The electric power system and method for supplying power to of computer roomTechnical field
The application is related to power supply field, in particular to the electric power system and method for supplying power to of a kind of computer room.
Background technology
At present, for the power supply plan in data center, it is contemplated that its security powered, the power system of data centerOften use uninterrupted power source (UPS) solution, mainly there is following several UPS distribution structure in correlation technique:Single systemStructure (i.e. the frameworks of Tier 1), series redundancy structure (Tier2 frameworks), parallel redundancy structure (Tier2 frameworks), distributed redundancyStructure (Tier3 frameworks) and dual system redundancy structure (Tier4 frameworks).Wherein, different distribution structures is applied to different fieldsScape.Currently, for data center, it often uses the level frameworks (i.e. UPS distribution structures) such as single Tier, so, justIt can not be adjusted flexibly according to current business, electric resources are matched somebody with somebody in waste, such as some business, such as off-line calculation, Map Services can connectDesigned by the relatively low Tier of availability, such as the even Tier 1 of Tier 2, and financial business, such as pay, then need Tier3 veryDesigned to Tier4.In order to ensure UPS power supply stability, existing system design, often using 2N or 2 (N+1) systems (i.e.Dual system redundancy structure), with high costs, so, cost is higher and is difficult to the system for being flexibly downgraded to Tier3 or Tier2.
For it is above-mentioned the problem of, not yet propose effective solution at present.
The content of the invention
The embodiment of the present application provides the electric power system and method for supplying power to of a kind of computer room, to solve in correlation technique due to numberUPS distribution structures according to the power system at center are single, it is impossible to the technical problem of UPS distribution structures is adjusted flexibly.
According to the one side of the embodiment of the present application, there is provided a kind of electric power system, including:At least one power supply;Multiple UPS groups, are connected with the leading-out terminal of the power supply;The computer room load of multiple computer rooms, the outlet with the multiple UPS groupsEnd connection;The multiple UPS groups and the computer room load composition UPS distribution structures in each computer room, wherein, the UPS distributionStructure includes at least two in following distribution structure:Single system structure, series redundancy structure, parallel redundancy structure, distributionRedundancy structure, dual system redundancy structure.
According to the another aspect of the embodiment of the present application, a kind of method of supplying power to is additionally provided, including:By default multiple UPSGroup and the computer room load composition UPS distribution structures of multiple computer rooms, wherein, the UPS distribution structures are included in following distribution structureAt least two:Single system structure, series redundancy structure, parallel redundancy structure, distributed redundancy structure, dual system redundancy structure;It is the computer room load supplying by the distribution structure.
In the embodiment of the present application, using setting multiple UPS groups in electric power system, and by multiple UPS groups and multiple machinesThe mode of computer room load at least two distribution structures of composition in room, realizes and a variety of distribution knots is realized in same electric power systemStructure, and then the UPS distribution structures for solving the power system in correlation technique due to data center are single, it is impossible to it is adjusted flexiblyThe technical problem of UPS distribution structures.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding of the present application, forms the part of the application, this ShenSchematic description and description please is used to explain the application, does not form the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the electrical system architecture schematic diagram according to a kind of Tier 1 of correlation technique;
Fig. 2 is the electrical system architecture schematic diagram according to a kind of Tier 2 of correlation technique;
Fig. 3 is the electrical system architecture schematic diagram according to a kind of Tier 3 of correlation technique;
Fig. 4 is the electrical system architecture schematic diagram according to a kind of Tier 4 of correlation technique;
Fig. 5 is the structural representation of the electric power system of computer room in a kind of building according to the embodiment of the present application;
Fig. 6 is the structural representation according to the optional electric power system of another kind of the embodiment of the present application
Fig. 7 is the flow chart of the method for supplying power to of computer room in a kind of optional building according to the embodiment of the present application.
Embodiment
In order that those skilled in the art more fully understand application scheme, below in conjunction with the embodiment of the present applicationAccompanying drawing, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described embodiment is onlyThe embodiment of the application part, rather than whole embodiments.Based on the embodiment in the application, ordinary skill peopleThe every other embodiment that member is obtained under the premise of creative work is not made, it should all belong to the model of the application protectionEnclose.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, "Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so useData can exchange in the appropriate case, so as to embodiments herein described herein can with except illustrating herein orOrder beyond those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that coverCover it is non-exclusive include, be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipmentThose steps or unit clearly listed, but may include not list clearly or for these processes, method, productOr the intrinsic other steps of equipment or unit.
First, the part noun or term occurred during the embodiment of the present application is described is applied to following solutionRelease:
UPS distribution structures and Tier classification be it is corresponding, it is specific as shown in table 1
Table 1
| Configuration | Availability yardstick | Tier is classified |
| Capacity (N) | 1=is minimum | Tier 1 |
| Series redundancy | 2 | Tier 2 |
| Parallel redundancy (N+1) | 3 | Tier 3 |
| Dual system (2N, 2N+1) | 5=highests | Tier 4 |
Wherein:
Capacity " N ":
Also known as single system structure.In the calculating process of UPS design configurations, generally use letter " N " sets to refer to UPSMeter configuration.For example, parallel redundant system is also referred to as N+1 designs, and Dual System Design can be represented with 2N." N " can be simpleGround is defined as " need (demand) " of critical loads.In other words, that is, the power supply capacity of institute's protection equipment delivery is met.WeThe purposes of " N " can be explained with I T equipment such as RAI D (RAID) systems.For example, if memory capacity needs4 disks are wanted, and RAI d systems just include 4 disks, then it is one " N " design to claim this., whereas if RAI d systems have5 disks, and memory capacity only needs 4 disks, then is designed for " N+1 ".
In brief, N systems refer to by the one group parallel connection equal with critical loads planned capacity of single UPS module or capacityThe system that UPS module is formed.So far, such system is the most widely used configuration in UPS industries.DeskUnder small-sized UPS i.e. belong to N configuration.Equally, it is 400kW for planning and designing capacity, area is 500 square metres (5000 squaresFoot) computer floor, if using two 200kW UPS in parallel using single 400kW UPS or on common bus,So fall within N configurations.Therefore, N can be configured to the minimum requirements for regarding as critical loads power supply.Concrete structure such as Fig. 1 institutesShow.
Series redundancy configures (structure):
Also known as " N+1 " system, but, it is completely different with the parallel redundancy configuration represented under normal circumstances with N+1.StringConnection Redundancy Design concept both do not need parallel bus, also should not modulus block capacity must it is identical, do not require that module comes from evenSame manufacturer.In the configuration, it is main or " master " UPS module is load supplying by one under normal circumstances.Meanwhile oneIndividual " series connection " or " auxiliary " UPS is that the static by-pass of main UPS module is powered.The static state of the main UPS module of the configuration requirement is otherRoad has single input circuit.This mode can be carried out in the case where retaining existing UPS to irredundant configuration beforeExpand, to obtain a certain degree of redundancy.Series redundancy structure can be obtained based on structure shown in Fig. 2, will two UPS by simultaneouslyConnection is changed to connect, and is then each UPS bypass circuit in parallel.
Parallel redundancy structure (configuration):
In parallel redundancy allocation plan, when single UPS module breaks down, without critical loads are transformed into cityElectricity.All UPS purposes is all the influence for protecting critical loads Bu Shou city's Electrical changes and power-off.
In parallel redundancy allocation plan, multiple capacity identical UPS modules in parallel share an output bus.If" standby " electricity is at least equal to the capacity of a system module, then system is N+1 redundancies;If standby electricity is equal to twoThe capacity of system module, then system is N+2 redundancies;By that analogy.Parallel redundant system is required using the production of same manufacturerThe UPS module of identical capacity.UPS module is synchronized by the system parallel circuit plate of outside, and UPS module is also embedding in itself sometimesEnter this function.In some cases, the parallel function also electric current output between control module.Mutually communicated between each UPS module,To produce the output voltage of Complete Synchronization.The quantity of UPS module that can be in parallel on one common bus has one in logicLimit, for different UPS manufacturers, the maximum is also different.Under normal operating conditions, in parallel redundancy designUPS module uniformly shares critical loads capacity.If taken from parallel bus next module repaired (or if someModule is shut down because of internal fault), then remaining UPS module must bear the load of the UPS module to break down immediately.ByIn there is this function, therefore any one module can be removed from bus and is placed under repair, without critical loads are directly connectedIt is connected to civil power.Referring specifically to shown in Fig. 2.
Distributed redundancy structure:
The design is based on three or more UPS modules and independent input and output circuit.Independent output is totalLine is connected by multiple triplex level redundancies and STS with critical loads.UPS, distributed Redundancy Design and dual system are linked into from civil powerDesign as (will be discussed in the next section) is almost.Both schemes are each provided with concurrent maintenance function, and willSingle fault point minimize.The two most important difference is, is critical loads in the distribution structure from UPS to critical loadsThe quantity for providing the UPS module needed for redundant power circuit is different.Concrete structure is as shown in Figure 3.
Dual system redundancy structure:
Dual system, multi-channel parallel bus, dual input, 2 (N+1), 2N+2, [(N+1) ten (N+1)] and 2N are all referred toThe variant of the configuration.By this design, can set up completely now at all need not be by the UPS of load transfer to civil powerSystem.When designing these systems, each possible single fault point can be excluded as far as possible.
Fig. 4 shows a kind of variant of the configuration, and 2 (N+1), it is made up of two pallarel redundant UPS systems.Ideal situationUnder, single distribution board can be used, or even individually civil power and generator system are powered for these UPS.
Although can be configured using power system (electric power system) of the above-mentioned distribution structure to computer room, it is relatedSingle distribution structure is often used in technology, does not provide the reality that a variety of distribution structures how are supported in same unified power systemExisting mode.
Embodiment 1
The present embodiment provides a kind of electric power system of computer room in building, as shown in figure 5, the electric power system includes:
At least one power supply 50, in Figure 5 by taking two power supplies as an example, but is not limited to this, for example, it is also possible toFor three, four power supplies etc., flexibly set with specific reference to actual conditions.Alternatively, above-mentioned primary power cource includes:It is electrically connected with cityThe transformer connect;Above-mentioned stand-by power supply includes:Generator.The generator includes but is not limited to:Steam turbine generator, hydraulic generatorMachine, diesel-driven generator, gasoline engine generator etc.;Certainly, can also be included according to the difference of mode classification, generator:DC generationMachine, alternating current generator;
In one alternate embodiment, above-mentioned distributed redundancy structure can be accomplished by the following way, but not limited to this.Above-mentioned power supply includes:Primary power cource and stand-by power supply, above-mentioned primary power cource and above-mentioned stand-by power supply are opened by automatic conversionATS is closed to connect with above-mentioned multiple UPS groups;Wherein, above-mentioned ATS is used for above-mentioned multiple computer rooms in above-mentioned primary power cource failureThe power supply circuit of computer room load switches to above-mentioned stand-by power supply.
Multiple UPS groups 52, it is connected with the leading-out terminal of above-mentioned power supply 50;Said in Fig. 5 by taking three UPS groups as an exampleBright, the quantity of UPS groups is not limited to this, such as can be 2,3,4 etc..Wherein, can include in each UPS groups but notIt is limited to 2,3,4 UPS modules, but not limited to this, particular number can flexibly be set according to actual conditions.
The computer room load of multiple computer rooms 54, is connected with the leading-out terminal of above-mentioned multiple UPS groups 52;Alternatively, above-mentioned multiple machinesThe computer room load in room includes:The computer room load of Internet data center.
It should be noted that the building in the embodiment of the present application can include but is not limited to data center.
Illustrated in Fig. 5 by taking three computer rooms as an example, but not limited to this;
Above-mentioned multiple UPS groups and the above-mentioned computer room load composition UPS distribution structures in each computer room, wherein, the UPS distributionStructure includes at least two in following distribution structure:Single system structure, series redundancy structure, parallel redundancy structure, distributionRedundancy structure, dual system redundancy structure.
The structure type of above-mentioned distribution structure described further below:
In one alternate embodiment, above-mentioned single system structure can be realized in the following ways:Above-mentioned multiple UPS groups bagsInclude:First UPS groups;Above-mentioned single system structure includes:A UPS in above-mentioned first UPS groups, and connect with said one UPSComputer room load in any computer room connect.
In one alternate embodiment, above-mentioned series redundancy structure and parallel redundancy structure can be real in the following mannerIt is existing, but not limited to this:
Above-mentioned multiple UPS groups include:2nd UPS groups and the 3rd UPS groups;Above-mentioned parallel redundancy structure includes:Above-mentioned secondIn the UPS parallel modules composed in parallel in UPS groups by multiple UPS, and the first computer room being connected with above-mentioned UPS parallel modulesComputer room loads;Above-mentioned series redundancy structure includes:The UPS serial module structures that multiple UPS are composed in series in above-mentioned 3rd UPS groups, withAnd the computer room load in the second computer room being connected with above-mentioned UPS serial module structures;Wherein, above-mentioned first computer room and the second computer room areComputer room in above-mentioned multiple computer rooms.It should be noted that above-mentioned 2nd UPS groups and the 3rd UPS groups can be identical group, also may be usedThink different groups.
In one alternate embodiment, above-mentioned distributed redundancy structure can be accomplished by the following way, but not limited to this.Above-mentioned distributed redundancy structure includes:First UPS module in each UPS groups in above-mentioned multiple UPS groups, with above-mentioned multiple machinesAt least one computer room load connection in room in the 3rd computer room:Above-mentioned first UPS module includes:The UPS that multiple UPS are composed in parallelModule or a UPS.
In one alternate embodiment, above-mentioned distributed redundancy structure can be accomplished by the following way, but not limited to this.Above-mentioned multiple UPS groups include:4th UPS groups and the 5th UPS groups;Above-mentioned dual system redundancy structure includes:In above-mentioned 4th UPS groupsThe second UPS module and above-mentioned 5th UPS groups in the 3rd UPS module, and with above-mentioned second UPS module and above-mentioned 3rd UPSThe computer room load of 4th computer room in above-mentioned multiple computer rooms of module connection.
It should be noted that it can be realized in the following ways for above-mentioned distribution structure:
Full configuration mode is used to each computer room, fixed configurations mode is used to each computer room;
For full configuration mode, the full configuration mode is that each computer room supports at least two of above-mentioned distribution structure, is led toCross and switching switch is set between UPS groups and computer room, the closed and disconnected by switching switch configures the distribution structure of computer room.CanWith including two kinds of implementations:1) switching switch can be that a master switch (is responsible for controlling all UPS groups and all computer roomsBetween one of path switch), 2) multiple switch is set in each computer room, and (now, each switch is arranged at computer room and is responsible for and UPSBetween the UPS of group).When switching switch is master switch, its control process is as follows:When master switch closes, each computer room is supportedA variety of distribution structures, computer room is then configured by the sub switch set in computer room in computer room and supports a certain distribution structure;When totalWhen switching off, then each computer room only supports its distribution structure given tacit consent to.2) plant implementation for the, each UPS groups orThe UPS of part UPS groups is connected to some computer room or some computer rooms, and computer room is set by the switch between UPS and computer room loadDistribution structure.
For fixed configurations mode, that is, the distribution structure of computer room is pre-configured with, for each computer room, in the computer roomIt after distribution structure configures, can not be adjusted flexibly, can only fix using a certain distribution structure.
For ease of understanding above-described embodiment and its alternative embodiment, described in detail below in conjunction with framework shown in Fig. 6.
As shown in fig. 6, inlet wire (or more than 1 tunnel) all the way is introduced in middle pressure 10kV (or other voltage class), to severalTransformer is fed.Each frame is the IT/ network equipments of dual power supply (or more power supplys).With shown in this example, using twoRoad 10kV medium voltage electricity inlet wire, fed to 3 transformers.Transformer pressure 10kV in is converted to low pressure 400V, simultaneouslyDiesel-driven generator is configured with, coordinates ATS automatic change-overs, when civil power or transformer fail, is put into as emergency power supplyUse.There is N number of transformer, just there is N number of generator, generator and transformer are configured to 1 pair 1 (1:1).
On low pressure 400V output buses, line related or loop are respectively connected to, with shown in this example, under every group of transformerThere are 3 loops, there is 1 UPS (direct current or exchange) in each loop.
Every group of transformer is selected 1 (can more parallel connections) UPS, combination of two is carried out in computer room module -1, organizes compositionCloth redundant system, meet that Tier3 is designed;
1 (or more parallel connections) UPS arbitrarily under two groups of transformers of selection, if this example is A groups and B group transformers,Composition 2N (2N+1) construction for electricity in computer room module -2, meet Tier4 designs (supply power with double circuit, two-way UPS, two-way power generation machine);
1 (or more parallel connections) UPS arbitrarily under one group of transformer of selection, if this example is C group transformers, in computer room mouldBlock -3 forms N (N+1) construction for electricity, meets that Tier 1/2 is designed;
In summary, the present embodiment takes distributed electrical architecture to coordinate distributed UPS designs, in an electrical systemIndependent assortment difference Tier grades, realize flexible mixing Tier frameworks.This electrical architecture figure, can by the adjustment of capacity,Meet more than 1 kinds of construction for electricity mixing of Tier4/Tier3/Tier 2/Tier, such as 50% Tier4,30% Tier3,20% Tier2, match different application and Connection availability Tier requirement c.
Embodiment 2
According to the embodiment of the present application, a kind of embodiment of the method for method of supplying power to is additionally provided, it is necessary to illustrate, in accompanying drawingFlow the step of illustrating can be performed in the computer system of such as one group computer executable instructions, although also,Show logical order in flow charts, but in some cases, can with different from order herein perform it is shown orThe step of description.
As shown in fig. 7, the method for supplying power to that the embodiment of the present application provides, including step S702-704:
Step S702, by the following at least two UPS distribution of the computer room of default multiple UPS groups and multiple computer rooms load compositionStructure, wherein, the UPS distribution structures include at least two in following distribution structure:Single system structure, series redundancy structure,Parallel redundancy structure, distributed redundancy structure, dual system redundancy structure;
Alternatively, above-mentioned UPS distribution structures can be accomplished by the following way, but not limited to this:
Above-mentioned multiple UPS groups include:First UPS groups;Above-mentioned single system structure includes:One in above-mentioned first UPS groupsComputer room load in UPS, and any computer room being connected with said one UPS;And/or
Above-mentioned multiple UPS groups include:2nd UPS groups and the 3rd UPS groups;Above-mentioned parallel redundancy structure includes:Above-mentioned secondIn the UPS parallel modules composed in parallel in UPS groups by multiple UPS, and the first computer room being connected with above-mentioned UPS parallel modulesComputer room loads;Above-mentioned series redundancy structure includes:The UPS serial module structures that multiple UPS are composed in series in above-mentioned 3rd UPS groups, withAnd the computer room load in the second computer room being connected with above-mentioned UPS serial module structures;Wherein, above-mentioned first computer room and the second computer room areComputer room in above-mentioned multiple computer rooms;And/or
Above-mentioned distributed redundancy structure includes:First UPS module in each UPS groups in above-mentioned multiple UPS groups, it is and upperState at least one computer room load connection in multiple computer rooms in the 3rd computer room:Above-mentioned first UPS module includes:Multiple UPS are in parallelThe UPS module of composition or a UPS;And/or
Above-mentioned multiple UPS groups include:4th UPS groups and the 5th UPS groups;Above-mentioned dual system redundancy structure includes:Above-mentioned3rd UPS module in the second UPS module and above-mentioned 5th UPS groups in four UPS groups, and with above-mentioned second UPS module and upperState the computer room load of the 4th computer room in above-mentioned multiple computer rooms of the 3rd UPS module connection.
Step S704, it is above-mentioned computer room load supplying by above-mentioned distribution structure.
It should be noted that for foregoing each method embodiment, in order to be briefly described, therefore it is all expressed as a series ofCombination of actions, but those skilled in the art should know, the application is not limited by described sequence of movement becauseAccording to the application, some steps can use other orders or carry out simultaneously.Secondly, those skilled in the art should also knowKnow, embodiment described in this description belongs to preferred embodiment, involved action and module not necessarily the applicationIt is necessary.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-mentioned implementationThe method of example can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but a lotIn the case of the former be more preferably embodiment.Based on such understanding, the technical scheme of the application is substantially in other words to existingThe part that technology contributes can be embodied in the form of software product, and the computer software product is stored in a storageIn medium (such as ROM/RAM, magnetic disc, CD), including some instructions to cause a station terminal equipment (can be mobile phone, calculateMachine, server, or network equipment etc.) perform each embodiment of the application described in method.
Above-mentioned the embodiment of the present application sequence number is for illustration only, does not represent the quality of embodiment.
In above-described embodiment of the application, the description to each embodiment all emphasizes particularly on different fields, and does not have in some embodimentThe part of detailed description, it may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, others can be passed throughMode is realized.Wherein, device embodiment described above is only schematical, such as the division of the unit, is onlyA kind of division of logic function, can there is an other dividing mode when actually realizing, for example, multiple units or component can combine orPerson is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutualBetween coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or moduleConnect, can be electrical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unitThe part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multipleOn NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs's.
In addition, each functional unit in each embodiment of the application can be integrated in a processing unit, can alsoThat unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated listMember can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is used as independent production marketing or useWhen, it can be stored in a computer read/write memory medium.Based on such understanding, the technical scheme of the application is substantiallyThe part to be contributed in other words to prior art or all or part of the technical scheme can be in the form of software productsEmbody, the computer software product is stored in a storage medium, including some instructions are causing a computerEquipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the application whole orPart steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are depositedReservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codesMedium.
Described above is only the preferred embodiment of the application, it is noted that for the ordinary skill people of the artFor member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also shouldIt is considered as the protection domain of the application.