Movatterモバイル変換


[0]ホーム

URL:


CN108773094A - The preparation method of diaphragm for appliance - Google Patents

The preparation method of diaphragm for appliance
Download PDF

Info

Publication number
CN108773094A
CN108773094ACN201810512532.1ACN201810512532ACN108773094ACN 108773094 ACN108773094 ACN 108773094ACN 201810512532 ACN201810512532 ACN 201810512532ACN 108773094 ACN108773094 ACN 108773094A
Authority
CN
China
Prior art keywords
diaphragm
petg
preparation
rolling
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810512532.1A
Other languages
Chinese (zh)
Inventor
姚峻峰
查凯
刘喆威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Ya Qi Medical Technology Co Ltd
Original Assignee
Sichuan Ya Qi Medical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Ya Qi Medical Technology Co LtdfiledCriticalSichuan Ya Qi Medical Technology Co Ltd
Priority to CN201810512532.1ApriorityCriticalpatent/CN108773094A/en
Publication of CN108773094ApublicationCriticalpatent/CN108773094A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

The present invention relates to a kind of preparation methods of the diaphragm for appliance.The preparation method includes the following steps:PETG particles are subjected to removal moisture drying processing, the PETG particles after being dried;PETG particles after the drying are squeezed out in double screw extruder, screw rod melting temperature is 180 DEG C -270 DEG C, and rotating speed is 5-100 revs/min, and residence time of the PETG particles in screw rod after the drying is 0.5-5 minutes;The PETG particles after extrusion are rolled, diaphragm is obtained.The preparation method of the above-mentioned diaphragm for appliance, not only preparation process is simple, moreover it is possible to improve the mechanical property of diaphragm.

Description

The preparation method of diaphragm for appliance
Technical field
The present invention relates to orthodontic technology fields, more particularly to a kind of preparation method of the diaphragm for appliance.
Background technology
Invisible orthotic device due to it is beautiful, facilitate the advantages that it is more and more welcomed by the people.Correction patient is hidden by wearingShape appliance carries out orthodontic.Invisible orthotic device acts power to tooth(Corrective force)To achieve the effect that correction.It is stealthyAppliance is made using high-molecular diaphragm, and the mechanical property of high-molecular diaphragm is related to the stealthy mechanical property of facing.Therefore, rightIt is necessary that the mechanical property of high-molecular diaphragm, which carries out research,.
Invention content
Based on this, it is necessary to the problem of for the mechanical property for how improving diaphragm, provide a kind of film for applianceThe preparation method of piece.
A kind of preparation method of diaphragm for appliance, includes the following steps:
PETG particles are subjected to removal moisture drying, the PETG particles after being dried;
PETG particles after the drying are squeezed out in double screw extruder, screw rod melting temperature is 180 DEG C -270 DEG C, rotating speedIt it is 5-100 revs/min, residence time of the PETG particles in screw rod after the drying is 0.5-5 minutes;
The PETG particles after extrusion are rolled, diaphragm is obtained.
Include by the step of PETG particles progress removal moisture drying processing in one of the embodiments,:The PETG is putEnter dehumidifying heat pump and carry out removal moisture drying, the drying temperature of the dehumidifying heat pump is 80 DEG C -100 DEG C, and dew point is less than 40 degree, doesThe dry time is 3-7 hours.The die head temperature of the double screw extruder is 40 DEG C -80 DEG C in one of the embodiments,.
The PETG particles after extrusion are by three floating billowing pressures, three floating rollings in one of the embodiments,Respectively first floating rolling, the second floating rolling and the floating rolling of third;The temperature of described first floating rolling is 40 DEG C -80 DEG C;Described second is floatingThe temperature of the floating rolling of rolling is 38 DEG C -70 DEG C;The temperature of the floating rolling of the third is 35 DEG C -60 DEG C.
The temperature of the described first floating rolling, the second floating rolling are controlled by constant temperature water tank in one of the embodiments,Temperature and the temperature of the floating rolling of the third.
After the step of rolling by the PETG particles after extrusion in one of the embodiments, obtain diaphragm,It further include step:Protective film is enclosed on the surface of the diaphragm.
The protective film is PE films in one of the embodiments,.
The thickness of the protective film is 0.02 millimeter -0.1 millimeter in one of the embodiments,.
The diaphragm for enclosing the protective film is cut in one of the embodiments, the diaphragm is cutAt the rectangular sheet of predetermined size.
The rectangular sheet is put into punching machine in one of the embodiments, strikes out disk.
PETG particles are carried out removal moisture drying, after being dried by the preparation method of the above-mentioned diaphragm for appliancePETG, then the PETG particles after drying are squeezed out in double screw extruder, screw rod melting temperature is 180 DEG C -270 DEG C, rotating speedIt it is 5-100 revs/min, residence times of the PETG after drying in screw rod is 0.5-5 minutes, and PETG particles after extrusion carry outRolling, obtains diaphragm, which is rolled again by carrying out Screw Extrusion to PETG, obtains diaphragm, preparation process letterIt is single, in addition, by the control to Screw Extrusion condition, improve the mechanical property of diaphragm.
Description of the drawings
Fig. 1 is the flow diagram of the preparation method of the diaphragm for appliance of an embodiment.
Specific implementation mode
To make the above purposes, features and advantages of the invention more obvious and understandable, below in conjunction with the accompanying drawings to the present inventionSpecific embodiment be described in detail.
As shown in Figure 1, the preparation method of the diaphragm for appliance of an embodiment includes the following steps:
S110:PETG particles are subjected to removal moisture drying processing, the PETG particles after being dried.
Specifically, PETG particles(SK groups of South Korea, ECOZEN T90G)As masterbatch.PETG particles are put into materialBucket, dehumidifying heat pump(Shanghai Song Tian mechanical equipments Co., Ltd, model:ST-C150)PETG particles in automatic sucking charging basketInto equipment, the drying temperature of dehumidifying heat pump is 80 DEG C -100 DEG C, and dew point is less than 40 degree, and drying time is 3-7 hours.ToCan PETG be dehumidified and be dried, to prevent the moisture in PETG etc. from being had an impact to it.In other embodiments, also may be usedWith by PETG particles in vacuum drying oven 80 DEG C -100 DEG C 3-7 hours dry, the PETG particles after being dried.
S120:PETG particles after drying are squeezed out in double screw extruder.
Specifically, PETG particles after dry squeeze out after melt kneading stirs evenly in double screw extruder.Twin-screwThe condition of extrusion is:Screw rod melting temperature is 180 DEG C -270 DEG C, and rotating speed is 5-100 revs/min, and the PETG particles after drying existResidence time in screw rod is 0.5-5 minutes.By the PETG masterbatch after progress removal moisture drying in step S110 in twin-screw extrusionIt is squeezed out in machine.Wherein, the producer of used double screw extruder is the limited public affairs of Shijiazhuang Wei Shida twin-screw extrusion machine equipmentsDepartment, model TE-36.
The die head temperature of double screw extruder is 40 DEG C -80 DEG C in one of the embodiments,.To the PETG after dryingMasterbatch enters double screw extruder by blanking device, and PETG masterbatch is in molten condition, then is squeezed out from die head.PETG particles are doubleDuring Screw Extrusion, PETG is in molten condition, and the molecule of PETG moves at high temperature, then is carried out centainly by die headCooling, be conveniently molded into sheet material.In addition, screw rod melting temperature is different, the degree of molecular motion differs under PETG molten conditionsSample, so that the mechanical property of the PETG after extruded can be different.
It should be noted that the shape of the PETG masterbatch after twin-screw extrusion can be determined by the selection of die head.At thisIn embodiment, the PETG particles after twin-screw extrusion are with certain thickness PETG sheet materials.At this point, by die head to thisThe thickness of PETG has carried out first adjustment.
S130:PETG particles after extrusion are rolled, diaphragm is obtained.
Specifically, the PETG sheet materials squeezed out in step S130 are rolled by roller press.In one embodiment, squeezeFor the PETG particles after going out by three floating billowing pressures, three floating rollings are respectively that the first floating rolling, the second floating rolling and third are floatingRolling.The temperature of first floating rolling is 40 DEG C -80 DEG C, and the temperature of the second floating floating rolling of rolling is 38 DEG C -70 DEG C, and the temperature of the floating rolling of third is 35℃-60℃.Wherein, the first floating rolling floats downward rolling for rolling, and second floats rolling rolls to be floated in rolling, and the floating rolling of third is rolling floating rolling.By three floating billowing pressures, required diaphragm thickness is obtained, wherein floating rolling can adjust the thickness of diaphragm, is realized to diaphragm thicknessFurther accurate adjustment.Rolling is floated in rolling and rolls the spacing for floating downward rolling wherein it is possible to adjust, to adjust the thickness of diaphragm, andThe accurate thickness for adjusting diaphragm.It should be noted that the thickness of diaphragm can be determined according to actual needs, the thickness of diaphragmDegree can be 0.5 millimeter, 0.75 millimeter etc..
In one of the embodiments, after step s 130, further include step:Protection is enclosed on the surface of diaphragmFilm.By the setting of protective film, the surface tear etc. of diaphragm is avoided.In one embodiment, which is PE films.It needs to illustrate, which may be PVC film etc..Wherein, the thickness of protective film can be 0.02 millimeter -0.1 millimeter.In this implementationIn example, the thickness of protective film is 0.05 millimeter.Furthermore, it is necessary to which explanation, can enclose protection on a surface of diaphragmFilm can also enclose protective film on two opposite surfaces of diaphragm.
The diaphragm after protective film will be enclosed in one of the embodiments, to cut again, will enclose the film after protective filmThe rectangular sheet that piece is cut to predetermine sizes.Wherein, predetermined size herein and is not construed as limiting according to being determined needed for production.IntoOne step, in one embodiment, rectangular sheet is put into punching machine, and strike out disk.Specifically, the film of protective film will be enclosedPiece is cut into the rectangular sheet of specific dimensions, then tests.After the assay was approved, it then is carried out striking out disk.Wherein, circleThe diameter of piece can be 125mm.
PETG particles are carried out removal moisture drying, after being dried by the preparation method of the above-mentioned diaphragm for appliancePETG, then the PETG particles after drying are squeezed out in double screw extruder, screw rod melting temperature is 180 DEG C -270 DEG C, rotating speedIt it is 5-100 revs/min, residence times of the PETG after drying in screw rod is 0.5-5 minutes, and PETG particles after extrusion carry outRolling, obtains diaphragm, which is rolled again by carrying out Screw Extrusion to PETG, obtains diaphragm, preparation process letterIt is single, in addition, by the control to Screw Extrusion condition, improve the mechanical property of diaphragm.
Below by way of specific embodiment, the invention will be further elaborated.
Embodiment 1
(1) PETG is dried:By PETG in dehumidifying heat pump 100 DEG C of dryings 5 hours, the PETG after being dried;
(2) twin-screw extrusion:PETG after drying is squeezed out in double screw extruder, the condition of twin-screw extrusion is:Screw rodMelting temperature is 180 DEG C, and rotating speed is 100 revs/min, and residence times of the PETG in screw rod after drying is 2 minutes;Twin-screwThe die head temperature of extruder is 60 DEG C;
(4) it rolls:Sheet material after extrusion is rolled by roller press, the condition rolled is:The temperature of rolling is floated downward in rollingDegree is 70 DEG C;The temperature that rolling is floated in rolling is 50 DEG C;The temperature of rolling floating rolling is 40 DEG C;The thickness of diaphragm is 0.75 millimeter.
By diaphragm made from embodiment 1 by universal testing machine tested for flexural modulus be 1050MPA;It is hard using RockwellThe hardness that degree testing machine measures the diaphragm is 70R(Rockwell hardness).
Embodiment 2
Embodiment 2 is identical as the preparation method of embodiment 1, and the condition difference lies in twin-screw extrusion is:Screw rod melting temperature is200 DEG C, rotating speed is 100 revs/min, and residence times of the PETG in screw rod after drying is 2 minutes;The mould of double screw extruderHead temperature is 60 DEG C.
By diaphragm made from embodiment 2 by universal testing machine tested for flexural modulus be 1410MPA;Using HB-The hardness that 3000 type ball hardness testing machines measure the diaphragm is 91R.
Embodiment 3
Embodiment 3 is identical as the preparation method of embodiment 1, and the condition difference lies in twin-screw extrusion is:Screw rod melting temperature is210 DEG C, rotating speed is 100 revs/min, and residence times of the PETG in screw rod after drying is 2 minutes;The mould of double screw extruderHead temperature is 60 DEG C.
By diaphragm made from embodiment 3 by universal testing machine tested for flexural modulus be 1930MPA;Using HB-The hardness that 3000 type ball hardness testing machines measure the diaphragm is 107R.
Embodiment 4
Embodiment 4 is identical as the preparation method of embodiment 1, and the condition difference lies in twin-screw extrusion is:Screw rod melting temperature is230 DEG C, rotating speed is 100 revs/min, and residence times of the PETG in screw rod after drying is 2 minutes;The mould of double screw extruderHead temperature is 60 DEG C.
By diaphragm made from embodiment 4 by universal testing machine tested for flexural modulus be 2040MPA;Using HB-The hardness that 3000 type ball hardness testing machines measure the diaphragm is 115R.
Embodiment 5
Embodiment 5 is identical as the preparation method of embodiment 1, and the condition difference lies in twin-screw extrusion is:Screw rod melting temperature is250 DEG C, rotating speed is 100 revs/min, and residence times of the PETG in screw rod after drying is 2 minutes;The mould of double screw extruderHead temperature is 60 DEG C.
By diaphragm made from embodiment 5 by universal testing machine tested for flexural modulus be 1820MPA;Using HB-The hardness that 3000 type ball hardness testing machines measure the diaphragm is 110R.
Embodiment 6
Embodiment 6 is identical as the preparation method of embodiment 1, and the condition difference lies in twin-screw extrusion is:Screw rod melting temperature is270 DEG C, rotating speed is 100 revs/min, and residence times of the PETG in screw rod after drying is 2 minutes;The mould of double screw extruderHead temperature is 60 DEG C.
By diaphragm made from embodiment 1 by universal testing machine tested for flexural modulus be 1410MPA;Using HB-The hardness that 3000 type ball hardness testing machines measure the diaphragm is 109R.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned realityIt applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not depositedIn contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneouslyIt cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the artIt says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present inventionRange.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

CN201810512532.1A2018-05-252018-05-25The preparation method of diaphragm for appliancePendingCN108773094A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201810512532.1ACN108773094A (en)2018-05-252018-05-25The preparation method of diaphragm for appliance

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201810512532.1ACN108773094A (en)2018-05-252018-05-25The preparation method of diaphragm for appliance

Publications (1)

Publication NumberPublication Date
CN108773094Atrue CN108773094A (en)2018-11-09

Family

ID=64027832

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201810512532.1APendingCN108773094A (en)2018-05-252018-05-25The preparation method of diaphragm for appliance

Country Status (1)

CountryLink
CN (1)CN108773094A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN109528322A (en)*2018-11-142019-03-29四川雅齐医疗科技有限公司Multilayer Film and preparation method thereof
CN110450306A (en)*2019-09-162019-11-15郭建设A kind of production method of Longfiber reinforced plastic particles rolling producing apparatus
CN111716774A (en)*2020-06-242020-09-29杭州隐力科技有限公司Manufacturing process of dental diaphragm
CN113717503A (en)*2021-09-062021-11-30兰州大学Novel material for piezoelectric self-cleaning antibacterial invisible appliance, preparation method and test method
CN115284709A (en)*2022-08-082022-11-04北京化工大学 A composite membrane for invisible orthodontics and its preparation method and application

Citations (11)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JP2004059811A (en)*2002-07-302004-02-26Kureha Chem Ind Co LtdSemiconducting sheet and polyester resin composition
CN1669773A (en)*2005-04-012005-09-21江苏维达机械有限公司Polyester composite sheet material production line and its processing method
CN1712211A (en)*2004-06-232005-12-28上海达凯塑胶有限公司Moulding method for copolymered ether sheets for certificates
CN101798446A (en)*2009-02-112010-08-11江苏华信塑业发展有限公司PETG (Polyethylene Terephthalate Glycol) printing sheet for RFID (radio frequency identification device) label and manufacture process thereof
CN102294863A (en)*2011-06-132011-12-28卓高泰(广州)包装有限公司Impact resisting packaging sheet material and preparation method thereof
CN104774434A (en)*2015-04-012015-07-15苏州欢颜电气有限公司Solar battery backboard material with high weather resistance and preparation method thereof
CN204844770U (en)*2015-07-282015-12-09江苏光辉包装材料有限公司Piece rapid prototyping device is cast to flat embrane method polyester thermal contraction membrane
CN105315624A (en)*2014-06-252016-02-10北京化工大学Teeth orthodontic material, preparation and application thereof
CN106109027A (en)*2016-07-162016-11-16上海正雅齿科科技有限公司Multidimensional facing, its preparation method and application
CN106393476A (en)*2016-12-092017-02-15韩喜梅Phenolic moulding plastic hot dicing process
CN106867210A (en)*2017-02-272017-06-20天津正丽科技有限公司PETG composites, its preparation method and application

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JP2004059811A (en)*2002-07-302004-02-26Kureha Chem Ind Co LtdSemiconducting sheet and polyester resin composition
CN1712211A (en)*2004-06-232005-12-28上海达凯塑胶有限公司Moulding method for copolymered ether sheets for certificates
CN1669773A (en)*2005-04-012005-09-21江苏维达机械有限公司Polyester composite sheet material production line and its processing method
CN101798446A (en)*2009-02-112010-08-11江苏华信塑业发展有限公司PETG (Polyethylene Terephthalate Glycol) printing sheet for RFID (radio frequency identification device) label and manufacture process thereof
CN102294863A (en)*2011-06-132011-12-28卓高泰(广州)包装有限公司Impact resisting packaging sheet material and preparation method thereof
CN105315624A (en)*2014-06-252016-02-10北京化工大学Teeth orthodontic material, preparation and application thereof
CN104774434A (en)*2015-04-012015-07-15苏州欢颜电气有限公司Solar battery backboard material with high weather resistance and preparation method thereof
CN204844770U (en)*2015-07-282015-12-09江苏光辉包装材料有限公司Piece rapid prototyping device is cast to flat embrane method polyester thermal contraction membrane
CN106109027A (en)*2016-07-162016-11-16上海正雅齿科科技有限公司Multidimensional facing, its preparation method and application
CN106393476A (en)*2016-12-092017-02-15韩喜梅Phenolic moulding plastic hot dicing process
CN106867210A (en)*2017-02-272017-06-20天津正丽科技有限公司PETG composites, its preparation method and application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邹恩广: "《塑料制品加工技术》", 30 April 2008, 北京:中国纺织出版社*

Cited By (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN109528322A (en)*2018-11-142019-03-29四川雅齐医疗科技有限公司Multilayer Film and preparation method thereof
CN110450306A (en)*2019-09-162019-11-15郭建设A kind of production method of Longfiber reinforced plastic particles rolling producing apparatus
CN111716774A (en)*2020-06-242020-09-29杭州隐力科技有限公司Manufacturing process of dental diaphragm
CN113717503A (en)*2021-09-062021-11-30兰州大学Novel material for piezoelectric self-cleaning antibacterial invisible appliance, preparation method and test method
CN115284709A (en)*2022-08-082022-11-04北京化工大学 A composite membrane for invisible orthodontics and its preparation method and application

Similar Documents

PublicationPublication DateTitle
CN108773094A (en)The preparation method of diaphragm for appliance
JP2004168063A5 (en)
CN108164960A (en)A kind of high heat-resisting, high fondant-strength blowing PC/ABS composite materials and preparation method thereof
CN106769479A (en)Supper-fast stretching device and its experimental technique associated with a kind of scattering of and X-ray
CN108624062A (en)A kind of food-grade composite silicone rubber and food-grade composite silicone rubber roller
CN111688045A (en)Hollow plastic cushion plate and preparation method and application thereof
CN110018119A (en)A kind of release force test method of FINAT
CN102034892A (en) A kind of production technology of solar cell encapsulating EVA adhesive film
DE60303936D1 (en) METHOD AND DEVICE FOR REGULATING THE MANUFACTURE OF MINERALWOOD BY MEANS OF A CASCADE ROTOR
CN210678891U (en)Rubber film slitter
CN205420671U (en) Fiber spreading equipment for fiber composite materials
CN119123962A (en) Ionic liquid flexible strain sensor based on mechanical metamaterial and preparation method thereof
CN209718675U (en)Sheet processing system
CN209050918U (en)A kind of macromolecule curtain coating film handling apparatus
CN112341746A (en) A kind of thermoplastic elastomer composite material and preparation method thereof
JPS5566A (en)Tea processor
CN210899781U (en)Static electricity eliminating structure of steel belt casting machine
CN105382953A (en)Rubber mixing mill
CN108395650A (en)A kind of preparation method of modified PVC tubing
EP3800463B1 (en)Method for testing melt-processible fluororesin injection-molded product and method for producing melt-processible fluororesin injection-molded product
KR101364468B1 (en)A polycarbonate film manufacturing apparatus and a film manufacturing method using thereof
CN1060432C (en)Process for preparation of biaxially oriented polyester film
CN204977435U (en)Plastic film corona treatment machine
CN216230392U (en)Calender for processing rubber products
CN107932942A (en)A kind of BOPP film for being used for accurate printing and preparation method thereof

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20181109


[8]ページ先頭

©2009-2025 Movatter.jp