Movatterモバイル変換


[0]ホーム

URL:


CN110323785B - Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction - Google Patents

Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction
Download PDF

Info

Publication number
CN110323785B
CN110323785BCN201910684886.9ACN201910684886ACN110323785BCN 110323785 BCN110323785 BCN 110323785BCN 201910684886 ACN201910684886 ACN 201910684886ACN 110323785 BCN110323785 BCN 110323785B
Authority
CN
China
Prior art keywords
load
power
distribution network
voltage
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201910684886.9A
Other languages
Chinese (zh)
Other versions
CN110323785A (en
Inventor
金国彬
权然
辛业春
刘钊
石超
潘狄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University, Electric Power Research Institute of State Grid Jilin Electric Power Co LtdfiledCriticalNortheast Dianli University
Priority to CN201910684886.9ApriorityCriticalpatent/CN110323785B/en
Publication of CN110323785ApublicationCriticalpatent/CN110323785A/en
Application grantedgrantedCritical
Publication of CN110323785BpublicationCriticalpatent/CN110323785B/en
Expired - Fee Relatedlegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Classifications

Landscapes

Abstract

Translated fromChinese

本发明是一种基于源‑网‑荷‑储互动的多电压等级直流配电网优化调度方法,其特点是,在直流配电网中引入源‑网‑荷‑储互动优化概念,在深入分析互动负荷特性基础上,充分发挥互动负荷及储能技术对系统消纳光伏的效用;建立以运行成本、网损率和电压偏差为目标的直流配电网多目标优化调度模型,采用多目标粒子群优化算法对优化模型进行求解;并对多目标优化结果进行对比分析验证源‑网‑荷‑储互动模型能够使系统更为优化运行,同时利用互动负荷和储能系统进行协同优化能大幅降低系统运行成本、网损率及电压偏差,有效提高光伏消纳水平,实现直流配电网安全可靠运行。具有方法科学合理,适用性强,效果佳的优点。

Figure 201910684886

The invention is a multi-voltage level DC distribution network optimization scheduling method based on source-grid-load-storage interaction, which is characterized in that the concept of source-grid-load-storage interaction optimization is introduced into the DC distribution network. On the basis of analyzing the characteristics of the interactive load, give full play to the effect of the interactive load and energy storage technology on the photovoltaic system; The particle swarm optimization algorithm solves the optimization model; and compares and analyzes the multi-objective optimization results to verify that the source-grid-load-storage interactive model can make the system operate more optimally, and the use of interactive load and energy storage system for collaborative optimization can significantly improve Reduce system operation cost, network loss rate and voltage deviation, effectively improve photovoltaic absorption level, and realize safe and reliable operation of DC distribution network. It has the advantages of scientific and reasonable method, strong applicability and good effect.

Figure 201910684886

Description

Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction
Technical Field
The invention relates to the technical field of direct current power distribution networks, in particular to a source-network-load-storage interaction-based multi-voltage-level direct current power distribution network optimal scheduling method.
Background
With the development of power generation technologies of clean renewable energy sources such as solar energy, the proportion of direct current sources and loads connected into a power grid in a power system is increased day by day. Under the background, compared with an alternating-current power distribution network, the direct-current power distribution network is convenient for the access of a direct-current source and a load, the use of a current converter can be reduced, the operation efficiency of the system is improved, and the direct-current power distribution network becomes the focus of domestic and foreign research. Typical renewable energy photovoltaic power generation can be directly connected into a direct current distribution network through a DC/DC converter, so that the input cost and the operation loss of the system are greatly improved. However, the fluctuation and randomness of the output power of the photovoltaic power generation system also cause the problem of photovoltaic power generation consumption, so that the problem of optimal scheduling of the direct-current power distribution network is more complicated. How to improve the operation of the system and design an optimization model suitable for a direct current power distribution network so as to enable the system to achieve the optimal operation is a problem to be solved urgently at present.
Disclosure of Invention
The invention discloses a source-network-charge-storage interaction-based multi-voltage level direct current distribution network optimal scheduling method, which aims to solve the problems that the random fluctuation of photovoltaic output power in a photovoltaic-containing multi-voltage level direct current distribution network is strong and photovoltaic absorption exists, introduces a source-network-charge-storage interaction optimization concept into the direct current distribution network, and fully exerts the photovoltaic absorption effect of an interaction load and energy storage technology on a system on the basis of deeply analyzing the interaction load characteristics; establishing a direct-current power distribution network multi-target optimization scheduling model with the operation cost, the network loss rate and the voltage deviation as targets, and solving the optimization model by adopting a multi-target particle swarm optimization algorithm; and the multi-objective optimization result is compared, analyzed and verified to enable the system to operate more optimally through the source-network-load-storage interaction model, and meanwhile, the interactive load and the energy storage system are utilized to perform collaborative optimization, so that the system operation cost, the network loss rate and the voltage deviation can be greatly reduced, the photovoltaic consumption level is effectively improved, and the safe and reliable operation of the direct-current power distribution network is realized.
The technical scheme adopted for realizing the aim of the invention is as follows: 1. a multi-voltage-level direct-current power distribution network optimal scheduling method based on source-network-load-storage interaction is characterized by comprising the following steps:
1) establishing an optimized dispatching system model of a multi-voltage-level direct-current power distribution network, wherein the direct-current power distribution network comprises a voltage source type converter, a DC/DC converter, a photovoltaic power generation unit, an energy storage system and a load;
2) establishing a source-network-load-storage interaction optimization system model in the multi-voltage-level direct-current power distribution network, as shown in formulas (1) to (8);
Figure GDA0003339410570000021
Figure GDA0003339410570000022
Figure GDA0003339410570000023
Figure GDA0003339410570000024
Figure GDA0003339410570000025
Figure GDA0003339410570000026
Figure GDA0003339410570000027
Figure GDA0003339410570000028
in the formula (1), VAIn order to be able to transfer the load characteristics of the load,
Figure GDA0003339410570000029
is the minimum power at which the load a can be transferred,
Figure GDA00033394105700000210
is the maximum power at which the load a can be transferred,
Figure GDA00033394105700000211
in order to be able to transfer the initial running time of the load a,
Figure GDA00033394105700000212
in order to be able to transfer the end run time of the load a,
Figure GDA00033394105700000213
minimum power consumption to transferable load A, CTLRepresenting a transferable load; in the formulae (2) to (4),
Figure GDA00033394105700000214
power for transferable loads during time T; equation (2) indicates that the power of the transferable load is within the allowable range during operation; formula (3) shows that at the end of the run, the power should meet the minimum power requirement to indicate that the equipment has completed work; the formula (4) shows that the transferable load participates in load scheduling to respond to the power grid requirement, and the power is transferred in a certain time and the work requirement is ensured to be completed; in the formula (5), VBIn order to be able to interrupt the load's load characteristics,
Figure GDA00033394105700000215
for the minimum power at which the load B can be interrupted,
Figure GDA00033394105700000216
for the maximum power at which the load B can be interrupted,
Figure GDA00033394105700000217
in order to be able to interrupt the initial running time of the load B,
Figure GDA00033394105700000218
in order to interrupt the termination run time of the load B,
Figure GDA00033394105700000219
minimum satisfaction requirement for interruptible load B, CILRepresenting an interruptible load; in the formulae (6) to (8),
Figure GDA00033394105700000220
in order to interrupt the load power for a period T,
Figure GDA00033394105700000221
for the actual satisfaction value of the interruptible load B at time T, equation (6) represents that the minimum power is 0 when the actual state of the device meets the satisfaction requirement of the user during the operation of the interruptible load; formula (7) shows that when the actual state of the device is not higher than the minimum satisfaction requirement of the user, the minimum power is the rated power of the device; the formula (8) shows that the interruptible load participates in load scheduling to meet the power grid requirement in the range of meeting the comfort level of the user;
3) taking the minimum total operation cost, voltage deviation and network loss rate of the multi-voltage-level direct-current power distribution network as a target function of the direct-current power distribution network, as shown in formulas (9) to (11), and obtaining an optimal scheduling model of the multi-voltage-level direct-current power distribution network by taking power balance constraint, node voltage constraint, line transmission power constraint, energy storage system constraint, photovoltaic power generation constraint, distribution network and external network interaction power constraint and interaction load constraint as constraint conditions as shown in formulas (12) to (21);
Figure GDA0003339410570000031
Figure GDA0003339410570000032
Figure GDA0003339410570000033
in formula (9), T is the scheduling period, Fpv(t) photovoltaic cost in DC distribution network operating cost, Fess(t) energy storage cost in DC distribution network operating cost, Fgrid(t) cost of purchasing electricity from a large power grid, Floss(t) is the loss cost of the DC distribution network in the operating cost, Fil(t) Interactive load cost in DC distribution network operating cost, NiAs number of devices, cpvFor the unit cost of electricity generation of the photovoltaic system, cessFor the unit power generation cost of the energy storage system, cbuyTo purchase electricity, csellFor selling electricity, clossTo the loss cost of the network, clsCompensating costs for transferable loads, ccuCompensating costs for interruptible loads, Ppv,iFor photovoltaic power generation, Pess,iFor charging and discharging power, P, of the energy storage systembuyTo purchase electric power, PsellFor selling electricity, PlossFor total loss of the network, Pls,subFor transferable load power, Pcu,subIs interruptible load power; in the formula (10), Ui,tIs the voltage amplitude, U, of node i during a period te,iIs the nominal voltage of node i; in formula (11), PLi,lossFor the loss of line i, PTj,lossFor losses in transformer j, PtotalThe total active power input for the whole network;
Ppv+Pess+Pgrid=Pload+Ploss+Pil (12)
Figure GDA0003339410570000041
Figure GDA0003339410570000042
Figure GDA0003339410570000043
Figure GDA0003339410570000044
SOCmin≤SOC(t)≤SOCmax (17)
RPV≥Rpv,min (18)
Figure GDA0003339410570000045
Figure GDA0003339410570000046
mload≤Mload (21)
in the formula (13), Ui,tFor the duration of time t the voltage magnitude at node i,
Figure GDA0003339410570000047
for the lower limit value of the voltage of the node i for the period t,
Figure GDA0003339410570000048
the upper limit value of the voltage of the node i in the period t; in formula (14), Pij,tFor the transmission power on line i, j for period t,
Figure GDA0003339410570000049
maximum transmission power on line ij for time period t; in the formulae (15) to (17),
Figure GDA00033394105700000410
for the charging power of the energy storage system i at time t,
Figure GDA00033394105700000411
for the discharge power of the energy storage system i at time t,
Figure GDA00033394105700000412
is the maximum charging power of the energy storage system i,
Figure GDA00033394105700000413
is the maximum discharge power, SOC, of the energy storage system iminIs the minimum value of the state of charge, SOC, of the energy storage systemmaxThe maximum value of the state of charge of the energy storage system; in the formulae (18) and (19), RPVThe photovoltaic absorption rate; rpv,minIs the minimum value of the photovoltaic absorption rate, Ppv(t) is the photovoltaic system output power at time t,
Figure GDA00033394105700000414
outputting the maximum value of the power of the photovoltaic system in the t time period; in the formula (20), PgridFor the power interaction between the direct current distribution network and the external network,
Figure GDA00033394105700000415
is the minimum value of the interactive power of the direct current distribution network and the external network,
Figure GDA00033394105700000416
the maximum value of the interaction power of the direct-current power distribution network and the external network is obtained; in the formula (21), mloadTo be able to transfer the amount of load transfer, MloadIs a transferable load capacity;
4) solving the multi-voltage-level direct-current power distribution network optimized dispatching model in the step 3) through a multi-objective particle swarm optimization algorithm to obtain an optimal solution.
The invention provides a source-network-load-storage interaction-based multi-voltage-class direct-current power distribution network optimal scheduling method aiming at the problems that the random fluctuation of photovoltaic output power in a photovoltaic-containing multi-voltage-class direct-current power distribution network is strong and photovoltaic consumption exists, and the method is characterized in that a source-network-load-storage interaction optimization concept is introduced into the direct-current power distribution network, and the photovoltaic consumption effect of an interaction load and energy storage technology on a system is fully exerted on the basis of deep analysis of interaction load characteristics; establishing a direct-current power distribution network multi-target optimization scheduling model taking operation cost, network loss rate and voltage deviation as targets, and solving the optimization model by adopting a multi-target particle swarm optimization algorithm; and the multi-objective optimization result is compared, analyzed and verified to enable the system to operate more optimally through the source-network-load-storage interaction model, and meanwhile, the interactive load and the energy storage system are utilized to perform collaborative optimization, so that the system operation cost, the network loss rate and the voltage deviation can be greatly reduced, the photovoltaic consumption level is effectively improved, and the safe and reliable operation of the direct-current power distribution network is realized. Has the advantages of scientific and reasonable method, strong applicability and good effect.
Drawings
FIG. 1 is a schematic diagram of a source-grid-load-storage interaction principle of an optimal scheduling method of a multi-voltage-class direct-current power distribution network based on source-grid-load-storage interaction;
fig. 2 is a diagram of a dc distribution network structure according to the present invention;
FIG. 3 is a schematic view of a photovoltaic prediction curve according to the present invention;
FIG. 4 is a schematic view of a load prediction curve according to the present invention;
FIG. 5 is a diagram illustrating the charging and discharging operation of an energy storage system according to the present invention;
FIG. 6 is a schematic diagram of load curves before and after a transferable load transfer in accordance with the present invention;
fig. 7 is a schematic diagram of a comparison curve of transmission power of a low voltage class interconnection branch according to the present invention.
Detailed Description
The following describes a source-grid-load-storage interaction-based multi-voltage-class direct-current distribution network optimal scheduling method in the present invention with reference to the accompanying drawings and embodiments.
The invention discloses a source-network-load-storage interaction-based multi-voltage-level direct-current power distribution network optimal scheduling method, which comprises the following steps of:
1) establishing an optimized dispatching system model of a multi-voltage-level direct-current power distribution network, wherein the direct-current power distribution network comprises a voltage source type converter, a DC/DC converter, a photovoltaic power generation unit, an energy storage system and a load;
2) establishing a source-network-load-storage interaction optimization system model in the multi-voltage-level direct-current power distribution network, as shown in formulas (1) to (8);
Figure GDA0003339410570000061
Figure GDA0003339410570000062
Figure GDA0003339410570000063
Figure GDA0003339410570000064
Figure GDA0003339410570000065
Figure GDA0003339410570000066
Figure GDA0003339410570000067
Figure GDA0003339410570000068
in the formula (1), VAIn order to be able to transfer the load characteristics of the load,
Figure GDA0003339410570000069
is the minimum power at which the load a can be transferred,
Figure GDA00033394105700000610
is the maximum power at which the load a can be transferred,
Figure GDA00033394105700000611
in order to be able to transfer the initial running time of the load a,
Figure GDA00033394105700000612
in order to be able to transfer the end run time of the load a,
Figure GDA00033394105700000613
minimum power consumption to transferable load A, CTLRepresenting a transferable load; in the formulae (2) to (4),
Figure GDA00033394105700000614
power for transferable loads during time T; equation (2) indicates that the power of the transferable load is within the allowable range during operation; formula (3) shows that at the end of the run, the power should meet the minimum power requirement to indicate that the equipment has completed work; the formula (4) shows that the transferable load participates in load scheduling to respond to the power grid requirement, and the power is transferred in a certain time and the work requirement is ensured to be completed; in the formula (5), VBIn order to be able to interrupt the load's load characteristics,
Figure GDA00033394105700000615
for the minimum power at which the load B can be interrupted,
Figure GDA00033394105700000616
for the maximum power at which the load B can be interrupted,
Figure GDA00033394105700000617
in order to be able to interrupt the initial running time of the load B,
Figure GDA00033394105700000618
in order to interrupt the termination run time of the load B,
Figure GDA00033394105700000619
minimum satisfaction requirement for interruptible load B, CILRepresenting an interruptible load; in the formulae (6) to (8),
Figure GDA00033394105700000620
in order to interrupt the load power for a period T,
Figure GDA00033394105700000621
for the actual satisfaction value of the interruptible load B at time T, equation (6) represents that the minimum power is 0 when the actual state of the device meets the satisfaction requirement of the user during the operation of the interruptible load; formula (7) shows that when the actual state of the device is not higher than the minimum satisfaction requirement of the user, the minimum power is the rated power of the device; the formula (8) shows that the interruptible load participates in load scheduling to meet the power grid requirement in the range of meeting the comfort level of the user;
3) taking the minimum total operation cost, voltage deviation and network loss rate of the multi-voltage-level direct-current power distribution network as a target function of the direct-current power distribution network, as shown in formulas (9) to (11), and obtaining an optimal scheduling model of the multi-voltage-level direct-current power distribution network by taking power balance constraint, node voltage constraint, line transmission power constraint, energy storage system constraint, photovoltaic power generation constraint, distribution network and external network interaction power constraint and interaction load constraint as constraint conditions as shown in formulas (12) to (21);
Figure GDA0003339410570000071
Figure GDA0003339410570000072
Figure GDA0003339410570000073
in formula (9), T is the scheduling period, Fpv(t) photovoltaic cost in DC distribution network operating cost, Fess(t) energy storage cost in DC distribution network operating cost, Fgrid(t) cost of purchasing electricity from a large power grid, Floss(t) is the loss cost of the DC distribution network in the operating cost, Fil(t) Interactive load cost in DC distribution network operating cost, NiAs number of devices, cpvFor the unit cost of electricity generation of the photovoltaic system, cessFor the unit power generation cost of the energy storage system, cbuyTo purchase electricity, csellFor selling electricity, clossTo the loss cost of the network, clsCompensating costs for transferable loads, ccuCompensating costs for interruptible loads, Ppv,iFor photovoltaic power generation, Pess,iFor charging and discharging power, P, of the energy storage systembuyTo purchase electric power, PsellFor selling electricity, PlossFor total loss of the network, Pls,subFor transferable load power, Pcu,subIs interruptible load power; in the formula (10), Ui,tIs the voltage amplitude, U, of node i during a period te,iIs the nominal voltage of node i; in formula (11), PLi,lossFor the loss of line i, PTj,lossFor losses in transformer j, PtotalThe total active power input for the whole network;
Ppv+Pess+Pgrid=Pload+Ploss+Pil (12)
Figure GDA0003339410570000081
Figure GDA0003339410570000082
Figure GDA0003339410570000083
Figure GDA0003339410570000084
SOCmin≤SOC(t)≤SOCmax (17)
RPV≥Rpv,min (18)
Figure GDA0003339410570000085
Figure GDA0003339410570000086
mload≤Mload (21)
in the formula (13), Ui,tFor the duration of time t the voltage magnitude at node i,
Figure GDA0003339410570000087
for the lower limit value of the voltage of the node i for the period t,
Figure GDA0003339410570000088
the upper limit value of the voltage of the node i in the period t; in formula (14), Pij,tFor the transmission power on line i, j for period t,
Figure GDA0003339410570000089
maximum transmission power on line ij for time period t; in the formulae (15) to (17),
Figure GDA00033394105700000810
for the charging power of the energy storage system i at time t,
Figure GDA00033394105700000811
for the discharge power of the energy storage system i at time t,
Figure GDA00033394105700000812
is the maximum charging power of the energy storage system i,
Figure GDA00033394105700000813
is the maximum discharge power, SOC, of the energy storage system iminIs the minimum value of the state of charge, SOC, of the energy storage systemmaxThe maximum value of the state of charge of the energy storage system; in the formulae (18) and (19), RPVThe photovoltaic absorption rate; rpv,minIs the minimum value of the photovoltaic absorption rate, Ppv(t) is the photovoltaic system output power at time t,
Figure GDA00033394105700000814
outputting the maximum value of the power of the photovoltaic system in the t time period; in the formula (20), PgridFor the power interaction between the direct current distribution network and the external network,
Figure GDA00033394105700000815
is the minimum value of the interactive power of the direct current distribution network and the external network,
Figure GDA00033394105700000816
the maximum value of the interaction power of the direct-current power distribution network and the external network is obtained; in the formula (21), mloadTo be able to transfer the amount of load transfer, MloadIs a transferable load capacity;
4) solving the multi-voltage-level direct-current power distribution network optimized dispatching model in the step 3) through a multi-objective particle swarm optimization algorithm to obtain an optimal solution.
Referring to fig. 1, the invention realizes bidirectional transmission of energy and information at the source side, the multi-voltage-level direct current distribution network side, the load side and the energy storage side in the direct current distribution system based on source-network-load-storage interaction, and realizes active management decision and optimal control.
Referring to fig. 2, the direct current distribution network adopts a double-end ring network structure, operates under two voltage levels of +/-10 kV and +/-0.375 kV, and comprises 19 nodes in total. Thenodes 1 and 2 are connected with an alternating current power grid through an AC/DC converter and are infinite power supplies; thenodes 9 and 10 are subjected to voltage grade conversion through a DC/DC converter; thenode 3 and the node 9 are respectively an electric automobile power change station and a cell load, wherein the electric automobile power change station and the cell load comprise transferable loads;node 8 is an industrial campus that contains interruptible load nodes. The SOC regulation range of the energy storage system is 2% -95%, and the charge-discharge efficiency is 95%. The node types and parameters are shown in table 1, the other nodes are load nodes, and the load values are shown in fig. 1.Region 1 andregion 2 are two different regions in the low voltage class, and nodes 13-17 are interconnected by a DC/DC converter. The resistance of each branch of the direct-current distribution network is shown in table 2, and the voltage deviation in the objective function is within +/-7% of a standard limit value. The electricity rate information is shown in table 3.
TABLE 1 DC distribution network parameters
Figure GDA0003339410570000091
TABLE 2 DC POWER DISTRIBUTION NETWORK RESISTANCE
Figure GDA0003339410570000092
TABLE 3 time-of-use electricity price situation of DC distribution network
Figure GDA0003339410570000093
Figure GDA0003339410570000101
Referring to fig. 3, a predicted 24-hour photovoltaic power generation output curve in a dc power distribution grid in accordance with an embodiment of the present invention.
Referring to fig. 4, a 24-hour load prediction curve in a dc distribution network according to an embodiment of the present invention.
And analyzing a direct current distribution network source-network-load-storage interaction optimization system, and setting three different optimization scheduling schemes.Scheme 1 is that a source-load-storage interaction optimization system participates in optimization scheduling; in thescheme 2, a DC/DC converter is added on the basis of thescheme 1 to regulate the voltage of the fixed voltage node; in thescheme 3, interconnection interaction optimization among different areas with low voltage grades is added on the basis of thescheme 2, and the resistance of an interconnection branch is 1.0398 omega.
Referring to fig. 5, in the energy storage system according to the three schemes of the embodiment of the present invention, it can be seen from the figure that when the photovoltaic power generation amount is greater than the load demand in the daytime, the stored energy is charged to ensure the photovoltaic power consumption; after the photovoltaic system stops generating power at night and is also in the peak period of power utilization, the energy storage system discharges, the electric quantity transferred from the external network to the direct-current power distribution network is reduced, and the system cost and the network loss are improved.
Referring to fig. 6, the three schemes of the embodiment of the present invention can transfer load before and after transfer, and as can be seen from the figure, the transferable load transfers part of the load during night (18 to 22 o 'clock) to the middle (10 to 14 o' clock) to operate, so that the load during the high peak time period is transferred, which not only relieves the power supply pressure, but also promotes photovoltaic absorption during the day, can coordinate with the energy storage system, avoids the light rejection phenomenon, relieves the charging and discharging conditions of the energy storage, and can delay the aging speed of the storage battery.
The voltage of each node after system optimization in the three schemes is shown in table 6, the rated voltage of the node 1-11 before optimization is 10kV, and the rated voltage of the node 12-19 before optimization is 0.375 kV. The results show that the network side participates in interaction through the DC/DC converter, the voltage of each node is corrected, the reference value of the fixed voltage is adjusted, and the system is optimally scheduled. In the case of thescheme 2 and thescheme 3, the fixedvoltage nodes 1 and 2 are regulated, and the node voltage is increased within the voltage deviation margin range, so that the system network loss is improved.
TABLE 6 optimized three schemes
Figure GDA0003339410570000102
Figure GDA0003339410570000111
Referring to fig. 7, before and after the optimization of the interactive transmission power of the low voltage network according to an embodiment of the present invention, it can be seen from the figure that the line can adjust the transmission power in real time after the optimization of the interconnection branch in thescheme 3, which more meets the system requirements. Thescheme 1 and thescheme 2 are not provided with interconnection interaction optimization, and the transmission power is consistent with the optimized front curve in thescheme 3.
The results after optimization are shown in table 7.Scheme 1 is source-load-storage interactive optimization scheduling result, comparesscheme 1 with two other schemes and can reachs, and the interaction that has increased the net side can play obvious improvement effect to the objective function of optimization model, and the DC/DC converter that increases inscheme 2 is to the voltage regulation of fixed voltage node, and rising node voltage makes the net rate of loss can obviously reduce, and although the voltage deviation improves slightly, total operating cost obtains reducing under the circumstances of net loss cost reduction. Further comparing the optimization results inscheme 3, it can be seen that increasing the power of the interconnection line can significantly improve the system voltage deviation, the network loss rate, and the total operating cost compared to the two schemes. In summary, the source-network-load-storage overall interactive system in thescheme 3 can optimize the objective function.
TABLE 7 comparison of the results of the optimization of the three protocols
Figure GDA0003339410570000112
The embodiments of the present invention are not exhaustive, and those skilled in the art will still fall within the scope of the present invention as claimed without simple duplication and modification by the inventive efforts.

Claims (1)

1. A multi-voltage-level direct-current power distribution network optimal scheduling method based on source-network-load-storage interaction is characterized by comprising the following steps:
1) establishing an optimized dispatching system model of a multi-voltage-level direct-current power distribution network, wherein the direct-current power distribution network comprises a voltage source type converter, a DC/DC converter, a photovoltaic power generation unit, an energy storage system and a load;
2) establishing a source-network-load-storage interaction optimization system model in the multi-voltage-level direct-current power distribution network, as shown in formulas (1) to (8);
Figure FDA0003339410560000011
Figure FDA0003339410560000012
Figure FDA0003339410560000013
Figure FDA0003339410560000014
Figure FDA0003339410560000015
Figure FDA0003339410560000016
Figure FDA0003339410560000017
Figure FDA0003339410560000018
in the formula (1), VAIn order to be able to transfer the load characteristics of the load,
Figure FDA0003339410560000019
is the minimum power at which the load a can be transferred,
Figure FDA00033394105600000110
is the maximum power at which the load a can be transferred,
Figure FDA00033394105600000111
in order to be able to transfer the initial running time of the load a,
Figure FDA00033394105600000112
in order to be able to transfer the end run time of the load a,
Figure FDA00033394105600000113
minimum power consumption to transferable load A, CTLRepresenting a transferable load; in the formulae (2) to (4),
Figure FDA00033394105600000114
power for transferable loads during time T; equation (2) indicates that the power of the transferable load is within the allowable range during operation; formula (3) shows that at the end of the run, the power should meet the minimum power requirement to indicate that the equipment has completed work; the formula (4) shows that the transferable load participates in load scheduling to respond to the power grid requirement, and the power is transferred in a certain time and the work requirement is ensured to be completed; in the formula (5), VBIn order to be able to interrupt the load's load characteristics,
Figure FDA00033394105600000115
for the minimum power at which the load B can be interrupted,
Figure FDA00033394105600000116
for the maximum power at which the load B can be interrupted,
Figure FDA00033394105600000117
in order to be able to interrupt the initial running time of the load B,
Figure FDA00033394105600000118
in order to interrupt the termination run time of the load B,
Figure FDA00033394105600000119
is the lowest satisfaction of interruptible load BDegree required, CILRepresenting an interruptible load; in the formulae (6) to (8),
Figure FDA00033394105600000120
in order to interrupt the load power for a period T,
Figure FDA00033394105600000121
for the actual satisfaction value of the interruptible load B at time T, equation (6) represents that the minimum power is 0 when the actual state of the device meets the satisfaction requirement of the user during the operation of the interruptible load; formula (7) shows that when the actual state of the device is not higher than the minimum satisfaction requirement of the user, the minimum power is the rated power of the device; the formula (8) shows that the interruptible load participates in load scheduling to meet the power grid requirement in the range of meeting the comfort level of the user;
3) taking the minimum total operation cost, voltage deviation and network loss rate of the multi-voltage-level direct-current power distribution network as a target function of the direct-current power distribution network, as shown in formulas (9) to (11), and obtaining an optimal scheduling model of the multi-voltage-level direct-current power distribution network by taking power balance constraint, node voltage constraint, line transmission power constraint, energy storage system constraint, photovoltaic power generation constraint, distribution network and external network interaction power constraint and interaction load constraint as constraint conditions as shown in formulas (12) to (21);
Figure FDA0003339410560000021
Figure FDA0003339410560000022
Figure FDA0003339410560000023
in formula (9), T is the scheduling period, Fpv(t) photovoltaic cost in DC distribution network operating cost, Fess(t) is direct currentEnergy storage cost in distribution network operating cost, Fgrid(t) cost of purchasing electricity from a large power grid, Floss(t) is the loss cost of the DC distribution network in the operating cost, Fil(t) Interactive load cost in DC distribution network operating cost, NiAs number of devices, cpvFor the unit cost of electricity generation of the photovoltaic system, cessFor the unit power generation cost of the energy storage system, cbuyTo purchase electricity, csellFor selling electricity, clossTo the loss cost of the network, clsCompensating costs for transferable loads, ccuCompensating costs for interruptible loads, Ppv,iFor photovoltaic power generation, Pess,iFor charging and discharging power, P, of the energy storage systembuyTo purchase electric power, PsellFor selling electricity, PlossFor total loss of the network, Pls,subFor transferable load power, Pcu,subIs interruptible load power; in the formula (10), Ui,tIs the voltage amplitude, U, of node i during a period te,iIs the nominal voltage of node i; in formula (11), PLi,lossFor the loss of line i, PTj,lossFor losses in transformer j, PtotalThe total active power input for the whole network;
Ppv+Pess+Pgrid=Pload+Ploss+Pil (12)
Figure FDA0003339410560000024
Figure FDA0003339410560000025
Figure FDA0003339410560000031
Figure FDA0003339410560000032
SOCmin≤SOC(t)≤SOCmax (17)
RPV≥Rpv,min (18)
Figure FDA0003339410560000033
Figure FDA0003339410560000034
Figure FDA0003339410560000035
in the formula (13), Ui,tFor the duration of time t the voltage magnitude at node i,
Figure FDA0003339410560000036
for the lower limit value of the voltage of the node i for the period t,
Figure FDA0003339410560000037
the upper limit value of the voltage of the node i in the period t; in formula (14), Pij,tFor the transmission power on line i, j for period t,
Figure FDA0003339410560000038
maximum transmission power on line ij for time period t; in the formulae (15) to (17),
Figure FDA0003339410560000039
for the charging power of the energy storage system i at time t,
Figure FDA00033394105600000310
for the discharge power of the energy storage system i at time t,
Figure FDA00033394105600000311
is the maximum charging power of the energy storage system i,
Figure FDA00033394105600000312
is the maximum discharge power, SOC, of the energy storage system iminIs the minimum value of the state of charge, SOC, of the energy storage systemmaxThe maximum value of the state of charge of the energy storage system; in the formulae (18) and (19), RPVThe photovoltaic absorption rate; rpv,minIs the minimum value of the photovoltaic absorption rate, Ppv(t) is the photovoltaic system output power at time t,
Figure FDA00033394105600000313
outputting the maximum value of the power of the photovoltaic system in the t time period; in the formula (20), PgridFor the power interaction between the direct current distribution network and the external network,
Figure FDA00033394105600000314
is the minimum value of the interactive power of the direct current distribution network and the external network,
Figure FDA00033394105600000315
the maximum value of the interaction power of the direct-current power distribution network and the external network is obtained; in the formula (21), mloadTo be able to transfer the amount of load transfer, MloadIs a transferable load capacity;
4) solving the multi-voltage-level direct-current power distribution network optimized dispatching model in the step 3) through a multi-objective particle swarm optimization algorithm to obtain an optimal solution.
CN201910684886.9A2019-07-262019-07-26Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interactionExpired - Fee RelatedCN110323785B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201910684886.9ACN110323785B (en)2019-07-262019-07-26Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201910684886.9ACN110323785B (en)2019-07-262019-07-26Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction

Publications (2)

Publication NumberPublication Date
CN110323785A CN110323785A (en)2019-10-11
CN110323785Btrue CN110323785B (en)2022-02-01

Family

ID=68124574

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201910684886.9AExpired - Fee RelatedCN110323785B (en)2019-07-262019-07-26Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction

Country Status (1)

CountryLink
CN (1)CN110323785B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111490563B (en)*2020-05-052021-09-28东北电力大学Adaptive time scale optimization scheduling method suitable for alternating current-direct current power distribution network
CN114938040B (en)*2022-06-102023-12-29国网浙江省电力有限公司电力科学研究院Comprehensive optimization regulation and control method and device for source-network-load-storage alternating current-direct current system
CN115498664A (en)*2022-09-282022-12-20国网浙江省电力有限公司杭州供电公司Hydrogen-electricity coupling comprehensive energy system combined with flexible direct-current power distribution network
CN115622052B (en)*2022-11-182023-03-28国网天津市电力公司电力科学研究院 Centralized optimization dispatching method, equipment, system and storage medium of distribution network side
CN115940299B (en)*2023-02-272023-06-09国网江西省电力有限公司经济技术研究院 A collaborative optimization method for active power and reactive power of power distribution system source network load storage
CN117239768B (en)*2023-10-312024-11-26国网北京市电力公司 A method, system, device and medium for controlling voltage of AC/DC hybrid distribution network
CN117638912A (en)*2023-12-042024-03-01国网北京市电力公司Multi-element equipment coordination control method and device, electronic equipment and storage medium thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JP2015135625A (en)*2014-01-172015-07-27中国電力株式会社Load control device, load control system, load control method, and program
CN105914758A (en)*2016-05-172016-08-31华北电力大学Power grid reactive power optimization method considering reactive power compensation cost of distributed power supply
CN107196310A (en)*2016-03-152017-09-22中国电力科学研究院The active distribution network Multiple Time Scales optimization method of consideration source net lotus coordination and interaction
CN108494015A (en)*2018-02-092018-09-04中国科学院电工研究所The integrated energy system design method of one introduces a collection-lotus-storage coordination and interaction
CN109962476A (en)*2019-02-012019-07-02中国电力科学研究院有限公司 A method and device for interactive energy management of source-grid-load-storage interaction in microgrid

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JP2015135625A (en)*2014-01-172015-07-27中国電力株式会社Load control device, load control system, load control method, and program
CN107196310A (en)*2016-03-152017-09-22中国电力科学研究院The active distribution network Multiple Time Scales optimization method of consideration source net lotus coordination and interaction
CN105914758A (en)*2016-05-172016-08-31华北电力大学Power grid reactive power optimization method considering reactive power compensation cost of distributed power supply
CN108494015A (en)*2018-02-092018-09-04中国科学院电工研究所The integrated energy system design method of one introduces a collection-lotus-storage coordination and interaction
CN109962476A (en)*2019-02-012019-07-02中国电力科学研究院有限公司 A method and device for interactive energy management of source-grid-load-storage interaction in microgrid

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Active Distribution Network Bi-level Planning Considering the "Source-Grid-Load-Storage" Collaborative;YAN Hanting et al.;《2018 International Conference on Power System Technology (POWERCON)》;20190107;第1712-1716页*
The OPF model and algorithm for "source-grid-load" interactive optimal regulation participated with flexible load;Qi Li et al.;《2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT)》;20160314;第205-209页*
含柔性负荷的主动配电网优化模型研究;贾先平等;《电测与仪表》;20180710;第55卷(第13期);第46-52、116页*
基于柔性互联的源网荷储协同主动配电网设计研究;章雷其等;《供用电》;20180105;第35卷(第1期);第205-209页*

Also Published As

Publication numberPublication date
CN110323785A (en)2019-10-11

Similar Documents

PublicationPublication DateTitle
CN110323785B (en)Multi-voltage-level direct-current power distribution network optimization scheduling method for source network load storage interaction
Tran et al.An efficient energy management approach for a solar-powered EV battery charging facility to support distribution grids
CN110311396B (en)Hybrid energy storage capacity optimization configuration method for AC/DC hybrid micro-grid
CN105591406B (en)A kind of optimized algorithm of the microgrid energy management system based on non-cooperative game
CN110289622B (en)Day-ahead economic optimization scheduling method for optical storage and energy charging router
CN107069791B (en) An Integrated Demand Response Approach Considering the Interaction of Industrial Parks and Factories
CN108695871B (en) Configuration method for islanded microgrids with power springs to reduce energy storage capacity requirements
CN108448632B (en) Intraday rolling optimal scheduling method for AC/DC microgrid considering energy storage state-of-charge cycle
CN106339778A (en)Optical storage microgrid operation optimization method considering multiple objectives
CN202134924U (en) Construction of a solar power grid-connected self-use multifunctional system
CN109193803B (en)Multi-energy intelligent control integrated system and multi-energy intelligent control method
CN105406520A (en)Economic dispatch optimization method of independent microgrid on basis of dual master control dynamic cooperation
CN110601334A (en)Charging station and energy dispatching management method thereof
CN116780588A (en)Method of controlling a battery energy storage system of an electrical power system with a high dynamic load
CN110350553A (en)Inlet wire power peak suppressing method and system based on more power conditioning technologies
Kallel et al.An energy cooperative system concept of DC grid distribution and PV system for supplying multiple regional AC smart grid connected houses
CN115173466A (en)Photovoltaic-charging pile-building integrated alternating current-direct current microgrid system and control method
CN109866628B (en)Ordered charging control method for electric vehicle with active power distribution network
CN103441555B (en)A kind of based on the MPPT accumulator charging control method controlled
CN108376994B (en) Operation optimization method of AC-DC hybrid microgrid based on grid-connected three-port power electronic transformer
Abronzini et al.Multi-source power converter system for EV charging station with integrated ESS
CN115459348B (en)Micro-grid optimal resource regulation and control method considering peak-valley electricity price
CN102931676A (en)Structure and method of solar power grid-connected self-use multifunctional system
CN116565964B (en)Direct current bus control system under all working conditions of household light storage system
Choudhary et al.Reduction of electricity bill with stand-alone solar PV system

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant
CF01Termination of patent right due to non-payment of annual fee
CF01Termination of patent right due to non-payment of annual fee

Granted publication date:20220201