Movatterモバイル変換


[0]ホーム

URL:


CN109236274A - Well selection method for water plugging of high-water-content oil well - Google Patents

Well selection method for water plugging of high-water-content oil well
Download PDF

Info

Publication number
CN109236274A
CN109236274ACN201811296419.0ACN201811296419ACN109236274ACN 109236274 ACN109236274 ACN 109236274ACN 201811296419 ACN201811296419 ACN 201811296419ACN 109236274 ACN109236274 ACN 109236274A
Authority
CN
China
Prior art keywords
water
water content
well
oil well
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811296419.0A
Other languages
Chinese (zh)
Other versions
CN109236274B (en
Inventor
吴天江
陆红军
杨海恩
唐凡
陈荣环
张�荣
刘保彻
程辰
薛芳芳
曹荣荣
徐春梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co LtdfiledCriticalPetrochina Co Ltd
Priority to CN201811296419.0ApriorityCriticalpatent/CN109236274B/en
Publication of CN109236274ApublicationCriticalpatent/CN109236274A/en
Application grantedgrantedCritical
Publication of CN109236274BpublicationCriticalpatent/CN109236274B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The invention discloses a well selection method for water plugging of a high-water-content oil well, which is used for evaluating the water content and the flooding degree of the oil well by adopting a water content rising index and is used for a well selection decision for water plugging of the oil well. Firstly, a data sequence of the water content of the oil well and corresponding time is obtained, a relation curve of the data sequence is drawn, then mathematical calculation is carried out on a relation function of the water content changing along with time, and finally a water content rising index is obtained. The water content rising index reflects the water content and the flooding degree of the oil well and the development degree of the dominant water flow channel in the oil layer area controlled by the oil well. The larger the water content rising index is, the higher the water shutoff priority is. The water content rise index calculation method has the advantages of simple data and convenient calculation, and is strong in pertinence and practicability for water plugging and well selection of the oil well.

Description

Well selection method for water plugging of high-water-content oil well
Technical Field
The invention belongs to the technical field of oil extraction processes, and particularly relates to a well selection method for water plugging of a high-water-content oil well.
Background
In the process of water injection development of an oil field, the water content of an oil well can continuously rise along with time. Due to the existence of reservoir heterogeneity and cracks, the uneven propulsion of injected water is easy to form a dominant water flow channel or suddenly advance along the cracks, which is easy to cause the accelerated rise of the water content of the oil well and even water logging. The water plugging technology of the oil well is an important means for treating the oil well with high water content (the water content is more than or equal to 60 percent) and keeping the yield stable.
In the implementation process of water shutoff of the oil well, scientific well selection is a foundation and is also an important technical link for implementation of water shutoff of the oil well. At present, the technical means of well selection and loop section for water plugging of an oil well is single, and the parameter of the water content of the oil well is used for carrying out intuitive decision on the basis of the production dynamics of a water injection well and the oil well. The higher the water content of the oil well, the more water plugging needs to be implemented. The water content reflects the water control urgency degree of the production face in the current stage of the oil well to a certain extent, reflects the development degree of a dominant water flow channel in the oil layer water injection development process, and has certain adaptability by being used as a water plugging and well selecting basis and water plugging priority judgment. However, the water content used as a decision for selecting a water plugging well has two disadvantages, one is that the water content can only reflect the current condition of the oil well and cannot reflect the dynamic change condition of the oil well along with time since the production is put into operation; and secondly, when the water content of the oil well is the same, the priority level of water plugging is difficult to be quickly judged.
In fact, the change of the water content along with time in the production process of the oil well is complex, the water content is increased, decreased and fluctuated in different periods, and the change amplitude is different.
Disclosure of Invention
The invention aims to provide a well selection method for water plugging of a high-water-content oil well, so as to solve the problems.
In order to achieve the purpose, the invention adopts the following technical scheme:
a well selection method for water plugging of a high water content oil well comprises the following steps:
step 1, the total number of oil wells produced in a target block is M, and water plugging is carried out on N oil wells when T and T are greater than 0 and N is less than M; recording data sequences of water contents and corresponding time of all M oil wells within 0-T production time;
step 2, respectively drawing curves of the M oil well data sequences recorded in the step 1 by taking time as an abscissa and taking water content as an ordinate;
step 3, recording a relation function of the water content and the time as f ═ f (t) according to the curve drawn in the step 2, and recording t as the production time; respectively calculating the water content rising index F of the oil wells with M portswcA value;
step 4, raising the water content index F of the oil well with M portswcAnd sequencing the values from large to small, and sequentially selecting the corresponding N oil wells, namely the wells for preferably plugging water.
Further, the unit of time T in step 1 is day, month or year.
Further, step 3 water content rising indexWherein,the water content of the oil well is expressed from f within the production time of 0 to T0Rises to fTIs integrated.
Go toOf step (f)0Water content at 0 time, fTAnd the water content of the oil well at the time T is corresponding to the water content of the oil well.
Further, the water content increase index F in the step 3wcThe significance of is that: fwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; conversely, the lower the water shutoff priority.
Compared with the prior art, the invention has the following technical effects:
according to the method, the area integral is carried out on the relation function of the water content changing along with the time by utilizing the related data of the water content and the time in the production process of the oil well, the corresponding mathematical calculation is carried out, and finally the water content rising index of the oil well is obtained.
Drawings
FIG. 1 is a schematic representation of the water cut of an oil well as the time of production;
FIG. 2W 24-09 well water cut curve;
FIG. 3W 24-07 well water cut curve;
FIG. 4W 20-115 well water cut curve;
FIG. 5X 78-30 well water cut curve;
FIG. 6X 75-30 well water cut curve;
FIG. 7X 74-43 well water cut curve;
FIG. 8X 65-12 well water cut curves.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
referring to fig. 1 to 8, a method for selecting a high water content oil well for water plugging includes the following steps:
step 1, the total number of oil wells produced in a target block is M, and water plugging is carried out on N oil wells when T and T are greater than 0 and N is less than M; recording data sequences of water contents and corresponding time of all M oil wells within 0-T production time;
step 2, respectively drawing curves of the M oil well data sequences recorded in the step 1 by taking time as an abscissa and taking water content as an ordinate;
step 3, recording a relation function of the water content and the time as f ═ f (t) according to the curve drawn in the step 2, and recording t as the production time; respectively calculating the water content rising index F of the oil wells with M portswcA value;
step 4, raising the water content index F of the oil well with M portswcAnd sequencing the values from large to small, and sequentially selecting the corresponding N oil wells, namely the wells for preferably plugging water.
The unit of the time T in the step 1 is day, month or year.
Step 3 Water content rising indexWherein,the water content of the oil well is expressed from f within the production time of 0 to T0Rises to fTIs integrated.
f0Water content at 0 time, fTAnd the water content of the oil well at the time T is corresponding to the water content of the oil well.
Water content increase index F of step 3wcThe significance of is that: fwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; conversely, the lower the water shutoff priority.
FIG. 1 is a plot of water cut f (T) of a well versus production time T, where the X-axis is time and the Y-axis is water cut. Corresponding water content is from f within 0-T0Rises to fT. For illustration, the following auxiliary lines are required: the crossing time point T is a point a intersected by a straight line (a dotted line) parallel to the Y axis and the water content curve and connected with afT. Is passing through f0The point is taken as a straight line (dotted line) perpendicular to the Y-axis and compared to the straight line aT to the point b.
The water content is from f within 0 to T0Rises to fTIs integrated to obtainThe mathematical meaning is expressed as 0f in FIG. 10area enclosed by aT. Calculating f0The value of T is 0f in FIG. 10bT, the rectangular area enclosed by the bT. ThenI.e. the area of the shaded portion in fig. 1.
Symbol F for water content ratio rising indexwcAnd then:
Fwcthe mathematical meaning of (a) is expressed as the ratio of the shaded area in figure 1 to the time of the production cycle T. During time T, FwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; conversely, the lower the water shutoff priority. According to the big to small pairs FwcAnd sequencing the values, and sequentially corresponding the oil wells which need to be blocked.
Example 1:
in block 3 high water content oil wells, 2 wells were selected as water shutoff implementing wells. And (5) carrying out specific example well selection on the water plugging of the 3 oil wells in the block.
1) The initial water content of the target well w24-09 is 27%, and the water content is 85% after 7 years of production; the initial water content of the target well w24-07 is 32%, and the water content is 84% after 7 years of production; the initial water content of the target well w20-115 is 62%, and the water content after 7 years of production is 85%. The water content data sequence corresponding to the three oil wells is shown in the following table 1.
TABLE 1
2) And (3) drawing a curve by taking the production time as an abscissa and the water content as an ordinate according to the data sequence recorded in the step 1) in the table 1. The w24-09 well corresponds to FIG. 2, the w24-07 well corresponds to FIG. 3, and the w20-115 well corresponds to FIG. 4.
3) Calculating the water content rising index F according to the curve chart drawn in the step 2)wcThe value is obtained. The ratio of the shaded area to the production time in FIGS. 2, 3 and 4 is the water content increase indexWherein,the initial water content is f to 7 years0Rises to fTIs the integral of the change curve of (a), which is the shaded area in fig. 2, fig. 3 and fig. 4, respectively; f. of0The T value is the rectangular area in the lower portion of the hatching in fig. 2, 3, and 4, respectively. Finally obtaining the F of the w24-09 wellwc0.404, w24-07 wellsFwcF for 0.247, w20-115 wellwcIs 0.101.
4) When the water content is equivalent after 7 years of production (85% for w24-09 well, 84% for w24-07 well and 85% for w20-115 well), F of three wellswcThe values are w24-09, w24-07 and w20-115 from large to small. According to FwcThe meaning of the characterization shows that the higher the water content and the water flooding degree of the w24-09 well and the w24-07 well, the more developed the oil layer water drive dominant channel controlled by the oil well, and the higher the water plugging priority. Therefore, the w24-09 well and the w24-07 well are preferably selected to carry out water plugging.
Example 2
In block 2 high water cut oil wells, 1 well was selected as the water shutoff implementation well. And (5) carrying out specific example well selection on the water plugging of the 2 oil wells in the block.
1) The initial water content of the target well x78-30 is 15%, and the water content is 94% after 18 months of production; the initial water content of the target well x75-30 is 18%, and the water content after 18 months of production is 96%. The water cut data sequence for both wells is shown in table 2 below.
TABLE 2
2) And (3) drawing a curve by taking the production time as an abscissa and the water content as an ordinate according to the data sequence recorded in the step 1) in the table 2. The x78-30 wells correspond to FIG. 5 and the x75-30 wells correspond to FIG. 6.
3) Calculating the water content rising index F according to the curve chart drawn in the step 2)wcThe value is obtained. The ratio of the shaded area to the production time in FIGS. 5 and 6 is the water content increase indexWherein,the initial water content is f within 0-18 months0Rises to fTIs the integral of the change curve of (a), which is the shaded area in fig. 5 and 6, respectively; f. of0The T value is the rectangular area shaded in fig. 5 and 6, respectively. Finally obtaining F of x78-30 wellwcF for 0.442, x75-30 wellswcIs 0.370.
4) When the water content is equivalent after 18 months of production (94% for x78-30 wells and 96% for x75-30 wells), F of the two wells is calculatedwcThe values are ordered sequentially from large to small. F for x78-30 wellwcLarge value, x75-30 well FwcThe value is small. According to FwcThe meaning of the characterization indicates that the water content and the water flooding degree of the x78-30 well are high, the water drive dominant channel of an oil layer controlled by the oil well develops, and the water plugging priority is high. Therefore, the x78-30 wells are preferably selected for water plugging.
Example 3:
in block 2 high water cut oil wells, 1 well was selected as the water shutoff implementation well. And (5) carrying out specific example well selection on the water plugging of the 2 oil wells in the block.
1) The initial water content of the target well x74-43 is 19%, and the water content is 94% after 5 years of production; the initial water content of the target well x65-12 is 17%, and the water content after 9 years of production is 92%. The water cut data sequence for the two wells is shown in table 3 below.
TABLE 3
2) The data sequence recorded in the step 1) in the table 3 is plotted by taking the production time as an abscissa and the water content as an ordinate. The x74-43 wells correspond to FIG. 7, and the x65-12 wells correspond to FIG. 8.
3) Calculating the water content rising index F according to the curve chart drawn in the step 2)wcThe value is obtained. The ratio of the shaded area to the production time in FIGS. 7 and 8 is the water content increase indexWherein,the initial water content is f to 5 years and 0 to 9 years0Rises to fTIs the integral of the change curve of (a), which is the shaded area in fig. 7 and fig. 8, respectively; f. of0The T value is the rectangular area in the lower portion of the hatching in fig. 7 and 8, respectively. Finally obtaining F of x74-43 wellwcF for 0.547, x65-12 wellwcIs 0.608.
4) When the water content of the x74-43 well is equivalent to that of the x65-12 well after 5 years of production (94% for the x74-43 well and 92% for the x65-12 well), F of the two wells is calculatedwcThe values are ordered sequentially from large to small. F for x65-12 wellwcLarge value, x74-43 well FwcThe value is small. According to FwcThe meaning of the characterization indicates that the water content and the water flooding degree of the x65-12 well are high, the water drive dominant channel of an oil layer controlled by the oil well develops, and the water plugging priority is high. Therefore, the x65-12 well is preferably selected to implement water shutoff.
The water content rising index calculation method provided by the invention has the advantages that the data required by calculation is convenient to record, the calculation is simple, the operation is strong, the operation is easy, compared with the traditional water content method, the water drive condition of the oil layer and the dynamic change rule of the water content are more accurately reflected by the method, and the method has the characteristics of rapidness, simplicity, convenience and strong practicability when being used for the decision of water plugging and well selection of the oil well.
The above examples are merely illustrative of the present invention and should not be construed as limiting the scope of the invention, which is intended to be covered by the claims and any design similar or equivalent to the scope of the invention.

Claims (5)

CN201811296419.0A2018-11-012018-11-01Well selection method for water plugging of high-water-content oil wellActiveCN109236274B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201811296419.0ACN109236274B (en)2018-11-012018-11-01Well selection method for water plugging of high-water-content oil well

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201811296419.0ACN109236274B (en)2018-11-012018-11-01Well selection method for water plugging of high-water-content oil well

Publications (2)

Publication NumberPublication Date
CN109236274Atrue CN109236274A (en)2019-01-18
CN109236274B CN109236274B (en)2022-05-10

Family

ID=65080408

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201811296419.0AActiveCN109236274B (en)2018-11-012018-11-01Well selection method for water plugging of high-water-content oil well

Country Status (1)

CountryLink
CN (1)CN109236274B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN110439503A (en)*2019-08-142019-11-12西安石油大学A kind of Fractured Low-Permeability Reservoir multistage plug Selective Water Plugging method
CN110617041A (en)*2019-10-092019-12-27中国石油天然气股份有限公司Water injection well water absorption profile adjusting sleeve and adjusting method

Citations (15)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN1342829A (en)*2001-08-272002-04-03石油大学(华东)Edge water scheduling technique for oil field using edge water to displace oil
CN1560428A (en)*2004-02-252005-01-05石油大学(华东) A Decision-Making Method for Water Shutoff in Bottom Water Reservoirs
EP2305767A1 (en)*2009-10-022011-04-06Services Pétroliers SchlumbergerMethod and compositon to prevent fluid mixing in pipe
CN102720485A (en)*2012-07-202012-10-10中国石油天然气股份有限公司Prediction method for water cut rising rate of oil field with medium and high water cut
CN103075142A (en)*2013-01-142013-05-01中国石油大学(华东)Method for selecting water plugging oil well during development of oilfield through water injection
CN103225500A (en)*2013-05-022013-07-31中国石油大学(华东)Novel water flooding layer logging evaluation method applying three parameters self-consistent iterative algorithm
CN103244087A (en)*2013-05-212013-08-14中国石油大学(北京)Profile control and water plugging well selection decision-making method for low-permeability reservoirs
CN103821474A (en)*2012-11-162014-05-28中国石油天然气股份有限公司Ultra-low permeability oil reservoir deep profile control method
CN104099074A (en)*2014-06-102014-10-15中国石油集团川庆钻探工程有限公司工程技术研究院Volume fracturing reconstruction crack plugging agent and water plugging construction method
RU2569101C1 (en)*2014-12-022015-11-20Открытое акционерное общество "Татнефть" им. В.Д.ШашинаMethod of decrease of water inflow to horizontal wells
WO2015191026A1 (en)*2014-06-092015-12-17WellTracer Technology, LLCGas lift analysis and troubleshooting
CN105178909A (en)*2015-09-112015-12-23中国石油天然气股份有限公司Horizontal well continuous water plugging process pipe column and method
CN107035348A (en)*2017-05-082017-08-11中国石油天然气股份有限公司Multi-factor analysis well selection method and device for oil field profile control
CN107676064A (en)*2017-10-182018-02-09中国石油天然气股份有限公司Water-drive reservoir water content prediction method and prediction device thereof
CN108518219A (en)*2018-03-292018-09-11中国石油大港油田勘探开发研究院It is a kind of that the evaluation method of well is selected based on the natural energy scale extract that develops oil fields

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN1342829A (en)*2001-08-272002-04-03石油大学(华东)Edge water scheduling technique for oil field using edge water to displace oil
CN1560428A (en)*2004-02-252005-01-05石油大学(华东) A Decision-Making Method for Water Shutoff in Bottom Water Reservoirs
EP2305767A1 (en)*2009-10-022011-04-06Services Pétroliers SchlumbergerMethod and compositon to prevent fluid mixing in pipe
CN102720485A (en)*2012-07-202012-10-10中国石油天然气股份有限公司Prediction method for water cut rising rate of oil field with medium and high water cut
CN103821474A (en)*2012-11-162014-05-28中国石油天然气股份有限公司Ultra-low permeability oil reservoir deep profile control method
CN103075142A (en)*2013-01-142013-05-01中国石油大学(华东)Method for selecting water plugging oil well during development of oilfield through water injection
CN103225500A (en)*2013-05-022013-07-31中国石油大学(华东)Novel water flooding layer logging evaluation method applying three parameters self-consistent iterative algorithm
CN103244087A (en)*2013-05-212013-08-14中国石油大学(北京)Profile control and water plugging well selection decision-making method for low-permeability reservoirs
WO2015191026A1 (en)*2014-06-092015-12-17WellTracer Technology, LLCGas lift analysis and troubleshooting
CN104099074A (en)*2014-06-102014-10-15中国石油集团川庆钻探工程有限公司工程技术研究院Volume fracturing reconstruction crack plugging agent and water plugging construction method
RU2569101C1 (en)*2014-12-022015-11-20Открытое акционерное общество "Татнефть" им. В.Д.ШашинаMethod of decrease of water inflow to horizontal wells
CN105178909A (en)*2015-09-112015-12-23中国石油天然气股份有限公司Horizontal well continuous water plugging process pipe column and method
CN107035348A (en)*2017-05-082017-08-11中国石油天然气股份有限公司Multi-factor analysis well selection method and device for oil field profile control
CN107676064A (en)*2017-10-182018-02-09中国石油天然气股份有限公司Water-drive reservoir water content prediction method and prediction device thereof
CN108518219A (en)*2018-03-292018-09-11中国石油大港油田勘探开发研究院It is a kind of that the evaluation method of well is selected based on the natural energy scale extract that develops oil fields

Cited By (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN110439503A (en)*2019-08-142019-11-12西安石油大学A kind of Fractured Low-Permeability Reservoir multistage plug Selective Water Plugging method
CN110439503B (en)*2019-08-142021-08-10西安石油大学Selective water plugging method for fractured low-permeability reservoir multi-section plug oil well
CN110617041A (en)*2019-10-092019-12-27中国石油天然气股份有限公司Water injection well water absorption profile adjusting sleeve and adjusting method

Also Published As

Publication numberPublication date
CN109236274B (en)2022-05-10

Similar Documents

PublicationPublication DateTitle
CN111322050A (en)Shale horizontal well section internal osculating temporary plugging fracturing construction optimization method
CN105626006B (en)Low-permeability oil deposit CO2Drive technical limit well space and determine method
Zhuang et al.Multi-objective optimization of reservoir development strategy with hybrid artificial intelligence method
CN109236274B (en)Well selection method for water plugging of high-water-content oil well
CN111091293B (en)Dynamic early warning method for oil reservoir development
CN103149600A (en)Automatic wiring method for determining hydrogeological parameters based on optimization control point
CN107965315A (en)A kind of low-permeability oil deposit PRODUCTION FORECASTING METHODS
CN119849337B (en)Oil reservoir gas flooding injection and production parameter optimization method, device, equipment and medium
US20250297539A1 (en)Method and system for optimization of development by carbon dioxide injection based on incomplete miscibility characteristics
Liu et al.Remaining Oil Distribution and Development Strategy for Offshore Unconsolidated Sandstone Reservoir at Ultrahigh Water‐Cut Stage
CN104481473A (en)Gas drive reservoir injection and production method and device
CN118065842B (en)Well pattern optimization method and system based on carbon dioxide incomplete miscible displacement characteristics
Xu et al.Nonlinear flow mechanism and production characteristics of thin interbedded tight oil reservoirs
He et al.Fine characterisation of remaining oil using time-varying numerical simulation: Experimental study, characterisation in model, and application in QHD oilfield
CN104747154B (en)Method for improving research precision of steam flooding residual oil by utilizing oil displacement efficiency ratio
CN114737947A (en) Method and device for development and adjustment of horizontal wells in carbonate reservoirs
Yupu et al.Commercial success of polymer flooding in Daqing Oilfield—lessons learned
Quintero et al.Carbon footprint and energy intensity assessment for enhanced oil recovery (eor) based on polymer injection: A colombian case study
Li et al.Research and practice of chemical flooding on offshore heavy oilfield in Bohai Bay of China
US20250278542A1 (en)Well pattern optimization method based on co2 incomplete miscible displacement characteristics
CN111143994B (en)Optimization method for core oil saturation monitoring point layout mode
CN112502677A (en)Water injection development effect evaluation method based on multiple linear regression
CN112464476A (en)Method for evaluating residual oil saturation distribution field of reservoir
He et al.How to improve sweep efficiency of horizontal wells for offshore fluvial oil reservoir by ICD inflow control device
Jie et al.Time-varying Numerical Simulation Of Reservoir Physical Properties Based On Surface Flux

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp