CN107392458A - Based on field device operation intellectual analysis relative influence equipment topological analysis - Google Patents

Based on field device operation intellectual analysis relative influence equipment topological analysis
Download PDF

Info

Publication number
CN107392458A
CN107392458ACN201710579043.3ACN201710579043ACN107392458ACN 107392458 ACN107392458 ACN 107392458ACN 201710579043 ACN201710579043 ACN 201710579043ACN 107392458 ACN107392458 ACN 107392458A
Authority
CN
China
Prior art keywords
distribution
information
work
equipment
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710579043.3A
Other languages
Chinese (zh)
Inventor
潘旭辉
王�华
潘祥林
岑正军
陆贞旭
刘夜雨
王泽睿
陈成
黄鹏
文蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leishan Power Supply Bureau
Original Assignee
Leishan Power Supply Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Leishan Power Supply BureaufiledCriticalLeishan Power Supply Bureau
Priority to CN201710579043.3ApriorityCriticalpatent/CN107392458A/en
Publication of CN107392458ApublicationCriticalpatent/CN107392458A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

The invention discloses a kind of topological structure of electric relation in mobile device application generalized information system.The present invention fully applies existing information construction achievement, expand the advanced application function of power grid GIS, pass through location equipment, using topological structure of electric and equipment account information, according to actual business requirement, bill is automatically generated according to business norms, bill circulation is completed using development of Mobile Internet technology, operating efficiency is improved, work is preferably served, serves society.The present invention solves because business is overlapping, same Data duplication typing, data syn-chronization not in time, it is inconsistent the problems such as, ensure data uniformities, integrality, uniformity, promptness, mitigate operating pressure, improve work incentive.

Description

Based on field device operation intellectual analysis relative influence equipment topological analysis
Technical field
The present invention is based on topological structure of electric in generalized information system and establishes equipment operation experts database, carries out two using mobile deviceTicket make out an invoice business and according to nominal value require intellectual analysis identification positioning security information.
Background technology
With the continuous development of electric network information construction, enterprise needs quick comprehensive information to support decision-making, it is necessary to letterPrompt convenient Information flow restructuring carrys out power-assisted management innovation.Southern net GIS platform completed in 2013 transmission & distribution net wire frame model andThe storage generaI investigation and typing work of basic data, complete function and the data construction of " figure is opened by the whole province one, transmission & distribution one are thrown the net ".2015Year completes with south electric network " 6+1 " system Construction, and power information steps on a new stage, in the whole network level of IT applicationIt is raised to the whole network covering, the level of crew's application.Because the odjective causes such as geographical position, amblent air temperature, allocation of facility are present, causeDistribution operational management cannot be applied well at county level and following power supply unit, and information system is not only without backman wellMake, but also increase the system maintenance work amount of operation teams and groups.
At present, south electric network " 6+1 " system and southern net GIS platform are good in the application of at county level and above unit, applicationSubstantially each business module is covered, particularly markets, produce the Business Streams such as major network side, finance, human resources and total management systemJourney is clear, basis is good, high using proficiency, well propulsion and practical application.
In order to solve at county level and following power supply unit to the practical problem of information system, scene work on daytime can be typically usedMake, work overtime at night amended record data and the inspection of the scene of a crime, return to office space application system, return again to work on the spot, be operated foldingReturn race.Accordingly even when job schedule is slow, it can also reach practical.
Work on the spot on daytime, amended record data of working overtime at night, data inputting is not in time, working strength is big, pressure is big, Yuan GonggongIt is poor to make enthusiasm, impracticable, it is that employee's Reduction of Students' Study Load requires to be not suitable for electric network information construction.
Work turning back run, and relatively data promptness is relative meets information system management requirement.Returned from working siteAdministrative Area, after handling bill, data entry system, all operation flows freely can circulate in information system.Now, workThe flow such as need to cover as personnel, then carried out the work by data to scene according to related request.During back and forth, flowerThe expense plenty of time is hurrying on a journey, if would become hard to obtain timely processing, operating efficiency and society for remote working site problemService ability cannot improve.
The content of the invention
The purpose of the present invention is:Based on topological structure of electric in generalized information system, identification rack hierarchical structure, device class andIts account data establishes a set of intellectual analysis experts database, facilitates work on the spot intelligently to make out an invoice and intelligence using mobile device exploitation is a set ofPositioning site safety risk point, the workbench of south electric network " 6+1 " system that links can be identified, to overcome prior art notFoot.
What the present invention was realized in:By the topological structure of electric relation in mobile device application generalized information system according to station,Line, change, family level logical relation, and circuit, shaft tower, shaft tower auxiliary device subordinate relation, distribution automatic switch, ring main unit,The logical relation of the equipment such as distribution box, switchyard, distribution transformer, wire forms device intelligence analysis storehouse;Had a power failure according to distributionBusiness need is overhauled, on GIS figures after positioning maintenance object, power failure range is automatically identified with device intelligence analysis storehouse, opensPass, disconnecting link and ground wire information, then require specification filling, form standard instructs work bill according to the ticket of distribution two;It will moveDynamic network technology, Internet technology, production management system, distribution SCADA system and battalion are with the informatization of monitoring command centreAchievement is comprehensively utilized, and will be formed work and is got up with Administrative Area linkage, is formed between scene and Office Area, system and systemSlitless connection;Realize that application, execution task are filled in working site, information data returns in real time, synchronous each system, Administrative AreaReal-time monitoring work progress, so as to realize that ticket, Administrative Area examination & verification, the monitoring of live execution task, Administrative Area are filled out in working siteModern management requirement.
It is an advantage of the invention that:
1st, the present invention fully applies existing information construction achievement, expands the advanced application function of power grid GIS, is set by positioningIt is standby, using topological structure of electric and equipment account information, according to actual business requirement, bill is automatically generated according to business norms,Bill circulation is completed using development of Mobile Internet technology, operating efficiency is improved, preferably serves work, serves society.
2nd, the present invention is solved because business is overlapping, same Data duplication typing, data syn-chronization not in time, inconsistent etc. askTopic, ensure data uniformity, integrality, uniformity, promptness, mitigate operating pressure, improve work incentive.
Brief description of the drawings
Fig. 1 is the workflow diagram of the present invention;
Fig. 2 is the system structure diagram of the present invention;
Embodiment
Embodiments of the invention:Topological structure of electric relation in mobile device application generalized information system, should by mobile deviceIt is attached according to station, line, change, family level logical relation, and circuit, shaft tower, shaft tower with the topological structure of electric relation in generalized information systemBelong to the logic of the equipment such as equipment subordinate relation, distribution automatic switch, ring main unit, distribution box, switchyard, distribution transformer, wireRelation forms device intelligence analysis storehouse;According to distribution interruption maintenance business need, on GIS figures after positioning maintenance object, useDevice intelligence analysis storehouse automatically identifies power failure range, switch, disconnecting link and ground wire information, then requires to advise according to the ticket of distribution twoModel is filled, and form standard instructs work bill;By mobile network's technology, Internet technology, production management system, distributionSCADA system and battalion are comprehensively utilized with monitoring command centre informatization achievement, and formation work and Administrative Area are joinedMove up, form slitless connection between scene and Office Area, system and system;Realize that application, execution task are filled in working site,Information data returns in real time, synchronous each system, the real-time monitoring work progress of Administrative Area, so as to realize working site fill out ticket,Administrative Area examination & verification, the modern management requirement of live execution task, Administrative Area monitoring.
Specific operating process is as shown in Figure 1:
In step S001, in mobile device application power grid GIS Orientation on map equipment, identification power failure range, equipment is obtainedInformation;
Power grid GIS has all topological structure relations and account information of power network, carries out positioning on this basis and setsStandby, identification power failure range, acquisition account information carry out two tickets and fill content automatically, nominal value content is examined by filling out ticket people,Modification.
In step S002, after ticket information is filled in completely, fill out ticket people start flow and done by mobile wireless network arrivalPublic area is audited, and push flow gives work on the spot director after the completion of person approving's examination & verification, and work on the spot is arranged by director;
In step S003, field personnel to be taken pictures when completing stage sex work as work on the spot according toAccording to, while service end is returned, service end establishes monitoring module and checks picture function, and real-time scrolling information informs field condition.
In an embodiment of the present invention, whole system structure is as shown in Figure 2.
1) power grid GIS topological structure application;
Power grid GIS map establishes all power grid architectures, contains station, line, change, family hierarchical relationship, circuit, shaft tower, shaft towerThe equipment such as auxiliary device subordinate relation, distribution automatic switch, ring main unit, distribution box, switchyard, distribution transformer, wire is patrolledThe relation of collecting, using distribution net equipment logical relation, selector tower, with regard to front-rear switch position can be found, so as to obtain theseAccount information, two ticket contents are produced according to two ticket specification Auto-matchings.
2) work on the spot monitors.
Distribution SCADA system is the critical system of current distribution scheduling monitoring site equipment, and obtaining intelligence by remote signalling opensThe status information of pass, and then field personnel can be ordered, but for manually operated switch, at present or needManual operation is wanted, the mode of phone contact, accurately monitoring site can not be worked.Increase monitoring module, mobile terminal scene performedJourney preserves data uploading pictures in real time, and system is voluntarily analyzed, and identifies hand switch state, while reacts existing well by photoField working condition.The action that an operation order is exactly switching switch has been performed to complete, then equipped with photo site, so as to reachTo the purpose of monitoring site work.
3) the integrated application of information system.
Production management system is the management system of whole power network production run, be all devices operating index storing place andMouth is counted, the ticket of distribution two issued in mobile terminal is required for entering production management system;While two ticket stubs rows are completed to fileData automatic synchronization carries out filing statistics to production management system.Distribution SCADA system can be carried out to the operational outfit at sceneMonitoring and control, to realize the various functions such as data acquisition, equipment control, measurement, parameter regulation and various types of signal alarm, collectionDevice status data is obtained into the system, is illustrated in monitor supervision platform, facilitates monitoring personnel to hold two ticket stubs row field conditions.It is integratedBattalion is mainly considered in service society aspect, battalion has and social interaction's work(with monitoring command centre with monitoring command centreCan, have a power failure rush to repair during, can by work complete information real-time release, inform user's safety at power cut, repairing process andSend a telegram in reply time etc..

Claims (1)

1. one kind is based on field device operation intellectual analysis relative influence equipment topological analysis, it is characterised in that:By mobile deviceUsing the topological structure of electric relation in generalized information system according to station, line, change, family level logical relation, circuit, shaft tower, shaft tower are attachedThe logic of the equipment such as equipment subordinate relation, distribution automatic switch, ring main unit, distribution box, switchyard, distribution transformer, wire is closedSystem forms device intelligence analysis storehouse;According to distribution interruption maintenance business need, on GIS figures after positioning maintenance object, with settingStandby intellectual analysis storehouse automatically identifies power failure range, switch, disconnecting link and ground wire information, then requires specification according to the ticket of distribution twoFilling, form standard instructs work bill;By mobile network's technology, Internet technology, production management system, distribution SCADASystem and battalion are comprehensively utilized with monitoring command centre informatization achievement, will be formed work and are linked with Administrative AreaCome, form slitless connection between scene and Office Area, system and system;Realize that application, execution task, information are filled in working siteData return in real time, synchronous each system.
CN201710579043.3A2017-07-172017-07-17Based on field device operation intellectual analysis relative influence equipment topological analysisPendingCN107392458A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201710579043.3ACN107392458A (en)2017-07-172017-07-17Based on field device operation intellectual analysis relative influence equipment topological analysis

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201710579043.3ACN107392458A (en)2017-07-172017-07-17Based on field device operation intellectual analysis relative influence equipment topological analysis

Publications (1)

Publication NumberPublication Date
CN107392458Atrue CN107392458A (en)2017-11-24

Family

ID=60340363

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201710579043.3APendingCN107392458A (en)2017-07-172017-07-17Based on field device operation intellectual analysis relative influence equipment topological analysis

Country Status (1)

CountryLink
CN (1)CN107392458A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN112231328A (en)*2020-10-132021-01-15国网安徽省电力有限公司安庆供电公司 A method for mapping and collation of distribution network topology information and GIS information based on artificial intelligence
CN112580970A (en)*2020-12-152021-03-30西安华海众和电力科技有限公司Energy mapping platform based on GIS and power grid holographic sensing
CN112835998A (en)*2020-12-312021-05-25国家电网公司华中分部 A method for generating dynamic topology map of power grid

Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102096856A (en)*2010-12-032011-06-15湖州电力局Method for generating electricity production work sheet simplified diagram on the basis of power grid topology
CN102968689A (en)*2012-11-162013-03-13江苏省电力公司徐州供电公司Intelligent monitoring method for remote control of power transformation overhaul work
CN104091231A (en)*2014-06-302014-10-08国家电网公司Distribution network fault repairing commanding and processing system and method
CN104484835A (en)*2014-12-102015-04-01国家电网公司Application of power grid GIS on mobile equipment
CN105976268A (en)*2016-05-232016-09-28国网山东省电力公司临沂供电公司Power grid planning and processing method based on mobile GIS platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102096856A (en)*2010-12-032011-06-15湖州电力局Method for generating electricity production work sheet simplified diagram on the basis of power grid topology
CN102968689A (en)*2012-11-162013-03-13江苏省电力公司徐州供电公司Intelligent monitoring method for remote control of power transformation overhaul work
CN104091231A (en)*2014-06-302014-10-08国家电网公司Distribution network fault repairing commanding and processing system and method
CN104484835A (en)*2014-12-102015-04-01国家电网公司Application of power grid GIS on mobile equipment
CN105976268A (en)*2016-05-232016-09-28国网山东省电力公司临沂供电公司Power grid planning and processing method based on mobile GIS platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN112231328A (en)*2020-10-132021-01-15国网安徽省电力有限公司安庆供电公司 A method for mapping and collation of distribution network topology information and GIS information based on artificial intelligence
CN112231328B (en)*2020-10-132022-11-01国网安徽省电力有限公司安庆供电公司 AI-based distribution network topology information and GIS information mapping and proofreading method
CN112580970A (en)*2020-12-152021-03-30西安华海众和电力科技有限公司Energy mapping platform based on GIS and power grid holographic sensing
CN112835998A (en)*2020-12-312021-05-25国家电网公司华中分部 A method for generating dynamic topology map of power grid

Similar Documents

PublicationPublication DateTitle
CN113450065B (en)Production operation management system and method for wind power plant
CN101887547A (en)Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment
CN102593953B (en)Automatic line pulling control method based on provincial and regional integration
CN101216926A (en) An urban emergency command operation system and its implementation method
CN106685074A (en) A kind of electric power guarantee command system and method
CN105184442A (en)Power distribution network dispatching management statistical analysis system
CN105564465A (en)System and method for controlling maintenance operation of railway electrical service signal equipment
CN103618382A (en)Transformer substation operation and maintenance integration field work data collection and field work instruction system
CN104700192A (en)Aided intelligent management and control system for power transmission and transformation project and management and control method thereof
CN110826981A (en)Transmission tower construction progress control system and method based on Internet of things
CN108304983A (en)Management platform is repaiied in a kind of oil and gas pipeline inspection acquired based on unmanned plane and network communication technology data
CN107392458A (en)Based on field device operation intellectual analysis relative influence equipment topological analysis
CN104050529A (en)Power grid dispatching intelligent maintenance order and operation order system
CN107390087A (en)Platform is supported in a kind of power network repairing operation
CN110288176A (en) Distribution network monitoring analysis and emergency repair command platform based on power grid GIS
CN109034404A (en)A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses
CN114399265A (en) A whole process management and control system for power engineering construction projects
CN102968689A (en)Intelligent monitoring method for remote control of power transformation overhaul work
CN110276516A (en) Distribution network monitoring analysis and emergency repair command method based on power grid GIS
CN116503021A (en)Digital tool system and method for on-site rush repair of power base unit
CN106408455A (en)Railway electric power supply and distribution facility informatization record data processing system and method
CN113128717A (en)Intelligent operation and inspection system and method based on digital team and group electric power big data
CN109977066A (en)Wisdom emergency in possession delivers all-in-one machine
CN110866061A (en) A GIS-based Information Visualization System
CN201984525U (en)Remote subway construction inspection system based on GIS (geographic information system) and GPRS (general packet radio service)

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20171124