CN110223028A - A kind of efficient method and its system for formulating building engineering construction scheme - Google Patents

A kind of efficient method and its system for formulating building engineering construction scheme
Download PDF

Info

Publication number
CN110223028A
CN110223028ACN201910327228.4ACN201910327228ACN110223028ACN 110223028 ACN110223028 ACN 110223028ACN 201910327228 ACN201910327228 ACN 201910327228ACN 110223028 ACN110223028 ACN 110223028A
Authority
CN
China
Prior art keywords
scheme
module
special
construction
formulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910327228.4A
Other languages
Chinese (zh)
Inventor
单光炎
葛黎明
方俊杰
李春生
王方远
姜志新
刘炳东
吴健
徐建国
叶水标
杨雄
林捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Communications Construction Group Co LtdfiledCriticalZhejiang Communications Construction Group Co Ltd
Priority to CN201910327228.4ApriorityCriticalpatent/CN110223028A/en
Publication of CN110223028ApublicationCriticalpatent/CN110223028A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

The present invention provides a kind of method for efficiently formulating building engineering construction scheme, and this method comprises the following steps: step S101: obtaining user's arrangement and method for construction and works out plan calls;Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, scheme module and codes and standards from database;Step S103: integrating the matched career field, scheme module and codes and standards, generates initialization special scheme;Step S104: the initialization special scheme of generation is pushed to the user.

Description

A kind of efficient method and its system for formulating building engineering construction scheme
Technical field
The invention belongs to arrangement and method for construction to formulate field, and in particular to a method of efficiently formulate building engineering construction schemeAnd its system.
Background technique
To ensure engineering construction safety, the biggish part-to-item project construction risk of risk is reduced, national government organ,Industry and associated mechanisms require establishment special construction plan to determine one after a series of activities such as establishment, demonstration, examinationThe whole series meet live practical and operable arrangement and method for construction and ensure the person and property safety to prevent construction safety accident;?When developing programs, it is desirable that the technical staff to develop programs fully considers execution conditions and construction safety, and scheme is made to comply fully with skillThe requirement of art specification, working specification and safety code;In addition, also to reduce construction cost as far as possible, keep scheme more economically reasonable,It is very high to the experience of technical staff and Capability Requirement among these, and it is thorough to be difficult to consideration.
Currently, most technical staff different by experience work out, the foundation of reference in preliminary arrangement and method for construction establishmentThe generally template of older generation's retention, the experience and similar scheme is voluntarily searched in internet that mouth oral instructions are awarded, on this basisThen modification and perfection submits departments of examination and approval to be audited, as a result causes the compiling level of scheme irregular, engineering department is difficult toAccomplish effective accumulation to scheme establishment technique, approving person is in the scheme of audit, time and effort consuming, now a general special schemeReview Cycle be one month, seriously affect construction efficiency, cause the significant wastage of personnel cost.Secondly, currently existing scheme is compiledSystem is by projects portion designer's complete independently, and because authorized personnel's individual skill ability is different, Compilation Quality is irregular, similarProblem can repeat, and no system scheme is unable to resource-sharing, Synchronous lifting.
Summary of the invention
In order to solve the above technical problems, efficiently formulating building engineering construction scheme the purpose of the present invention is to provide a kind ofMethod, this method comprises the following steps:
Step S101: it obtains user's arrangement and method for construction and works out plan calls;
Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, scheme module from databaseAnd codes and standards;
Step S103: integrating the matched career field, special scheme and codes and standards, and it is special to generate initializationScheme;
Step S104: the initialization special scheme of generation is pushed to the user.
Preferably, the database purchase career field, special scheme module library and codes and standards library.
Preferably, according to different regions, weather, the actual conditions of geology and national regulation standard, user select toFew a set of people, machine, material, method, ring, initialization special scheme module for surveying demand of meeting confirms excellent for approving person's trade-off decisionSelect special scheme.
Preferably, initializing special scheme according to audit opinion modification and perfection to obtain preferred special scheme.
Preferably, the preferred special scheme generates account after establishment examination & approval and than selecting outstanding side after modification and perfectionCase generates excellent alternative library.
Preferably, the career field uses hierarchical partition mode, the typing in each subdivision career field moduleThe advantage and disadvantage of its corresponding arrangement and method for construction.
Preferably, legal basis and standard criterion are included in the codes and standards library.
It is another object of the present invention to provide the efficient system for formulating building engineering construction scheme, which includes numberAccording to library, processor and user terminal,
Database is worked out according to arrangement and method for construction and is requested for storing career field, special scheme module library and codes and standards libraryExtract matching career field, scheme module and codes and standards;
User terminal, works out plan calls by the arrangement and method for construction that user inputs, and establishment plan calls are sent to processor sum numberAccording to library;
Processor, the arrangement and method for construction for receiving user's transmission are worked out plan calls, are obtained and establishment plan calls correspondingCareer field, special scheme and the codes and standards matched;And it is pushed to user.
Preferably, user terminal includes recording module, inquiry request module and generation module, the recording module is used forTyping is constructed essential information, and the construction essential information includes engineering type, special scheme title, scheme type, career field,Whether need to be expounded through peer review and call time on planning;The inquiry request module is used to extract and the arrangement and method for construction from databaseMatched career field, scheme module and codes and standards are requested in establishment;The generation module includes that project is basic for generatingInformation and the initialization special scheme of acquisition.
Preferably, the user terminal further includes approval module, warning module, excellent alternative library, proposal inquiry module;
Approval module audits initialization special scheme for auditor;
Warning module is for setting the examination & approval time of each link, more than the data of time limit for appraisal and ratification, automatically according to early warningGrade sends early warning short message to supervisor people, and the examination & approval timeliness of each link is supervised by supervising and manage people;
Excellent alternative library, for storing the excellent alternative selected after examining;
Proposal inquiry module generates initialization special scheme, excellent alternative and scheme statistical conditions for user's quick search.
Compared with prior art, the invention has the following advantages:
1. the present invention passes through building database, the database purchase career field, special scheme module library and codes and standardsThe preferred embodiment that library, the current general construction technology of scheme module set and enterprises employee provide, can effectively solveCertainly programming level is irregular, improves the formulation quality of scheme, greatly improves establishment efficiency, the establishment of arrangement and method for constructionIndividual is no longer depended critically upon, but unified system template is used to work out, special scheme library therein is examined by editorial staffCore typing ensure that the standard criterion of scheme;Personnel is effectively avoided to cause arrangement and method for construction and the stream of other knowledge simultaneouslyIt loses;In addition, perfect by the continuous iteration of scheme base to enterprise, gradually building forms the owned technical data library of enterprise.
2. being able to solve project checking period longer problem from system provided by the invention, improve efficiency.
3. implementation level of organization establishes unified version, solves existing scheme format disunity, content is nonstandardThe problems such as, advantage is Specification Schema format and content, lifting scheme Compilation Quality.
4. implementation compiling module, selection and excellent can be carried out according to different construction site situations by authorized personnelChange, meet the needs of programming under different construction environments, equipment, material condition to greatest extent, greatly reduces authorized personnel'sWorking strength promotes working efficiency.
5. implementation IT application in management, scheme module text online resource is shared, authorized personnel, approving person other sideCase text quality sustainable improvement and raising, establishment, approving person can information sharing, interaction, the volume of continuous lifting schemeQuality processed and examination & approval efficiency.
Detailed description of the invention
Fig. 1 is career field manual editing example schematic diagram provided by the invention;
Fig. 2 is that career field provided by the invention imports template example schematic diagram;
Fig. 3 is hierarchical career field example schematic diagram;
Fig. 4 is legal basis and standard criterion example schematic diagram;
Fig. 5 is the concrete operations flow chart of exemplary programming;
Fig. 6 is establishment scheduling example figure;
Fig. 7 is the hierarchical career field exemplary diagram that cast-in-situ bored pile special construction plan marks off;
Fig. 8 is special scheme preferable example figure;
Fig. 9 is that special scheme works out exemplary diagram;
Figure 10 is that special scheme improves exemplary diagram;
Figure 11 is that special scheme improves account figure.
Specific embodiment
Explanation of nouns-special scheme module library
By the variable that people, machine, material, method, ring, survey etc. influence labor and materials machine be refined as cannot divided separate unit again, for establishmentPeople carries out layout combination according to engineering characteristic, technical logic relationship and writes, these are known as by the system that separate unit formsSpecial scheme module library.
Explanation of nouns-special scheme
Special scheme refers to the set of the corresponding arrangement and method for construction of multiple subdivision career fields.
Below in conjunction with specific embodiment, the present invention will be described in detail, it should be appreciated that this field skillFor art personnel, it can be modified or changed according to the above description, and all these improvement or transformation all should belong to institute of the present inventionWithin attached scope of protection of the claims.
A kind of system for efficiently formulating building engineering construction scheme provided by the invention, which includes database, processingDevice and user terminal,
Database is worked out according to arrangement and method for construction and is requested for storing career field, special scheme module library and codes and standards libraryMatching career field, scheme module and codes and standards are extracted, according to the preferred arrangement and method for construction of career field and are collectedIt closes and obtains special scheme, each career field corresponding arrangement and method for construction set current general arrangement and method for construction and enterpriseThe preferred embodiment that industry interior employee provides.
The career field uses hierarchical partition mode, in each subdivision career field module typing its corresponding applyThe advantage and disadvantage of work scheme, so that subsequent each project management department can quickly select in drawing up a plan;In the present invention, to professional class, arrangement and method for construction does not carry out careful division, according to industry development and requirement of engineering, frequently to career field library carry out later maintenance andIt updates, the purpose of this technological means is to facilitate trainee, the project personnel for not editing scheme or the insufficient volume of correlation experiencePeople processed can carry out Fast Learning, Effective selection to plan content needed for project according to class library.
Codes and standards library includes but is not limited to legal basis and standard criterion, is all made of Newest Law foundation in industryAnd standard criterion, real-time update, it is ensured that work out legal basis and mark various needed for special construction plan in projects portionQuasi- specification is in last state, avoids quoting expired specification, standard;Meanwhile reduce project management department search specification, standard whenBetween, improve programming efficiency and quality;When carrying out programming, it is introduced directly into one-to-one codes and standards;This behavePurpose be: due to special scheme establishment when more quote a large amount of standards, specification and laws and regulations, so setting up standard criterion mouldBlock synchronizes the legal basis and standard criterion of each engineering type, and in each scheme module, primary chapters and sections content is professionStandard criterion carries out selection reference from standard, specification module when carrying out scheme module establishment, in addition, when legal basis andWhen standard criterion, interior under corresponding career field file can be updated, the normative content uploaded is with old versionForm is deposited in the database, and data list page table name old version number is to identify;Content can be by scheme module after enablingIt is quoted.
User terminal, works out plan calls by the arrangement and method for construction that user inputs, and establishment request is sent to processor sum numberAccording to library,
Processor, the arrangement and method for construction for receiving user's transmission work out request message.
In a preferred embodiment of the invention, the user terminal includes recording module, inquiry request module and lifeAt module, for the recording module for typing construction essential information, the construction essential information includes but is not limited to engineering type,Special scheme title, scheme type, career field, if needs are expounded through peer review and call time on planning;It is high in time convenient for enterpriseEstablishment and declaration work are completed in effect ground, improve efficiency;
The inquiry request module, which is used to extract from database, requests matched career field, scheme with arrangement and method for construction establishmentModule and codes and standards, such as according to the key word of the inquiry of Scenario Name setting or according to search index, extraction is asked with establishmentSeek matched career field, due in career field typing have the corresponding arrangement and method for construction of each career field advantage and disadvantage andRationale for the recommendation, therefore during this, user can select multiple initialization special scheme modules according to career field, in order to for compilingProcess authorized personnel processed filters out preferred special scheme according to construction site actual conditions.
The generation module is used to generate the initialization special scheme including project essential information and acquisition;
It is highly preferred that the user terminal further includes approval module, warning module, proposal inquiry module and excellent alternative library;
Approval module audits initialization special scheme for approving person, and approval module has to initialization special schemeFunction is modified, supplements and completes, system automatically records the information such as the location revision of modification people, modification content, modification time,Facilitate follow-up link auditor to just look at the part of modification, quickly audits scheme;
Warning module is for setting the examination & approval time of each link, more than the data of time limit for appraisal and ratification, automatically according to early warningGrade sends early warning short message to supervisor people, and the examination & approval timeliness of each link is supervised by supervising and manage people;
Account is generated after establishment examination & approval modification and perfection and than selecting excellent alternative, generation excellent alternative library;Concrete operations are as follows: initialAfter change special scheme is worked out, relevant departments is reported to be examined, quantization can be carried out in approval process to scheme Compilation Quality and commentedPoint, competition excellent alternative enters excellent alternative library, and the basic material for regularly updating, being promoted as scheme module library forms knowledgeAccumulation, instructs subsequent schedule to work out, the total quality of continuous lifting scheme establishment.It is automatic raw simultaneously according to scheme approval statusAt special scheme account, for technical staff with reference to utilization.
Initialization special scheme, excellent alternative and the scheme statistics that proposal inquiry module is generated for user's quick searchSituation;Specifically, system can automatically form scheme categories statistics, scheme career field according to the special scheme process data of generationStatistics, excellent alternative statistics, scheme fractional statistics, scheme declare lag ranking, scheme declares the multiple angles such as company's rankingStatistical analysis charts, convenient special scheme of grasping in time examine situation.
System provided by the invention has programming speed fast, and programming quality is high, and review efficiency is high, easy to useThe features such as.
Based on the system of quick preferred building engineering construction scheme provided above, the present invention mentions a kind of efficiently formulate and buildsThe method of scheme of project construction, this method comprises the following steps:
Step S101: it obtains user's arrangement and method for construction and works out plan calls;
Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, special scheme from databaseAnd codes and standards;
Step S103: integrating the matched career field, scheme module and codes and standards, and it is special to generate initializationScheme;
Step S104: the initialization special scheme of generation is pushed to the user.
In the initialization special scheme of generation, according to the actual conditions of different regions and national regulation standard, forThe same arrangement and method for construction request selects the initialization special scheme of more set meet demands for authorized personnel's trade-off decision;SimultaneouslyFor approving person's modification, supplement and perfect information;
In step S101, arrangement and method for construction establishment request is obtained, typing construction essential information, the construction essential information includes projectTitle, project leader, contract value, time limit for contract, the plan starting duration, engineering type, Scenario Name, scheme type, speciallyIndustry classification, if needs are expounded through peer review and call time on planning;Typing essential information facilitates subsequent proposal inquiry and informationStatistics, Information Statistics include scheme categories statistics, scheme career field statistics, excellent alternative statistics, scheme fractional statistics, schemeThe statistical analysis charts of the multiple angles such as establishment lag ranking, programming efficiency company ranking, facilitate manager to grasp in timeSpecial scheme declares situation;Wherein according to establishment plan calls, multiple career fields are covered in an establishment in the works, and each specialMark off multiple junior's career fields under industry classification, special scheme title includes that hollow slab girder prefabricated construction, cast-in-situ bored pile are specialArrangement and method for construction, cantilever bridge special scheme, subgrade construction scheme, bent cap special construction plan, cushion cap special construction plan andBridge cross-line construction special scheme etc., wherein corresponding to each special scheme title marks off multiple career fields, referring to Fig. 7 exampleThe hierarchical career field marked off such as cast-in-situ bored pile special construction plan is science of bridge building-pile foundation engineering-cast-in-situ bored pile-Convolution, rotary digging, impact, full-sleeve, gas lift reverse circulation and caisson.
Therefore user determines each career field at first, then obtains corresponding construction party by each career fieldThe arrangement and method for construction module of each career field is integrated and obtains entire initial scheme by method, then that initial scheme is correspondingLegal basis and standard criterion typing wherein, that is, ultimately generate initialization special scheme.
Further, initialization special scheme is audited subject to approval module, is confirmed after audit according to audit opinionModification and perfection initializes special scheme to obtain preferred special scheme;
Still further, the preferred special scheme generates account after establishment examination & approval and than selecting outstanding side after modification and perfectionCase generates excellent alternative library.
In an application example, the administrator of each company or Project Manager provide user account, are divided into enterprise-levelOperating platform account and project level operating platform account,
Wherein, enterprise-level operating platform account, can be according to " at the same level for career field and maintenance special scheme module library to be arrangedThe buttons such as new line increment ", " the new line increment of junior ", " deleting row " carry out manual editing to the career field of all types of engineerings, such as Fig. 1 instituteShow, using hierarchical career field, level-one career field is subgrade engineering, and it is soft that junior's career field is arranged by the new line increment of juniorBase punishment passes through the new line increment of junior and new line increment function editor's career field powder-spray pile at the same level, pile for prestressed pipe, plastic drainingPlate, Base with Sand Gravel Cushion and geosynthetics punishment;In addition, import feature also can be used referring to fig. 2, leading for career field is downloadedEnter template to be edited, be imported after the completion;In addition, enterprise-level operating platform account editor's special scheme module library, and it is realWhen maintenance update is carried out to special scheme module library, specific maintenance span includes but is not limited to the modification of chapters and sections catalogue, attachment latticeThe interspersed modification of the upload and modification of formula, table, the newly-increased and modification of laws and regulations;In special scheme module library selection schemeWhen, " Scenario Name " first is edited, then corresponding " career field " selection " engineering type ", " scheme type " and " career field ", choosingIt when selecting " career field ", is selected according to subitem level, as shown in figure 3, hierarchical career field is that pile foundation engineering-drilling fillsStake is infused, lower layer's career field of corresponding cast-in-situ bored pile includes convolution, rotary digging, impact, full-sleeve, gas lift reverse circulation and boreholePile driving construction scheme, and the characteristics such as suitable environment and advantage and disadvantage for showing on edit page each arrangement and method for construction, facilitate establishmentPersonnel quickly select at least one suitable arrangement and method for construction;Further, the typing about legal basis and standard criterionIt is that the subdivision based on career field carries out selection editor, legal basis and standard criterion illustratively select referring to fig. 4.
As shown in figure 5, illustratively, the tool that project level operating platform account schema is worked out in the present embodiment is described in detailBody operating process, including special scheme work out plan-special scheme preferably-special scheme establishment-special scheme is perfect-special project sideCase account, specifically comprises the following steps:
Step S201 special scheme works out plan: user is according to project demands, to the special project side of each engineering type and scheme typeCase is confined, and determines the basic datas, such as the present embodiment such as " special scheme title ", " career field ", " plan reports the date "In project be G228 highway (to the east of Shanghai Zhejiang provincial boundaries-Laolong's spring port ,-Nan Lu highway to the east of the road of bay) engineering, listWork out plan referring to Fig. 6, engineering type is highway engineering, and the special scheme title listed, which includes that hollow slab girder is prefabricated, to be appliedWork, cast-in-situ bored pile special construction plan, the river Zhang Jing cantilever bridge safe plans, subgrade construction scheme, the construction of bent cap special projectScheme, cushion cap special construction plan and the river Zhang Jing bridge cross-line construction safety special scheme, wherein corresponding to each special schemeTitle marks off multiple career fields, the hierarchical profession class marked off referring to Fig. 7 such as cast-in-situ bored pile special construction planIt Wei not science of bridge building-pile foundation engineering-cast-in-situ bored pile-convolution-bit diameter-power (according to geological conditions)-pulping materialMaterial-technical indicator-detection method-the relevant technologies and operating post capability standard;
Step S202: special scheme is preferred, is divided according to the career field hierarchical of each special scheme title of step S201,Preferred arrangement and method for construction is selected, the hierarchical career field marked off such as cast-in-situ bored pile special construction plan is science of bridge building-In pile foundation engineering-cast-in-situ bored pile-convolution, rotary digging, impact, full-sleeve, gas lift reverse circulation and caisson, according to its advantage and disadvantageDescription and preliminary judge to construction environment, as shown in figure 8, selection suggested design convolution, also can choose multiple recommendationsScheme is selected for authorized personnel;With the corresponding arrangement and method for construction of same operation selection other specialties Scenario Name, then gatheredInitialization special scheme is obtained, the program is sent into approval process progress scheme and is preferably confirmed;
Step S203: then special scheme establishment, preferably confirmation initialization special scheme are edited special to the initialization preferably gone outScheme is edited, and with reference to Fig. 9, the 1st chapter basis of compilation is used to record legal basis and standard criterion, and editorial staff canThe efficient each career field legal basis of typing and standard criterion, at the same can also directly in platform editor's other information,It is preset with schemes generation template within the system, above-mentioned selected career field, special scheme and codes and standards are integrated intoThe predeterminated position of above-mentioned generation template generates initialization special scheme, and ultimately generating declaration scheme can be deposited with word version?;
Step 204: special scheme is perfect: user according to special scheme work out in suggestions made after examination modified to special schemeIt deals with problems arising from an accident, business handling is clicked in this module and enters edit page such as Figure 10, finally obtains special scheme.
Step 205: special scheme account, in the present embodiment, referring to Figure 11, special scheme account is to all special project sidesThe whole statistics of case is brought all schemes that special scheme works out plan into automatically, and is carried out according to real-time status to scheme stateIt updates, after special scheme, which improves, reports completion workflow examination and approval, it is that " examination & approval are logical that the corresponding scheme in account, which just will be updated state,It crosses ".

Claims (10)

9. the efficient system for formulating building engineering construction scheme according to claim 8, it is characterised in that: user terminal includesRecording module, inquiry request module and generation module, the recording module is for typing construction essential information, the construction baseThis information includes engineering type, special scheme title, scheme type, career field, if needs are expounded through peer review and plan to reportTime;The inquiry request module is used to extract from database with the matched career field of arrangement and method for construction establishment request, speciallyItem scheme and codes and standards;The generation module is used to generate the initialization special project side including project essential information and acquisitionCase.
CN201910327228.4A2019-04-232019-04-23A kind of efficient method and its system for formulating building engineering construction schemePendingCN110223028A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201910327228.4ACN110223028A (en)2019-04-232019-04-23A kind of efficient method and its system for formulating building engineering construction scheme

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201910327228.4ACN110223028A (en)2019-04-232019-04-23A kind of efficient method and its system for formulating building engineering construction scheme

Publications (1)

Publication NumberPublication Date
CN110223028Atrue CN110223028A (en)2019-09-10

Family

ID=67820032

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201910327228.4APendingCN110223028A (en)2019-04-232019-04-23A kind of efficient method and its system for formulating building engineering construction scheme

Country Status (1)

CountryLink
CN (1)CN110223028A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111242457A (en)*2020-01-072020-06-05中国建筑第八工程局有限公司Construction technology management system and method
CN112131856A (en)*2020-10-272020-12-25成都建工第二建筑工程有限公司Building construction scheme generation method
CN112749435A (en)*2021-01-132021-05-04深圳国志智慧科技有限公司Matching method and device of park space carrier related elements, storage medium and electronic equipment
CN113298435A (en)*2021-06-212021-08-24中交第二航务工程局有限公司Intelligent construction scheme compiling method and system for building industry
CN114037259A (en)*2021-11-072022-02-11深圳市双盈电子科技有限公司 A method and system for intelligently generating a business plan, and a method and system for collaboratively processing business
CN114066053A (en)*2021-11-152022-02-18基建通(三亚)国际科技有限公司 Pushing method, device and storage medium of construction plan based on geological early warning
CN114372784A (en)*2022-01-122022-04-19四川隧唐科技股份有限公司 A construction plan pushing method, device and equipment based on construction budget
CN114781997A (en)*2022-04-062022-07-22中国矿业大学 Intelligent review system and implementation method of special construction plan for dangerous and large projects

Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102073632A (en)*2009-07-182011-05-25苏州鼎思科技有限公司Comprehensive construction management knowledge base data structure for construction engineering
CN106897861A (en)*2017-02-162017-06-27龙岩学院A kind of project management system
CN109657911A (en)*2018-11-142019-04-19遵义华正电缆桥架有限公司System is instructed in a kind of assessment of power construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102073632A (en)*2009-07-182011-05-25苏州鼎思科技有限公司Comprehensive construction management knowledge base data structure for construction engineering
CN106897861A (en)*2017-02-162017-06-27龙岩学院A kind of project management system
CN109657911A (en)*2018-11-142019-04-19遵义华正电缆桥架有限公司System is instructed in a kind of assessment of power construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张乐: "网络进度计划辅助生成研究", 《万方数据库》*

Cited By (9)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111242457A (en)*2020-01-072020-06-05中国建筑第八工程局有限公司Construction technology management system and method
CN112131856A (en)*2020-10-272020-12-25成都建工第二建筑工程有限公司Building construction scheme generation method
CN112749435A (en)*2021-01-132021-05-04深圳国志智慧科技有限公司Matching method and device of park space carrier related elements, storage medium and electronic equipment
CN113298435A (en)*2021-06-212021-08-24中交第二航务工程局有限公司Intelligent construction scheme compiling method and system for building industry
CN114037259A (en)*2021-11-072022-02-11深圳市双盈电子科技有限公司 A method and system for intelligently generating a business plan, and a method and system for collaboratively processing business
CN114066053A (en)*2021-11-152022-02-18基建通(三亚)国际科技有限公司 Pushing method, device and storage medium of construction plan based on geological early warning
CN114066053B (en)*2021-11-152025-04-18基建通(三亚)国际科技有限公司 Method, device and storage medium for pushing construction plan based on geological early warning
CN114372784A (en)*2022-01-122022-04-19四川隧唐科技股份有限公司 A construction plan pushing method, device and equipment based on construction budget
CN114781997A (en)*2022-04-062022-07-22中国矿业大学 Intelligent review system and implementation method of special construction plan for dangerous and large projects

Similar Documents

PublicationPublication DateTitle
CN110223028A (en)A kind of efficient method and its system for formulating building engineering construction scheme
CN111369158A (en)BIM-based informatization quality management method and system
Goh et al.Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization
Daoud et al.Exploring the relationship between materials procurement and waste minimization in the construction industry: The case of Egypt
Al-Bataineh et al.Using simulation to plan tunnel construction
CN105373875A (en)Intelligent engineering construction project management system
McCabeMonte Carlo simulation for schedule risks
CN114186955A (en) A safety production standardization management system
Rahigude et al.Construction waste management in the context of de-tools, industry 4.0 & circular economy, a critical review of pune metropolitan area, India
CN111810144B (en)Shale gas well engineering intelligent scheduling method and system
Zhong et al.Theory on real-time control of construction quality and progress and its application to high arc dam
Jiang et al.Lean construction practice: Culture, standardization and informatization—A case from China
Shrestha et al.A road maintenance management tool for rural roads in Kenya
CN116739446A (en) Intelligent management method of construction waste reverse logistics based on BIM-WMS technology
CN115587692A (en)Building construction technical scheme management system and method based on informatization management platform
CN115600967A (en) A collaborative management platform for tunnel boring machine business
Nguyen et al.Exploring the adaption of lean principles to highway construction
Muttaqin et al.Analysis of project implementation schedule using Microsoft Project (Case Study: Trenggalek City Square Area)
Allouche et al.Software for planning and cost control in directional drilling projects
ChouItem-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control
Kondrachova et al.Design Build and Design Bid Build traditional project delivery methods and modern industry trends. What is most efficient?
Bruce et al.An expert systems approach to highway construction scheduling
DevaguptapuForensic analysis of DWR data for effective prediction of highway production rates
Anderson et al.Synthesis on construction unit cost development: technical report.
HusinAPPLICATION OF PER INTEGRATION ON B

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication

Application publication date:20190910

RJ01Rejection of invention patent application after publication