Movatterモバイル変換


[0]ホーム

URL:


CN107387082A - A kind of method for weakening coal seam tight roof - Google Patents

A kind of method for weakening coal seam tight roof
Download PDF

Info

Publication number
CN107387082A
CN107387082ACN201710638644.7ACN201710638644ACN107387082ACN 107387082 ACN107387082 ACN 107387082ACN 201710638644 ACN201710638644 ACN 201710638644ACN 107387082 ACN107387082 ACN 107387082A
Authority
CN
China
Prior art keywords
tight roof
well
coal seam
drilling
drilling well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710638644.7A
Other languages
Chinese (zh)
Inventor
张永成
李兵
刘亮亮
刘君
徐云
张江华
张为
秦玉霞
李德慧
王越
白杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co LtdfiledCriticalShanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201710638644.7ApriorityCriticalpatent/CN107387082A/en
Publication of CN107387082ApublicationCriticalpatent/CN107387082A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

Collapse roof weakening processing technology field the invention belongs to the hard difficulty in coal seam, specifically a kind of method for weakening coal seam tight roof.Solve in actual recovery process, the outstanding dew of tight roof large area, it is difficult to spontaneous caving, it is mostly large area caving after being caving, the problem of its coverage is larger, 1)Drilling well is set, and 2)Ground drilling, 3)Chemolysis, 4)Hydraulic fracturing, 5)Ground extraction.The present invention can both give full play to emollescence of the chemical solution to tight roof rock, and and can gives full play to hydraulic fracturing and seam effect is made to Rock cutting, so that tight roof rock softening.

Description

A kind of method for weakening coal seam tight roof
Technical field
Collapse roof weakening processing technology field the invention belongs to the hard difficulty in coal seam, be specifically a kind of reduction coal seam tight roofMethod.
Background technology
In China, preservation has a large amount of tight roof coal seams, the direct preservation of such top plate above coal seam or thinner thickness it is straightConnect top above, intensity is high, thickness is big, globality is strong, joint fissure agensis.Coal mining is caving when using tool pillar mining method or longwellWhen method is exploited, tight roof can be in the outstanding dew very large area in goaf without being caving, and first weighting and periodic weighting step pitch are big, to pressWhen produce impact of dynamic pressure, be easily damaged support, goaf area of suspension roof is up to thousands of, tens of thousands of square metres under serious conditions.In timeThe tight roof of the outstanding dew of processing, it is prevent top plate large area inbreak basic to reduce accumulation of energy and reduce top plate height of dropMethod.
The hard difficulty in colliery collapses the improvement of top plate, is always the more important research contents in coal mine roof plate CONTROL OF STRATA MOVEMENT field.Processing tight roof be mainly by take overhead caving measure change top plate mechanical condition, and then weaken top plate intensity andIt is whole to destroy the integrality of top plate, goaf top plate is layered and is caving by several times, shorten first weighting and periodic weighting step pitch, fromAnd ground pressure strength is reduced, reach and hard difficulty is reduced or eliminated collapses the purpose that top plate is endangered working face extraction.Processing coal both at home and abroadThe method of ore deposit tight roof is more based on blasting procedure, supplemented by underground water-injection pressure break reduction method.Blasting is simple, but quantitiesGreatly, subsurface environment is polluted, and for highly gassy mine, potential safety hazard also be present.Underground fracture water filling weakens the application of methodAlso there is its limitation, main cause is that water filling discharge capacity is limited, and pressure break and atenuator region are limited in scope.Coal adopts country altogether with coal bed gasKey lab develops correlation technique.
The content of the invention
The present invention is in order to solve in actual recovery process, the outstanding dew of tight roof large area, it is difficult to spontaneous caving, be cavingIt is mostly afterwards large area caving, its coverage is larger, ore deposit can be caused to shake under serious conditions, and accidental pollution event accident now is directAffect the problem of the normal of mining area is with safety in production, there is provided a kind of method for weakening coal seam tight roof.
The present invention takes following technical scheme:A kind of method for weakening coal seam tight roof, is comprised the following steps that,
1)Drilling well is set:
Tunnelling speed under the strict surge well of well spacing, it is unaffected to down-hole mining before guarantee engineering construction, by hydraulic fracturingDrilling well, which is arranged in, cuts eye inward in the range of 200m, wells spacing 100-200m, considers that the engineering well later stage will carry out ground gas and take outPut, therefore drilling well arrangement selection is apart from the nearlyer side of return airway.
2)Ground drilling:
(1)The perforate of drilling well one uses Ф 311mm drill bit perforates, creeps into stablizing below basement rock, tripping in Ф 244.5mm surface pipesTo hole depth, the full sealing of cementing;
(2)The perforate of drilling well two is drilled into exposure coal seam using Ф 215.9mm drill bits and stops boring, after drilling well below back-up sand to tight roof,Tripping in Ф 139.7mm production casings conventional density well cementation, are waited after coagulating 72 hours to back-up sand sand face, survey cementing quality, pressure testing.
3)Chemolysis:
After completion, perforation is used to old top tight roof, after injecting chemical solution, closing well -36 hours 24 hours, ensures chemical solutionThe abundant corrosion of liquid is pushed up always, reduces stress concentration, while be beneficial to follow-up pressing crack construction.
4)Hydraulic fracturing:
To the old jacking row conventional hydraulic sand fracturing of well of constructing, injected and constructed using light sleeve pipe, it is desirable to Hydrodynamic support fracture half-lengthFor 100~130m.
5)Ground extraction:
Using Ф 114mm drill bits drilling wells to coal seam position, ground gas extraction equipment is installed to well head and carries out gas ground extraction.By that to vertical mining influence region gas ground extraction, gas can be avoided to concentrate release and goaf gas once largely to gushGo out, realize improvement and control to mining influence regional coal-seam gas.
Compared with prior art, the present invention can both give full play to emollescence of the chemical solution to tight roof rock, againHydraulic fracturing can be given full play to seam effect is made to Rock cutting, so that tight roof rock softening;On the one hand it is initially switched off in advance oldTop, top plate is weakened, weaken working face first weighting intensity;Another aspect pressure break weakening top coal, strengthen top coal gas permeability, make top coalIt is caving in time, avoids gas from concentrating release and goaf gas once to pour out.The beneficial effect of following five aspect can be obtained:
1) constraint of traditional coal seam tight roof processing method is broken through, complicated to geological structure, firm and thicker heavily fortified point can be realizedResist plate bump solution danger stubbornly.
2) to tight roof rock softening and crushed by chemistry and physical method comprehensive function, reduce bump windDanger.
3) after by chemical action softening rock, rock rupture pressure is advantageously reduced;Implement hydraulic fracturing again, more utilizeBeing smoothed out for construction, can reduce rock strength.
4) said from security standpoint, this method is a kind of aggressive regional precautionary measures, and purpose is more clear and definite.
5) old top tight roof is weakened by pressure break, strengthens top coal gas permeability, avoid gas from concentrating release and goaf wattThis once pours out, and reaching first mash gas transfinites the purpose of improvement.
Brief description of the drawings
Fig. 1 is drilling well plane of arrangement figure;
Fig. 2 is wellbore structure schematic diagram;
1- stops exploiting field, 2- working faces, 3- return airways, 4- drilling wells, 5- air intake lanes, the perforates of 6- mono-, the perforates of 7- bis-, 8- perforations in figure.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, completeSite preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based onEmbodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not madeEmbodiment, belong to the scope of protection of the invention.
A kind of method for weakening coal seam tight roof, is comprised the following steps that,
1)Drilling well is set:
Hydraulic fracturing drilling well is arranged in and cuts eye inward in the range of 200m, wells spacing 100-200m, drilling well arrangement selection away fromFrom the nearlyer side of return airway.
2)Ground drilling:
(1)The perforate of drilling well one uses Ф 311mm drill bit perforates, creeps into stablizing below basement rock, tripping in Ф 244.5mm surface pipesTo hole depth, the full sealing of cementing;
(2)The perforate of drilling well two is drilled into exposure coal seam using Ф 215.9mm drill bits and stops boring, after drilling well below back-up sand to tight roof,Tripping in Ф 139.7mm production casings conventional density well cementation, are waited after coagulating 72 hours to back-up sand sand face, survey cementing quality, pressure testing.
3)Chemolysis:
After completion, perforation is used to old top tight roof, after injecting chemical solution, closing well -36 hours 24 hours, ensures chemical solutionThe abundant corrosion of liquid is pushed up always, reduces stress concentration, while be beneficial to follow-up pressing crack construction.
4)Hydraulic fracturing:
To the old jacking row conventional hydraulic sand fracturing of well of constructing, injected and constructed using light sleeve pipe, it is desirable to Hydrodynamic support fracture half-lengthFor 100~130m.
5)Ground extraction:
Using Ф 114mm drill bits drilling wells to coal seam position, ground gas extraction equipment is installed to well head and carries out gas ground extraction.
It is not easy, across the harm fallen, to ensure mine safety production to solve tight roof, breaks through the existing tight roof of mineProcessing method, propose ground drilling, handle tight roof by the way of injection chemical solution and waterpower sand fracturing are compound.I.e.According to colliery digging planning and progress, in the construction ground drilling well at a certain distance from tunnelling face, tight roof is injectedChemical solution simultaneously carries out fracturing engineering, in coal seam formed up to 100~130m crack so that concentrated stress be released orRedistribute, eliminate tight roof layer stress concentration.
Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art,It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc.With replacing, within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., this should be included inWithin the protection domain of invention.

Claims (1)

CN201710638644.7A2017-07-312017-07-31A kind of method for weakening coal seam tight roofPendingCN107387082A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201710638644.7ACN107387082A (en)2017-07-312017-07-31A kind of method for weakening coal seam tight roof

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201710638644.7ACN107387082A (en)2017-07-312017-07-31A kind of method for weakening coal seam tight roof

Publications (1)

Publication NumberPublication Date
CN107387082Atrue CN107387082A (en)2017-11-24

Family

ID=60342434

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201710638644.7APendingCN107387082A (en)2017-07-312017-07-31A kind of method for weakening coal seam tight roof

Country Status (1)

CountryLink
CN (1)CN107387082A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN108999636A (en)*2018-07-202018-12-14中铁十九局集团矿业投资有限公司A kind of pressure break and the softening hard difficulty of underground coal mine collapse the constructing device and method of top plate
CN109488273A (en)*2018-11-262019-03-19武汉工程大学A kind of device of carbon dioxide and water fluid-mixing pressure break limestone roof
CN109539920A (en)*2018-12-272019-03-29西安通源石油科技股份有限公司A kind of top plate fracturing method and device of coal mining
CN110080769A (en)*2019-05-092019-08-02大同煤矿集团有限责任公司A kind of coal mine faces sky stope drift active workings tight roof ground and precisely cuts top pressure relief method
CN110080763A (en)*2019-05-132019-08-02西安科技大学A kind of coal seam country rock pressure relief method based on internal-injection type static crushing pressure relief means thereon
CN110242270A (en)*2019-07-012019-09-17重庆大学 A hydraulic fracturing method for coal gas reservoirs that is stuffed first and then compressed
CN111946343A (en)*2020-07-292020-11-17山西晋城无烟煤矿业集团有限责任公司Method for solving hard top plate collapse problem through ground vertical hole composite jet fracturing
CN112160767A (en)*2020-11-052021-01-01重庆大学 A tunnel mechanical-chemical corrosion-hydraulic cutting combined excavation construction method
CN112160766A (en)*2020-11-052021-01-01重庆大学Mechanical-chemical corrosion-hydraulic cutting combined tunneling construction equipment and working method
CN113738378A (en)*2021-09-072021-12-03西南交通大学Chemical rock breaking medium and chemical auxiliary rock breaking method
CN115726783A (en)*2022-09-212023-03-03甘肃靖远煤电股份有限公司魏家地煤矿Ground drilling high-pressure water injection method for weakening coal seam roof and coal seam water injection dust fall
CN119957245A (en)*2025-04-112025-05-09中煤科工开采研究院有限公司 Treatment method and device for roof of fully mechanized mining face

Citations (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102392678A (en)*2011-10-212012-03-28河南煤业化工集团研究院有限责任公司Gas drainage method combining surface and underground fracturing and permeability improvement
CN102493831A (en)*2011-11-142012-06-13山西晋城无烟煤矿业集团有限责任公司Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes
CN105971662A (en)*2016-07-052016-09-28重庆大学Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing
CN106150503A (en)*2016-07-052016-11-23重庆大学The method of tight roof is administered in a kind of fracturing
US20170152433A1 (en)*2014-05-092017-06-01Halliburton Energy Services, Inc.Cationic Polymers for Foam Fracturing Applications
CN106833595A (en)*2017-03-132017-06-13河南理工大学A kind of multi-solvent combination fracturing liquid and coal bed gas well pressing crack construction technique
CN106930746A (en)*2017-03-062017-07-07中国矿业大学The alternative expression coal seam anti-reflection method that drilling acetone invasion and attack are combined with hydraulic fracturing

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102392678A (en)*2011-10-212012-03-28河南煤业化工集团研究院有限责任公司Gas drainage method combining surface and underground fracturing and permeability improvement
CN102493831A (en)*2011-11-142012-06-13山西晋城无烟煤矿业集团有限责任公司Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes
US20170152433A1 (en)*2014-05-092017-06-01Halliburton Energy Services, Inc.Cationic Polymers for Foam Fracturing Applications
CN105971662A (en)*2016-07-052016-09-28重庆大学Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing
CN106150503A (en)*2016-07-052016-11-23重庆大学The method of tight roof is administered in a kind of fracturing
CN106930746A (en)*2017-03-062017-07-07中国矿业大学The alternative expression coal seam anti-reflection method that drilling acetone invasion and attack are combined with hydraulic fracturing
CN106833595A (en)*2017-03-132017-06-13河南理工大学A kind of multi-solvent combination fracturing liquid and coal bed gas well pressing crack construction technique

Cited By (15)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN108999636A (en)*2018-07-202018-12-14中铁十九局集团矿业投资有限公司A kind of pressure break and the softening hard difficulty of underground coal mine collapse the constructing device and method of top plate
CN109488273A (en)*2018-11-262019-03-19武汉工程大学A kind of device of carbon dioxide and water fluid-mixing pressure break limestone roof
CN109539920B (en)*2018-12-272023-08-25通源石油科技集团股份有限公司Top plate fracturing method and device for coal exploitation
CN109539920A (en)*2018-12-272019-03-29西安通源石油科技股份有限公司A kind of top plate fracturing method and device of coal mining
CN110080769A (en)*2019-05-092019-08-02大同煤矿集团有限责任公司A kind of coal mine faces sky stope drift active workings tight roof ground and precisely cuts top pressure relief method
CN110080763A (en)*2019-05-132019-08-02西安科技大学A kind of coal seam country rock pressure relief method based on internal-injection type static crushing pressure relief means thereon
CN110242270A (en)*2019-07-012019-09-17重庆大学 A hydraulic fracturing method for coal gas reservoirs that is stuffed first and then compressed
CN111946343A (en)*2020-07-292020-11-17山西晋城无烟煤矿业集团有限责任公司Method for solving hard top plate collapse problem through ground vertical hole composite jet fracturing
CN112160766A (en)*2020-11-052021-01-01重庆大学Mechanical-chemical corrosion-hydraulic cutting combined tunneling construction equipment and working method
CN112160767B (en)*2020-11-052022-05-27重庆大学 A tunnel mechanical-chemical corrosion-hydraulic cutting combined excavation construction method
CN112160766B (en)*2020-11-052022-05-27重庆大学Mechanical-chemical corrosion-hydraulic cutting combined tunneling construction equipment and working method
CN112160767A (en)*2020-11-052021-01-01重庆大学 A tunnel mechanical-chemical corrosion-hydraulic cutting combined excavation construction method
CN113738378A (en)*2021-09-072021-12-03西南交通大学Chemical rock breaking medium and chemical auxiliary rock breaking method
CN115726783A (en)*2022-09-212023-03-03甘肃靖远煤电股份有限公司魏家地煤矿Ground drilling high-pressure water injection method for weakening coal seam roof and coal seam water injection dust fall
CN119957245A (en)*2025-04-112025-05-09中煤科工开采研究院有限公司 Treatment method and device for roof of fully mechanized mining face

Similar Documents

PublicationPublication DateTitle
CN107387082A (en)A kind of method for weakening coal seam tight roof
CN104863629B (en)A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring
CN113404535B (en)Method for preventing rock burst by hydraulic fracturing of coal mine underground
CN102852546B (en)Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area
CN101915072B (en)Method for extracting coal bed gas in stable mining region by ground well drilling
CN102080518B (en)Method for extracting gas from coal seam roof complex branched well
CN115182729B (en)Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN105804754B (en)A kind of coal seam is Main aquifer pitshaft method for uncovering coal
CN108999634A (en)Surface drilling realizes that a hole of water damage prevention and treatment and surface settlement control is mostly used method
CN102392677A (en)Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN103953386B (en)Upstream-blocking and downstream-seepage method for extracting gas in mining area
CN104929567A (en)Low-cost construction process for passing through goaf
CN111764960B (en) A kind of coal mining separation layer water damage prevention method
CN109236297A (en)Split the coal-mining method filled and leave coal seam in conjunction with the residual exploiting field of uplink second mining tool post
CN108412453A (en)A kind of coal mining water controls system and construction method altogether with gas
CN107120137B (en)A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
AU2021447461A1 (en)Extra-thick coal seam upper layer old goaf roof reconstruction method and construction method
CN104879159A (en)Gas permeability-increase extraction device and method for soft coal seam stoping face
CN108343418A (en)The method for controlling Affected areas by mining from earth's surface directional hydraulic fracturing presplitting basement rock
CN107816366A (en)A kind of multilayer goaf filling well is into well engineering method
CN107620581A (en)The construction method of the dual-purpose mine shaft inspection hole of one well
CN111677531A (en) A pre-mining disposal method for the caving area of the old mining residual coal re-mining working face in thick coal seam
CN212318072U (en)Colliery rock burst and harmful gas comprehensive control system
CN108316964A (en)A kind of low air permeability coal seam pressure relief gas pumping mining method
CN111894672B (en)Method for advanced treatment of roof separation water damage of stope by adopting ground drainage drilling

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication

Application publication date:20171124

RJ01Rejection of invention patent application after publication

[8]ページ先頭

©2009-2025 Movatter.jp