CN109686036A - A kind of fire monitoring method, device and edge calculations device - Google Patents

A kind of fire monitoring method, device and edge calculations device
Download PDF

Info

Publication number
CN109686036A
CN109686036ACN201910019256.XACN201910019256ACN109686036ACN 109686036 ACN109686036 ACN 109686036ACN 201910019256 ACN201910019256 ACN 201910019256ACN 109686036 ACN109686036 ACN 109686036A
Authority
CN
China
Prior art keywords
environmental monitoring
monitoring data
fire
data
machine learning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910019256.XA
Other languages
Chinese (zh)
Other versions
CN109686036B (en
Inventor
王元鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Clp Smart Security Polytron Technologies Inc
Original Assignee
Shenzhen Clp Smart Security Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clp Smart Security Polytron Technologies IncfiledCriticalShenzhen Clp Smart Security Polytron Technologies Inc
Priority to CN201910019256.XApriorityCriticalpatent/CN109686036B/en
Publication of CN109686036ApublicationCriticalpatent/CN109686036A/en
Application grantedgrantedCritical
Publication of CN109686036BpublicationCriticalpatent/CN109686036B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The present invention is suitable for fire hazard monitoring technical field, provide a kind of fire monitoring method, device and edge calculations device, wherein, method includes: to obtain environmental monitoring data more than two, the environmental monitoring data is pre-processed according to the time series of the environmental monitoring data, obtain pretreated environmental monitoring data, the pretreated environmental monitoring data is inputted into pre-training machine learning model, the result of decision for obtaining the pre-training machine learning model output sends corresponding information warning to user terminal according to the result of decision.The present invention, which carries out data fusion to environmental monitoring data using edge calculations device operation machine learning model, realizes real-time, objective, safe and reliable Fire danger assessment to calculate the degree of danger of fire.Corresponding information warning is sent according to the state of fire simultaneously and improves the efficiency of fire fighting and rescue action to provide true and reliable decision-making foundation for fire fighting and rescue personnel.

Description

A kind of fire monitoring method, device and edge calculations device
Technical field
The invention belongs to fire hazard monitoring technical field more particularly to a kind of fire monitoring methods, device and edge calculations dressIt sets.
Background technique
Existing fire monitoring system can only often provide simple alarm signal, for example, the most common fire-alarm no matterHow is the degree of danger of fire, can only issue the same alarm bell sound, therefore the cammander of fire fighting and rescue action is difficult to understand fireThe real hazard degree of calamity, the arrangement that evacuation personnel and fire extinguishing are made according to these simple information warnings of having no idea influenceThe efficiency of action of fighting calamities and providing relief.Also, if necessary to assessment fire hazard degree, related personnel is generally required in scene of fireFire behavior is judged, judging result subjectivity is stronger, and may threaten safely to human life.
On the other hand, some intelligent fire alarm systems tend to rely on Internet of Things and cloud computing technology, and sensor is adoptedThe environmental monitoring data of collection is uploaded to cloud and is handled, and processing result is then transmitted to use by internet and mobile networkFamily terminal can have the case where larger delay, cloud processing may also can encounter network congestion, be lined up in data transmission procedure,It is difficult to meet fast changing fire fighting and rescue scene to the requirement of real-time of data processing and transmission.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of fire monitoring method, device and edge calculations device, to solveAlarm signal is too simple in the prior art, real-time is poor, is difficult to the problem of providing objective fire hazard rating.
The first aspect of the embodiment of the present invention provides a kind of fire monitoring method, comprising:
Obtain environmental monitoring data more than two;
The environmental monitoring data is pre-processed according to the time series of the environmental monitoring data, obtains pretreatmentEnvironmental monitoring data afterwards;
The pretreated environmental monitoring data is inputted into pre-training machine learning model, obtains the pre-training machineThe result of decision of learning model output;
Corresponding information warning is sent to user terminal according to the result of decision.
Optionally, the pretreated environmental monitoring data is inputted into pre-training machine learning model, obtained described pre-Before the result of decision of training machine learning model output, comprising:
The environmental monitoring data for obtaining history event of fire is established according to the environmental monitoring data of the history event of fireSample data;
Label is added for the sample data and as training sample;
According to the training sample training machine learning model, the pre-training machine learning model is obtained.
Optionally, label is added as training sample for the sample data, comprising:
It is that the sample data adds label to obtain training sample using Field Using Fuzzy Comprehensive Assessment.
Optionally, before according to the corresponding information warning to user terminal of result of decision transmission, comprising:
Establish the corresponding relationship between the result of decision and the information warning.
Optionally, the environmental monitoring data is pre-processed according to the time series of the environmental monitoring data, is obtainedTake pretreated environmental monitoring data, comprising:
The error information in the environmental monitoring data is deleted, updated environmental monitoring data is obtained;Wherein, the mistakeDifference data includes the environmental monitoring data more than the first preset data threshold value and/or the environment prison lower than the second preset data threshold valueMeasured data;
Updated environmental monitoring data is obtained according to the rate of change of time series variation, is obtained described pretreatedEnvironmental monitoring data.
Optionally, the machine learning model includes decision-tree model and/or BP neural network model.
The second aspect of the embodiment of the present invention provides a kind of fire-disaster monitoring device, comprising:
First obtains module, for obtaining environmental monitoring data more than two;
Preprocessing module carries out the environmental monitoring data for the time series according to the environmental monitoring data pre-Processing, obtains pretreated environmental monitoring data;
Input module is obtained for the pretreated environmental monitoring data to be inputted pre-training machine learning modelThe result of decision of the pre-training machine learning model output;
Sending module, for sending corresponding information warning to user terminal according to the result of decision.
The third aspect of the embodiment of the present invention provides a kind of edge calculations device, comprising: memory, processor and depositsThe computer program that can be run in the memory and on the processor is stored up, the processor executes the computer journeyIt realizes when sequence such as the step of the above method.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storageMedia storage has computer program, realizes when the computer program is executed by processor such as the step of the above method.
On the one hand, the embodiment of the present invention carries out environmental monitoring data using edge calculations device operation machine learning modelData fusion realizes real-time, objective, safe and reliable Fire danger assessment to calculate the degree of danger of fire.It is anotherAspect, the embodiment of the present invention sends corresponding information warning according to the state of fire, to provide really for fire fighting and rescue personnelReliable decision-making foundation improves the efficiency of fire fighting and rescue action.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior artNeeded in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention someEmbodiment for those of ordinary skill in the art without any creative labor, can also be according to theseAttached drawing obtains other attached drawings.
Fig. 1 is the flow diagram for the fire monitoring method that the embodiment of the present invention one provides;
Fig. 2 is the flow diagram of fire monitoring method provided by Embodiment 2 of the present invention;
Fig. 3 is the flow diagram for the fire monitoring method that the embodiment of the present invention three provides;
Fig. 4 is the flow diagram for the fire monitoring method that the embodiment of the present invention four provides;
Fig. 5 is the structural schematic diagram for the fire-disaster monitoring device that the embodiment of the present invention five provides;
Fig. 6 is the schematic diagram for the edge calculations device that the embodiment of the present invention six provides.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present inventionAttached drawing, technical solution in the embodiment of the present invention are explicitly described, it is clear that described embodiment is the present invention oneThe embodiment divided, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doingEvery other embodiment obtained under the premise of creative work out, should fall within the scope of the present invention.
Description and claims of this specification and term " includes " and their any deformations in above-mentioned attached drawing, meaningFigure, which is to cover, non-exclusive includes.Such as process, method or system comprising a series of steps or units, product or equipment do not haveIt is defined in listed step or unit, but optionally further comprising the step of not listing or unit, or optionally also wrapInclude the other step or units intrinsic for these process, methods, product or equipment.In addition, term " first ", " second " and" third " etc. is for distinguishing different objects, not for description particular order.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Embodiment one
As shown in Figure 1, this method can be applied to such as mobile phone, PC, plate the present embodiment provides a kind of fire monitoring methodThe terminal devices such as computer, or the edge calculations device exclusively for fire hazard monitoring design.Fire hazard monitoring side provided by the present embodimentMethod, comprising:
S101, environmental monitoring data more than two is obtained;
In a particular application, two groups or more environmental monitoring data is obtained;Wherein, environmental monitoring data refers to logicalCross the environmental parameter of sensor acquisition;Sensor includes but is not limited to temperature sensor, smoke sensor device, oxygen concentration detection biographySensor, carbon monoxide transducer;Every group of environmental monitoring data includes but is not limited to temperature, oxygen concentration, carbonomonoxide concentration, cigaretteMistiness degree.It should be noted that (i.e. root can be ranked up to environmental monitoring data according to the time for getting environmental monitoring dataEnvironmental monitoring data is arranged according to time series), likewise, can be that environmental monitoring data adds the time according to time seriesLabel.
In one embodiment, this method can be executed by edge calculations device, and edge calculations device includes pretreatment mouldBlock, decision-making module, alarm module, communication module.
In one embodiment, step S101 can be executed by communication module, communication module and sensor, user terminal(or cloud) communication connection.
S102, the environmental monitoring data is pre-processed according to the time series of the environmental monitoring data, is obtainedPretreated environmental monitoring data.
In a particular application, environmental monitoring data is pre-processed according to the time series for obtaining environmental monitoring data,Obtain pretreated environmental monitoring data;Wherein, pretreatment includes the error information deleted in environmental monitoring data, to environmentMonitoring data carry out the processing methods such as sliding-model control.Each environment can also be calculated according to the time series of environmental monitoring data to joinSeveral rate of changes, such as temperature rate-of-rise, temperature fall off rate, smokescope climbing speed, smokescope fall off rateDeng.When using BP neural network model as machine learning model, pretreatment further includes that data are normalized.
In one embodiment, step S102 can be executed by preprocessing module,
S103, the pretreated environmental monitoring data is inputted into pre-training machine learning model, obtains the pre- instructionPractice the result of decision of machine learning model output.
In a particular application, pretreated environmental monitoring data is inputted to the pre-training engineering obtained by pre-trainingModel is practised, to obtain the result of decision of pre-training machine learning model output.Wherein, the result of decision can be according to the stage to fireJudged to obtain intensity of a fire state, and obtains the corresponding degree of danger of fire stage;The result of decision includes but is not limited to fireInitial stage-primary degree of danger, the intensity of a fire expand under stage-intermediate degree of danger, the intensity of a fire violent stage-advanced degree of danger, the intensity of a fireDepression of order section-middle rank degree of danger, fire extinguish the stage-and hide degree of danger.In one embodiment, step S103 can be by certainlyPlan module executes.
S104, corresponding information warning is sent to user terminal according to the result of decision.
In a particular application, corresponding information warning is sent to user terminal according to the result of decision, with remind user according toInformation warning executes corresponding fire countermeasure.In the present embodiment, corresponding warning message can be sent according to the result of decisionTo fire-fighting center or the terminal device of monitoring personnel, to notify that fire fighter or monitoring personnel are corresponding according to warning message progressThe operation such as fire extinguishing, evacuating personnel.In one embodiment, alarm module can generate corresponding information warning according to the result of decision,Information warning is sent to the user terminal (or cloud) by communication module.
The present embodiment carries out data fusion to environmental monitoring data using machine learning model, to calculate the dangerous journey of fireDegree, realizes real-time, objective, safe and reliable Fire danger assessment;Meanwhile corresponding police is sent according to the state of fireShow information, to provide true and reliable decision-making foundation for fire fighting and rescue personnel, improves the efficiency of fire fighting and rescue action.
Embodiment two
As shown in Fig. 2, the present embodiment is the further explanation to the method and step in embodiment one.In the present embodiment,Before step S103, further includes:
S201, the environmental monitoring data for obtaining history event of fire, according to the environmental monitoring number of the history event of fireAccording to establishing sample data.
In a particular application, the history event of fire really occurred can be obtained from the database of Fire-fighting Information SystemIn the environmental monitoring data that is measured by environmental sensor (such as temperature sensor, smoke sensor device, carbon monoxide transducer etc.),And the time series of environmental monitoring data, and according to the time series of environmental monitoring data calculate each environmental parameter (such as temperature,Smokescope etc.) rate of change (climbing speed and fall off rate), can also be to environmental monitoring data and rate of change dataIt is normalized, to establish sample data.The experiment of standard fire can also be carried out in monitored place, pass through experimental fieldEnvironmental sensor obtains the environmental monitoring data of predetermined number, establishes sample number according to the environmental monitoring data that standard fire is testedAccording to.
S202, label is added for the sample data and as training sample.
In a particular application, label is added (i.e. according to the development process of history event of fire to sample number for sample dataAccording to the label of addition fire stage), and the sample data after label will be added as training sample, with to machine learning model intoRow pre-training.For example, adding if certain group sample data is that the intensity of a fire of certain history event of fire expands the environmental monitoring data in stageThe widened label of flame enrichment gesture is to sample data, to generate corresponding training sample.It can manually be supervised according to the environment of environmental parameterMeasured data and rate of change to specify label for corresponding sample data.In some embodiments, it can use fuzzy synthesis to commentValence method is that the sample data adds label to obtain training sample.It specifically, can be by environmental parameter and environmental parameterRate of change establishes Comment gathers (such as { low degree of danger, moderate risk as evaluation index, according to fire hazard gradingDegree, high-risk degree ... }), the weight vectors of evaluation index are constructed by method of expertise or analytic hierarchy process (AHP).Then structureBuild the subordinating degree function that each evaluation index grades for each fire hazard degree.Fire hazard degree label is added for one group of sampleWhen, fuzzy overall evaluation matrix is obtained according to the numerical value of the subordinating degree function of each index and evaluation index.It chooses suitable fuzzyOperator carries out fuzzy matrix composition to weight vectors and evaluations matrix.Then sentenced according to composite result using maximum membership grade principleBreak corresponding fire hazard grading.Then using the fire hazard grading as the label of sample.Successively to sample numberAll samples in add label, to obtain the training sample for being used for training machine learning model.Utilize fuzzy overall evaluationMethod is that the sample data adds label acquisition training sample, and machine learning model can be made to learn expertise, improve fire behaviorThe precision of assessment.
S203, according to the training sample training machine learning model, obtain the pre-training machine learning model.
In a particular application, according to sample data training machine learning model, pre-training machine learning model is obtained.With realityWhen sample data now being inputted pre-training machine learning model, pre-training machine learning model is exportable corresponding with sample dataThe result of decision (i.e. fire stage and corresponding degree of danger).
In one embodiment, machine learning model includes but is not limited to decision-tree model and/or BP neural network model.
In one embodiment, the step S202, comprising:
Corresponding label is added according to the developing stage of fire in the sample data, to obtain training sample;Wherein, instituteThe developing stage for stating fire includes Initial Stage of Fire, intensity of a fire expansion stage, the intensity of a fire violent stage, intensity of a fire decline stage, fire extinguishingStage.
In one embodiment, the step S202, further includes:
It is that the sample data adds label to obtain training sample using Field Using Fuzzy Comprehensive Assessment.
It in a particular application, is that the sample data adds label acquisition training sample using Field Using Fuzzy Comprehensive Assessment, it canSo that machine learning model learns expertise, the precision of fire behavior assessment is improved.
The present embodiment by handling sample data, and according to treated sample data to machine learning model intoRow pre-training improves the precision of model, lays a good foundation to provide accurately information warning.
Embodiment three
As shown in figure 3, the present embodiment is the further explanation to the method and step in embodiment one.In the present embodiment,Before step S104, further includes:
S301, corresponding relationship between the result of decision and the information warning is established.
In a particular application, the corresponding relationship between the result of decision and the information warning is established.For example, if the result of decisionFor the intensity of a fire violent stage-advanced degree of danger, then corresponding information warning is that the intensity of a fire is violent instantly, and it is existing please to withdraw fire immediately?.
The present embodiment is getting the result of decision by establishing the corresponding relationship between the result of decision and information warning, realizationWhen can issue corresponding information warning, to remind user to execute corresponding with information warning reply means, ensure that the peace of userEntirely.
Example IV
As shown in figure 4, the present embodiment is the further explanation to the method and step in embodiment one.In the present embodiment,Step S102, comprising:
Error information in S1021, the deletion environmental monitoring data, obtains updated environmental monitoring data;Wherein,The error information includes more than the environmental monitoring data of the first preset data threshold value and/or lower than the second preset data threshold valueEnvironmental monitoring data.
In a particular application, the error information in environmental monitoring data is deleted, updated environmental monitoring data is obtained;ItsIn, error information includes more than the environmental monitoring data of the first preset data threshold value and/or lower than the second preset data threshold valueEnvironmental monitoring data.Wherein, the first preset data threshold value and the second preset data threshold value can specifically be set according to the actual situationIt is fixed.For example, the second preset data threshold value of temperature is set as -40 DEG C, the temperature number for being lower than the second preset data threshold value is deletedValue.(a possibility that occurring lower than fire at a temperature of this second preset data threshold value is very small or judges temperature sensorIt is likely to occur failure, leads to the temperature data for getting mistake).
S1022, updated environmental monitoring data is obtained according to the rate of change of time series variation, obtain the pre- placeEnvironmental monitoring data after reason.
In a particular application, updated environmental monitoring data is obtained according to the changed rate of change of time series,(environmental monitoring data that can be updated according to the rate of change discretization of updated environmental monitoring data), obtains pretreatedEnvironmental monitoring data.For example, obtaining the temperature that the temperature data obtained at the first time is got to the second time according to time seriesThe change rate of degree evidence, the change rate for the temperature data that the temperature data that the second time of acquisition obtains to third time is got.Wherein, change rate can be the ratio of the temperature data for the temperature data and the acquisition of previous time that latter time obtains.10:00 is obtainedThe temperature got is 23 DEG C, and the temperature that 10:30 is got is 25 DEG C, and the temperature that 11:00 is got is 30 DEG C, then 10:00-10:The rate of temperature change that 30 rate of temperature change is 25/23,10:30-11:00 is 30/25.
In one embodiment, step S103, comprising:
S1031, the pretreated environmental monitoring data is inputted into pre-training machine learning model.
In a particular application, pretreated environmental monitoring data is inputted into pre-training machine learning model, so that pre- instructionPractice machine learning model to handle pretreated environmental monitoring data, obtains the corresponding result of decision.
S1032, data are carried out to the pretreated environmental monitoring data by the pre-training machine learning modelFusion, exports the result of decision.
In a particular application, data are carried out to pretreated environmental monitoring data by pre-training machine learning model to meltIt closes, exports the result of decision.
The present embodiment, to obtain effective, accurate environmental monitoring data, is mentioned by pre-processing to environmental monitoring dataThe high accuracy of the result of decision simultaneously further improves the efficiency that fire is prevented and treated.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each processExecution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limitIt is fixed.
Embodiment five
As shown in figure 5, the present embodiment provides a kind of fire-disaster monitoring device 100, for executing the step of the method in embodiment oneSuddenly.Fire-disaster monitoring device 100 provided in this embodiment, comprising:
First obtains module 101, for obtaining environmental monitoring data more than two;
Preprocessing module 102, for according to the time series of the environmental monitoring data to the environmental monitoring data intoRow pretreatment, obtains pretreated environmental monitoring data;
Input module 103 is obtained for the pretreated environmental monitoring data to be inputted pre-training machine learning modelObtain the result of decision of the pre-training machine learning model output;
Sending module 104, for sending corresponding information warning to user terminal according to the result of decision.
In one embodiment, described device 100, further includes:
Second obtains module 201, for obtaining the environmental monitoring data of history event of fire, according to the history fire thingThe environmental monitoring data of part establishes sample data;
Label model 202, for adding label for the sample data and as training sample;
Third obtains module 203, for obtaining the pre-training machine according to the training sample training machine learning modelDevice learning model.
In one embodiment, the label model 202, comprising:
Tag unit, for being that the sample data adds label to obtain training sample using Field Using Fuzzy Comprehensive Assessment.
In one embodiment, described device 100, further includes:
Module is established, the corresponding relationship for establishing between the result of decision and the information warning.
In one embodiment, preprocessing module 102, comprising:
It deletes unit and obtains updated environmental monitoring number for deleting the error information in the environmental monitoring dataAccording to;Wherein, the error information includes more than the environmental monitoring data of the first preset data threshold value and/or lower than the second present countAccording to the environmental monitoring data of threshold value;
Discretization unit is obtained for obtaining updated environmental monitoring data according to the rate of change of time series variationTake the pretreated environmental monitoring data.
In one embodiment, the machine learning model includes decision-tree model and/or BP neural network model.
The present embodiment carries out data fusion to environmental monitoring data using machine learning model, to calculate the dangerous journey of fireDegree, realizes real-time, objective, safe and reliable Fire danger assessment;Meanwhile corresponding police is sent according to the state of fireShow information, to provide true and reliable decision-making foundation for fire fighting and rescue personnel, improves the efficiency of fire fighting and rescue action.
Embodiment six
Fig. 6 is the schematic diagram of edge calculations device provided in this embodiment.As shown in fig. 6, the edge calculations of the embodimentDevice 6 includes: processor 60, memory 61 and is stored in the memory 61 and can run on the processor 60Computer program 62, such as fire hazard monitoring program.The processor 60 is realized above-mentioned each when executing the computer program 62Step in fire monitoring method embodiment, such as step S101 to S104 shown in FIG. 1.Alternatively, the processor 60 executesThe function of each module/unit in above-mentioned each Installation practice, such as module 101 shown in Fig. 5 are realized when the computer program 62To 104 function.
Illustratively, the computer program 62 can be divided into one or more module/units, it is one orMultiple module/units are stored in the memory 61, and are executed by the processor 60, to complete the present invention.Described oneA or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used forImplementation procedure of the computer program 62 in the edge calculations device 6 is described.For example, the computer program 62 can be withIt is divided into the first acquisition module, preprocessing module, input module and sending module, each module concrete function is as follows:
First obtains module, for obtaining environmental monitoring data more than two;
Preprocessing module carries out the environmental monitoring data for the time series according to the environmental monitoring data pre-Processing, obtains pretreated environmental monitoring data;
Input module is obtained for the pretreated environmental monitoring data to be inputted pre-training machine learning modelThe result of decision of the pre-training machine learning model output;
Sending module, for sending corresponding information warning to user terminal according to the result of decision.
The edge calculations device 6 can be the calculating such as desktop PC, notebook, palm PC and Edge ServerEquipment.The edge calculations device may include, but be not limited only to, processor 60, memory 61.Those skilled in the art can manageSolution, Fig. 6 is only the example of edge calculations device 6, does not constitute the restriction to edge computing device 6, may include than diagramMore or fewer components perhaps combine certain components or different components, such as the edge calculations device can also wrapInclude input-output equipment, network access equipment, bus etc..
Alleged processor 60 can be central processing unit (Central Processing Unit, CPU), can also beOther general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processorDeng.
The memory 61 can be the internal storage unit of the edge calculations device 6, such as edge calculations device 6Hard disk or memory.The memory 61 is also possible to the External memory equipment of the edge calculations device 6, such as the edge meterCalculate the plug-in type hard disk being equipped on device 6, intelligent memory card (Smart Media Card, SMC), safe digital card (SecureDigital, SD), flash card (Flash Card) etc..Further, the memory 61 can also both include the edge meterThe internal storage unit for calculating device 6 also includes External memory equipment.The memory 61 for store the computer program withAnd other programs and data needed for the edge calculations device.The memory 61 can be also used for temporarily storing defeatedOut or the data that will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each functionCan unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by differentFunctional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completingThe all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can alsoTo be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integratedUnit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function listMember, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above systemThe specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodimentThe part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosureMember and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actuallyIt is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technicianEach specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceedThe scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/edge calculations device and method,It may be implemented in other ways.For example, device described above/edge calculations Installation practice is only schematic, for example, the division of the module or unit, only a kind of logical function partition, can there is other draw in actual implementationThe mode of dividing, such as multiple units or components can be combined or can be integrated into another system, or some features can be ignored,Or it does not execute.Another point, shown or discussed mutual coupling or direct-coupling or communication connection can be by oneThe INDIRECT COUPLING or communication connection of a little interfaces, device or unit can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unitThe component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multipleIn network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unitIt is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated listMember both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale orIn use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementationAll or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer programCalculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that onThe step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generationCode can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable mediumIt may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry the computer program codeDish, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM,Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that describedThe content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practiceSubtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictionsBelieve signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned realityApplying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned eachTechnical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modifiedOr replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should allIt is included within protection scope of the present invention.

Claims (10)

CN201910019256.XA2019-01-092019-01-09Fire monitoring method and device and edge computing deviceActiveCN109686036B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201910019256.XACN109686036B (en)2019-01-092019-01-09Fire monitoring method and device and edge computing device

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201910019256.XACN109686036B (en)2019-01-092019-01-09Fire monitoring method and device and edge computing device

Publications (2)

Publication NumberPublication Date
CN109686036Atrue CN109686036A (en)2019-04-26
CN109686036B CN109686036B (en)2020-12-22

Family

ID=66192136

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201910019256.XAActiveCN109686036B (en)2019-01-092019-01-09Fire monitoring method and device and edge computing device

Country Status (1)

CountryLink
CN (1)CN109686036B (en)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN110220554A (en)*2019-06-052019-09-10北京百度网讯科技有限公司Method and apparatus for output information
CN110278416A (en)*2019-07-122019-09-24山东智洋电气股份有限公司Power transmission line intelligent prison based on artificial intelligence claps device
CN110322656A (en)*2019-06-282019-10-11三一重机有限公司Digger engine cabin fire automatic alarm device and excavator
CN110459031A (en)*2019-08-062019-11-15福建工程学院 Fire prevention and disaster prevention method, system and storage medium with early warning function
CN110475223A (en)*2019-07-012019-11-19深圳市中电数通智慧安全科技股份有限公司A kind of method for safety monitoring, device and terminal device
CN110930626A (en)*2019-11-252020-03-27西安和光明宸科技有限公司Fire early warning system
CN111031107A (en)*2019-11-292020-04-17武汉智菱物联科技有限公司Geological disaster monitoring system and method based on low-power-consumption communication network
CN111079855A (en)*2019-12-272020-04-28三一重能有限公司 Wind turbine fire fighting method, device, storage medium and fire control console
CN111238446A (en)*2020-01-152020-06-05湖北民族大学 A communication tower tilt monitoring system
CN111275270A (en)*2020-03-092020-06-12南京中电科能技术有限公司Method for predicting regional electrical fire risk based on edge calculation and neural network
CN111753900A (en)*2020-06-232020-10-09中南林业科技大学 A method of monitoring forest fires
CN111784994A (en)*2020-07-142020-10-16中国民航大学 Fire detection method and device
CN112016886A (en)*2020-08-172020-12-01北京双洲科技有限公司Mobile terminal safety office management and control method, device and system
CN112666851A (en)*2019-10-152021-04-16许桂林Projector with environment monitoring function and personal health data generation method
CN113125675A (en)*2021-04-192021-07-16北京物资学院Storage yard coal spontaneous combustion early warning device and early warning method of edge computing framework
CN113743015A (en)*2021-09-072021-12-03同济大学Fire scene data acquisition method, medium and electronic device
CN114627607A (en)*2022-01-302022-06-14江苏蓝图消防装备有限公司Fire-fighting comprehensive information retrieval system based on industrial sensor network
CN114758470A (en)*2022-06-162022-07-15张家港金典软件有限公司Fire early warning method and system based on fire engineering
CN114840541A (en)*2022-04-262022-08-02中煤航测遥感集团有限公司Updating processing method and system of environment monitoring data and computing equipment
CN114949665A (en)*2022-05-202022-08-30国能包头能源有限责任公司Spontaneous combustion prevention processing method and device for coal yard and computer readable storage medium
CN115100838A (en)*2022-05-312022-09-23杭州鸿泉物联网技术股份有限公司Vehicle fire early warning method, device, equipment, medium and computer program product
CN116542442A (en)*2023-04-032023-08-04中国消防救援学院 A UAV-based fire auxiliary dispatch management method and system
CN116824783A (en)*2022-01-302023-09-29王烁天 A kitchen fire early warning method and system based on multi-dimensional data fusion technology
CN116868243A (en)*2021-01-262023-10-10亚萨合莱有限公司 Implement training of ML models for monitoring people
CN117392798A (en)*2023-09-252024-01-12中国消防救援学院 A forest fire early warning method
CN117592789A (en)*2024-01-182024-02-23山东金桥保安器材有限公司Power grid environment fire risk assessment method and equipment based on time sequence analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101581940A (en)*2009-06-052009-11-18西安电子科技大学Tunnel event detection method based on integrated learning time sequence prediction
CN102013148A (en)*2010-10-282011-04-13中国科学技术大学Multi-information fusion fire hazard detection method
CN105806400A (en)*2016-02-292016-07-27北斗导航位置服务(北京)有限公司Intelligent method and system for monitoring hydrant's safety state
CN108230637A (en)*2017-12-292018-06-29深圳市泛海三江科技发展有限公司A kind of fire alarm method and system
CN108447210A (en)*2018-03-222018-08-24河南科技大学A kind of multiple spot push intelligent repository fire alarm system and its alarm method
CN108985192A (en)*2018-06-292018-12-11东南大学A kind of video smoke recognition methods based on multitask depth convolutional neural networks

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101581940A (en)*2009-06-052009-11-18西安电子科技大学Tunnel event detection method based on integrated learning time sequence prediction
CN102013148A (en)*2010-10-282011-04-13中国科学技术大学Multi-information fusion fire hazard detection method
CN105806400A (en)*2016-02-292016-07-27北斗导航位置服务(北京)有限公司Intelligent method and system for monitoring hydrant's safety state
CN108230637A (en)*2017-12-292018-06-29深圳市泛海三江科技发展有限公司A kind of fire alarm method and system
CN108447210A (en)*2018-03-222018-08-24河南科技大学A kind of multiple spot push intelligent repository fire alarm system and its alarm method
CN108985192A (en)*2018-06-292018-12-11东南大学A kind of video smoke recognition methods based on multitask depth convolutional neural networks

Cited By (34)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN110220554A (en)*2019-06-052019-09-10北京百度网讯科技有限公司Method and apparatus for output information
CN110322656A (en)*2019-06-282019-10-11三一重机有限公司Digger engine cabin fire automatic alarm device and excavator
CN110475223A (en)*2019-07-012019-11-19深圳市中电数通智慧安全科技股份有限公司A kind of method for safety monitoring, device and terminal device
CN110278416A (en)*2019-07-122019-09-24山东智洋电气股份有限公司Power transmission line intelligent prison based on artificial intelligence claps device
CN110459031A (en)*2019-08-062019-11-15福建工程学院 Fire prevention and disaster prevention method, system and storage medium with early warning function
CN112666851A (en)*2019-10-152021-04-16许桂林Projector with environment monitoring function and personal health data generation method
CN110930626A (en)*2019-11-252020-03-27西安和光明宸科技有限公司Fire early warning system
CN111031107A (en)*2019-11-292020-04-17武汉智菱物联科技有限公司Geological disaster monitoring system and method based on low-power-consumption communication network
CN111031107B (en)*2019-11-292022-08-05武汉智菱物联科技有限公司Geological disaster monitoring system and method based on low-power-consumption communication network
CN111079855B (en)*2019-12-272023-08-11三一重能股份有限公司 Fire-fighting method, device, storage medium and fire-fighting console for wind turbine
CN111079855A (en)*2019-12-272020-04-28三一重能有限公司 Wind turbine fire fighting method, device, storage medium and fire control console
CN111238446A (en)*2020-01-152020-06-05湖北民族大学 A communication tower tilt monitoring system
CN111275270A (en)*2020-03-092020-06-12南京中电科能技术有限公司Method for predicting regional electrical fire risk based on edge calculation and neural network
CN111753900B (en)*2020-06-232023-04-07中南林业科技大学Forest fire monitoring method
CN111753900A (en)*2020-06-232020-10-09中南林业科技大学 A method of monitoring forest fires
CN111784994B (en)*2020-07-142021-11-30中国民航大学 Fire detection method and device
CN111784994A (en)*2020-07-142020-10-16中国民航大学 Fire detection method and device
CN112016886A (en)*2020-08-172020-12-01北京双洲科技有限公司Mobile terminal safety office management and control method, device and system
CN116868243A (en)*2021-01-262023-10-10亚萨合莱有限公司 Implement training of ML models for monitoring people
CN113125675A (en)*2021-04-192021-07-16北京物资学院Storage yard coal spontaneous combustion early warning device and early warning method of edge computing framework
CN113743015A (en)*2021-09-072021-12-03同济大学Fire scene data acquisition method, medium and electronic device
CN113743015B (en)*2021-09-072024-03-29同济大学 Fire scene data acquisition methods, media and electronic equipment
CN114627607A (en)*2022-01-302022-06-14江苏蓝图消防装备有限公司Fire-fighting comprehensive information retrieval system based on industrial sensor network
CN116824783A (en)*2022-01-302023-09-29王烁天 A kitchen fire early warning method and system based on multi-dimensional data fusion technology
CN114627607B (en)*2022-01-302022-11-29江苏蓝图消防装备有限公司Fire-fighting comprehensive information retrieval system based on industrial sensor network
CN114840541A (en)*2022-04-262022-08-02中煤航测遥感集团有限公司Updating processing method and system of environment monitoring data and computing equipment
CN114840541B (en)*2022-04-262025-08-01中煤航测遥感集团有限公司Update processing method, system and operation equipment of environment monitoring data
CN114949665A (en)*2022-05-202022-08-30国能包头能源有限责任公司Spontaneous combustion prevention processing method and device for coal yard and computer readable storage medium
CN115100838A (en)*2022-05-312022-09-23杭州鸿泉物联网技术股份有限公司Vehicle fire early warning method, device, equipment, medium and computer program product
CN114758470A (en)*2022-06-162022-07-15张家港金典软件有限公司Fire early warning method and system based on fire engineering
CN116542442A (en)*2023-04-032023-08-04中国消防救援学院 A UAV-based fire auxiliary dispatch management method and system
CN117392798A (en)*2023-09-252024-01-12中国消防救援学院 A forest fire early warning method
CN117592789A (en)*2024-01-182024-02-23山东金桥保安器材有限公司Power grid environment fire risk assessment method and equipment based on time sequence analysis
CN117592789B (en)*2024-01-182024-04-16山东金桥保安器材有限公司Power grid environment fire risk assessment method and equipment based on time sequence analysis

Also Published As

Publication numberPublication date
CN109686036B (en)2020-12-22

Similar Documents

PublicationPublication DateTitle
CN109686036A (en)A kind of fire monitoring method, device and edge calculations device
US12125368B2 (en)Statistic agent for computer-aided dispatch systems
Park et al.Technological opportunities discovery for safety through topic modeling and opinion mining in the fourth industrial revolution: The case of artificial intelligence
CN118898397A (en) Security risk dynamic assessment system and method based on multi-source heterogeneous data analysis
CN109460664A (en)Risk analysis method, device, Electronic Design and computer-readable medium
CN109242361A (en)A kind of fire-fighting methods of risk assessment, device and terminal device
CN109669837A (en)Equipment state method for early warning, system, computer installation and readable storage medium storing program for executing
CN107426022A (en)Security incident monitoring method and device, electronic equipment, storage medium
CN111739243B (en)D-S evidence theory-based fire state detection method
CN118966809A (en) A safe and intelligent control system for power operation sites
CN114168967B (en)Industrial control system security situation prediction method and system
CN118862059B (en) A safety assessment system and method based on data hazard source identification
CN110222513A (en)A kind of method for monitoring abnormality of Above-the-line, device and storage medium
CN117692203A (en) An intelligent recommendation method and system for event handling strategies
CN114398465A (en) Exception handling method, device and computer equipment for Internet service platform
CN117172545A (en)Risk early warning method and device and computer readable storage medium
Shu et al.Emergency treatment mechanism of laboratory safety accidents in university based on IoT and context aware computing
CN119474961A (en) Data processing method, device, equipment and medium
CN109523141A (en)A kind of fire-fighting region deployment method, apparatus and terminal device
CN113361855A (en)Short, medium and long-term risk warning method and device
CN116308730A (en)Credit business data monitoring method and device based on stream computing
Qu et al.Research on fire detection based on multi-source sensor data fusion
Wan-Jun et al.Research on risk management of construction safety based on Bayesian network
CN111160694A (en)Method and device for evaluating emergency capacity of power system
CN116010616A (en)Multi-source alarm association analysis method and device

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp