CN106842918B - A calculation method of real-time coal volume of scraper conveyor - Google Patents

A calculation method of real-time coal volume of scraper conveyor
Download PDF

Info

Publication number
CN106842918B
CN106842918BCN201611271965.XACN201611271965ACN106842918BCN 106842918 BCN106842918 BCN 106842918BCN 201611271965 ACN201611271965 ACN 201611271965ACN 106842918 BCN106842918 BCN 106842918B
Authority
CN
China
Prior art keywords
real
coal
time
coal amount
drag conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611271965.XA
Other languages
Chinese (zh)
Other versions
CN106842918A (en
Inventor
范宝冬
陈伟
王会枝
宋冰清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State-owned Assets Supervision and Administration Commission of the State Council
Original Assignee
State-owned Assets Supervision and Administration Commission of the State Council
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State-owned Assets Supervision and Administration Commission of the State CouncilfiledCriticalState-owned Assets Supervision and Administration Commission of the State Council
Priority to CN201611271965.XApriorityCriticalpatent/CN106842918B/en
Publication of CN106842918ApublicationCriticalpatent/CN106842918A/en
Application grantedgrantedCritical
Publication of CN106842918BpublicationCriticalpatent/CN106842918B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The present invention relates to coal mining technology field, the calculation method of specifically a kind of real-time coal amount of drag conveyor.Existing method is the coal amount detected on elevating conveyor by the coal amount scanning sensor being mounted on elevating conveyor, the current coal amount being inferred on drag conveyor by this data.Although the method precision is higher, there are certain hysteresis qualitys.The present invention passes through to mining height of coal mining machine, the speed of travel, section deep, electric current, the acquisition of the data such as drag conveyor electric current, voltage, the speed of service, realize the calculating of the real-time coal amount of drag conveyor, amendment is made to calculation method in conjunction with the coal amount scanner on elevating conveyor, guarantees the accurate of real-time coal weighing method.The invention has the advantages that the calculation method of design is scientific and reasonable, the coal amount data of reaction are accurate in real time, realize the calculating to the real-time coal amount of drag conveyor, the coal amount data for grasping drag conveyor in real time, provide data basis to adjust the speed automatically in drag conveyor operational process according to coal amount.

Description

Translated fromChinese
一种刮板输送机实时煤量的计算方法A calculation method of real-time coal volume of scraper conveyor

技术领域technical field

本发明涉及煤矿井下开采运输过程中刮板输送机智能调速技术领域,具体地说是一种刮板输送机实时煤量的计算方法。The invention relates to the technical field of intelligent speed regulation of scraper conveyors during underground mining and transportation in coal mines, in particular to a method for calculating the real-time coal volume of scraper conveyors.

背景技术Background technique

煤矿井下综采工作面煤层开采时,刮板输送机通过刮板链运动将原煤运出工作面,随着变频技术在刮板输送机上广泛应用,使得根据刮板输送机当前煤量智能调速成为可能,这就对刮板输送机实时煤量数据的采集和计算提出了更高的要求。现有方法是通过安装在转载机上的煤量扫描传感器检测转载机上的煤量,通过此煤量来推断出刮板输送机上的煤量。此方法虽然精度较高,但存在一定的滞后性,即只有当煤卸落到转载机后方能计算出煤量,反应出的刮板输送机实时煤量有一定的滞后性。为了能够实时掌握刮板输送机的煤量及负载状况,便于根据刮板输送机实时负载对其进行调速,达到刮板输送机应用过程中实现绿色、节能目的,发明了一种刮板输送机实时煤量的计算方法。When the coal seam is mined in the fully mechanized working face of the coal mine, the scraper conveyor transports the raw coal out of the working face through the scraper chain movement. It becomes possible, which puts forward higher requirements for the collection and calculation of real-time coal quantity data of scraper conveyor. The existing method is to detect the coal quantity on the loader through a coal quantity scanning sensor installed on the loader, and infer the coal quantity on the scraper conveyor through the coal quantity. Although this method has high accuracy, it has a certain hysteresis, that is, the coal amount can only be calculated after the coal is unloaded to the loader, and the real-time coal amount of the scraper conveyor has a certain hysteresis. In order to be able to grasp the coal amount and load status of the scraper conveyor in real time, to adjust the speed of the scraper conveyor according to the real-time load of the scraper conveyor, and to achieve the purpose of green and energy saving in the application process of the scraper conveyor, a scraper conveyor was invented. Calculation method of real-time coal volume.

发明内容SUMMARY OF THE INVENTION

本发明的目的是发明一种刮板输送机实时煤量的计算方法,准确感知刮板输送机运行过程中的当前煤量,便于刮板输送机实时调速中应用。The purpose of the present invention is to invent a method for calculating the real-time coal amount of the scraper conveyor, which can accurately perceive the current coal amount during the operation of the scraper conveyor, and is convenient for application in the real-time speed regulation of the scraper conveyor.

本发明采用的技术方案是:一种刮板输送机实时煤量的计算方法,利用采煤机采煤过程中采高、截深、行走速度、位置、电流、方向,刮板输送机电机转速、输入电流,液压支架推移步距,煤量扫描仪检测的煤量数据等,综合以上数据计算出刮板输送机实时煤量。一种刮板输送机实时煤量的计算方法,包括以下步骤:The technical scheme adopted in the present invention is: a method for calculating the real-time coal amount of a scraper conveyor, which utilizes the mining height, cutting depth, running speed, position, current, direction, and rotating speed of the scraper conveyor motor during the coal mining process of the shearer. , input current, hydraulic support moving step distance, coal volume data detected by coal volume scanner, etc., based on the above data to calculate the real-time coal volume of scraper conveyor. A method for calculating the real-time coal amount of a scraper conveyor, comprising the following steps:

①煤量数据计算系统1通过采煤机控制系统2、支架电液控系统3、刮板输送机变频控制器4、煤量扫描仪5等采集采煤机6采煤过程中采高、截深、行走速度、位置、电流、方向,刮板输送机7运行速度、输入电流,液压支架9推移步距,安装在转载机8上的煤量扫描仪5煤量数据等数据,为煤量数据计算提供数据基础。①Coal quantity data calculation system 1 collects the cutting height, cutting height and cutting height of the shearer 6 through the shearer control system 2, the bracket electro-hydraulic control system 3, the scraper conveyor frequency conversion controller 4, the coal quantity scanner 5, etc. Depth, travel speed, position, current, direction, running speed and input current of scraper conveyor 7, hydraulic support 9 moving step distance, coal quantity scanner installed on loader 8, coal quantity data and other data, which are coal quantity Data computing provides the data foundation.

②通过采煤机采高、截深、行走速度、位置、电流、方向和液压支架推移步距等数据构建刮板输送机实时煤量计算的数学模型:②Construct a mathematical model for the real-time coal volume calculation of scraper conveyor through data such as mining height, cutting depth, walking speed, position, current, direction and hydraulic support moving step distance:

式中k为采煤机装煤系数,Q1为采煤机计算的煤量,t0为基准时间,t1为装煤时间点,t2为实时时间,v1采煤机运行速度,v2刮板输送机运行速度,H采煤机采高,D采煤机截深,Lt0为t0时刻采煤机位置。where k is the coal loading coefficient of the shearer, Q1 is the coal amount calculated by the shearer,t0 is the reference time,t1 is the coal loading time point,t2 is the real- time time, v1 is the running speedof the shearer, v2 is the running speed of the scraper conveyor, H is the cutting height of the shearer, D is the cutting depth of the shearer, and Lt0 is the position of the shearer at timet0 .

③通过刮板输送机电流与负载存在的关系计算出刮板输送机上的煤量;刮板输送机负载变化的因素不只有煤量的变化,还有刮板输送机弯曲度、工作面条件变化等其他因素,所以根据电流变化计算的煤量只占实时煤量一部分;③ Calculate the amount of coal on the scraper conveyor through the relationship between the current and the load of the scraper conveyor; the factors of the load change of the scraper conveyor are not only the change of the amount of coal, but also the curvature of the scraper conveyor and the change of working surface conditions and other factors, so the coal amount calculated according to the current change only accounts for a part of the real-time coal amount;

刮板输送机在平直的、没有客观因素的条件下运行时,理论上速度一定的情况下电流与实时煤量成线性关系,即:When the scraper conveyor operates in a straight condition without objective factors, the current has a linear relationship with the real-time coal amount under the condition of a certain speed theoretically, namely:

I2 刮板输送机电流I2 scraper conveyor current

Q2 根据电流计算的刮板输送机实时煤量Q2 Real-time coal quantity of scraper conveyor calculated according to current

m 系数m factor

I0 刮板输送机空载电流I0 Scraper conveyor no-load current

根据刮板输送机在运行过程中的弯曲度,调整电流计算实时煤量的比例,得出计算刮板输送机的实时煤量;According to the curvature of the scraper conveyor during operation, adjust the ratio of the current to calculate the real-time coal volume, and obtain the real-time coal volume of the scraper conveyor;

④根据工作面条件和各设备运行情况计算刮板输送机实时煤量:④ Calculate the real-time coal volume of the scraper conveyor according to the working face conditions and the operation of each equipment:

Q=pQ1+(1-p)Q2Q=pQ1 +(1-p)Q2

式中Q为计算所得刮板输送机实时煤量,Q1由采煤机计算的刮板输送机实时煤量,Q2由刮板输送机实时电流计算刮板输送机煤量,p为采煤机计算煤量占实时煤量计算的比重。In the formula, Q is the calculated real-time coal volume of the scraper conveyor, Q1 is the real-time coal volume of the scraper conveyor calculated by the shearer, Q2 is the scraper conveyor real-time current calculation of the scraper conveyor coal volume, p is the mining The proportion of coal calculated by the coal machine in the real-time calculation of coal volume.

⑤计算出的刮板输送机煤量与安装在转载机上的煤量扫描仪检测到的刮板输送机上同一时刻的煤量进行比对,当长时间存在较大差异时调整计算方法中的各参数,保证计算结果的准确性。⑤Compare the calculated coal quantity on the scraper conveyor with the coal quantity on the scraper conveyor at the same time detected by the coal quantity scanner installed on the loader, and adjust each parameter in the calculation method when there is a large difference for a long time parameters to ensure the accuracy of the calculation results.

煤量数据计算系统1通过实时的数据通讯从采煤机控制系统2采集采煤机6的实时数据,包括采煤机的行走速度、两摇臂高度、采煤机当前位置及采煤机截割电流等信息,计算出采煤机采高、截深等信息。The coal quantity data calculation system 1 collects the real-time data of the shearer 6 from the shearer control system 2 through real-time data communication, including the running speed of the shearer, the height of the two rocker arms, the current position of the shearer and the cutoff of the shearer. The cutting current and other information are calculated, and the cutting height and cutting depth of the shearer are calculated.

煤量数据计算系统1与液压支架电液控系统3采集液压支架9的推移步距,根据推移步距和采煤机当前位置信息计算出采煤机的截深,并通过采煤机的截割电流和行走速度作为辅助参数验证截深。The coal quantity data calculation system 1 and the hydraulic support electro-hydraulic control system 3 collect the moving step distance of the hydraulic support 9, calculate the cutting depth of the shearer according to the moving step distance and the current position information of the shearer, and pass the cutting distance of the shearer. Cutting current and walking speed are used as auxiliary parameters to verify the depth of cut.

煤量数据计算系统1通过刮板输送机变频控制器4取得刮板输送机7各变频电机输入电流、电机转速等,以变频电机转速、减速器变比等信息计算出刮板输送机的当前运行速度,变频电机的输入电流是刮板输送机负载状况的直观反应,由于除煤量变化外影响刮板输送机输入电流变化的因素较多,所以输入电流只作为反应刮板输送机实时煤量的辅助参数。The coal quantity data calculation system 1 obtains the input current and motor speed of each variable frequency motor of the scraper conveyor 7 through the scraper conveyor frequency conversion controller 4, and calculates the current speed of the scraper conveyor based on the information such as the variable frequency motor speed and the ratio of the reducer. The running speed and the input current of the variable frequency motor are the intuitive response of the load condition of the scraper conveyor. Since there are many factors that affect the change of the scraper conveyor input current besides the change of coal volume, the input current is only used as a reaction to the real-time coal consumption of the scraper conveyor. amount of auxiliary parameters.

煤量数据计算系统1采集安装在转载机8上的煤量扫描仪5煤量数据,作为煤量数据计算系统计算结果的验证,当验证结果存在偏差较大时,综合系统中其他采集数据,系统自动修正参数设置,从而保证计算结果的准确。The coal quantity data calculation system 1 collects the coal quantity data of the coal quantity scanner 5 installed on the loader 8 as a verification of the calculation result of the coal quantity data calculation system. The system automatically corrects the parameter settings to ensure the accuracy of the calculation results.

本发明设计合理,实现便捷,利用综采工作面现有的设备采集各数据,通过计算机技术实现对刮板输送机实时煤量的计算,能够实时掌握刮板输送机的煤量数据,为刮板输送机运行过程中根据煤量自动调速提供数据基础。The invention is reasonable in design and convenient in implementation, uses the existing equipment of the fully mechanized mining face to collect various data, realizes the calculation of the real-time coal volume of the scraper conveyor through computer technology, and can grasp the coal volume data of the scraper conveyor in real time, so as to improve the scraping efficiency of the scraper conveyor. During the operation of the plate conveyor, the automatic speed regulation according to the amount of coal provides the data basis.

附图说明Description of drawings

图1是本发明的系统图。FIG. 1 is a system diagram of the present invention.

图2是刮板输送机实时煤量计算的流程图。Figure 2 is a flow chart of the real-time coal amount calculation of the scraper conveyor.

图3是通过采煤机计算刮板输送机实时煤量的曲线图。Figure 3 is a graph of the real-time coal volume of the scraper conveyor calculated by the shearer.

图中:1煤量数据计算系统,2采煤机控制系统,3支架电液控系统,4刮板输送机变频控制器,5煤量扫描仪,6采煤机,7刮板输送机,8转载机,9液压支架。In the picture: 1 Coal volume data calculation system, 2 Coal shearer control system, 3 Support electro-hydraulic control system, 4 Scraper conveyor inverter controller, 5 Coal volume scanner, 6 Coal shearer, 7 Scraper conveyor, 8 loader, 9 hydraulic supports.

具体实施方式Detailed ways

下面结合附图和具体实施方案对本发明作进一步详细说明:The present invention is described in further detail below in conjunction with the accompanying drawings and specific embodiments:

如图1可知,一种刮板输送机实时煤量的计算方法,所涉及的设备包括煤量数据计算系统1,采煤机控制系统2,支架电液控系统3,刮板输送机变频控制器4,煤量扫描仪5,采煤机6,刮板输送机7,转载机8,液压支架9。煤量数据计算系统1运行在一台隔爆计算机上,安装在顺槽设备列车处,通过通讯采集采煤机控制系统2、支架电液控系统3、刮板输送机变频控制器4、煤量扫描仪5的数据,通讯协议和接口根据各关联设备而定。采煤机控制系统2从采煤机6上实时采集采高、截深、行走速度、位置、电流、方向等数据。支架电液控系统3采集各液压支架9的推移步距、支护高度等数据。刮板输送机变频控制器4采集各变频电机的输入电流、电机转速等。煤量扫描仪5安装在转载机8上,检测刮板输送机上卸下的煤量,检测结果与刮板输送机上前阶段煤量进行比对,验证计算结果的准确性。As can be seen in Figure 1, a method for calculating the real-time coal volume of a scraper conveyor, the equipment involved includes a coal volume data calculation system 1, a shearer control system 2, a support electro-hydraulic control system 3, and a scraper conveyor frequency conversion control system 4, coal quantity scanner 5, shearer 6, scraper conveyor 7, loader 8, hydraulic support 9. The coal quantity data calculation system 1 runs on an explosion-proof computer and is installed at the equipment train along the trough, and collects the shearer control system through communication 2, the bracket electro-hydraulic control system 3, the scraper conveyor frequency conversion controller 4, the coal The data, communication protocol and interface of the scanner 5 are determined according to each associated device. The shearer control system 2 collects real-time data such as mining height, cutting depth, traveling speed, position, current, and direction from the shearer 6 . The support electro-hydraulic control system 3 collects data such as the moving step distance and support height of each hydraulic support 9 . The frequency conversion controller 4 of the scraper conveyor collects the input current, motor speed, etc. of each frequency conversion motor. The coal amount scanner 5 is installed on the loader 8 to detect the amount of coal unloaded on the scraper conveyor, and the detection results are compared with the coal amount in the previous stage of the scraper conveyor to verify the accuracy of the calculation results.

1、采煤机截深的确定1. Determination of cutting depth of shearer

液压支架的推移步距在理论上是采煤机截深的直观反映,在实际工况下,由于支架的推移方法和传感器误差原因,推移步距和采煤机截深有时存在较大误差。采煤机截深与截割电流关系存在线性关系:In theory, the moving step of the hydraulic support is an intuitive reflection of the shearer's cutting depth. In actual working conditions, due to the moving method of the support and the reason of the sensor error, sometimes there is a large error in the moving step and the shearer's cutting depth. There is a linear relationship between shearer cutting depth and cutting current:

I=aD+bI=aD+b

I 采煤机截割电流I shearer cutting current

a 斜率a slope

b 采煤机空载截割电流b shearer no-load cutting current

D 采煤机截深D Shearer cutting depth

根据实际工况可确定公式中a、b。公式确定后可根据采煤机滚筒截割电流对液压支架的推移步距(即采煤机截深)进行补偿。当截割电流长时间与截深不匹配,则根据电流调整计算煤量时运用的采煤机截深数值。According to the actual working conditions, a and b in the formula can be determined. After the formula is determined, the moving step distance of the hydraulic support (ie the cutting depth of the shearer) can be compensated according to the cutting current of the shearer drum. When the cutting current does not match the cutting depth for a long time, the cutting depth value of the shearer used when calculating the coal quantity is adjusted according to the current.

2、根据采煤机运行情况对刮板输送机实时煤量计算2. Calculate the real-time coal volume of the scraper conveyor according to the operation of the shearer

煤量数据计算系统1根据检测到的采煤机运行数据进行计算刮板输送机上实时煤量。根据采煤机运行情况,煤量数据计算系统1累计计算采煤机截割下的煤量,通过装煤系数计算刮板输送机上累计煤量,在此基础上除去刮板输送机卸掉的煤量为刮板输送机的实时煤量。计算如下:The coal quantity data calculation system 1 calculates the real-time coal quantity on the scraper conveyor according to the detected operation data of the shearer. According to the operation of the shearer, the coal quantity data calculation system 1 accumulates the amount of coal cut by the shearer, calculates the accumulated coal quantity on the scraper conveyor through the coal loading coefficient, and removes the amount of coal unloaded by the scraper conveyor on this basis. The coal quantity is the real-time coal quantity of the scraper conveyor. The calculation is as follows:

①、采煤机在刮板输送机中部运行①. The shearer runs in the middle of the scraper conveyor

当采煤机向机尾方向运行时,When the shearer runs towards the tail,

当采煤机向机头方向运行时,When the shearer runs in the direction of the nose,

k 采煤机装煤系数k Coal loading coefficient of shearer

Q1 为采煤机计算的煤量Q1 is the amountof coal calculated by the shearer

t0 为基准时间t0 is the reference time

t1 为装煤时间点t1 is the coal loading time point

t2 为实时时间t2 is the real time

v1 采煤机运行速度v1 shearer running speed

v2 刮板输送机运行速度v2 scraper conveyor running speed

H 采煤机采高H shearer cutting height

D 采煤机截深D Shearer cutting depth

Lt0 t0时刻采煤机位置The position of the shearer at time Lt0t0

②、采煤机运行至机尾后反向运行②, the shearer runs in reverse after running to the tail

当刮板输送机运行至机尾后,反向向机头运行,When the scraper conveyor runs to the end of the machine, it runs in the opposite direction to the head of the machine.

k 采煤机装煤系数k Coal loading coefficient of shearer

Q1 为采煤机计算的煤量Q1 is the amountof coal calculated by the shearer

t0 为基准时间t0 is the reference time

t1 为装煤时间点t1 is the coal loading time point

t2 为实时时间t2 is the real time

v1 采煤机运行速度v1 shearer running speed

v2 刮板输送机运行速度v2 scraper conveyor running speed

H 采煤机采高H shearer cutting height

D 采煤机截深D Shearer cutting depth

Lt0 t0时刻采煤机位置The position of the shearer at time Lt0t0

L 工作面长度L Working face length

③、采煤机运行至机头后反向运行③. The shearer runs in reverse after running to the nose

当刮板输送机运行至机头后,反向向机尾运行,When the scraper conveyor runs to the nose, it runs in the opposite direction to the tail.

k 采煤机装煤系数k Coal loading coefficient of shearer

Q1 为采煤机计算的煤量Q1 is the amountof coal calculated by the shearer

t0 为基准时间t0 is the reference time

t1 为装煤时间点t1 is the coal loading time point

t2 为实时时间t2 is the real time

v1 采煤机运行速度v1 shearer running speed

v2 刮板输送机运行速度v2 scraper conveyor running speed

H 采煤机采高H shearer cutting height

D 采煤机截深D Shearer cutting depth

Lt0 t0时刻采煤机位置The position of the shearer at time Lt0t0

煤量数据计算系统1以以上方法为基础,通过采煤机实时位置选取以上计算公式。公式中的t0时刻的选取可按采煤机运行周期变化,但t0必须小于t1Based on the above method, the coal quantity data calculation system 1 selects the above calculation formula through the real-time position of the shearer. The selection of time t0 in the formula can be changed according to the operating cycle of the shearer, but t0 must be less than t1 .

3、刮板输送机实时煤量计算3. Real-time coal volume calculation of scraper conveyor

刮板输送机在平直的、没有客观因素的条件下运行时,理论上速度一定的情况下电流与实时煤量成线性关系,即:When the scraper conveyor operates in a straight condition without objective factors, the current has a linear relationship with the real-time coal amount under the condition of a certain speed theoretically, namely:

I2 刮板输送机电流I2 scraper conveyor current

Q2 根据电流计算的刮板输送机实时煤量Q2 Real-time coal quantity of scraper conveyor calculated according to current

m 系数m factor

I0 刮板输送机空载电流I0 Scraper conveyor no-load current

根据刮板输送机在运行过程中的弯曲度,调整电流计算实时煤量的比例,得出计算刮板输送机的实时煤量如下:According to the curvature of the scraper conveyor during operation, adjust the ratio of the current to calculate the real-time coal amount, and calculate the real-time coal amount of the scraper conveyor as follows:

Q=pQ1+(1-p)Q2Q=pQ1 +(1-p)Q2

Q 计算所得刮板输送机实时煤量Q Calculated real-time coal volume of scraper conveyor

Q1 由采煤机计算的刮板输送机实时煤量Q1 Real-time coal quantity of scraper conveyor calculated by shearer

Q2 由刮板输送机实时电流计算刮板输送机煤量Q2 Calculate the coal amount of scraper conveyor by real-time current of scraper conveyor

p 采煤机计算煤量占实时煤量计算的比重p Proportion of coal amount calculated by shearer in real-time calculation of coal amount

刮板输送机将原煤卸到转载机后,系统对t1时计算的煤量与煤量扫描仪5检测到的煤量进行比较,当计算煤量值与检测值长时间存在较大差异时,对计算结果按比例进行修正。After the scraper conveyor unloads the raw coal to the loader, the system compares the coal amount calculated at t1 with the coal amount detected by the coal amount scanner 5. When there is a big difference between the calculated coal amount and the detected value for a long time , and the calculation results are corrected proportionally.

Claims (3)

CN201611271965.XA2016-12-232016-12-23 A calculation method of real-time coal volume of scraper conveyorActiveCN106842918B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201611271965.XACN106842918B (en)2016-12-232016-12-23 A calculation method of real-time coal volume of scraper conveyor

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201611271965.XACN106842918B (en)2016-12-232016-12-23 A calculation method of real-time coal volume of scraper conveyor

Publications (2)

Publication NumberPublication Date
CN106842918A CN106842918A (en)2017-06-13
CN106842918Btrue CN106842918B (en)2019-07-16

Family

ID=59118271

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201611271965.XAActiveCN106842918B (en)2016-12-232016-12-23 A calculation method of real-time coal volume of scraper conveyor

Country Status (1)

CountryLink
CN (1)CN106842918B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN107697598A (en)*2017-10-122018-02-16中煤张家口煤矿机械有限责任公司A kind of frequency conversion drag conveyor Intelligent speed-adjustable control system
CN108491360B (en)*2018-02-262022-04-01北京天玛智控科技股份有限公司Coal mining amount calculation method
CN108910405B (en)*2018-04-132020-03-17宁夏天地奔牛实业集团有限公司Coal seam height control device on underground mining scraper conveyor and working method thereof
CN110033128B (en)*2019-03-182023-01-31西安科技大学 Adaptive load prediction method for scraper conveyor based on restricted Boltzmann machine
CN110040472A (en)*2019-04-252019-07-23连云港天明装备有限公司A kind of fully-mechanized mining working frequency conversion scratch board conveyor automatic speed governing device and its method
CN111897376A (en)*2020-06-102020-11-06常州联力自动化科技有限公司Automatic speed regulation method for conveyor and coal mining machine without coal flow sensor
CN111689170B (en)*2020-06-172021-11-30青岛中加特电气股份有限公司Scraper conveyor and self-adaptive speed regulation method thereof
CN112340387A (en)*2020-09-302021-02-09中煤科工集团上海有限公司Belt conveyor intelligent control system and control method based on machine vision
CN114988024B (en)*2022-06-092025-07-11北京天地华泰矿业管理股份有限公司 A scraper transport speed control system and method for fully mechanized mining working face
CN116477311A (en)*2023-04-102023-07-25中煤张家口煤矿机械有限责任公司Self-adaptive speed regulation method for scraper conveyor
CN116916193B (en)*2023-09-122023-12-12苏州爱雄斯通信技术有限公司Coal mining data transmission method for multi-platform collaborative operation
CN117361062A (en)*2023-11-062024-01-09北京天玛智控科技股份有限公司Scraper conveyor load detection method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104358587A (en)*2014-09-302015-02-18宁夏天地奔牛实业集团有限公司Adverse feedback conveying system for working face of underground coal mine
CN104444211A (en)*2014-09-302015-03-25宁夏天地奔牛实业集团有限公司Method for intelligently adjusting speed of working face scraper conveyer under coal mine
CN104555343A (en)*2014-09-302015-04-29宁夏天地奔牛实业集团有限公司Adaptive intelligent scraper conveyer used for coal mine underground mining face
CN104860030A (en)*2015-05-142015-08-26中煤张家口煤矿机械有限责任公司Fully mechanized coal face coal flow monitoring and control system
CN204702158U (en)*2015-05-142015-10-14中煤张家口煤矿机械有限责任公司Fully-mechanized mining working coal stream Monitoring and control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104358587A (en)*2014-09-302015-02-18宁夏天地奔牛实业集团有限公司Adverse feedback conveying system for working face of underground coal mine
CN104444211A (en)*2014-09-302015-03-25宁夏天地奔牛实业集团有限公司Method for intelligently adjusting speed of working face scraper conveyer under coal mine
CN104555343A (en)*2014-09-302015-04-29宁夏天地奔牛实业集团有限公司Adaptive intelligent scraper conveyer used for coal mine underground mining face
CN104860030A (en)*2015-05-142015-08-26中煤张家口煤矿机械有限责任公司Fully mechanized coal face coal flow monitoring and control system
CN204702158U (en)*2015-05-142015-10-14中煤张家口煤矿机械有限责任公司Fully-mechanized mining working coal stream Monitoring and control system

Also Published As

Publication numberPublication date
CN106842918A (en)2017-06-13

Similar Documents

PublicationPublication DateTitle
CN106842918B (en) A calculation method of real-time coal volume of scraper conveyor
CN105217271B (en) Adaptive Control Method of Belt Transportation System Based on Video Recognition
CN106743339A (en)A kind of method and apparatus for automatically adjusting adhesive tape conveyor speed
CN202886922U (en)A bucket wheel material taking system capable of automatically controlling material taking flow
CN203127522U (en)Specialized dredging device of mixed material bin or raw material bin used for sintering production
CN108910405B (en)Coal seam height control device on underground mining scraper conveyor and working method thereof
CN105109955A (en)Feeder flow automatic control method in tobacco primary processing line
CN107697598A (en)A kind of frequency conversion drag conveyor Intelligent speed-adjustable control system
CN105800276A (en)Reclaiming control system and method for blending reclaimer
CN205060798U (en)Tobacco tobacco cutting production line feeding machine tail band rotational speed automatic regulating apparatus
CN113503160A (en)Fully mechanized coal mining face key equipment energy consumption modeling and collaborative optimization control method
CN107015523A (en)A kind of coal preparation plant's rubber conveyer automatic control system
CN108733095B (en)Intelligent speed regulating system and method for complete coal mine transportation equipment based on machine vision
CN101826830A (en)Four-motor driving power balancing system of belt conveyor and power balancing method
CN114167714B (en)Automatic dragging control method for coal mining machine motor based on double closed-loop control
CN104891133B (en)Control system and method of pushed and slipped motion order of scraper conveyer
CN103670341A (en)Digitalized energy-saving pumping unit based on wifi network cloud service
CN103466285A (en) A belt conveyor energy management system
CN104355083A (en)Algorithm for preset frequency of variable frequency driving-type scrapping plate conveyor
CN104760821B (en)A kind of start stop apparatus for metal abrasives recovery system
CN218908807U (en)Colliery coal flow speed governing system
CN104811106B (en)The method and system of direct current generator closed-loop control
CN107703758B (en)Self-adaptive variable-speed drive control system and control method for oil pumping unit
CN209369780U (en)A kind of closed-loop control system of frequency conversion pumping unit
CN203673324U (en)Energy consumption monitoring device and mixing plant

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant