CN107067155ACN201710100146.7ACN201710100146ACN107067155ACN 107067155 ACN107067155 ACN 107067155ACN 201710100146 ACN201710100146 ACN 201710100146ACN 107067155 ACN107067155 ACN 107067155A
Authority
CN
China
Prior art keywords
electricity
website
management platform
work order
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710100146.7A
Other languages
Chinese (zh)
Inventor
谭敏
胡记伟
魏明
徐萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Fiberhome Technical Services Co Ltd
Original Assignee
Wuhan Fiberhome Technical Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Fiberhome Technical Services Co LtdfiledCriticalWuhan Fiberhome Technical Services Co Ltd
Priority to CN201710100146.7ApriorityCriticalpatent/CN107067155A/en
Publication of CN107067155ApublicationCriticalpatent/CN107067155A/en
Pendinglegal-statusCriticalCurrent

Links

Classifications

Landscapes

Abstract

The invention discloses a kind of antitheft electric management system based on work order and method, it is related to managing electric quantity field.The system includes management platform, WorkForm System, power management system and some electric quantity acquisition units, in each site deployment electric quantity acquisition unit;Management platform completes the importing of WorkForm System;Power management system is monitored to the electricity service condition of each website;Website is actively reported to abnormal electricity service condition;Management platform is inquired about the work order in the range of abnormal website given time;Management platform carries out stealing electricity diagnosis;Management platform diagnoses grade according to stealing electricity, and stealing electricity event alarm is carried out to keeper;Keeper confirms to stealing electricity event alarm;Management platform confirms and diagnosis situation according to stealing electricity event alarm, realizes in the thing reasonable to stealing electricity event and manages.The present invention can effectively be supervised to the electricity of magnanimity website, management platform is found stealing electricity event in the very first time, can accurately be alerted, it is to avoid fail to report or report by mistake.

Description

Antitheft electric management system and method based on work order
Technical field
The present invention relates to managing electric quantity field, a kind of antitheft electric management system based on work order and side are specifically related toMethod.
Background technology
With being showing improvement or progress day by day for Internet technology, Internet of Things service industry has also welcome the spring of high speed development.It is major logicalBelieve operator facing to base station number is more, the equipment scale of construction is big, the present situation such as resource distribution is wide, how intelligence is carried out to vast resourcesEnergyization management turns into where key to the issue, and the monitoring wherein for each website energy consumption is more particularly important.TraditionThe networking of power management system is shown in Figure 1, and NM server connects outdoor base station, electric power monitoring system, work order and adjusted respectivelyDegree system, monitor terminal, mobile phone alarm terminal.
Energy resource consumption and the attention degree utilized are improved year by year with country, increasing enterprise passes through electric quantity monitoringSystem carries out management and control to electricity.This management method effectively solves remote website meter reading hardly possible, magnanimity station statistics difficulty etc. and askedTopic, but website is taken place frequently by stealing electricity problem at present, still do not solved rationally, particularly some remote or unattended stationsPoint, this problem is more protruded, and has greatly been jeopardized the economic interests of major operators, therefore, how stealing electricity event has been enteredRow effectively supervision, as an important social concern.
At present, power management system is mainly used to record the electricity service condition of each website, and can monthly or week drawsElectricity uses trend graph, facilitates client to inquire about and count the electricity service condition of magnanimity website, abnormal to power consumptionWebsite is checked that main flow is as follows:
1. in each site deployment electric quantity acquisition unit;
2. the electricity service condition of each website is monitored using power management system;
3. keeper is periodically inquired about and analyzed to the electricity of website in power management system;
4. keeper counts to the abnormal website of power consumption, and is checked as one sees fit.
Above technology has the following disadvantages:
1. determined for electricity using abnormal website by keeper according to inquiry data subjectivity, no judgment basis.
2. it can only accomplish to supervise afterwards, at this time stealing electricity event has often been pass by using abnormal website for electricityLong period, therefore can not be pinpointed the problems in the very first time.
The content of the invention
The invention aims to overcome the shortcomings of above-mentioned background technology, there is provided a kind of preventing fraudulent use of electricity based on work orderManagement system and method, can effectively be supervised to the electricity of magnanimity website, enable management platform to find to steal in the very first timeElectric event, and possess the ability accurately alerted, it is to avoid fail to report or report by mistake.
The present invention provides a kind of antitheft electric management system based on work order, and the system includes management platform, work order systemSystem, power management system and some electric quantity acquisition units, in each site deployment electric quantity acquisition unit;Management platform completes work orderThe importing of system;Power management system is monitored to the electricity service condition of each website;Website is actively used abnormal electricitySituation is reported;Management platform is inquired about the work order in the range of abnormal website given time;Management platform carries out stealing electricityDiagnosis;Management platform diagnoses grade according to stealing electricity, and stealing electricity event alarm is carried out to keeper;Keeper enters to stealing electricity event alarmRow confirms;Management platform confirms and diagnosis situation according to stealing electricity event alarm, realizes in the thing reasonable to stealing electricity event and managesReason.
On the basis of above-mentioned technical proposal, the time cycle of the abnormal electricity generation of management platform foundation, work order classThe maximum power consumption of type, work order time and website, carries out stealing electricity diagnosis.
On the basis of above-mentioned technical proposal, the management platform confirms and diagnosis situation according to stealing electricity event alarm, entersPirate electricity investigation work order is issued, or improves the maximum power consumption of website, is realized in the thing reasonable to stealing electricity event and is managed.
On the basis of above-mentioned technical proposal, the stealing electricity diagnosis grade includes three kinds of situations:
It is senior:Stealing electricity possibility is high, abnormal corresponding to occurring electricity in website electricity measurement period, and in the measurement periodThe situation of power consumption is not influenceed without work order event, or work order event, and management platform carries out stealing electricity alarm to keeper, and notifiesRelated maintenance personnel carries out stealing electricity investigation in time;
Middle rank:Stealing electricity possibility is medium, abnormal corresponding to occurring electricity in website electricity measurement period, and the measurement periodInside there is work order event, while the event type potentially affects the use of electricity, management platform can carry out electricity consumption to keeperIt is abnormal to confirm alarm, and point out keeper to carry out manual confirmation to abnormal electricity consumption situation, if manual confirmation is normal, management is flatPlatform can be improved according to this power consumption to the maximum power consumption of website, if manual confirmation is abnormal, notify related generationDimension personnel carry out stealing electricity investigation;
It is rudimentary:Stealing electricity possibility is low, abnormal corresponding to occurring electricity in website electricity measurement period, and in the measurement periodThere is work order event, while the event type directly influences the use of electricity, management platform is only recorded to multiplexing electric abnormality, andKeeper is pointed out to lift the maximum power consumption of website.
The present invention also provides a kind of preventing fraudulent use of electricity management method based on work order, comprises the following steps:
S1, in each site deployment electric quantity acquisition unit;
S2, management platform complete the importing of WorkForm System;
S3, power management system are monitored to the electricity service condition of each website;
S4, website are actively reported to abnormal electricity service condition;
S5, management platform are inquired about the work order in the range of abnormal website given time;
S6, management platform carry out stealing electricity diagnosis;
S7, management platform diagnose grade according to stealing electricity, and stealing electricity event alarm is carried out to keeper;
S8, keeper confirm to stealing electricity event alarm;
S9, management platform confirm and diagnosis situation according to stealing electricity event alarm, realize the thing reasonable to stealing electricity eventMiddle management.
On the basis of above-mentioned technical proposal, in step S6, week time that the management platform occurs according to abnormal electricityPhase, work order type, the maximum power consumption of work order time and website, carry out stealing electricity diagnosis.
On the basis of above-mentioned technical proposal, in step S9, the management platform confirms and examined according to stealing electricity event alarmDisconnected situation, carries out stealing electricity investigation work order and issues, or improves the maximum power consumption of website, realizes the thing reasonable to stealing electricity eventMiddle management.
On the basis of above-mentioned technical proposal, the stealing electricity diagnosis grade includes three kinds of situations:
It is senior:Stealing electricity possibility is high, abnormal corresponding to occurring electricity in website electricity measurement period, and in the measurement periodThe situation of power consumption is not influenceed without work order event, or work order event, and management platform carries out stealing electricity alarm to keeper, and notifiesRelated maintenance personnel carries out stealing electricity investigation in time;
Middle rank:Stealing electricity possibility is medium, abnormal corresponding to occurring electricity in website electricity measurement period, and the measurement periodInside there is work order event, while the event type potentially affects the use of electricity, management platform can carry out electricity consumption to keeperIt is abnormal to confirm alarm, and point out keeper to carry out manual confirmation to abnormal electricity consumption situation, if manual confirmation is normal, management is flatPlatform can be improved according to this power consumption to the maximum power consumption of website, if manual confirmation is abnormal, notify related generationDimension personnel carry out stealing electricity investigation;
It is rudimentary:Stealing electricity possibility is low, abnormal corresponding to occurring electricity in website electricity measurement period, and in the measurement periodThere is work order event, while the event type directly influences the use of electricity, management platform is only recorded to multiplexing electric abnormality, andKeeper is pointed out to lift the maximum power consumption of website.
Compared with prior art, advantages of the present invention is as follows:
(1) management platform in the present invention needs to fulfil the importing of generation dimension WorkForm System ahead of schedule, and it is specifically interior to combine work orderHold and the influence to power consumption, work order type is classified, when there is website electricity occur using exception, management platform can be rightWork order in the range of the given time of the website is inquired about, and adds stealing electricity diagnostic analysis flow, final according to diagnosis knotFruit carries out stealing electricity event alarm to keeper, and takes the circumstances into consideration to point out keeper to improve the maximum power consumption of the website, completesThe maintenance and renewal of each website electricity consumption data of fulgurite platform.The present invention can effectively be supervised to the electricity of magnanimity website, make pipePlatform can find stealing electricity event in the very first time, and possess the ability accurately alerted, it is to avoid fail to report or report by mistake.
(2) present invention can allow management platform to possess the ability for carrying out stealing electricity diagnosis to abnormal electricity consumption, and in time to managementMember's alarm, solves the problems, such as the website taken place frequently at present by stealing electricity.
(3) management platform can carry out stealing electricity diagnosis to the website of abnormal electricity consumption, save the supervision cost of magnanimity website;Stealing electricity diagnosis basis is reasonable, it is to avoid the inaccuracy of keeper's subjective judgement in the past, reduces failing to judge for stealing electricity eventWith erroneous judgement incidence.
(4) management platform can be alerted to keeper according to result, changed over afterwards to different after stealing electricity diagnosis is completedChang Zhandian carries out the mode of operation of statistical analysis, realizes in the thing to stealing electricity event and manages, and reduces website and occurs after stealing electricityEconomic loss.
(5) management platform passes through the time cycle that abnormal electricity occurs, work order type, work order time and website electricityThe analysis of maximum power consumption carries out stealing electricity diagnosis, sets up reasonable determinating mode, realizes to stealing electricity event Intelligence DiagnosisPurpose.
(6) administrative mechanism in the thing with manual confirmation is diagnosed based on stealing electricity, management platform is accused according to keeper's stealing electricity eventIt is alert, confirm and intelligent diagnostics result, follow-up work is carried out, by the supervision of the stealing electricity event of magnanimity website, by keeper peopleWork judges to be changed into management platform intellectuality judgement, and stealing electricity event is managed by managing to be changed into thing afterwards.
Brief description of the drawings
Fig. 1 is the networking schematic diagram of traditional power management system.
Fig. 2 is the flow chart of the preventing fraudulent use of electricity management method based on work order in the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described in further detail.
The embodiment of the present invention provides a kind of antitheft electric management system based on work order, the system include management platform,WorkForm System, power management system and some electric quantity acquisition units.
Shown in Figure 2, the embodiment of the present invention provides a kind of preventing fraudulent use of electricity management method based on work order, including followingStep:
S1, in each site deployment electric quantity acquisition unit;
S2, management platform complete the importing of WorkForm System;
S3, power management system are monitored to the electricity service condition of each website;
S4, website are actively reported to abnormal electricity service condition;
S5, management platform are inquired about the work order in the range of abnormal website given time;
The maximum of time cycle, work order type, work order time and website that S6, management platform occur according to abnormal electricityPower consumption, carries out stealing electricity diagnosis;
S7, management platform diagnose grade according to stealing electricity, and stealing electricity event alarm is carried out to keeper;
S8, keeper confirm to stealing electricity event alarm;
S9, management platform confirm and diagnosis situation according to stealing electricity event alarm, carry out stealing electricity investigation work order and issue, or improveThe maximum power consumption of website, realizes in the thing reasonable to stealing electricity event and manages.
Stealing electricity diagnosis grade includes three kinds of situations:
1. it is senior:Stealing electricity possibility is higher, abnormal corresponding to occurring electricity in website electricity measurement period, and statistics weekWithout work order event in phase, or work order event does not influence the situation of power consumption, and management platform can carry out stealing electricity alarm to keeper,And notify related maintenance personnel to carry out stealing electricity investigation in time.
2. middle rank:Stealing electricity possibility is medium, abnormal corresponding to occurring electricity in website electricity measurement period, and statistics weekThere is work order event in phase, while the event type potentially affects the use of electricity, management platform can be used keeperElectrical anomaly confirms alarm, and points out keeper to carry out manual confirmation to abnormal electricity consumption situation, if manual confirmation is normal, managesPlatform can be improved according to this power consumption to the maximum power consumption of website, if manual confirmation is abnormal, notify relatedMaintenance personnel carries out stealing electricity investigation.
3. it is rudimentary:Stealing electricity possibility is relatively low, abnormal corresponding to occurring electricity in website electricity measurement period, and statistics weekThere is work order event in phase, while the event type directly influences the use of electricity, management platform can only be carried out to multiplexing electric abnormalityRecord, and point out keeper the maximum power consumption for lifting website.
Above-mentioned steps S2, S3~S9 is the places different with prior art, Main change have it is following some:
1. management platform need to increase the importing of WorkForm System.
2. management platform is after the multiplexing electric abnormality for receiving website is reported, it is necessary to the work in the range of abnormal website given timeIt is single to be inquired about, and make stealing electricity diagnosis.
3. the maximum for time cycle, work order type, work order time and the website that stealing electricity diagnosis basis exception electricity occursThe conditions such as power consumption.
4. management platform carries out stealing electricity event alarm, and require keeper to stealing electricity thing according to diagnostic result to keeperPart alarm is confirmed.
5. management platform confirms according to stealing electricity event alarm and diagnosis situation carries out follow-up work:Under stealing electricity investigation work orderHair, or improve the maximum power consumption of website.
Due to there is the requirement of temperature environment in website room, therefore the usage amount of website electric power throughout the year is all relatively stable,And website needs to carry out adding for related electrical equipment, or during the transformation of associate power system environments, corresponding work order note is hadRecord, thus work order can as electric quantity change foundation.
Management platform carries out stealing electricity diagnosis using the work order particular content in WorkForm System and the influence to power consumption as foundationAnalysis, the maximum power consumption of time cycle, work order type, work order time and website that stealing electricity diagnosis is occurred by abnormal electricity is total toIt is a realtime analysis system based on work order with determining.Management platform carries out stealing electricity event according to diagnostic result to keeperAlarm so that management can confirm that management platform is true according to stealing electricity event alarm in the very first time to stealing electricity event alarmRecognize and diagnosis situation, carry out stealing electricity investigation work order and issue, or improve the maximum power consumption of website, realization is reasonable to stealing electricity event to be hadAccording to thing in manage.
Management platform can be monitored to the electricity service condition of magnanimity website, and exception is used when there is website electricity occurWhen, management platform can be inquired about the work order in the range of the given time of the website, and according to work order type, work order time withAnd the maximum power consumption of the website, stealing electricity diagnosis is carried out, it is final according to diagnostic result, stealing electricity event alarm is carried out to keeper.
Those skilled in the art can carry out various modifications and variations to the embodiment of the present invention, if these modifications and changeType is within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present inventionWithin.
The prior art that the content not being described in detail in specification is known to the skilled person.

Claims (8)

1. a kind of antitheft electric management system based on work order, it is characterised in that:The system includes management platform, work order systemSystem, power management system and some electric quantity acquisition units, in each site deployment electric quantity acquisition unit;Management platform completes work orderThe importing of system;Power management system is monitored to the electricity service condition of each website;Website is actively used abnormal electricitySituation is reported;Management platform is inquired about the work order in the range of abnormal website given time;Management platform carries out stealing electricityDiagnosis;Management platform diagnoses grade according to stealing electricity, and stealing electricity event alarm is carried out to keeper;Keeper enters to stealing electricity event alarmRow confirms;Management platform confirms and diagnosis situation according to stealing electricity event alarm, realizes in the thing reasonable to stealing electricity event and managesReason.
CN201710100146.7A2017-02-232017-02-23Antitheft electric management system and method based on work orderPendingCN107067155A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201710100146.7ACN107067155A (en)2017-02-232017-02-23Antitheft electric management system and method based on work order

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201710100146.7ACN107067155A (en)2017-02-232017-02-23Antitheft electric management system and method based on work order

Publications (1)

Publication NumberPublication Date
CN107067155Atrue CN107067155A (en)2017-08-18

Family

ID=59622699

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201710100146.7APendingCN107067155A (en)2017-02-232017-02-23Antitheft electric management system and method based on work order

Country Status (1)

CountryLink
CN (1)CN107067155A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104036357A (en)*2014-06-122014-09-10国家电网公司Analysis method for electricity stealing behavioral mode of electricity utilization of user
CN104348413A (en)*2014-10-132015-02-11东南大学Data-analysis-based adaptive photovoltaic electricity stealing prevention method
CN105184663A (en)*2015-07-232015-12-23国网青海省电力公司西宁供电公司Intelligent management system for electric energy metering device
CN106156269A (en)*2016-06-012016-11-23国网河北省电力公司电力科学研究院One is opposed electricity-stealing precise positioning on-line monitoring method
CN106295985A (en)*2016-08-082017-01-04国网山东省电力公司济南供电公司A kind of platform district line loss management system of local electric network and management method
CN106291253A (en)*2016-09-232017-01-04国网天津市电力公司A kind of anti-electricity-theft early warning analysis method
CN106411559A (en)*2016-05-242017-02-15国网山东省电力公司阳信县供电公司Low voltage transformer area anti-electricity-stealing diagnosis system
CN106447198A (en)*2016-09-282017-02-22国网山东省电力公司电力科学研究院Power consumption checking method based on business expanding installation data

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104036357A (en)*2014-06-122014-09-10国家电网公司Analysis method for electricity stealing behavioral mode of electricity utilization of user
CN104348413A (en)*2014-10-132015-02-11东南大学Data-analysis-based adaptive photovoltaic electricity stealing prevention method
CN105184663A (en)*2015-07-232015-12-23国网青海省电力公司西宁供电公司Intelligent management system for electric energy metering device
CN106411559A (en)*2016-05-242017-02-15国网山东省电力公司阳信县供电公司Low voltage transformer area anti-electricity-stealing diagnosis system
CN106156269A (en)*2016-06-012016-11-23国网河北省电力公司电力科学研究院One is opposed electricity-stealing precise positioning on-line monitoring method
CN106295985A (en)*2016-08-082017-01-04国网山东省电力公司济南供电公司A kind of platform district line loss management system of local electric network and management method
CN106291253A (en)*2016-09-232017-01-04国网天津市电力公司A kind of anti-electricity-theft early warning analysis method
CN106447198A (en)*2016-09-282017-02-22国网山东省电力公司电力科学研究院Power consumption checking method based on business expanding installation data

Similar Documents

PublicationPublication DateTitle
CN106655522B (en)A kind of main station system suitable for electric grid secondary equipment operation management
CN106200602B (en)A kind of preparation equipment moving monitoring system and method based on Internet of Things and industrial cloud
CN105446328B (en)Generating set remote fault diagnosis and health monitoring systems and data capture method
CN104944240A (en)Elevator equipment state monitoring system based on large data technology
CN102880115B (en)A kind of numerically controlled machine remote cooperative diagnosis system based on Internet of Things
CN109491341B (en)Monitoring and data analysis system for oil field operation equipment
CN105353702A (en)High voltage equipment intelligent monitoring system
CN105160864A (en)Operating data monitoring system and method for intelligent ammeters
EP3030863B1 (en)Method for measuring dynamics of a flow of energy and corresponding device and system
CN107395117A (en)Distributed solar energy electricity generation system monitors and remote diagnosis SaaS platforms
CN110333402A (en) A user voltage anomaly sensing method and system based on edge computing
CN108470386A (en)A kind of cable run intelligent inspection system based on GPS and cloud platform
CN109740946A (en)A kind of factory's quality abnormal processing system and its method
CN117459319A (en)Oil liquid remote online real-time monitoring system based on Internet of things
CN104793270B (en)A kind of synthetic determination method of equipment running status in Integrated Meteorological Observation net
CN105137945A (en)Raw milk intelligent monitoring system
CN107465264B (en)Method for remotely optimizing and managing monitoring information of power distribution network
CN110119110A (en)A kind of remote alarms guarantee system and method based on cloud platform
CN118192400A (en)Automatic management and control method for intelligent pump station
CN107741522A (en) A method for remote diagnosis of electric energy meter faults
CN106569475B (en)A kind of long-range water intaking monitoring device failure sorted diagnostic method
CN104590966A (en)Elevator intelligent monitoring system based on Internet of Things
CN207456571U (en)A kind of differential pressure flowmeter remote failure rapid diagnosis system
EP3561456A1 (en)Method and device for measurement of consumption
CN114157577A (en)Internet of things comprehensive management analysis system

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication
RJ01Rejection of invention patent application after publication

Application publication date:20170818


[8]ページ先頭

©2009-2025 Movatter.jp