-dimensional coordinate of extraneous input and by device distribution threeDimension coordinate is sent to device distribution module 14.14 receiving device of device distribution module distribution three-dimensional coordinate simultaneously calls total memory moduleThe threedimensional models of 11 storages, marking arrangement position is simultaneously in the three-dimensional model according to device distribution three-dimensional coordinate for device distribution module 14Threedimensional model after label is sent to progress update module 15.
As shown in Figure 1, information completion module 22 receives the engineering information of extraneous input and engineering information is sent to progressUpdate module 15.Progress update module 15 receive engineering information and according to engineering information to the threedimensional model received atReason obtains current schedules threedimensional model and is sent to memory module and is stored.
It receives group member's contact details of extraneous input as shown in Figure 1, group establishes module 13 and joins group memberIt is that information is sent to total memory module 11.Accident uploading module 23 receives the accident information of extraneous input and is sent to accident alarmingModule 16.Accident information includes traffic injury time, classification, place, related facility, name of contact person and phone.Accident alarmingModule 16 calls working as memory module storage to advance in response to accident information after accident alarming module 16 receives accident informationThreedimensional model is spent, then sends alarm signal, current schedules threedimensional model and accident information to emergency management and rescue group.General pipeline is pattedPlatform 1 can obtain the threedimensional model of construction by BIM technology, and anyone of construction site can pass through total monitoring system 2Accident information is sent Xiang general pipeline platform 1, general pipeline platform 1 can be by accident information and with equipment after receiving accident informationThe threedimensional model of distribution is sent to emergency management and rescue group, and emergency management and rescue group is enable to recognize the specific feelings of construction site rapidlyCondition can effectively improve rescue effect so that emergency management and rescue group makes most detailed rescue method with most fast speed and implementsRate enables emergency management and rescue group rapidly to carry out sufficient preparation for rescue, loses caused by reduction accident.
As shown in Figure 1, alarm feedback module 24 receives alarm signal, the current schedules three-dimensional that accident alarming module 16 is sentModel and accident information are simultaneously shown.Site operation personnel can receive the information that general pipeline platform 1 is sent back to, and be convenient for constructorMember is saved oneself at the scene or emergency processing.
As shown in Fig. 2, general control system further includes spot sampling module 25, handling of goods and materials module 26 and regular reminding module261.Spot sampling module 25 acquires the image information of construction site and image information is sent to total memory module 11 and depositsStorage.User can recall the image information of the scene of the accident by total memory module 11 to obtain field condition when accident occurs.
As shown in Fig. 2, handling of goods and materials module 26 is stored with blank goods and materials report, handling of goods and materials module 26 receives extraneous inputCurrent goods and materials report is formed in material information and the goods and materials report that fills in the blanks, handling of goods and materials module 26 sends current goods and materials reportIt is stored to total memory module 11.Regular reminding module 261 is equipped with preset time and carries out timing, handling of goods and materials module at any timeSignal of registering is sent to regular reminding module 261 while 26 transmission current goods and materials report.Regular reminding module 261 receives labelTiming time is reset after to signal, when regular 261 timing of reminding module reaches preset time, regular reminding module 261 is to objectIt provides management module 26 and sends alarm.Special messenger can be assigned to be responsible for safeguarding relief goods, regular or each rescue action is all to rescueGoods and materials are checked.It is checked convenient for administrative staff and understands relief goods inventories.
As shown in figure 3, general control system further includes the condition of a disaster judgment module 27, emergency communication module 271 and power-off control mouldBlock 272.The condition of a disaster judgment module 27 receives the accident information that accident uploading module 23 exports, and the condition of a disaster judgment module 27 is believed according to accidentBreath judges whether that fire or casualties occurs.The condition of a disaster judgment module 27 exports fire alarm signal when a fire;Work as hairThe condition of a disaster judgment module 27 exports medical alarm signal when raw casualties.Accident alarming module 16 is sent out to emergency communication module 271Send alarm signal, current schedules threedimensional model and accident information.Emergency communication module 271 receives what the condition of a disaster judgment module 27 exportedFire alarm signal and medical alarm signal.Fire is issued to 119 after emergency communication module 271 receives fire alarm signalAlarm, alarm signal, current schedules threedimensional model and accident information;When emergency communication module 271 receives medical alarm signalBackward 120 issue medical alert, alarm signal, current schedules threedimensional model and accident information.
As shown in figure 4, general pipeline platform 1 further includes that emergency puts on record and module 17, weather monitoring module 19 and puts on record and call mouldBlock 18.Emergency module 17 of putting on record receives the emergency of extraneous input and puts on record and emergency is put on record and be sent to total memory module 11 and depositStorage.Weather monitoring module 19 obtains the weather information that relevant weather website issues, the gas of 19 pairs of weather monitoring module acquisitions in real timeImage information is judged.When weather information does not meet construction reference, the output of weather monitoring module 19 has the gas of weather informationPicture signals.Calling module 18 of putting on record receives accident information and meteorologic signal, when calling module 18 of putting on record receive accident information orWhen meteorologic signal, puts on record and carry out according to the emergency that the accident information and meteorologic signal that receive call total memory module 11 to storeDisplay.Administrative staff may be implemented typing emergency and put on record, and general pipeline platform 1 is opened up automatically when there is accident or bad weatherShow that emergency is put on record, puts on record convenient for administrative staff's quick decision emergency.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to thisRange, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention itIt is interior.