A system closure method for underground in-situ mining of oil shale
Download PDF

Info

Publication number
CN106703752A
CN106703752ACN201611097759.1ACN201611097759ACN106703752ACN 106703752 ACN106703752 ACN 106703752ACN 201611097759 ACN201611097759 ACN 201611097759ACN 106703752 ACN106703752 ACN 106703752A
Authority
CN
China
Prior art keywords
grouting
oil shale
layer
hole
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611097759.1A
Other languages
Chinese (zh)
Other versions
CN106703752B (en
Inventor
孙友宏
李强
周科
张弛
郭威
韩婧
刘世畅
吕世东
孙中瑾
李家晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin University
Original Assignee
Jilin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin UniversityfiledCriticalJilin University
Priority to CN201611097759.1ApriorityCriticalpatent/CN106703752B/en
Publication of CN106703752ApublicationCriticalpatent/CN106703752A/en
Application grantedgrantedCritical
Publication of CN106703752BpublicationCriticalpatent/CN106703752B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

Translated fromChinese

本发明公开了一种用于油页岩地下原位开采的体系封闭方法,本发明所涉及的封闭体系是由顶板隔热封闭层、底板隔热封闭层和水平开采区域封闭帷幕组成;本发明包括以下步骤:一、在油页岩层底板处设置底板隔热封闭层,覆盖油页岩原位开采区域,与水平开采区域封闭帷幕连接成为整体;二、在油页岩顶层板处设置顶板隔热封闭层,覆盖油页岩原位开采区域,设置顶板隔热封闭层采用劈裂注浆的方法,使各注浆孔中浆液相互串径。三、水平开采区域封闭帷幕是连续且密闭的,采用渗透注浆的方法,穿过开采油页岩层底板,到达透水性差的底部岩层;本发明为油页岩地下原位开采提供了一个密闭的加热区域,用于阻绝开采区域纵向地下水进入、热量散失以及水平方向地下水进入和油气及副产品流出。

The invention discloses a system sealing method for underground in-situ mining of oil shale. The sealing system involved in the invention is composed of a roof heat-insulating sealing layer, a bottom plate heat-insulating sealing layer and a sealing curtain for a horizontal mining area; the invention The method includes the following steps: 1. Set a heat-insulating sealing layer at the bottom of the oil shale layer, cover the in-situ mining area of the oil shale, and connect with the sealing curtain in the horizontal mining area to form a whole; The heat sealing layer covers the in-situ mining area of oil shale, and the heat insulation sealing layer of the roof is set and the method of split grouting is adopted, so that the grout in each grouting hole is connected to each other. 3. The closed curtain in the horizontal mining area is continuous and airtight, and the method of infiltration grouting is adopted to pass through the bottom plate of the exploited oil shale layer to reach the bottom rock layer with poor water permeability; the present invention provides an airtight curtain for the underground in-situ mining of oil shale The heating area is used to prevent the vertical groundwater entry and heat loss in the mining area, as well as the horizontal groundwater entry and the outflow of oil, gas and by-products.

Description

A kind of system enclosure method for oil shale underground in situ exploitation
Technical field
It is more particularly to a kind of for oil shale underground in situ exploitation the present invention relates to a kind of ground in-situ system enclosure methodSystem enclosure method.
Background technology
Oil shale in-situ production technique is a kind of new oil shale mining type after oil shale retorting, and it is by boringThe mode such as hole and hydraulic fracturing, forms heating passage, to oil shale after thermal source entrance heating passage in subterranean oil shale rock stratumHeating destructive distillation is carried out, the air-fuel mixture product of generation is derived to earth's surface through recovery well and carries out separating treatment.The oil shale that compares is doneTechnology is evaporated, oil shale in-situ production technique has ground installation few, and floor space is small, small grade is polluted in production process significantly excellentPoint.
Oil shale in-situ exploitation needs form one in underground mainly includes that oil shale heats passage and oil shale layer crackClosing exploitation space.The exploitation space of such a closing, is conducive to controlling the scope of oil shale in-situ exploitation, it is to avoid formerThe adverse effects such as oil gas leakage are produced in the recovery process of position to outside stratum.In the exploitation space of such a high temperature, especiallyIt is noted that the influence that underground water and the exploitation of temperature diffusion couple are produced.On the one hand, if having water in exploitation space or not exploitedThe characteristics of heat insulation work in space, specific heat big due to water, a big chunk heat will be only absorbed by the water, and exploitation is unable to reach in spaceIdeal temperature, influences oil shale recovery efficiency.On the other hand, if having water in exploitation space, even if generating oil gas, oil gasA large amount of vapor can be carried and return to earth's surface, while the work of oil supply gas-water separation brings difficulty, be greatly reduced returning for oil gasProduce effects rate.If exploitation space is connected with underground aquaporin, the pollutant produced in recovery process can enter underground reservoir,Polluted underground water.Therefore, it is particularly important for the production zone of oil shale provides closing space.
The ground in-situ production practice (ICP) of Shell Co. Ltd proposes a kind of underground freezing wall technology, with heated well andIt is certain and be interconnected to form the freezing well of closed system that producing well certain distance bores many mouthfuls of spacing, to injecting uniform temperature in wellFreezing liquid in system interior circulation, the underground water around well is formed freezing wall with surrounding rocks.But underground freezes answering for wallDuring, there is long construction period, power consumption is high, and the shortcomings of polluting is produced to underground water.
Patent CN102278116B provides a kind of cold districts and makes underground freezing wall device and make freezing wallMethod.The method is sent the low-temperature receiver obtained from winter outdoor temperature by the use of the low-temperature glycol aqueous solution as circulatory mediatorEnter in the hole beaten in advance, freeze geologic body, and then form freezing wall.The method construction can only in the winter time and winter temperature is coldArea is carried out, and limits larger, without the condition being widely popularized.
The content of the invention
The method presence that closing space is provided the invention aims to solve the existing production zone for oil shale is appliedThe work cycle is long, high energy consumption, pollution environment, the problem being subject to seasonal restrictions, and the one kind for providing is applied to different buried depth difference thicknessOil shale underground in situ exploitation system enclosure method.
Closed system involved in the present invention is by the heat-insulated confining bed of top board, floor spacer confining bed and horizon mining regionClosing curtain composition.
The present invention is comprised the following steps:
The first, floor spacer confining bed is set at oil shale layer base plate, oil shale in-situ production zone is covered, is opened with levelExploiting field domain closing curtain is connected to become entirety;
It is to bore a series of fracture grouting of quincuncial arrangements on ground for the fracture grouting method of floor spacer confining bedHole, the grouting serous fluid in adjacent fracture grouting hole mutually goes here and there footpath, and hole depth reaches oil shale layer base plate.
Injected hole passes through oil shale layer base plate, using the grouting mode of protrusive, slip casting, slurries is carried out in oil shale base plateUnder the action of pulling stress that pressure manages direction more than oil shale in-situ perpendicular to layer, oil shale layer of riving, the splitting route of slurriesIn crisscross veiny network, slurries mutually go here and there footpath in each injected hole, form floor spacer confining bed.
The 2nd, the heat-insulated confining bed of top board is set at oil shale top plate, oil shale in-situ production zone is covered, top board is setHeat-insulated confining bed makes slurries in each injected hole mutually go here and there footpath using the method for fracture grouting.
It is to bore a series of fracture grouting of quincuncial arrangements on ground for the fracture grouting method of the heat-insulated confining bed of top boardHole, the grouting serous fluid in adjacent fracture grouting hole mutually goes here and there footpath, and hole depth reaches oil shale layer top board.
Injected hole passes through oil shale layer top board, using the grouting mode of protrusive, slip casting, slurries is carried out in oil shale top boardUnder the action of pulling stress that pressure manages direction more than oil shale in-situ perpendicular to layer, oil shale layer of riving, the splitting route of slurriesIn crisscross veiny network, slurries mutually go here and there footpath in each injected hole, form the heat-insulated confining bed of top board;
Closing mud i.e. fracture grouting slurries are poured into fracture grouting hole, one-way valve tube is inserted to oil shale layer top board,Grouting serous fluid to be cleaved is set in one-way valve tube, is inserted into slip casting core pipe in one-way valve tube, carries out slip casting;Work as slurry pressureDuring more than oil shale in-situ vertical stratification direction tension, slurries are rived in oil shale layer and entrance crack, form top board heat-insulatedConfining bed.
3rd, closing curtain in horizon mining region is continuous and closed, using the method for osmotic grouting, through the oily page of exploitationRock stratum base plate, reaches the basal bed of bad hydraulic permeability.
It is to bore a series of single slip castings on ground for the osmotic grouting method of horizon mining region closing curtain constructionHole, slip casting hole depth is reached at oil shale layer base plate, and the grout mixing that slip casting pitch of holes should meet adjacent holes is overlapped, finallyContinuous and closed horizon mining region closing curtain can be formed.When carrying out slip casting to single hole, should use and be segmented from bottom to topThe mode of slip casting, since oil shale base plate, using only tholepin plug, carries out segmenting slip casting.
The course of work of the invention and principle are:
The present invention is to provide a closed heating zone around oil shale in-situ production zone i.e. heat injection well and recovery wellDomain.
Arrangement fracture grouting hole and curtain-grouting hole, fracture grouting hole is in quincunx distribution, and meets the slip casting of adjacent holesSlurries mutually go here and there footpath, and hole depth reaches oil shale layer base plate.The rounded single distribution in curtain-grouting hole, adjacent single hole spacing 3m, holeThe deep 5m below oil shale layer base plate.
Closing mud i.e. fracture grouting slurries are poured into fracture grouting hole, one-way valve tube is inserted to oil shale layer base plate,Grouting serous fluid to be cleaved is set in one-way valve tube, is inserted into slip casting core pipe in one-way valve tube, carries out slip casting.Work as slurry pressureDuring more than oil shale in-situ vertical stratification direction tension, slurries are rived in oil shale layer and entrance crack, form floor spacerConfining bed.Same method can form the heat-insulated confining bed of top board.
After top board, floor spacer confining bed is completed, the construction that curtain is closed in horizon mining region is carried out, single hole is appliedMan-hour, in the curtain-grouting hole under enter grouting pipe, using only tholepin plug segmenting slip casting from bottom to top, by curtain-grouting slurries fromGrouting pipe injects 5-1 sections, treats after the completion of 5-1 sections of injection, starts 5-2 sections of slip casting, until 5-n sections.After the completion of single hole construction,(construction ultimately forms horizon mining region closing curtain to carry out other curtain-grouting holes again.
After the completion of above step, that is, the heat-insulated closed area of oil shale in-situ exploitation is established, the region can carry out oily pageThe follow-up work of rock in-situ retorting.
Beneficial effects of the present invention:The present invention provides a closed heating region for oil shale underground in situ exploitation,Enter for blocking production zone longitudinal direction underground water, heat scatters and disappears and horizontal direction underground water enters and oil gas and by-product streamGo out.
Brief description of the drawings
Fig. 1 is the system enclosure method schematic diagram of the embodiment of the present invention.
Fig. 2 is the plane well location layout drawing of the embodiment of the present invention.
Fig. 3 is top board, the floor spacer confining bed construction technology figure of the embodiment of the present invention.
Fig. 4 is the horizon mining region closing curtain construction process figure of the embodiment of the present invention.
Specific embodiment
Refer to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, be the first embodiment of the present invention, the obturator that the present embodiment is related toSystem is made up of the heat-insulated confining bed of top board, floor spacer confining bed and horizon mining region closing curtain.
Need to block that underground water enters and heat scatters and disappears on longitudinal direction;Need to block underground water entrance and oil gas in horizontal directionAnd byproduct is reserved.
Shown according to geologic information, oil shale layer buried depth is 64~72m, belong to weak water penetration stratum stratum more.The oily page of delineationRock production zone is 30m × 30m square areas.
According to the weak water penetration property on stratum, the construction of the heat-insulated confining bed of top board and floor spacer confining bed is first carried out.AdoptConstructed with fracture grouting method, slip casting bore dia 80mm, hole depth 75m, through oil shale layer.Carried out by quincunx in production zoneCloth hole, distance between borehole 2.5m.Using protrusive grouting method.Grouting with plunger is:Drilling-slip casting-cleaning bottom of hole-drilling-slip casting.Drilling to 61m places, under enter stop grouting plug, carry out perforation slip casting, 2.5~3MPa of grouting pressure, material is modified rubber cement, also may be usedThink nano modification superhigh tenacity cement-base composite material.After the completion of top board slip casting, cleaning bottom of hole drilling is carried out, at drilling to 75m, underEnter stop grouting plug, perforation slip casting is carried out to base plate.
After the completion of the heat-insulated confining bed of top board and floor spacer confining bed fracture grouting, level is formed using permeation grouting method and is openedClose curtain, slip casting bore dia 80mm, hole depth 80m, to oil shale layer base plate in exploiting field domain.Injected hole is carried out along production zone peripheryCloth hole, distance between borehole 1m.During single hole mortar depositing construction, using retrusive segmenting slip casting method from bottom to top, segmentation distance is 8m,1~1.5MPa of grouting pressure, injecting paste material is fast solidifying type polymer cement waterproof slurry.
After the completion of closed system construction, water yield is from 19m in production zone3/ d drops to 1m3Within/d, oil shale in-situProduction practice is successfully carried out and output shale oil, it was demonstrated that the method can provide the anti-of heat-insulated closing for oil shale in-situ production practiceRegion is answered, thermal loss, underground water entrance and the outflow of oil gas and byproduct is reduced.
Refer to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, be the second embodiment of the present invention, the obturator that the present embodiment is related toSystem is made up of the heat-insulated confining bed of top board, floor spacer confining bed and horizon mining region closing curtain.
Compared with the Coal Gasification of ground, underground gasification need not be by coal mining to ground, but coal seam is carried out in undergroundGasification, also would not on the ground produce gangue or coal ash to account for the problem that firming ground, dust and fine particulates pollute air, phaseYing Di, hazardous trace elements can increase the risk of underground water pollution in underground in coal ash.For reduce coal ash and with coal ash in be harmful toPollution of the element to groundwater environment, therefore need in advance for underground coal gasification(UCG) provides a resistant-walled production zone.
Shown according to geologic information, somewhere coal seam buried depth is 41.2~47.0m, stratum underground water is on the high side, draw a circle to approve mining areaDomain is 50m × 50m.
According to the weak water penetration property on stratum, the construction of the heat-insulated confining bed of top board and floor spacer confining bed is first carried out.AdoptConstructed with fracture grouting method, slip casting bore dia 80mm, hole depth 50m, through coal seam.In production zone cloth is carried out by quincunxHole, distance between borehole 2.5m.Using protrusive grouting method.Grouting with plunger is:Drilling-slip casting-cleaning bottom of hole-drilling-slip casting.BoreProceed at 39m, under enter stop grouting plug, carry out perforation slip casting, 2.5~3MPa of grouting pressure, material is modified rubber cement, it is also possible toIt is nano modification superhigh tenacity cement-base composite material.After the completion of top board slip casting, carry out cleaning bottom of hole drilling, at drilling to 50m, under enterStop grouting plug, perforation slip casting is carried out to base plate.
After the completion of the heat-insulated confining bed of top board and floor spacer confining bed fracture grouting, level is formed using permeation grouting method and is openedClose curtain, slip casting bore dia 80mm, hole depth 54m, to seat earth in exploiting field domain.Injected hole carries out cloth along production zone peripheryHole, distance between borehole 1m.During single hole mortar depositing construction, using retrusive segmenting slip casting method from bottom to top, segmentation distance is 8m, noteSlurry 1~1.5MPa of pressure, injecting paste material is fast solidifying type polymer cement waterproof slurry.
After the completion of closed system construction, water yield is from 30m in production zone3/ d drops to 1m3Within/d, coal underground gasChemical industry skill is successfully carried out and output coal bed gas, it was demonstrated that the method can provide the reaction zone of heat-insulated closing for coal underground gasifying technologyDomain, reduces the pollution of coal ash and harmful element to groundwater environment.

Claims (1)

Translated fromChinese
1.一种用于油页岩地下原位开采的体系封闭方法,本方法所涉及的封闭体系是由顶板隔热封闭层、底板隔热封闭层和水平开采区域封闭帷幕组成;其特征在于:包括以下步骤:1. A system sealing method for underground in-situ mining of oil shale, the sealing system involved in the method is made up of roof heat insulation sealing layer, bottom plate heat insulation sealing layer and horizontal mining area sealing curtain; it is characterized in that: Include the following steps:一、在油页岩层(1)底板处设置底板隔热封闭层,覆盖油页岩原位开采区域,与水平开采区域封闭帷幕连接成为整体;1. A heat-insulating sealing layer for the bottom plate is set at the bottom plate of the oil shale layer (1), covering the in-situ mining area of the oil shale, and connected with the sealing curtain of the horizontal mining area to form a whole;用于底板隔热封闭层的劈裂注浆方法,是在地面钻一系列梅花形布置的劈裂注浆孔(6),相邻劈裂注浆孔(6)的注浆浆液相互串径,孔深到达油页岩层(1)底板;The split grouting method used for the thermal insulation sealing layer of the bottom plate is to drill a series of split grouting holes (6) arranged in a plum blossom shape on the ground, and the grouting grouts of adjacent split grouting holes (6) are connected to each other. , the hole depth reaches the bottom plate of the oil shale layer (1);注浆孔(6)穿过油页岩层(1)底板,采用前进式的注浆方式,在油页岩底板进行注浆,浆液在压力大于油页岩原位垂直于层理方向的拉应力作用下,劈开油页岩层,浆液的劈裂路线呈纵横交错的脉状网络,各注浆孔中浆液相互串径,形成底板隔热封闭层;The grouting hole (6) passes through the bottom plate of the oil shale layer (1), and grouting is carried out on the oil shale bottom plate by using the forward grouting method. Under the action, the oil shale layer is split, and the splitting route of the grout is a criss-cross vein network, and the grout in each grouting hole is connected to each other to form a heat-insulating sealing layer of the bottom plate;二、在油页岩顶层板处设置顶板隔热封闭层,覆盖油页岩原位开采区域,设置顶板隔热封闭层采用劈裂注浆的方法,使各注浆孔中浆液相互串径;2. Install a roof insulation sealing layer at the top layer of oil shale to cover the in-situ mining area of oil shale. Set the roof insulation sealing layer and adopt the method of split grouting so that the grout in each grouting hole is connected to each other;用于顶板隔热封闭层的劈裂注浆方法,是在地面钻一系列梅花形布置的劈裂注浆孔(6),相邻劈裂注浆孔(6)的注浆浆液相互串径,孔深到达油页岩层(1)顶板;The split grouting method used for the heat insulation sealing layer of the roof is to drill a series of split grouting holes (6) arranged in a quincunx shape on the ground, and the grouting grouts of adjacent split grouting holes (6) are connected to each other. , the hole depth reaches the top plate of the oil shale layer (1);注浆孔(6)穿过油页岩层(1)顶板,采用前进式的注浆方式,在油页岩顶板进行注浆,浆液在压力大于油页岩原位垂直于层理方向的拉应力作用下,劈开油页岩层,浆液的劈裂路线呈纵横交错的脉状网络,各注浆孔中浆液相互串径,形成顶板隔热封闭层;The grouting hole (6) passes through the roof of the oil shale layer (1), and grouting is performed on the oil shale roof by using the forward grouting method. Under the action, the oil shale layer is split, and the splitting route of the grout is a criss-cross vein network, and the grout in each grouting hole is connected to each other to form a heat-insulating sealing layer on the roof;在劈裂注浆孔(6)中灌入封闭泥浆即劈裂注浆浆液(13),插入单向阀管(11)到油页岩层顶板,待劈裂注浆浆液(13)凝固在单向阀管(11)中,再插入注浆芯管(12)到单向阀管中,进行注浆;当浆液压力大于油页岩原位垂直层理方向拉应力时,浆液劈开油页岩层(1)并进入裂隙中,形成顶板隔热封闭层(7);In the splitting grouting hole (6), pour the sealing mud, that is, the splitting grouting slurry (13), insert the one-way valve pipe (11) to the oil shale roof, and wait for the splitting grouting slurry (13) to solidify in the single Insert the grouting core pipe (12) into the one-way valve pipe (11) to perform grouting; when the grout pressure is greater than the tensile stress in the in-situ vertical bedding direction of the oil shale, the grout splits the oil shale The rock formation (1) enters the cracks to form a roof insulation sealing layer (7);三、水平开采区域封闭帷幕是连续且密闭的,采用渗透注浆的方法,穿过开采油页岩层底板,到达透水性差的底部岩层;3. The closure curtain in the horizontal mining area is continuous and airtight. The method of infiltration grouting is adopted to pass through the floor of the oil shale layer to reach the bottom rock layer with poor water permeability;用于水平开采区域封闭帷幕施工的渗透注浆方法,是在地面钻一系列单排注浆孔(6),注浆孔(6)深度达到油页岩层底板处,注浆孔(6)间距应满足相邻孔的浆液扩散范围重叠,最终可以形成连续且密闭的水平开采区域封闭帷幕;对单孔进行注浆时,应采用自下而上分段注浆的方式,从油页岩底板开始,利用止浆栓塞(16),进行分段注浆。The infiltration grouting method used for the construction of the closed curtain in the horizontal mining area is to drill a series of single row grouting holes (6) on the ground, the depth of the grouting holes (6) reaches the floor of the oil shale layer, and the distance between the grouting holes (6) It should be satisfied that the grout diffusion ranges of adjacent holes overlap, and finally a continuous and airtight sealing curtain of the horizontal mining area can be formed; when grouting a single hole, the bottom-up grouting method should be adopted, At the beginning, utilize stop grout plug (16), carry out segmental grouting.
CN201611097759.1A2016-12-032016-12-03System closing method for underground in-situ exploitation of oil shaleActiveCN106703752B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201611097759.1ACN106703752B (en)2016-12-032016-12-03System closing method for underground in-situ exploitation of oil shale

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201611097759.1ACN106703752B (en)2016-12-032016-12-03System closing method for underground in-situ exploitation of oil shale

Publications (2)

Publication NumberPublication Date
CN106703752Atrue CN106703752A (en)2017-05-24
CN106703752B CN106703752B (en)2019-04-19

Family

ID=58934509

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201611097759.1AActiveCN106703752B (en)2016-12-032016-12-03System closing method for underground in-situ exploitation of oil shale

Country Status (1)

CountryLink
CN (1)CN106703752B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN107060716A (en)*2017-06-142017-08-18长春工程学院A kind of oil shale underground in situ injection splitting constructing device and construction technology
CN107060717A (en)*2017-06-142017-08-18长春工程学院A kind of oil shale underground in situ splitting cracking constructing device and construction technology
CN107178355A (en)*2017-07-142017-09-19新疆国利衡清洁能源科技有限公司Coal underground gasification system and construction method thereof
CN107558950A (en)*2017-09-132018-01-09吉林大学Orientation blocking method for the closing of oil shale underground in situ production zone
CN107605422A (en)*2017-10-202018-01-19吉林大学For the combined type packer under high temperature and high pressure condition and packing method
CN110159233A (en)*2019-06-102019-08-23中国石油大学(华东)A method of gas hydrates recovery ratio is improved by artificial fine and close cap rock
CN110749477A (en)*2019-10-112020-02-04河海大学 A portable farmland shallow buried groundwater sampling and buried depth measurement device
CN112112601A (en)*2020-09-182020-12-22西安交通大学Closed system for underground in-situ pyrolysis of coal and construction method thereof
CN112127868A (en)*2020-09-272020-12-25中国地质大学(北京) Simulated underground coal gasification and oil shale combined production test device and test method
CN112160738A (en)*2020-09-182021-01-01西安交通大学Well arrangement structure for underground in-situ pyrolysis of coal and construction method thereof
CN112412430A (en)*2020-09-182021-02-26西安交通大学System and method for underground in-situ pyrolysis of coal
CN113006795A (en)*2021-04-092021-06-22中国煤炭地质总局勘查研究总院Treatment method of sandstone water on top plate of Jurassic coal field
CN115306367A (en)*2022-08-192022-11-08陕西省煤田地质集团有限公司Method for underground in-situ conversion and economic evaluation of oil-rich coal

Citations (11)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN1107536A (en)*1994-08-291995-08-30秦皇岛市第二建筑工程公司Splitting grouting and water-proof curtain construction method and equipment
US20070107901A1 (en)*2004-05-142007-05-17Maguire James QIn-situ method of fracturing gas shale and geothermal areas
US20070284107A1 (en)*2006-06-022007-12-13Crichlow Henry BHeavy Oil Recovery and Apparatus
CN102051868A (en)*2009-11-022011-05-11郑州优特基础工程维修有限公司Dam anti-seepage high polymer directional split grouting method
CN102182470A (en)*2011-03-212011-09-14同济大学Full-section sealing extrusion grouting method
CN202323973U (en)*2011-11-152012-07-11山西四建集团有限公司Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN103291325A (en)*2013-06-252013-09-11山东科技大学Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN204370373U (en)*2014-11-132015-06-03昆明理工大学Seepage proof curtain structure closed by a kind of reservoir
CN105041344A (en)*2015-06-302015-11-11中国矿业大学High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock
CN105421498A (en)*2015-11-162016-03-23同济大学Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system
CN105862722A (en)*2016-04-072016-08-17中建交通建设集团有限公司Three-dimensional treatment method of subway deep foundation pit in karst intense development region

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN1107536A (en)*1994-08-291995-08-30秦皇岛市第二建筑工程公司Splitting grouting and water-proof curtain construction method and equipment
US20070107901A1 (en)*2004-05-142007-05-17Maguire James QIn-situ method of fracturing gas shale and geothermal areas
US20070284107A1 (en)*2006-06-022007-12-13Crichlow Henry BHeavy Oil Recovery and Apparatus
CN102051868A (en)*2009-11-022011-05-11郑州优特基础工程维修有限公司Dam anti-seepage high polymer directional split grouting method
CN102182470A (en)*2011-03-212011-09-14同济大学Full-section sealing extrusion grouting method
CN202323973U (en)*2011-11-152012-07-11山西四建集团有限公司Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN103291325A (en)*2013-06-252013-09-11山东科技大学Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN204370373U (en)*2014-11-132015-06-03昆明理工大学Seepage proof curtain structure closed by a kind of reservoir
CN105041344A (en)*2015-06-302015-11-11中国矿业大学High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock
CN105421498A (en)*2015-11-162016-03-23同济大学Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system
CN105862722A (en)*2016-04-072016-08-17中建交通建设集团有限公司Three-dimensional treatment method of subway deep foundation pit in karst intense development region

Cited By (18)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN107060717A (en)*2017-06-142017-08-18长春工程学院A kind of oil shale underground in situ splitting cracking constructing device and construction technology
CN107060717B (en)*2017-06-142023-02-07长春工程学院 A construction device and construction technology for underground in-situ splitting and cracking of oil shale
CN107060716B (en)*2017-06-142023-02-07长春工程学院Oil shale underground in-situ jet splitting construction device and construction process
CN107060716A (en)*2017-06-142017-08-18长春工程学院A kind of oil shale underground in situ injection splitting constructing device and construction technology
CN107178355A (en)*2017-07-142017-09-19新疆国利衡清洁能源科技有限公司Coal underground gasification system and construction method thereof
CN107558950A (en)*2017-09-132018-01-09吉林大学Orientation blocking method for the closing of oil shale underground in situ production zone
CN107605422B (en)*2017-10-202023-04-25吉林大学 Combined packer and sealing method for high temperature and high pressure working conditions
CN107605422A (en)*2017-10-202018-01-19吉林大学For the combined type packer under high temperature and high pressure condition and packing method
CN110159233A (en)*2019-06-102019-08-23中国石油大学(华东)A method of gas hydrates recovery ratio is improved by artificial fine and close cap rock
CN110749477A (en)*2019-10-112020-02-04河海大学 A portable farmland shallow buried groundwater sampling and buried depth measurement device
CN112412430A (en)*2020-09-182021-02-26西安交通大学System and method for underground in-situ pyrolysis of coal
CN112160738A (en)*2020-09-182021-01-01西安交通大学Well arrangement structure for underground in-situ pyrolysis of coal and construction method thereof
CN112112601A (en)*2020-09-182020-12-22西安交通大学Closed system for underground in-situ pyrolysis of coal and construction method thereof
CN112127868A (en)*2020-09-272020-12-25中国地质大学(北京) Simulated underground coal gasification and oil shale combined production test device and test method
CN113006795A (en)*2021-04-092021-06-22中国煤炭地质总局勘查研究总院Treatment method of sandstone water on top plate of Jurassic coal field
CN113006795B (en)*2021-04-092023-10-20中国煤炭地质总局勘查研究总院Treatment method of dwarf coal field roof sandstone water
CN115306367A (en)*2022-08-192022-11-08陕西省煤田地质集团有限公司Method for underground in-situ conversion and economic evaluation of oil-rich coal
CN115306367B (en)*2022-08-192023-11-21陕西省煤田地质集团有限公司Underground in-situ conversion and economical evaluation method for oil-rich coal

Also Published As

Publication numberPublication date
CN106703752B (en)2019-04-19

Similar Documents

PublicationPublication DateTitle
CN106703752B (en)System closing method for underground in-situ exploitation of oil shale
CN112324337B (en) A whole-process gas drainage method for comb-shaped drilling along the top of the soft coal seam floor
CN107387052B (en)A kind of oil shale in-situ recovery method
CN102121395B (en) An integrated method for comprehensive management of low-permeability single coal seam gas
CN106337672B (en)A kind of method of the anti-reflection coal body extraction coal bed gas of cycle pulse formula low temperature freeze thawing
CA2662615C (en)Method of forming subterranean barriers with molten wax
CN102926770B (en)Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN103291325B (en)The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN101503957B (en)Aboveground and underground combined heat injection coal bed gas extraction method
CN110318674B (en) A method for cracking and outburst prevention of roadway roof
CN114876438B (en)Coal mining method for in-situ hydrogen production of filled coal
CN106089291B (en)A kind of method for cooperateing with extraction to be caving the old dead zone of formula and lower coal seam coal bed gas
CN105134284A (en)Gas extraction method based on horizontal orientation boring liquid nitrogen cycle freeze-thaw anti-reflection
CN105064967A (en)Coal seam gas fracturing and mash gas driving method
CN112796730B (en) A method for laying out well pattern of surface drilling wells in multi-level cross-mining area
CN105804786B (en)A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN104653148A (en)Well group reforming comprehensive utilization method for waste oil wells
CA2847759C (en)A method of enhancing resource recovery from subterranean reservoirs
CN107558985B (en) Well layout and formation treatment method for in-situ mining of oil shale
CN108915691A (en)A kind of water proof anti-seepage concrete single-layer lining construction method under aqueous basement rock environment
CN108590595A (en)A method of it is exploited using F type well groups non-at lithotype gas hydrates
CN104370508A (en)Coal mine floor rock mass grouting reinforcement method and grouting slurry
US8833454B2 (en)Hydrocarbon recovery method
CN117307121A (en) Supercritical CO2 closed-loop mining of hot dry rocks in complete reservoirs and methods for carbon sequestration
CN112610191A (en)Method for exploiting natural gas hydrate reservoir permeable by cover layer by utilizing branch horizontal well

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp