CN110287565A - Lifecycle management system is carried out to traffic engineering based on BIM+GIS - Google Patents

Lifecycle management system is carried out to traffic engineering based on BIM+GIS
Download PDF

Info

Publication number
CN110287565A
CN110287565ACN201910523930.8ACN201910523930ACN110287565ACN 110287565 ACN110287565 ACN 110287565ACN 201910523930 ACN201910523930 ACN 201910523930ACN 110287565 ACN110287565 ACN 110287565A
Authority
CN
China
Prior art keywords
risk
data
gis
information
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910523930.8A
Other languages
Chinese (zh)
Inventor
米国兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an New Window Technology Co Ltd
Original Assignee
Xi'an New Window Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an New Window Technology Co LtdfiledCriticalXi'an New Window Technology Co Ltd
Priority to CN201910523930.8ApriorityCriticalpatent/CN110287565A/en
Publication of CN110287565ApublicationCriticalpatent/CN110287565A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

The invention discloses one kind to carry out lifecycle management system to traffic engineering based on BIM+GIS, including O&M server, GIS Cloud Server, the end Web, mobile terminal, urban rail transit construction phase safety monitoring warning module, the distributed cloud computing module of operation stage integrated information administration module and big data analysis, the distributed cloud computing module of the O&M server and big data analysis, operation stage integrated information administration module, urban rail transit construction phase safety monitoring warning module, mobile terminal, the end Web and GIS Cloud Server are respectively connected with, the end Web is connected with GIS Cloud Server.The present invention realizes the intercommunication of data, shared, integrated decision-making, the final lifecycle management for realizing urban rail transit construction, foundation is provided for subsequent line construction, system has carried out structured storage, data supporting is provided to the integrated management of road and bridge for system, is suitable for the safety monitoring early warning of urban rail transit construction phase, operation stage integrated information is supervised.

Description

Lifecycle management system is carried out to traffic engineering based on BIM+GIS
Technical field
The present invention relates to rail traffic technical field of information management, it is specially a kind of based on BIM+GIS to traffic engineering intoRow lifecycle management system.
Background technique
System in Rail Transit Construction Project compared to common buildings engineering have scale of investment is big, the construction period is long, project under construction is more,The features such as construction technology is complicated, risk factors are more, big to social environment influence, and engineering construction risk is big.Urban rail transit construction workAccident is sent out in journey work progress repeatly, and part damage sequence is extremely heavy.In previous System in Rail Transit Construction Project, constituent partsOften only emphasize responsibility system, sense of responsibility, with traditional experience management method, this does not adapt to enhancing risk accidents prediction energyThe needs of power and prevention and control ability.In addition, subway construction is shorter in China's developing history, Expert Resources are limited, in addition engineering constructionData volume is big, and data class is more, and expert can not easily obtain data sometimes and analyze, and finds out risk hidden danger point in time.And as the level of IT application of metropolitan Construction of Urban Rail Traffic phase each in recent years and operation phase are continuously improved, in city railIn the long-term practical application of road traffic, many problems are gradually showed, such as the prison of Construction of Urban Rail Traffic phase and operation phasePipe connecting is poor, problem of detached island of information is serious, data are backward using way to manage, data resource treatment effeciency is low, city railThe defects such as traffic Applications construct mode is backward, engineering informationization management degree is low.Construction of Urban Rail Traffic phase and operation phaseInformation relevance more becomes the bottleneck for restricting entire urban track traffic job development, also exposes data resource, pipe graduallyThe problems such as reason mode, miscellaneous function etc. are not integrated sufficiently, cause in actual operation actual combat efficiency it is not high, largely shadowThe performance of supervision effect is rung.
Summary of the invention
The purpose of the present invention is to provide one kind to carry out lifecycle management system to traffic engineering based on BIM+GIS,To solve the problems mentioned in the above background technology.
In order to solve the above technical problem, the present invention provides following technical solutions:
One kind carrying out lifecycle management system to traffic engineering based on BIM+GIS, comprising:
O&M server is stored with BIM threedimensional model and data, construction material information, material experiment attribute information, constructionProgress msg, receiving the information and storage, the BIM threedimensional model for coming to the end Web and mobile terminal to input includes the bridge of udb formatBeam whole design model and road shell model;
GIS Cloud Server transfers BIM threedimensional model from O&M server, and loads map image and terrain information, isThe end Web provides GIS data basis, and is entered into the data in O&M server according to the subsequent end Web and mobile terminal and generates roadbedThe filling of block progress road shell model;
The end Web can be manually entered road information and be stored in O&M server, for checking depositing in O&M serverStore up threedimensional model, map image and terrain information in data and GIS Cloud Server;
Mobile terminal is sent to O&M server for acquiring road field data, and by field data;
Urban rail transit construction phase safety monitoring warning module, in Construction of Urban Rail Traffic station pit and sectionConstructing tunnel system constructs corresponding risk knowledge library respectively, and carries out risk assessment, risk using risk knowledge library informationTracking, risk control, module using pressure tester, Reinforcement Stress-count, soil pressure cell, axle power meter, multimetering slidingtypeThe sensors such as inclinometer constitute automatic data acquisition system, in conjunction with the artificial measurement data such as total station, level and manual inspectionData realize the multisource data fusion analysis to various data sources, integral monitoring Railway Transit Construction phase security risk;
It is all to can satisfy multi-line data resource sharing, emergency command coordination etc. for operation stage integrated information administration moduleMore integrated management demands pass through detection of passenger flow sensor, the spontaneous electric transducer of passive and wireless, laser, video sensor and constructionPhase pre-buried sensor realizes the monitoring management of rail transportation operation phase;
The distributed cloud computing module of big data analysis realizes rail traffic on big data, distributed frameworkConstruction period safety monitoring data and operation stage integrated information supervision data are collected, arrange, realize data intercommunication, it is shared andIntegrated decision-making, to realize that lifecycle management or even the subsequent line construction of urban rail transit construction provide foundation;
The distributed cloud computing module of the O&M server and big data analysis, operation stage integrated information supervise mouldBlock, urban rail transit construction phase safety monitoring warning module, mobile terminal, the end Web and GIS Cloud Server are respectively connected with, the end WebIt is connected with GIS Cloud Server.
Preferably, the urban rail transit construction phase safety monitoring warning module is to construct track based on history big dataTraffic engineering risk knowledge library, and realize the comprehensive identification of expert investigation and automatic identification and assessment risk, and according to evaluatingRisk establishes risk prediction scheme.
Preferably, the distributed cloud computing module of the big data analysis, collecting data information pass through center control systemThe data information of acquisition is compared by system with the threshold value of warning of corresponding monitoring information, if exceeding, central control system will be controlledGenerate early warning record.
Preferably, the urban rail transit construction phase safety monitoring warning module and operation stage integrated information supervise mouldBlock, if the risk generated is present in risk knowledge library, central control system will call directly related early warning scheme and notify phasePass personnel get rid of the danger;If not having to handle the scheme of respective risk in risk library, relevant person in charge is notified to formulate at corresponding riskReason scheme;Control system is eliminated early warning and is generated if early warning is effectively treated to form risk accidents not in time if completion of getting rid of the dangerRisk accidents report.
Preferably, the warning grade is divided into red, orange, yellow, central controller judges according to the information of acquisitionThe rank of early warning, and call corresponding scheme.
Preferably, establishing the real-time release mechanism of different alerts, take engineering straight for the monitoring data that transfinite of appearanceIt connects and participates in each side's consultation analysis, judgement and decision;For great dangerous situation, system is to the side of taking part in building, responsible departments of the government, responding agenciesThe alarm of real-time release, and start disposition and emergency preplan.
Preferably, it will include risk factors, the dynamic to cause the accident that occurrence risk accident, which forms risk accidents report,Risk concern, Risk-warning etc. look into the processing information of this risk overall process convenient for risk.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being: the present invention provides one kind to be based on BIM+GIS pairsTraffic engineering carries out lifecycle management system, the big data analysis platform based on cloud computing is established, by the business of big dataFramework applications build in rail traffic overall process information system and cover construction period construction safety information and operation period management monitoring letterThe integrated data system of breath realizes construction period many reference amounts index, multi-source data, multiple spot on-site data gathering, and the operation phase is examined safelyThe continuity of measurement information develops, and realizes intercommunication, the shared, integrated decision-making of data, the final full Life Cycle for realizing urban rail transit constructionPeriod management provides foundation for subsequent line construction;The data and work organization of science are provided, provide weight for the management of information systemThe decision support wanted;System has carried out structured storage, provides data supporting to the integrated management of road and bridge for system;Model for road generates and the late maintaining of highway provides data preparation;Suitable for the safety monitoring of urban rail transit construction phaseEarly warning, the supervision of operation stage integrated information.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the inventionIt applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is system building and operation block diagram of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, completeSite preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based onEmbodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every otherEmbodiment shall fall within the protection scope of the present invention.
A kind of BIM+GIS that is based on shown in FIG. 1 is please referred to traffic engineering progress lifecycle management system, including fortuneServer is tieed up, BIM threedimensional model and data, construction material information, material experiment attribute information, construction speed information are stored with,Receiving the information and storage, the BIM threedimensional model for coming to the end Web and mobile terminal to input includes that the bridge of udb format is integrally setCount model and road shell model;GIS Cloud Server transfers BIM threedimensional model from O&M server, and loads map imageAnd terrain information, GIS data basis is provided for the end Web, and be entered into O&M server according to the subsequent end Web and mobile terminalData generate the filling that ballast lump carries out road shell model;The end Web can be manually entered road information and be stored in O&M serviceIn device, threedimensional model, map image and landform letter in the storing data and GIS Cloud Server for checking in O&M serverBreath;Mobile terminal is sent to O&M server for acquiring road field data, and by field data;Urban rail transit construction phase peaceFull monitoring and warning module, constructs phase with running tunnel construction system for the station pit in Construction of Urban Rail Traffic respectivelyThe risk knowledge library answered, and risk assessment, risk tracking, risk control are carried out using risk knowledge library information, module is using pressureForce tester, Reinforcement Stress-count, soil pressure cell, axle power meter, multimetering the sensors such as sliding inclinometer constitute data fromDynamic acquisition system is realized in conjunction with the artificial measurement data such as total station, level and manual inspection data to the more of various data sourcesSource data convergence analysis, integral monitoring Railway Transit Construction phase security risk;Operation stage integrated information administration module, energyEnough meet many integrated management demands such as multi-line data resource sharing, emergency command coordination, passes through detection of passenger flow sensor, nothingSource wirelessly spontaneous electric transducer, laser, video sensor and construction period pre-buried sensor, realize the prison of rail transportation operation phaseKeyholed back plate reason;The distributed cloud computing module of big data analysis realizes rail traffic on big data, distributed frameworkConstruction period safety monitoring data and operation stage integrated information supervision data are collected, arrange, realize data intercommunication, it is shared andIntegrated decision-making, to realize that lifecycle management or even the subsequent line construction of urban rail transit construction provide foundation;The O&MThe distributed cloud computing module of server and big data analysis, operation stage integrated information administration module, urban rail transit construction phaseSafety monitoring warning module, mobile terminal, the end Web and GIS Cloud Server are respectively connected with, the end Web and GIS Cloud Server phaseEven.
Specifically, the urban rail transit construction phase safety monitoring warning module is based on history big data, and building track is handed overLogical engineering risk knowledge base, and realize expert investigation and the comprehensive identification of automatic identification and assessment risk, and according to the wind evaluatedRisk prediction scheme is established in danger.
Specifically, the distributed cloud computing module of the big data analysis, collecting data information pass through central control systemThe data information of acquisition is compared with the threshold value of warning of corresponding monitoring information, if exceeding, central control system produces controlRaw early warning record.
Specifically, the urban rail transit construction phase safety monitoring warning module and operation stage integrated information administration module,If the risk generated is present in risk knowledge library, central control system will call directly related early warning scheme and notify relevant peopleMember gets rid of the danger;If not having to handle the scheme of respective risk in risk library, relevant person in charge is notified to formulate corresponding risk processing sideCase;Control system eliminates early warning and generates risk if early warning is effectively treated to form risk accidents not in time if completion of getting rid of the dangerAccident report.
Specifically, the warning grade is divided into red, orange, yellow, and central controller judges pre- according to the information of acquisitionAlert rank, and call corresponding scheme.
Specifically, the real-time release mechanism for establishing different alerts takes engineering direct for the monitoring data that transfinite of appearanceParticipate in each side's consultation analysis, judgement and decision;For great dangerous situation, system is real to the side of taking part in building, responsible departments of the government, responding agenciesThe alarm of Shi Fabu, and start disposition and emergency preplan.
Specifically, it will include the risk factors to cause the accident, dynamic wind that occurrence risk accident, which forms risk accidents report,Danger concern, Risk-warning etc. look into the processing information of this risk overall process convenient for risk.
The operation principle of the present invention is that: by the BIM threedimensional model built up and landform image data distribution to GIS cloud serviceIn device, the BIM threedimensional model includes the bridge whole design model and road shell model of udb format, by mobile terminal,The end Web and co-operation platform by road construction information, bridge member information and material information real-time storage into O&M server, instituteIt states the end Web and is manually entered material information into O&M server, the two dimensional code that mobile terminal passes through the scanning bridge member to be madeIt by information association to the end Web and is stored in O&M server, co-operation platform by intelligent compaction data and is applied by data-interfaceWork manages data inputting into O&M server, and O&M server periodically filters out daily does not generate ballast lump and gutter modelData call the unified UDB data source file for generating model function and generating roadbed block models and gutter model, then pass through unified lifeIt is carried out under slice buffer memory to the path of announced roadbed block models and gutter model at caching function, GIS Cloud ServerAutomatically update roadbed block models and gutter model by ballast lump model data and gutter model data, and by roadbed block models andGutter model is filled into the corresponding position of road shell model, and shows that function is checked by the end Web threedimensional model, WebEnd shows that function transfers BIM bridge model and road shell model in GIS Cloud Server by threedimensional model, and passes through the timeThe display bridge or road information of axis selectivity, urban rail transit construction phase safety monitoring warning module are based on history big data structureRailway traffic engineering risk knowledge library is built, and realizes expert investigation and the comprehensive identification of automatic identification and assessment risk, according to assessmentRisk out establishes risk prediction scheme, and the distributed cloud computing module of big data analysis is collecting data information, is controlled by centerThe data information of acquisition is compared by system with the threshold value of warning of corresponding monitoring information, if exceeding, central control system will be controlledSystem generates early warning record, if urban rail transit construction phase safety monitoring warning module and operation stage integrated information administration module generateRisk be present in risk knowledge library, central control system will call directly related early warning scheme and related personnel is notified to arrangeDanger notifies relevant person in charge to formulate corresponding risk processing scheme, rail if not having to handle the scheme of respective risk in risk libraryRoad transport development phase safety monitoring warning module and operation stage integrated information administration module are the control systems if completion of getting rid of the dangerEarly warning is eliminated, if early warning is effectively treated to form risk accidents not in time, generates risk accidents report.
As stated above, the present invention provides one kind carries out lifecycle management system to traffic engineering based on BIM+GIS,The big data analysis platform based on cloud computing is established, the business structure of big data is applied to rail traffic overall process information systemSystem builds the integrated data system for covering construction period construction safety information and runing period management monitoring information, realizes that the construction period is moreParameter index, multi-source data, multiple spot on-site data gathering, the continuity development of operation phase safety detection information, realize the mutual of dataLogical, shared, integrated decision-making, the final lifecycle management for realizing urban rail transit construction, provides foundation for subsequent line construction;The data and work organization of science are provided, provide important decision support for the management of information system;System has carried out structuringStorage, provides data supporting to the integrated management of road and bridge for system;It is generated and highway for the model of roadLate maintaining provides data preparation;It is supervised suitable for the safety monitoring early warning of urban rail transit construction phase, operation stage integrated information.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be usedTo modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the inventionWithin protection scope.

Claims (7)

4. a kind of BIM+GIS that is based on according to claim 1 is to traffic engineering progress lifecycle management system, specialSign is: the urban rail transit construction phase safety monitoring warning module and operation stage integrated information administration module, if generateRisk is present in risk knowledge library, and central control system will call directly related early warning scheme and related personnel is notified to get rid of the danger;If not having to handle the scheme of respective risk in risk library, relevant person in charge is notified to formulate corresponding risk processing scheme;If rowIt completes then control system elimination early warning and generates risk accidents report if early warning is effectively treated to form risk accidents not in time in dangerIt accuses.
CN201910523930.8A2019-06-182019-06-18Lifecycle management system is carried out to traffic engineering based on BIM+GISPendingCN110287565A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201910523930.8ACN110287565A (en)2019-06-182019-06-18Lifecycle management system is carried out to traffic engineering based on BIM+GIS

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201910523930.8ACN110287565A (en)2019-06-182019-06-18Lifecycle management system is carried out to traffic engineering based on BIM+GIS

Publications (1)

Publication NumberPublication Date
CN110287565Atrue CN110287565A (en)2019-09-27

Family

ID=68004540

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201910523930.8APendingCN110287565A (en)2019-06-182019-06-18Lifecycle management system is carried out to traffic engineering based on BIM+GIS

Country Status (1)

CountryLink
CN (1)CN110287565A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN112232683A (en)*2020-10-202021-01-15中国能源建设集团浙江省电力设计院有限公司 A BIM-based full-cycle construction management system for integrated pipe gallery
CN112258159A (en)*2020-10-262021-01-22青岛理工大学BIM + GIS-based hydraulic structure management system and method
CN112308467A (en)*2020-11-262021-02-02上海济邦投资咨询有限公司Engineering project risk assessment system based on big data
CN112347212A (en)*2020-11-062021-02-09中铁第一勘察设计院集团有限公司Railway cloud GIS platform for BIM application and building method thereof
CN112477927A (en)*2020-11-272021-03-12成都汇辙科技有限公司Rail transit station control information system based on mobile terminal
CN112650115A (en)*2020-12-212021-04-13中国建筑第八工程局有限公司Bridge girder erection machine active safety monitoring system and monitoring method
CN113513052A (en)*2021-04-282021-10-19桂林电子科技大学BDS + BIM-based intelligent foundation pit monitoring system and method
CN113706126A (en)*2021-09-132021-11-26浙江众合科技股份有限公司Rail transit construction processing method and device based on GIS and BIM
CN113947333A (en)*2021-11-112022-01-18中铁第六勘察设计院集团有限公司Wisdom subway red line protection management system based on multisource information fusion technique
CN114519221A (en)*2020-11-202022-05-20比亚迪股份有限公司Operation and maintenance management method of cloud rail system, electronic device and readable storage medium
CN114979204A (en)*2022-05-182022-08-30江苏宁沪高速公路股份有限公司Digital management and control platform for highway operation management
CN119379019A (en)*2025-01-022025-01-28北京城建勘测设计研究院有限责任公司 A dynamic monitoring and management system for the entire process of subway construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN107194861A (en)*2017-07-022017-09-22四川藏区高速公路有限责任公司A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM
CN109409710A (en)*2018-10-152019-03-01山西省自动化研究所A kind of urban track traffic overall process comprehensive monitoring system
CN109635058A (en)*2018-11-202019-04-16吉林省昊远农林规划设计有限公司A kind of freeway management system and method using BIM technology and GIS technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN107194861A (en)*2017-07-022017-09-22四川藏区高速公路有限责任公司A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM
CN109409710A (en)*2018-10-152019-03-01山西省自动化研究所A kind of urban track traffic overall process comprehensive monitoring system
CN109635058A (en)*2018-11-202019-04-16吉林省昊远农林规划设计有限公司A kind of freeway management system and method using BIM technology and GIS technology

Cited By (16)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN112232683A (en)*2020-10-202021-01-15中国能源建设集团浙江省电力设计院有限公司 A BIM-based full-cycle construction management system for integrated pipe gallery
CN112258159A (en)*2020-10-262021-01-22青岛理工大学BIM + GIS-based hydraulic structure management system and method
CN112258159B (en)*2020-10-262022-08-12青岛理工大学 Hydraulic structure management system and method based on BIM+GIS
CN112347212A (en)*2020-11-062021-02-09中铁第一勘察设计院集团有限公司Railway cloud GIS platform for BIM application and building method thereof
CN114519221A (en)*2020-11-202022-05-20比亚迪股份有限公司Operation and maintenance management method of cloud rail system, electronic device and readable storage medium
CN112308467A (en)*2020-11-262021-02-02上海济邦投资咨询有限公司Engineering project risk assessment system based on big data
CN112477927A (en)*2020-11-272021-03-12成都汇辙科技有限公司Rail transit station control information system based on mobile terminal
CN112650115A (en)*2020-12-212021-04-13中国建筑第八工程局有限公司Bridge girder erection machine active safety monitoring system and monitoring method
CN113513052A (en)*2021-04-282021-10-19桂林电子科技大学BDS + BIM-based intelligent foundation pit monitoring system and method
CN113706126B (en)*2021-09-132024-04-30浙江众合科技股份有限公司Track traffic construction processing method and device based on GIS and BIM
CN113706126A (en)*2021-09-132021-11-26浙江众合科技股份有限公司Rail transit construction processing method and device based on GIS and BIM
CN113947333A (en)*2021-11-112022-01-18中铁第六勘察设计院集团有限公司Wisdom subway red line protection management system based on multisource information fusion technique
CN113947333B (en)*2021-11-112024-05-10中铁第六勘察设计院集团有限公司Intelligent subway red line protection management system based on multisource information fusion technology
CN114979204A (en)*2022-05-182022-08-30江苏宁沪高速公路股份有限公司Digital management and control platform for highway operation management
CN119379019A (en)*2025-01-022025-01-28北京城建勘测设计研究院有限责任公司 A dynamic monitoring and management system for the entire process of subway construction
CN119379019B (en)*2025-01-022025-04-25北京城建勘测设计研究院有限责任公司Dynamic monitoring management system for whole subway construction process

Similar Documents

PublicationPublication DateTitle
CN110287565A (en)Lifecycle management system is carried out to traffic engineering based on BIM+GIS
White et al.A digital twin smart city for citizen feedback
CN109686061B (en)Bridge monitoring aid decision-making system based on GIS and BIM
CN114005278B (en)Intelligent monitoring and early warning system and method for highway infrastructure group
CN109409710A (en)A kind of urban track traffic overall process comprehensive monitoring system
CN106991633A (en)The computer simulation system and emulation mode of a kind of public safety emergency management
CN105550824A (en)Intelligent disaster situation evaluation system
CN110263461A (en)A kind of bridge safety supervision early warning system based on BIM
CN118247965A (en)Intelligent monitoring and early warning system and method for expressway infrastructure group
CN105719053A (en)Disaster early warning and information issuing system based on multiple terminals
Daudé et al.ESCAPE: exploring by simulation cities awareness on population evacuation
CN112085929A (en)Dangerous chemical road transportation risk early warning system and method
CN109272175A (en)A kind of data collection system and method based on Urban Migrant network
Iwan et al.Utilization of mobile applications for the improvement of traffic management systems
CN109460939A (en)A kind of Municipal Engineering Construction safety control system and method based on 3DGIS+BIM technology
CN117933701A (en)Rail transit engineering construction safety risk monitoring method and system
CN117253341A (en)Road domain disaster monitoring and early warning method and system based on Beidou and high-resolution remote sensing technology
Borowska-Stefańska et al.Effectiveness of the policy for organising self-evacuation by private vehicle transport, as verified in microsimulations
Lodhia et al.An Investigation into the Recent Developments in Intelligent Transport System
Fang et al.RETRACTED ARTICLE: Excavation and support method of tunnel with high ground stress and weak surrounding rock based on GIS
An et al.Roadside sensor network deployment based on vehicle-infrastructure cooperative intelligent driving
Le et al.Agent-based modeling and simulation of citizens sheltering during a Tsunami: application to Da Nang City in Vietnam
WangApplication of Computer Artificial Intelligence Technology in Digital Twin Intelligent Traffic Control Planning System
Gu et al.Research on intelligent operation and platform of urban large bridge and tunnel cluster project based on BIM technology
Vennila et al.Traffic controlling and monitoring using IoT

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20190927


[8]ページ先頭

©2009-2025 Movatter.jp