技术领域technical field
本发明涉及物理模型试验制模辅助装置及方法,特别涉及一种用于微型传感器精确定位及快速埋设的装置和方法。The invention relates to an auxiliary device and method for making molds for physical model tests, in particular to a device and method for precise positioning and rapid embedding of micro sensors.
背景技术Background technique
在岩土工程物理模型试验中,土体模型内部土压力及孔隙水压力的测量是研究土体受力状态、结构物力学性能的重要手段。如何能够快速、准确地按照设计位置将传感器埋入土体模型中将直接关系到试验结果的准确性,而且不同的试验对传感器的埋设角度和埋设位置要求不同。传统的传感器埋设方法是:事先准备铝管,根据具体埋设深度及埋设角度要求,在铝管粘贴埋设标记点,再将铝圆管一端开一长条状缺口,将传感器放入其中,引线从缺口处引出;准备相应角度的泡沫块,斜坡中间开半圆形长槽,用于铝管的辅助定位,然后开始埋设工作。In geotechnical engineering physical model tests, the measurement of soil pressure and pore water pressure inside the soil model is an important means to study the stress state of soil and the mechanical properties of structures. How to quickly and accurately embed the sensor in the soil model according to the designed position will directly affect the accuracy of the test results, and different tests have different requirements for the embedment angle and embedment position of the sensor. The traditional sensor embedding method is: prepare the aluminum tube in advance, paste and embed marking points on the aluminum tube according to the specific embedding depth and embedding angle requirements, and then open a long strip-shaped gap at one end of the aluminum round tube, put the sensor into it, and the lead wire from Lead out from the gap; prepare foam blocks with corresponding angles, and open a semicircular long slot in the middle of the slope for auxiliary positioning of aluminum tubes, and then start the embedding work.
传统的埋设方法缺点主要有以下几个方面:The disadvantages of traditional embedding methods mainly include the following aspects:
(1)在埋设过程中,输送铝管的前部易对传感器壳体和引线造成伤害,导致传感器损坏;(1) During the embedding process, the front part of the conveying aluminum pipe is easy to cause damage to the sensor housing and lead wires, resulting in damage to the sensor;
(2)埋设角度主要依靠事先准备的泡沫块来辅助确定,泡沫块的加工及制作困难,且角度不可调节,埋设过程角度极易发生偏转,造成角度定位不准;(2) The embedding angle is mainly determined by the pre-prepared foam block. The processing and production of the foam block is difficult, and the angle cannot be adjusted. The angle is easily deflected during the embedding process, resulting in inaccurate angle positioning;
(3)埋设深度靠铝管上粘贴的标记来控制,粘贴的标记位置不够灵活,造成埋设深度不准确,且在埋设过程中容易出现脱落的现象。(3) The embedding depth is controlled by the mark pasted on the aluminum tube. The position of the pasted mark is not flexible enough, resulting in inaccurate embedding depth and prone to falling off during the embedding process.
发明内容Contents of the invention
本发明为解决公知技术中存在的技术问题而提供一种用于微型传感器精确定位及快速埋设的装置和方法,该装置和方法可在模型土的准备过程中,帮助试验人员快速、准确地将传感器埋入指定位置,提高埋设传感器的精准度和工作效率。In order to solve the technical problems in the known technology, the present invention provides a device and method for precise positioning and fast embedding of micro sensors. The device and method can help testers quickly and accurately place The sensor is buried in the specified position, which improves the accuracy and work efficiency of the buried sensor.
本发明为解决公知技术中存在的技术问题所采取的一个技术方案是:一种用于微型传感器精确定位及快速埋设的装置,包括定位架、角度定位轨道、深度定位轨道和输送棒,所述定位架包括矩形定位支撑底板和半圆形角度定位板,在所述矩形定位支撑底板的中央设有埋设入口,在所述埋设入口内固定有销轴,所述半圆形角度定位板垂直固定在所述矩形定位支撑底板上,底部横跨所述埋设入口,圆心位于所述销轴的中心线上,在所述半圆形角度定位板上设有多个角度定位槽,在所述定位支撑底板上设有与所述角度定位槽对应的入土起始点横向定位刻度;所述角度定位轨道设有滑槽,所述角度定位轨道的一个侧面与所述半圆形角度定位板相邻,并设有与所述角度定位槽插接的定位凸块,所述角度定位轨道的背面下端与所述销轴转动连接;所述深度定位轨道插装在所述角度定位轨道的滑槽内,在所述深度定位轨道内设有与传感器尺寸吻合的滑槽,在所述深度定位轨道的外侧设有尺寸刻度;所述输送棒插装在所述深度定位轨道的滑槽内,设有推杆,在所述推杆的头端设有与传感器适配的顶推部,在所述推杆的尾部设有埋设结束刻线。A technical solution adopted by the present invention to solve the technical problems existing in the known technology is: a device for precise positioning and rapid embedding of micro sensors, including a positioning frame, an angle positioning track, a depth positioning track and a conveying rod. The positioning frame includes a rectangular positioning support base plate and a semicircular angle positioning plate. An embedded entrance is arranged in the center of the rectangular positioning support base plate. A pin shaft is fixed in the embedded entrance, and the semicircular angle positioning plate is vertically fixed. On the rectangular positioning support base plate, the bottom spans the buried entrance, the center of the circle is located on the center line of the pin shaft, and a plurality of angle positioning grooves are arranged on the semicircular angle positioning plate. The support base plate is provided with the horizontal positioning scale of the initial point of entry corresponding to the angle positioning groove; the angle positioning track is provided with a chute, and one side of the angle positioning track is adjacent to the semicircular angle positioning plate, It is also provided with a positioning projection inserted into the angle positioning groove, the lower end of the back of the angle positioning track is rotatably connected with the pin shaft; the depth positioning track is inserted into the chute of the angle positioning track, A chute that matches the size of the sensor is provided in the depth positioning track, and a size scale is provided outside the depth positioning track; the delivery rod is inserted in the chute of the depth positioning track, and a pusher is provided. Rod, the head end of the push rod is provided with a push part adapted to the sensor, and the tail of the push rod is provided with an embedded end score line.
在上述方案的基础上,本发明还做了如下改进:On the basis of the foregoing scheme, the present invention has also made the following improvements:
所述角度定位轨道的滑槽和所述深度定位轨道的滑槽横截面均为凸字形。Both the chute of the angle positioning track and the chute of the depth positioning track have a convex cross-section.
所述输送棒的顶推部采用开口结构。The pushing part of the conveying rod adopts an open structure.
在所述推杆的尾部还设有埋设起始刻线。There is also a buried starting score line at the tail of the push rod.
所有所述角度定位槽沿周向均匀布置,间隔为15°。All the angular positioning grooves are evenly arranged along the circumferential direction with an interval of 15°.
本发明为解决公知技术中存在的技术问题所采取的另一个技术方案是:采用上述的用于微型传感器精确定位及快速埋设的装置埋设微型传感器的方法,采用以下步骤:Another technical solution adopted by the present invention to solve the technical problems existing in the known technology is: adopt the above-mentioned method for embedding the micro-sensor for precise positioning and fast embedding of the micro-sensor, and adopt the following steps:
一)按照传感器设计埋设角度调节角度定位轨道的倾角,并将其固定在半圆形角度定位板上;1) Adjust the inclination angle of the angle positioning track according to the sensor design embedding angle, and fix it on the semicircular angle positioning plate;
二)在土体模型的土面上以预设入土起始点为中心画十字交叉的横向线和纵向线,使定位支撑底板上与传感器设计埋设角度对应的横向定位刻度与纵向线重合,然后沿纵向调节定位支撑底板的位置,使预设入土起始点进入埋设入口并与角度定位轨道的宽度中点横向对齐,完成定位支撑底板的定位;2) On the soil surface of the soil model, draw a crossed horizontal line and a vertical line centered on the preset starting point of the soil, so that the horizontal positioning scale corresponding to the sensor design embedding angle on the positioning support base plate coincides with the vertical line, and then along the Longitudinal adjustment of the position of the positioning support base plate, so that the preset starting point of soil entry enters the buried entrance and is horizontally aligned with the midpoint of the width of the angle positioning track to complete the positioning of the positioning support base plate;
三)将传感器放入深度定位轨道的滑槽中,然后采用输送棒将传感器推送至深度定位轨道的前端;3) Put the sensor into the chute of the depth positioning track, and then use the delivery rod to push the sensor to the front end of the depth positioning track;
四)将深度定位轨道插入角度定位轨道的滑槽中,将深度定位轨道和输送棒一起推送,直到深度定位轨道上位于土面上的尺寸刻度与传感器的设计埋设深度相等;4) Insert the depth positioning track into the chute of the angle positioning track, and push the depth positioning track and the conveying rod together until the dimension scale on the soil surface on the depth positioning track is equal to the designed embedding depth of the sensor;
五)使用输送棒继续顶推传感器,直到埋设结束刻线进入深度定位轨道的内部,完成传感器的埋设;5) Use the delivery rod to continue to push the sensor until the engraved line enters the inside of the depth positioning track to complete the embedding of the sensor;
六)将深度定位轨道拉出,更换其他地点并重复以上步骤一)到步骤五),完成其他传感器的埋设工作。6) Pull out the depth positioning track, replace other locations and repeat the above steps 1) to 5) to complete the embedding of other sensors.
本发明具有的优点和积极效果是:采用定位架确定入土起始点位置,采用可调节角度的角度定位轨道确定埋设角度,采用可调节深度的深度定位轨道确定埋设深度,采用输送棒进行顶推输送和顶推式埋设,能够快速、准确地将传感器埋入土中的设计位置,埋设定位准确,速度快,适用范围大。The advantages and positive effects of the present invention are: use the positioning frame to determine the position of the starting point of the soil entry, use the angle-adjustable angle positioning track to determine the embedding angle, use the adjustable-depth depth positioning track to determine the embedding depth, and use the conveying rod to push and transport And push-type embedding, can quickly and accurately embed the sensor in the design position in the soil, the embedding position is accurate, the speed is fast, and the application range is large.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明的结构示意图;Fig. 2 is a structural representation of the present invention;
图3是本发明的定位架三维视图;Fig. 3 is a three-dimensional view of the positioning frame of the present invention;
图4是本发明的角度定位轨道三维视图;Fig. 4 is a three-dimensional view of the angular positioning track of the present invention;
图5是本发明的深度定位轨道三维视图;Fig. 5 is a three-dimensional view of the depth positioning track of the present invention;
图6是本发明的传感器输送棒三维视图;Fig. 6 is a three-dimensional view of the sensor delivery rod of the present invention;
图7是本发明确定横向定位刻度的原理示意图之一,角度定位轨道处于90°位置时的示意图;Fig. 7 is one of the principle schematic diagrams of determining the lateral positioning scale in the present invention, a schematic diagram when the angular positioning track is at a position of 90°;
图8是本发明确定横向定位刻度的原理示意图之二,角度定位轨道处于30°位置时的示意图。Fig. 8 is the second schematic diagram of the principle of determining the horizontal positioning scale in the present invention, and the schematic diagram when the angular positioning track is at a position of 30°.
图中:1、定位架;1-1、角度定位槽;1-2、销轴;1-3、入土起始点横向定位刻度;2、角度定位轨道;2-1、销孔;2-2、定位凸块;2-3、滑槽;3、深度定位轨道;3-1、尺寸刻度;3-2、滑槽;4、输送棒;4-1、顶推部;4-2、埋设结束刻线;5、传感器。In the figure: 1, positioning frame; 1-1, angle positioning groove; 1-2, pin shaft; 1-3, horizontal positioning scale of starting point of soil entry; 2, angle positioning track; 2-1, pin hole; 2-2 , positioning bump; 2-3, chute; 3, depth positioning track; 3-1, size scale; 3-2, chute; 4, conveying rod; 4-1, push part; 4-2, buried End the engraved line; 5, the sensor.
具体实施方式Detailed ways
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:In order to further understand the invention content, characteristics and effects of the present invention, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:
请参阅图1~图6,一种用于微型传感器精确定位及快速埋设的装置,包括定位架1、角度定位轨道2、深度定位轨道3和输送棒4。Please refer to FIGS. 1 to 6 , a device for precise positioning and rapid embedding of micro sensors, including a positioning frame 1 , an angle positioning track 2 , a depth positioning track 3 and a delivery rod 4 .
所述定位架1包括矩形定位支撑底板和半圆形角度定位板,在所述矩形定位支撑底板的中央设有埋设入口,在所述埋设入口内固定有销轴1-2,所述半圆形角度定位板垂直固定在所述矩形定位支撑底板上,底部横跨所述埋设入口,圆心位于所述销轴1-2的中心线上,在所述半圆形角度定位板上设有多个角度定位槽1-1,在所述定位支撑底板上设有与所述角度定位槽1-1对应的入土起始点横向定位刻度1-3。The positioning frame 1 includes a rectangular positioning support base plate and a semicircular angle positioning plate, an embedded entrance is provided at the center of the rectangular positioning support base plate, and pin shafts 1-2 are fixed in the embedded entrance, and the semicircle The angle positioning plate is vertically fixed on the rectangular positioning support base plate, the bottom spans the buried entrance, and the center of the circle is located on the center line of the pin shaft 1-2. An angle positioning groove 1-1 is provided on the positioning support base plate with a horizontal positioning scale 1-3 corresponding to the entry point of the angle positioning groove 1-1.
所述角度定位轨道2设有滑槽2-3,所述角度定位轨道2的一个侧面与所述半圆形角度定位板相邻,并设有与所述角度定位槽1-1插接的定位凸块2-2,所述角度定位轨道2的背面下端设有与所述销轴1-2转动连接的销孔2-1。The angle positioning track 2 is provided with a chute 2-3, and one side of the angle positioning track 2 is adjacent to the semicircular angle positioning plate, and is provided with a slot that is inserted into the angle positioning groove 1-1. The positioning projection 2-2, the lower end of the back of the angular positioning track 2 is provided with a pin hole 2-1 that is rotatably connected with the pin shaft 1-2.
所述深度定位轨道3插装在所述角度定位轨道2的滑槽内,在所述深度定位轨道3内设有与传感器尺寸吻合的滑槽3-2,在所述深度定位轨道2的外侧设有尺寸刻度3-1。The depth positioning track 3 is inserted in the chute of the angle positioning track 2, a chute 3-2 matching the size of the sensor is provided in the depth positioning track 3, and on the outside of the depth positioning track 2 There is a size scale 3-1.
所述输送棒4插装在所述深度定位轨道3的滑槽内,设有推杆,在所述推杆的头端设有与传感器适配的顶推部4-1,在所述推杆的尾部设有埋设结束刻线4-2,当所述输送棒4将传感器5推出深度定位轨道的滑槽3-2时,埋设结束刻线4-2进入深度定位轨道的滑槽3-2。也可以说,当埋设结束刻线4-2进入深度定位轨道的滑槽3-2时,表明传感器5已经脱离深度定位轨道3而埋入土中。所述输送棒4的长度应大于深度定位轨道3的长度。The conveying rod 4 is inserted in the chute of the depth positioning track 3, and a push rod is provided, and a push part 4-1 adapted to the sensor is arranged at the head end of the push rod. The end of the rod is provided with a buried end score line 4-2. When the delivery rod 4 pushes the sensor 5 out of the chute 3-2 of the depth positioning track, the end of the burying score line 4-2 enters the chute 3-2 of the depth positioning track. 2. It can also be said that when the embedding end score line 4-2 enters the chute 3-2 of the depth positioning track, it shows that the sensor 5 has broken away from the depth positioning track 3 and is buried in the soil. The length of the conveying rod 4 should be greater than the length of the depth positioning track 3 .
所述定位架的矩形定位支撑底板上的与所述角度定位槽对应的入土起始点横向定位刻度1-3用于准确定位入土起始点。因为深度定位轨道3和传感器5的推送轨迹偏离半圆形角度定位板的圆心,导致入土起始点的位置不易确定。为了准确确定入土起始点的位置,本发明在所述定位架1的矩形定位支撑底板上标出了与所述角度定位槽对应的入土起始点横向定位刻度1-3用于准确定位入土起始点。入土起始点横向定位刻度1-3的确定方法:请参阅图7和图8,传感器入土起始点的位置位于矩形定位支撑底板1的底部,无法准确确定,并且当角度定位轨道2绕销轴1-2时,传感器入土起始点与销轴1-2的距离发生变化,如图所示,角度定位轨道处于90°时,传感器入土起始点与销轴1-2的距离为2.4mm,角度定位轨道处于30°时,传感器入土起始点与销轴1-2的距离为7mm。因此需要针对不同的埋设角度提前将传感器入土起始点的横向位置竖直投影至矩形定位支撑底板1的上表面,并将其横向位置刻于矩形定位支撑底板1上,也就是入土起始点横向定位刻度1-3。The horizontal positioning scale 1-3 of the starting point of the soil entry corresponding to the angular positioning groove on the rectangular positioning support base plate of the positioning frame is used to accurately locate the starting point of the soil entry. Because the pushing trajectory of the depth positioning track 3 and the sensor 5 deviates from the center of circle of the semicircular angle positioning plate, the position of the starting point of entering the soil is difficult to determine. In order to accurately determine the position of the starting point of digging into the soil, the present invention marks the starting point of digging into the soil corresponding to the angle positioning groove on the rectangular positioning support base plate of the positioning frame 1. . The method of determining the horizontal positioning scale 1-3 of the starting point of the soil entry: Please refer to Figure 7 and Figure 8. The position of the sensor’s soil entry starting point is located at the bottom of the rectangular positioning support base plate 1, which cannot be accurately determined. -2, the distance between the starting point of the sensor entering the soil and the pin shaft 1-2 changes, as shown in the figure, when the angle positioning track is at 90°, the distance between the starting point of the sensor entering the soil and the pin shaft 1-2 is 2.4mm, and the angle positioning When the track is at 30°, the distance between the starting point of the sensor entering the soil and the pin axis 1-2 is 7mm. Therefore, it is necessary to vertically project the lateral position of the starting point of the sensor into the soil to the upper surface of the rectangular positioning support base plate 1 in advance for different embedding angles, and engrave its lateral position on the rectangular positioning support base plate 1, that is, the lateral positioning of the starting point of the soil entry Scale 1-3.
在本实施例中,所述角度定位轨道2的滑槽和所述深度定位轨道3的滑槽横截面均采用凸字形,便于槽内部件稳定滑动,有效防止槽内部件脱出。所述输送棒的顶推部4-1采用开口结构,便于保护传感器,可避免传感器受到损伤。为了更加方便操作,在所述推杆的尾部还可设有埋设起始刻线(图中未示出)。所有所述角度定位槽1-1沿周向均匀布置,间隔为15°。In this embodiment, the chute of the angle positioning track 2 and the chute of the depth positioning track 3 are convex in cross-section, which facilitates the stable sliding of the components in the trough and effectively prevents the components in the trough from falling out. The pushing part 4-1 of the conveying rod adopts an open structure, which is convenient for protecting the sensor and avoiding the sensor from being damaged. In order to be more convenient to operate, an embedded starting score line (not shown in the figure) may also be provided at the tail of the push rod. All the angle positioning grooves 1-1 are evenly arranged along the circumferential direction with an interval of 15°.
采用上述的用于微型传感器精确定位及快速埋设的装置埋设微型传感器的方法,采用以下步骤:Adopt the above-mentioned method for burying the microsensor for the precise positioning and fast embedding of the microsensor, adopt the following steps:
一)按照传感器设计埋设角度调节角度定位轨道2的倾角,将其定位凸块2-2落入在角度定位槽1-1内,完成角度定位轨道2在半圆形角度定位板上的固定,完成角度定位轨道2的定位。1) Adjust the inclination angle of the angle positioning track 2 by embedding the angle according to the design of the sensor, and drop its positioning protrusion 2-2 into the angle positioning groove 1-1 to complete the fixing of the angle positioning track 2 on the semicircular angle positioning plate, Complete the positioning of the angle positioning track 2.
二)在土体模型的土面上以预设入土起始点为中心画十字交叉的横向线和纵向线,使定位支撑底板上与传感器设计埋设角度对应的横向定位刻度与纵向线重合,然后沿纵向调节定位支撑底板的位置,使预设入土起始点进入埋设入口并与角度定位轨道2的宽度中点横向对齐,完成定位支撑底板的定位,也完成了定位架的定位。2) On the soil surface of the soil model, draw a crossed horizontal line and a vertical line centered on the preset starting point of the soil, so that the horizontal positioning scale corresponding to the sensor design embedding angle on the positioning support base plate coincides with the vertical line, and then along the The position of the positioning support base plate is adjusted longitudinally, so that the preset starting point of soil entry enters the buried entrance and is horizontally aligned with the width midpoint of the angle positioning track 2, and the positioning of the positioning support base plate is completed, and the positioning of the positioning frame is also completed.
三)将传感器5放入深度定位轨道3的滑槽中,然后采用输送棒4将传感器5推送至深度定位轨道3的前端,此时推杆尾部的埋设起始刻线与深度定位轨道3后端对齐。3) Put the sensor 5 into the chute of the depth positioning track 3, and then use the delivery rod 4 to push the sensor 5 to the front end of the depth positioning track 3. end aligned.
四)将深度定位轨道3插入角度定位轨道2的滑槽中,将深度定位轨道3和输送棒4一起推送,直到深度定位轨道3上位于土面上的尺寸刻度3-1与传感器的设计埋设深度相等,完成传感器的输送。4) Insert the depth positioning track 3 into the chute of the angle positioning track 2, and push the depth positioning track 3 and the conveying rod 4 together until the dimension scale 3-1 on the depth positioning track 3 on the soil surface is in line with the design of the sensor. The depth is equal to complete the delivery of the sensor.
五)使用输送棒4继续顶推传感器5,直到埋设结束刻线4-2进入深度定位轨道的滑槽3-2内部,传感器5脱落深度定位轨道的滑槽埋入土中,完成顶推式埋设。5) Use the conveying rod 4 to continue pushing the sensor 5 until the engraved line 4-2 enters the chute 3-2 of the depth positioning track, and the sensor 5 falls off the chute of the depth positioning track and embeds in the soil to complete the push-type embedding .
六)将深度定位轨道3拉出,更换其他地点并重复以上步骤一)到步骤五),完成其他传感器的埋设工作。6) Pull out the depth positioning track 3, replace other locations and repeat the above steps 1) to 5) to complete the embedding of other sensors.
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围的情况下,还可以做出很多形式,这些均属于本发明的保护范围之内。Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are only illustrative and not restrictive. Those of ordinary skill in the art Under the enlightenment of the present invention, people can also make many forms without departing from the purpose of the present invention and the scope of protection of the claims, and these all belong to the protection scope of the present invention.
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| CN201811330228.1ACN109142006B (en) | 2018-11-09 | 2018-11-09 | Device and method for precise positioning and rapid embedding of micro sensors | 
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| CN201811330228.1ACN109142006B (en) | 2018-11-09 | 2018-11-09 | Device and method for precise positioning and rapid embedding of micro sensors | 
| Publication Number | Publication Date | 
|---|---|
| CN109142006A CN109142006A (en) | 2019-01-04 | 
| CN109142006Btrue CN109142006B (en) | 2023-09-05 | 
| Application Number | Title | Priority Date | Filing Date | 
|---|---|---|---|
| CN201811330228.1AActiveCN109142006B (en) | 2018-11-09 | 2018-11-09 | Device and method for precise positioning and rapid embedding of micro sensors | 
| Country | Link | 
|---|---|
| CN (1) | CN109142006B (en) | 
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| CN113686681B (en)* | 2021-09-06 | 2022-09-20 | 广州大学 | Drawing test device and method for fibers with different embedding angles and embedding lengths | 
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| GB1400714A (en)* | 1971-09-28 | 1975-07-23 | Searle & Co | Gradient making device | 
| JPH09119834A (en)* | 1995-10-25 | 1997-05-06 | Raito Kogyo Co Ltd | Pipe line measuring device and pipe line measuring method | 
| JP2005257550A (en)* | 2004-03-12 | 2005-09-22 | Kiyoto Matsuyuki | Soil movement detecting device | 
| CA2768769A1 (en)* | 2004-07-23 | 2006-02-02 | Smart Structures, Inc. | Monitoring system for concrete pilings and method of installation | 
| DE602004018360D1 (en)* | 2004-12-28 | 2009-01-22 | Alcatel Lucent | Connecting device for space equipment elements with flexible deployable blades | 
| CN201637396U (en)* | 2010-01-15 | 2010-11-17 | 河海大学 | A Measuring Device for Relative Displacement Between Structure and Soil | 
| JP2011127370A (en)* | 2009-12-18 | 2011-06-30 | Kumagai Gumi Co Ltd | Underground soil sampling method | 
| JP2011169021A (en)* | 2010-02-18 | 2011-09-01 | Kumagai Gumi Co Ltd | Soil sampling pipe device | 
| CN104215365A (en)* | 2014-09-03 | 2014-12-17 | 哈尔滨工业大学 | Pavement structure layer internal shearing stress testing sensor and embedding technology and application thereof | 
| CN105181382A (en)* | 2015-08-21 | 2015-12-23 | 中国科学院南京土壤研究所 | Embedding device for soil solution sampling device under flooding condition | 
| CN106093358A (en)* | 2016-07-08 | 2016-11-09 | 清华大学 | Can directly measure concrete temperature stress testing machine and the method for concrete deformation | 
| CN206656873U (en)* | 2017-03-16 | 2017-11-21 | 上海昌发岩土工程勘察技术有限公司 | A kind of electronic soil sampler for engineering investigation | 
| CN206787884U (en)* | 2017-05-31 | 2017-12-22 | 榆林学院 | A kind of soil sample sample preparation device for supporting embedded sensor | 
| CN209043685U (en)* | 2018-11-09 | 2019-06-28 | 交通运输部天津水运工程科学研究所 | For microsensor accurate positioning and quick inbuilt device | 
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US7062952B2 (en)* | 2003-05-21 | 2006-06-20 | General Electric Company | Combustible gas detector having flow-through sensor container and method for measuring such gases | 
| US7113124B2 (en)* | 2003-11-25 | 2006-09-26 | Metrotech Corporation, Inc. | Centerline and depth locating method for non-metallic buried utility lines | 
| EP2820403B1 (en)* | 2012-02-28 | 2020-04-08 | Ramot at Tel-Aviv University Ltd. | Molecular sensor based on virtual buried nanowire | 
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| GB1400714A (en)* | 1971-09-28 | 1975-07-23 | Searle & Co | Gradient making device | 
| JPH09119834A (en)* | 1995-10-25 | 1997-05-06 | Raito Kogyo Co Ltd | Pipe line measuring device and pipe line measuring method | 
| JP2005257550A (en)* | 2004-03-12 | 2005-09-22 | Kiyoto Matsuyuki | Soil movement detecting device | 
| CA2768769A1 (en)* | 2004-07-23 | 2006-02-02 | Smart Structures, Inc. | Monitoring system for concrete pilings and method of installation | 
| DE602004018360D1 (en)* | 2004-12-28 | 2009-01-22 | Alcatel Lucent | Connecting device for space equipment elements with flexible deployable blades | 
| JP2011127370A (en)* | 2009-12-18 | 2011-06-30 | Kumagai Gumi Co Ltd | Underground soil sampling method | 
| CN201637396U (en)* | 2010-01-15 | 2010-11-17 | 河海大学 | A Measuring Device for Relative Displacement Between Structure and Soil | 
| JP2011169021A (en)* | 2010-02-18 | 2011-09-01 | Kumagai Gumi Co Ltd | Soil sampling pipe device | 
| CN104215365A (en)* | 2014-09-03 | 2014-12-17 | 哈尔滨工业大学 | Pavement structure layer internal shearing stress testing sensor and embedding technology and application thereof | 
| CN105181382A (en)* | 2015-08-21 | 2015-12-23 | 中国科学院南京土壤研究所 | Embedding device for soil solution sampling device under flooding condition | 
| CN106093358A (en)* | 2016-07-08 | 2016-11-09 | 清华大学 | Can directly measure concrete temperature stress testing machine and the method for concrete deformation | 
| CN206656873U (en)* | 2017-03-16 | 2017-11-21 | 上海昌发岩土工程勘察技术有限公司 | A kind of electronic soil sampler for engineering investigation | 
| CN206787884U (en)* | 2017-05-31 | 2017-12-22 | 榆林学院 | A kind of soil sample sample preparation device for supporting embedded sensor | 
| CN209043685U (en)* | 2018-11-09 | 2019-06-28 | 交通运输部天津水运工程科学研究所 | For microsensor accurate positioning and quick inbuilt device | 
| Publication number | Publication date | 
|---|---|
| CN109142006A (en) | 2019-01-04 | 
| Publication | Publication Date | Title | 
|---|---|---|
| CN203824472U (en) | Device for measuring height and stem diameter of plant | |
| CN103115605A (en) | Subway shaft orientated measurement method based on connected triangle | |
| CN109142006B (en) | Device and method for precise positioning and rapid embedding of micro sensors | |
| CN209043685U (en) | For microsensor accurate positioning and quick inbuilt device | |
| CN203550930U (en) | Slope deep displacement measuring device | |
| CN205228337U (en) | Gutter detection device | |
| CN204165549U (en) | A kind of laser crown slope measuring instrument | |
| CN207365865U (en) | A kind of side slope crack width observation device | |
| CN204718655U (en) | A kind of portable multi-function flow measurement bar | |
| CN105241421B (en) | A kind of pile tube inclination measurement method | |
| CN204726104U (en) | A kind of Rock Joint Profiles surveying instrument | |
| CN204479521U (en) | A kind of corollary apparatus measuring unrelieved stress for supercritical ultrasonics technology | |
| CN214010466U (en) | Underground water level measuring device | |
| CN106944676B (en) | The method that gate installation hole is opened up on the cylinder of steel containment vessel of nuclear power station | |
| CN205898122U (en) | Multi -functional pole detector | |
| CN202899117U (en) | Test head device special for flat spade diameter test device | |
| CN209295874U (en) | A kind of portable measurer that precisely comes to nothing | |
| CN104819708A (en) | Sand dune displacement positioning observation method | |
| CN203464881U (en) | tapered electric pole buried depth measuring tape | |
| CN202485614U (en) | Device for detecting internal shape and size of underground shaft | |
| CN107036515B (en) | Test device and test method for simulating deformation of ground surface caused by step method tunnel construction | |
| CN215968378U (en) | Karst erosion rate is erosion piece anchor clamps for field experiments | |
| CN106052530B (en) | Marine abrasion slot geometric shape measuring device and method | |
| CN216523858U (en) | Monitoring device for observation point based on concrete settlement | |
| CN204788165U (en) | It follows closely to monitor borer of inserting of open -air wind erosion process | 
| Date | Code | Title | Description | 
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |