Movatterモバイル変換


[0]ホーム

URL:


CN106470492A - Resource occupying method, device and user equipment - Google Patents

Resource occupying method, device and user equipment
Download PDF

Info

Publication number
CN106470492A
CN106470492ACN201510502476.XACN201510502476ACN106470492ACN 106470492 ACN106470492 ACN 106470492ACN 201510502476 ACN201510502476 ACN 201510502476ACN 106470492 ACN106470492 ACN 106470492A
Authority
CN
China
Prior art keywords
resource
advertised information
time
priority
domain position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510502476.XA
Other languages
Chinese (zh)
Other versions
CN106470492B (en
Inventor
卢有雄
吴栓栓
杨瑾
袁弋非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE CorpfiledCriticalZTE Corp
Priority to CN201510502476.XApriorityCriticalpatent/CN106470492B/en
Priority to PCT/CN2016/093993prioritypatent/WO2017028699A1/en
Publication of CN106470492ApublicationCriticalpatent/CN106470492A/en
Application grantedgrantedCritical
Publication of CN106470492BpublicationCriticalpatent/CN106470492B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The invention provides a kind of resource occupying method, device and user equipment.Wherein, the method includes:UE determines and will start to take first resource from the first time-domain position;Broadcasting announcements information on the PSCCH of the second time-domain position before the first time-domain position for the UE, wherein, advertised information is used for indicating that UE will start to take first resource from the first time-domain position.By the present invention, the direct-connected system of the equipment that solves the problems, such as cannot ensure urgency traffic it is ensured that in the direct-connected system of equipment urgency traffic transmission.

Description

Resource occupying method, device and user equipment
Technical field
The present invention relates to the communications field, in particular to a kind of resource occupying method, device and user equipment.
Background technology
With the variation of mobile communication business and application scenarios, for example, public safety, car networking, floor manager, social networkThe application such as network, E-Payment popularization in a wireless communication system so that closely the business transmission demand between user increasingly increaseLong.If the communication pattern of the device-to-device (Device-to-Device, referred to as D2D) between closely user, car are to car(Vehicle to Vehicle, abbreviation V2V) and other similar direct-connected systems of equipment, are increasingly subject to extensive concern.Such setShort-range communication between standby, can not rely on the infrastructure such as base station, can be applicable to disaster relief, floor manager etc. publicSecurity scenario, also apply be applicable to the interconnected communication scene of other efficient quicks, has important using value.
In cellular communications, when two user equipmenies (User Equipment, referred to as UE) are communicated, ordinary circumstanceLower UE using resource distributed unitedly by network equipment (as base station or access node), this network equipment referred to here asCentered on node.And the radio communication scene for non-stop layer node, or there is Centroid but resource distribution mode sets for userThe scene of standby competition, UE can only rely on the information itself obtaining to select to use resource, and autonomous random selection resource side is usually usedFormula.Which can lead to higher resource conflict problem (two or more user equipmenies select identical resource), and notCan guarantee that urgency traffic or the equipment communication of high precedence require.
The problem of urgency traffic cannot be ensured for the direct-connected system of equipment in correlation technique, not yet propose effective solution at present.
Content of the invention
The invention provides a kind of resource occupying method, device and user equipment, cannot be ensured with least solving the direct-connected system of equipmentThe problem of urgency traffic.
According to an aspect of the invention, it is provided a kind of resource takies method in advance, including:User equipment (UE) determines will be from firstTime-domain position starts to take first resource;The physics skidding control of the second time-domain position before described first time-domain position for the described UEBroadcasting announcements information on channel PSCCH processed, wherein, described advertised information is used for indicating that described UE will be from described first time domain positionPut and start to take described first resource.
Alternatively, the priority of described UE is higher than pre-set priority thresholding, and wherein, described pre-set priority thresholding is to allow to sendThe lowest priority that should have of the UE of described advertised information.
Alternatively, described pre-set priority thresholding, or the priority of described UE is to be determined according to the mode of one below respectively:Predefine, configured by Centroid, configured by high level.
Alternatively, described first time-domain position is the n-th communication cycle;Described second time-domain position is the n-th-m communication cycle, itsIn, n and m is positive integer, n>m.
Alternatively, described UE sends described advertised information on the described PSCCH of described second time-domain position and includes:DescribedUE uses the advertised information resource on the described PSCCH of described second time-domain position to send described advertised information.
Alternatively, position in described PSCCH for the described advertised information resource is to be determined according to the mode of one below:Predefined,Configured by Centroid, configured by high level.
Alternatively, described advertised information also includes:Instruction to the resource selection strategy of other UE or suggestion.
Alternatively, after described UE sends described advertised information on the described PSCCH of described second time-domain position, describedMethod also includes:Other UE receive described advertised information;Other UE described are according to default resource selection strategy or described logicalIndicate in announcement information or the resource selection strategy of suggestion carries out resource occupation.
Alternatively, the priority of other UE described is not higher than the priority of described UE, or the priority of other UE described is lowIn pre-set priority thresholding, wherein, described pre-set priority thresholding is to allow to send should having of the UE of described advertised informationLow priority.
Alternatively, described default resource selection strategy, or the resource selection strategy difference indicating in described advertised information or advisingIncluding at least one of:Abandon the described first resource that other UE described take;Reduce other UE described to provide to described firstThe select probability in source;Limit other UE described and select resource only on limited resources, wherein, described limited resources include:Except instituteState other resources outside first resource, or, the part resource in described first resource.
According to another aspect of the present invention, additionally provide a kind of resource occupation device, be applied to user equipment (UE), including:ReallyCover half block, will start to take first resource from the first time-domain position for determining;Sending module, in described first time domain positionBroadcasting announcements information in physics skidding control channel PSCCH of the second time-domain position before putting, wherein, described advertised information is usedTo start to take described first resource from described first time-domain position in the described UE of instruction.
Alternatively, the priority of described UE is higher than pre-set priority thresholding, and wherein, described pre-set priority thresholding is to allow to sendThe lowest priority that should have of the UE of described advertised information.
Alternatively, described pre-set priority thresholding, or the priority of described UE is to be determined according to the mode of one below respectively:Predefine, configured by Centroid, configured by high level.
Alternatively, described first time-domain position is the n-th communication cycle;Described second time-domain position is the n-th-m communication cycle, itsIn, n and m is positive integer, n>m.
Alternatively, described sending module, sends out for the advertised information resource on the described PSCCH using described second time-domain positionSend described advertised information.
Alternatively, position in described PSCCH for the described advertised information resource is to be determined according to the mode of one below:Predefined,Configured by Centroid, configured by high level.
Alternatively, described advertised information also includes:Instruction to the resource selection strategy of other UE or suggestion.
According to another aspect of the present invention, additionally provide a kind of user equipment, including above-mentioned resource occupation device.
By the present invention, adopt UE and determine and will start to take first resource from the first time-domain position;UE is before the first time-domain positionThe PSCCH of the second time-domain position on broadcasting announcements information, wherein, advertised information is used for indicating that UE will be from the first time-domain positionStart to take the mode of first resource, the direct-connected system of the equipment that solves the problems, such as cannot ensure urgency traffic it is ensured that equipment is direct-connectedThe transmission of urgency traffic in system.
Brief description
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, the present invention showsMeaning property embodiment and its illustrate for explaining the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of resource occupying method according to embodiments of the present invention;
Fig. 2 is the structured flowchart of resource occupation device according to embodiments of the present invention;
Fig. 3 is the flow chart of resource occupying method according to the preferred embodiment of the invention;
Fig. 4 is the schematic diagram of alternative resource area according to the preferred embodiment of the invention;
Fig. 5 is the schematic diagram of the SCI resource of sequence number 1 according to the preferred embodiment of the invention;
Fig. 6 is the schematic diagram of the SCI resource of sequence number 1 according to the preferred embodiment of the invention and sequence number 15;
Fig. 7 is the schematic diagram of special SCI resource according to the preferred embodiment of the invention.
Specific embodiment
To describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that in the case of not conflicting,Embodiment in the application and the feature in embodiment can be mutually combined.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " second " etc. are to useIn the similar object of difference, without for describing specific order or precedence.
Provide a kind of resource in the present embodiment and take method in advance, Fig. 1 is that resource according to embodiments of the present invention takies method in advanceFlow chart, as shown in figure 1, this flow process comprises the steps:
Step S102, UE determines and will start to take first resource from the first time-domain position;
Step S104, broadcasting announcements information on the PSCCH of the second time-domain position before the first time-domain position for the UE, wherein,Advertised information is used for indicating that UE will start to take first resource from the first time-domain position.
By above-mentioned steps, UE, before taking first resource, is indicated by PSCCH broadcasting announcements information and will take itThe first resource of time afterwards;Advertised information can be sent to other UE in the direct-connected system of equipment by PSCCH, at otherUE knows that this UE needs to take first resource, then can be with adjustresources selection strategy.With respect to fair competition resource between UEMode, by way of the present embodiment provides, can greatly improve UE take first resource probability, solve equipment direct-connectedSystem cannot ensure urgency traffic problem it is ensured that in the direct-connected system of equipment urgency traffic transmission.
Alternatively, above-mentioned UE can be portable equipment or non-portable device.As long as possessing the direct-connected function of equipmentEquipment all can be applied above-mentioned resource to take method in advance and take the direct-connected system resource of equipment.For example:D2D UE.
It is alternatively possible to only in the case that UE needs to carry out urgency traffic, just allowing broadcasting announcements information and first resource enteredRow preemption.The type of urgency traffic or mark can be default or by Centroid or high-rise configuration.
In other embodiments, can only allow the UE broadcasting announcements information possessing certain priority and first resource be carried out pre-Account for;And the UE of other priority then can not allow its broadcasting announcements information, also just first resource cannot be preempted.Wherein,The priority carrying out the UE of resource preemption is allowed to be higher than pre-set priority thresholding, wherein, pre-set priority thresholding is to allow broadcast logicalThe lowest priority that should have of the UE of announcement information.By such mode, low priority UE malice camp-on resource can be prevented,Thus more having ensured the success rate of high priority camp-on resource.
Alternatively, pre-set priority thresholding, or the priority of UE can be predefined respectively or configured by Centroid,Or configured by high level.And, when configuring the priority of UE it may be considered that the role of UE or the subscription information of UE.
Alternatively, the first time-domain position is the n-th communication cycle;Second time-domain position is the n-th-m communication cycle, wherein, n and mFor positive integer, n>m.For example, if high-priority users need to take resource in the n-th communication cycle, in the n-th-m cyclePSCCH upper broadcasting announcements information, represents its pre- occupancy resource.
Alternatively, UE broadcasting announcements information on the PSCCH of the second time-domain position includes:UE uses the second time-domain positionAdvertised information resource broadcast advertised information on PSCCH.
Wherein, advertised information resource refers to the PSCCH resource of ad-hoc location in PSCCH resource pool, and advertised information resource existsPosition in PSCCH can be predefined or be configured or configured by high level by Centroid.
Alternatively, advertised information can also include:Instruction to the resource selection strategy of other UE or suggestion.
Wherein, in UE on the PSCCH of the second time-domain position broadcasting announcements information, other UE receive advertised information after,Other UE can be according to default resource selection strategy, or in advertised information, instruction or the resource selection strategy advised carry out resource and account forWith.Specifically can be according in advance according to the resource selection strategy of instruction or suggestion in default resource selection strategy or advertised informationConfiguration or the configuration of Centroid or high-rise configuration determine.For example, precedence information can be carried in advertised information,Priority in advertised information, after receiving advertised information, can be compared by other UE with the priority of oneself, according toResult of the comparison can select corresponding resource selection strategy to carry out resource selection.
Alternatively, the priority of other the above-mentioned UE not higher than priority of the UE of broadcasting announcements information, or other UEIn the case that priority is less than pre-set priority thresholding, other UE ability are according to default resource selection strategy, or advertised information middle fingerThe resource selection strategy showing or advising carries out resource occupation.If the priority of other UE is higher than the preferential of the UE of broadcasting announcements informationLevel, or the priority of other UE is not less than pre-set priority thresholding, then and other UE can also ignore advertised information, and continuesContinue and carry out normal resource selection and occupancy.Wherein, pre-set priority thresholding is should having of the UE of permission broadcasting announcements informationLowest priority.
Alternatively, above-mentioned default resource selection strategy, or in advertised information, the resource selection strategy of instruction or suggestion wraps respectivelyInclude at least one of:Other UE abandon taking first resource;Reduce the select probability to first resource for other UE;Limit itHis UE selects resource only on limited resources, and wherein, limited resources include:Other resources in addition to first resource, or, thePart resource in one resource.
Through the above description of the embodiments, those skilled in the art can be understood that the side according to above-described embodimentMethod can realize by the mode of software plus necessary general hardware platform naturally it is also possible to pass through hardware, but in many cases beforePerson is more preferably embodiment.Based on such understanding, technical scheme substantially makes tribute to prior art in other wordsThat offers partly can be embodied in the form of software product, and this computer software product is stored in a storage medium (such asROM/RAM, magnetic disc, CD) in, including some instructions with so that a station terminal equipment (can be mobile phone, computer,Server, or the network equipment etc.) method described in execution each embodiment of the present invention.
Additionally provide a kind of resource occupation device in the present embodiment, be applied to UE, this device is used for realizing above-described embodiment and excellentSelect embodiment, carry out repeating no more of explanation.As used below, predetermined work(can be realized in term " module "The software of energy and/or the combination of hardware.Although the device described by following examples preferably to be realized with software, hardware,Or the realization of the combination of software and hardware is also may and to be contemplated.
Fig. 2 is the structured flowchart of resource occupation device according to embodiments of the present invention, as shown in Fig. 2 this device includes:DetermineModule 22 and sending module 24, wherein it is determined that module 22, will start to take first resource from the first time-domain position for determining;Sending module 24, coupled to determining module 22, the physics skidding for the second time-domain position before the first time-domain position controlsBroadcasting announcements information on channel PSCCH, wherein, advertised information is used for indicating that UE will start to take first from the first time-domain positionResource.
Alternatively, the priority of UE is higher than pre-set priority thresholding, and wherein, pre-set priority thresholding is to allow broadcasting announcements informationUE the lowest priority that should have.
Alternatively, pre-set priority thresholding, or the priority of UE is to be determined according to the mode of one below respectively:Predefined,Configured by Centroid, configured by high level.
Alternatively, the first time-domain position is the n-th communication cycle;Second time-domain position is the n-th-m communication cycle, wherein, n and mFor positive integer, n>m.
Alternatively, sending module 24, for the advertised information resource broadcast advertised information on the PSCCH using the second time-domain position.
Alternatively, position in PSCCH for the advertised information resource is to be determined according to the mode of one below:Predefined, by centerNode configures, is configured by high level.
Alternatively, advertised information also includes:Instruction to the resource selection strategy of other UE or suggestion.
It should be noted that above-mentioned modules can be by software or hardware to realize, for the latter, can by withUnder type is realized, but not limited to this:Above-mentioned module is respectively positioned in same processor;Or, above-mentioned module is located at multiple places respectivelyIn reason device.
Additionally provide a kind of user equipment in the present embodiment, including above-mentioned resource occupation device.
Embodiments of the invention additionally provide a kind of software, and this software is used for executing described in above-described embodiment and preferred implementationTechnical scheme.
Embodiments of the invention additionally provide a kind of storage medium.In the present embodiment, above-mentioned storage medium can be configured so that and depositsStore up the program code for executing following steps:
Step S102, UE determines and will start to take first resource from the first time-domain position;
Step S104, broadcasting announcements information on the PSCCH of the second time-domain position before the first time-domain position for the UE, wherein,Advertised information is used for indicating that UE will start to take first resource from the first time-domain position.
Alternatively, in the present embodiment, above-mentioned storage medium can include but is not limited to:USB flash disk, read only memory (Read-OnlyMemory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), mobile hardDisk, magnetic disc or CD etc. are various can be with the medium of store program codes.
Alternatively, the specific example in the present embodiment may be referred to the example described in above-described embodiment and optional embodiment,The present embodiment will not be described here.
In order that the description of the embodiment of the present invention is clearer, it is described with reference to preferred embodiment and illustrates.
The preferred embodiment of the present invention provides a kind of pre- processing method taking resource and equipment, ensures urgency traffic or height with preferentialThe use to the communication resource for the class user equipment.
As shown in figure 3, the scheme that the preferred embodiment of the present invention provides comprises the steps:
Step S302, user equipment, according to priority classification, is divided into high-priority users and low priority user;
Step S304, if high-priority users need to take resource in the n-th communication cycle, in the PSCCH in the n-th-m cycleUpper broadcasting announcements signal, represents its pre- occupancy resource;
Step S306, after low priority user is properly received right of way signal, according to the strategy of pre-configured strategy or right of way signal instructionTo select resource.Wherein said n is the integer not less than m;Described m is positive integer.
The preferred embodiment of the present invention can be applicable to non-stop layer node or Centroid is not involved in the communication system of communication resource distribution controlIn, the preferential communication quality ensureing high-priority users.
In step s 302, participate in the user (i.e. above-mentioned UE) of communication, can be according to the priority of transmitted application layer packetClassification, or the attribute of UE, are divided into multiple priority levels, such as 1~8 grade, represent that priority increases successively.Above-mentioned multiplePriority level can be further divided into two classes:High priority, low priority.
Wherein, high-priority users have higher resource occupation priority, can send resource and take advertised information in advance;Low preferentialLevel user has relatively low resource occupation priority it is impossible to send resource to take advertised information in advance, and low priority user needs to connectReceive and detect that (high-priority users can detect or not detect that other are high the resource occupation advertised information that high-priority users sendThe resource occupation advertised information that priority users send), if described advertised information is detected, it should be according to pre-configured strategyOr the strategy of advertised information instruction is selecting resource.Wherein, low priority is it is also possible to further according to different resource allocation plansSlightly, it is divided into 2a priority, 2b priority etc..
In step s 304, high priority UE is in specific skidding control information (Sidelink Control Information, letterReferred to as SCI) broadcasting announcements information in resource, inform the pre- occupancy situation of resource of low priority UE n-th communication cycle.
In step S306, low priority UE receives and detects advertised information, and according to pre-configured or advertised information instruction moneySource takies strategy and carrys out adjustresources occupancy, such as discharges or abandons to take resource, or change resource selection probability, or only limitedResource etc. is selected on part resource pond.
Alternatively, specific SCI resource, refers in PSSCH resource pool that ad-hoc location is used for sending resource and takies advertised information in advanceSCI resource.This resource location can be pre-configured or configured by Centroid or high level.As resource sequence number is 0 or and fallsSecond SCI resource of number, or other specific SCI combination of resources.Such SCI resource, is only used for high priority UE broadcast logicalAnnouncement information, other grades UE do not use such SCI resource.
Alternatively, advertised information, can be indicated by the specific valued combinations of the particular value in a domain in SCI content or several domain;Or define new SCI form, wherein contain one or more domains and be used to refer to advertised information.
Alternatively, the resource selection strategy of low priority UE, after referring to be properly received advertised information, priority according to oneself etc.Level uses corresponding resource occupation strategy, such as abandons taking resource, or changes resource occupation probability or change the money in resource poolSource range of choice etc..
Wherein, abandon taking resource, refer to that low priority UE, after having correctly received advertised information, abandons in the n-th communication cycleResource selection, abandon resource for high priority UE use.
Wherein, change resource occupation probability, refer to low priority UE on its selectable resource pool according to corresponding to its priorityProbability is selecting resource.Parameter probability valuing scope is 0~1.Value is 0, represents this priority UE on its selectable resource poolAbandon resource selection.
Wherein, change resource selection scope, refer to that low priority UE changes selectable resource pool size, limit this priorityUE only can its priority corresponding or configuration a range of resource area on select resource.The resource area that this limits asThe a subset of former resource pool.
Alternatively, resource pool, refers to be available for the set of the time domain of UE sending signal and frequency domain radio resource unit.Main inclusion thingReason skidding control channel (PSCCH) resource pool and physics skidding shared channel (PSSCH) resource pool.Wherein PSCCH resourcePond is the set of the radio resource unit sending SCI for UE, and PSSCH resource pool is the wireless money sending data for UEThe set of source unit.
Below in conjunction with specific embodiment, technical scheme is described and illustrates.
Preferred embodiment one
The SCI form of advertised information, has two ways:
Mode one:Using 3GPP agreement R12 version definition.
The SCI form of advertised information is still using fixed in 3GPP (3rd Generation Partnership Project) agreement R12 versionJustice.The certain combinations of values of the particular value or several domain that define one of domain here represents that advertised information is true, such as ' ModulationAnd coding scheme (MCS) ' domain uses one of retention (29,30,31), represents that right of way signal is true, or uses ' TimeThe retention in resource pattern ' domain, such as NTRPRetention 0 (N when=7TRP, the bit of Time resource pattern instructionLength), represent that right of way signal is true, that is, represent the pre- resource taking the n-th communication cycle of high priority UE, low priority UEResource selection should be carried out using the corresponding strategy of its priority, such as abandon taking resource, or change resource occupation probability or changeResource selection scope in resource pool etc..
One example:' Modulation and coding scheme (MCS) ' domain value 29 represents that right of way signal is true, noticeThe time domain of other domains of signal SCI instruction and frequency domain resource represent that these resources will be taken by high priority UE in the n-th communication cycle,Low priority UE can not reuse.
Mode two:Define new SCI form.
Define new SCI form, including the combination of in following domain or several:
Pre- occupancy identification field, represents whether high priority UE takies resource in the n-th communication cycle.
Sending probability domain, represents the sending probability of other priority UE.Can be multiple values, indicate respectively different priorities UESending probability.
Frequency domain resource instructions field (FR), represents frequency domain resource region or only selectable frequency domain that other priority UE should avoidResource area.
Time-domain resource instructions field (TR), represents time-domain resource region or only selectable time domain that other priority UE should avoidResource area.
As shown in figure 4, an example is such as:Pre- occupancy is designated 1, and sending probability is p1, p2.Frequency domain resource indicates FR, tableShow that other priority UE only can select in the resource area of FR instruction.Time-domain resource TR, represents that other priority UE only may be usedSelect in the time domain region of TR instruction.
Above SCI content representation, the n-th communication cycle, high priority UE takies resource in advance, and other priority UE are only permissibleSelect resource in the resource area of FR and TR instruction, and, the UE sending probability of 2a priority is p1,2b is preferentialThe sending probability of level UE is p2.
Preferred embodiment two
Position in PSCCH resource pool for the specific SCI resource of broadcasting announcements information, can be pre-configured for user equipment, or byCentroid configures, or sets up configuration signal to indicate by resource pool configuration signal or communication user group.
Example one, the specific SCI resource of advertised information is first SCI resource on PSCCH resource pool, wherein, SCI formDefined in preferred embodiment one.The resource location of sequence number 1 in first SCI resource location in example, such as Fig. 5:
Example two, the specific PSCCH resource sending for advertised information is not limited to first SCI on PSCCH resource poolResource, can define first SCI resource and penultimate SCI resource on PSCCH resource pool and be used for broadcasting announcements information,Or definition resource sequence number N meets the part PSCCH resource that N mod Nt is 2m or 2m+1, wherein Nt is that PSCCH providesThe subframe number in source pond, m is the integer more than or equal to zero.SCI resource as the sequence number 1 and 15 in Fig. 6.
Example three, the specific PSCCH resource of the SCI sending for advertised information, the special PSCCH resource of definable.AsOne end of the low frequency or high frequency that define PSCCH resource pool retains the transmission that continuous running time-frequency resource is used for advertised information.In Fig. 7Advertised information specific PSCCH resource area.Wherein send resource can select in this specific PSCCH resource area one orMultiple.
Alternatively, high priority UE takies the resource in the n-th cycle in advance if desired for broadcasting announcements information, then first defined aboveOne or more transmissions as advertised information are selected in advertised information SCI resource location.But if current period also has data toSend, that is, also need to send the SCI of data dispatch, then need to ensure advertised information SCI of selection with data dispatch SCI not in phaseSame subframe.If both have selected identical subframe position, consider to reselect data dispatch SCI resource, until at least 1Available advertised information SCI of individual selection not with data dispatch SCI in identical subframe.
Preferred embodiment three
Low priority UE takies advertised information SCI ad-hoc location in advance in resource and goes to receive and parse through advertised information, if be properly received,Obtain resource and take advertised information in advance, then the resource process side according to pre-configured resource processing mode or the instruction of advertised information SCIFormula carries out respective resources occupancy process.
If resource location shared by low priority UE current communication cycle sending signal exists with receiving advertised information SCI ad-hoc locationIdentical subframe, for single transmitting-receiving receiver user equipment, preferentially ensures to send the data of oneself, does not only send at oneselfAdvertised information and other signals are received on the subframe of data.
Wherein, pre-configured resource processing mode, is the initially cured configuration of UE equipment, or has obtained money through configuration processSource processes relevant configuration etc..During as there is the pre- Seize ACK message of high priority UE resource, pre-configured is corresponding with UE priority levelSending probability, or predefined selectable scope of resource etc..
The resource processing mode of advertised information SCI instruction, is the SCI content that low priority UE passes through that parsing carries advertised information,Obtain its follow-up sending probability taking resource, selectable scope of resource etc., then according to instruction carries out respective handling.
Alternatively, low priority UE is according to acquired or pre-configured resource occupation relevant configured parameter, in selectable resourceOn, participate in selecting and sending data with corresponding probit.
One example:Pre-configured low priority UE, after the resource occupation signal receiving high priority UE transmission, abandons n-thThe resource selection of communication cycle takies.
Another example, low priority UE, parse advertised information SCI, wherein in SCI parameter, sending probability is p1, can frequency-selectingDomain resource is FR, and optional time-domain resource is TR, then this UE is in the n-th communication cycle, with Probability p 1, in selectable resourceUpper autonomous selection resource carries out data is activation.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be with general calculatingRealizing, they can concentrate on single computing device device, or is distributed on the network that multiple computing devices are formed,Alternatively, they can be realized with the executable program code of computing device, it is thus possible to be stored in storage deviceIn to be executed by computing device, and in some cases, can be with the step shown or described different from order execution hereinSuddenly, or by them it is fabricated to each integrated circuit modules respectively, or the multiple modules in them or step are fabricated to singleIntegrated circuit modules are realizing.So, the present invention is not restricted to any specific hardware and software combination.
These are only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art,The present invention can have various modifications and variations.All any modifications within the spirit and principles in the present invention, made, equivalent,Improve etc., should be included within the scope of the present invention.

Claims (18)

CN201510502476.XA2015-08-142015-08-14Resource occupation method and device and user equipmentActiveCN106470492B (en)

Priority Applications (2)

Application NumberPriority DateFiling DateTitle
CN201510502476.XACN106470492B (en)2015-08-142015-08-14Resource occupation method and device and user equipment
PCT/CN2016/093993WO2017028699A1 (en)2015-08-142016-08-08Resource occupation method, device, and user equipment

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201510502476.XACN106470492B (en)2015-08-142015-08-14Resource occupation method and device and user equipment

Publications (2)

Publication NumberPublication Date
CN106470492Atrue CN106470492A (en)2017-03-01
CN106470492B CN106470492B (en)2020-07-07

Family

ID=58050412

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201510502476.XAActiveCN106470492B (en)2015-08-142015-08-14Resource occupation method and device and user equipment

Country Status (2)

CountryLink
CN (1)CN106470492B (en)
WO (1)WO2017028699A1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN108668373A (en)*2017-03-312018-10-16中兴通讯股份有限公司resource selection method and device
WO2019095226A1 (en)*2017-11-162019-05-23Lenovo (Beijing) LimitedMethod and apparatus for transmission resource selection
WO2019148489A1 (en)*2018-02-052019-08-08Oppo广东移动通信有限公司Resource reservation method and device, and computer storage medium
WO2019170084A1 (en)*2018-03-072019-09-12华为技术有限公司Method, device, and system for transmitting preemption information
CN110266449A (en)*2018-03-122019-09-20华为技术有限公司 A communication method and communication device
CN110521255A (en)*2017-03-242019-11-29高通股份有限公司Enhance for low delay of the carrier to the selection of CV2X primary resource and reuse adoption process that carrier communicates
WO2020015256A1 (en)*2018-07-172020-01-23Oppo广东移动通信有限公司Method for data transmission in sidelink and terminal device
WO2020029225A1 (en)*2018-08-102020-02-13Oppo广东移动通信有限公司Sidelink channel configuration method, terminal device, and network device
CN110932827A (en)*2018-09-192020-03-27华为技术有限公司Transmission method of collateral information, communication equipment and network equipment
CN112054874A (en)*2019-06-052020-12-08上海朗帛通信技术有限公司 A method and apparatus used in a node for wireless communication
CN112470516A (en)*2018-08-032021-03-09Oppo广东移动通信有限公司Resource allocation method and terminal equipment
CN112911521A (en)*2021-02-022021-06-04北京达源环保科技有限公司D2D communication-based intelligent monitoring method and system for sewage treatment plant
CN113498184A (en)*2020-04-032021-10-12夏普株式会社Method performed by user equipment and user equipment

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN111065160B (en)*2018-10-172022-12-02中兴通讯股份有限公司Resource allocation method and device, storage medium and electronic device
CN111263469B (en)*2019-01-182022-02-15维沃移动通信有限公司Method and device for determining parameter values
CN114944900A (en)*2019-11-152022-08-26上海朗帛通信技术有限公司 A method and apparatus used in a node for wireless communication

Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN103517276A (en)*2012-06-292014-01-15华为技术有限公司 Inter-device communication method, user equipment and base station
WO2014176972A1 (en)*2013-04-282014-11-06电信科学技术研究院Data transmitting method and device in d2d communication
CN104144501A (en)*2013-05-092014-11-12中兴通讯股份有限公司D2D discovery signal resource allocation method and system and related devices
CN104796986A (en)*2014-01-162015-07-22电信科学技术研究院 A D2D communication method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN103517276A (en)*2012-06-292014-01-15华为技术有限公司 Inter-device communication method, user equipment and base station
WO2014176972A1 (en)*2013-04-282014-11-06电信科学技术研究院Data transmitting method and device in d2d communication
CN104144501A (en)*2013-05-092014-11-12中兴通讯股份有限公司D2D discovery signal resource allocation method and system and related devices
CN104796986A (en)*2014-01-162015-07-22电信科学技术研究院 A D2D communication method and device

Cited By (28)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN110521255A (en)*2017-03-242019-11-29高通股份有限公司Enhance for low delay of the carrier to the selection of CV2X primary resource and reuse adoption process that carrier communicates
CN110521255B (en)*2017-03-242022-11-29高通股份有限公司 Low-latency enhancements to the CV2X autonomous resource selection and reselection process for vehicle-to-vehicle communication
CN108668373B (en)*2017-03-312023-06-02中兴通讯股份有限公司Resource selection method and device
CN108668373A (en)*2017-03-312018-10-16中兴通讯股份有限公司resource selection method and device
US11665670B2 (en)2017-11-162023-05-30Lenovo (Beijing) LimitedMethod and apparatus for transmission resource selection
WO2019095226A1 (en)*2017-11-162019-05-23Lenovo (Beijing) LimitedMethod and apparatus for transmission resource selection
WO2019148489A1 (en)*2018-02-052019-08-08Oppo广东移动通信有限公司Resource reservation method and device, and computer storage medium
CN112135273B (en)*2018-02-052022-04-12Oppo广东移动通信有限公司Resource reservation method and device and computer storage medium
CN112135273A (en)*2018-02-052020-12-25Oppo广东移动通信有限公司Resource reservation method and device and computer storage medium
US11265764B2 (en)2018-02-052022-03-01Guangdong Oppo Mobile Telecommunications Corp., Ltd.Resource reservation method and device, and computer storage medium
CN110248412A (en)*2018-03-072019-09-17华为技术有限公司Transmission method, equipment and the system of preemption information
WO2019170084A1 (en)*2018-03-072019-09-12华为技术有限公司Method, device, and system for transmitting preemption information
CN110248412B (en)*2018-03-072021-12-31华为技术有限公司Transmission method, equipment and system for preemption information
CN110266449A (en)*2018-03-122019-09-20华为技术有限公司 A communication method and communication device
WO2020015256A1 (en)*2018-07-172020-01-23Oppo广东移动通信有限公司Method for data transmission in sidelink and terminal device
US11582729B2 (en)2018-07-172023-02-14Guangdong Oppo Mobile Telecommunications Corp., Ltd.Method for data transmission in sidelink and terminal device
WO2020014985A1 (en)*2018-07-172020-01-23Oppo广东移动通信有限公司Method for transmitting data in sidelink, and terminal device
CN112470516B (en)*2018-08-032023-04-07Oppo广东移动通信有限公司Resource allocation method and terminal equipment
CN112470516A (en)*2018-08-032021-03-09Oppo广东移动通信有限公司Resource allocation method and terminal equipment
WO2020029225A1 (en)*2018-08-102020-02-13Oppo广东移动通信有限公司Sidelink channel configuration method, terminal device, and network device
US12120047B2 (en)2018-08-102024-10-15Guangdong Oppo Mobile Telecommunications Corp., Ltd.Sidelink channel configuration method, terminal device, and network device
CN110932827A (en)*2018-09-192020-03-27华为技术有限公司Transmission method of collateral information, communication equipment and network equipment
CN110932827B (en)*2018-09-192021-11-19华为技术有限公司Transmission method of collateral information, communication equipment and network equipment
US11902185B2 (en)2018-09-192024-02-13Huawei Technologies Co., Ltd.Sidelink information transmission method, communications device, and network device
CN112054874A (en)*2019-06-052020-12-08上海朗帛通信技术有限公司 A method and apparatus used in a node for wireless communication
CN112054874B (en)*2019-06-052022-03-29上海朗帛通信技术有限公司Method and apparatus in a node used for wireless communication
CN113498184A (en)*2020-04-032021-10-12夏普株式会社Method performed by user equipment and user equipment
CN112911521A (en)*2021-02-022021-06-04北京达源环保科技有限公司D2D communication-based intelligent monitoring method and system for sewage treatment plant

Also Published As

Publication numberPublication date
CN106470492B (en)2020-07-07
WO2017028699A1 (en)2017-02-23

Similar Documents

PublicationPublication DateTitle
CN106470492A (en)Resource occupying method, device and user equipment
US11290918B2 (en)Method and apparatus for transmitting control channel and data channel in V2X communication
CN104754748B (en)A kind of D2D resource allocation methods, data transmission method and device
KR102094190B1 (en)Method and apparatus for distributed scheduling for device to device communications
AU2018407846A1 (en)User device, and method for inter-user-device sending and receiving of positioning signal
US11522664B2 (en)Methods for efficient signaling in V2X communications
CN108024283B (en)Resource pool allocation method and device
EP3606208A1 (en)Resource selection method and apparatus, resource allocation method and apparatus, and related storage medium
CN110690944B (en)Method and device for transmitting and determining priority of channel state information, storage medium and user equipment
JP2019530335A (en) V2X communication method, device and system
KR20180049709A (en)Apparatus and method for providing v2p service based on proximity-based service direct communication
CN101282575A (en)Random access method and system
EP4192095B1 (en)Resource reselection method and apparatus
CN106060931B (en)Information processing method and user equipment
CN109391667B (en)Resource control method and terminal for Internet of vehicles
CN107005592A (en)Control signaling processing method, device and equipment
CN115399007B (en) Method, device and system for transmitting resource indication information
US11212805B2 (en)Terminal mode obtaining method and apparatus, and device
US10915360B2 (en)Resource processing method, apparatus, and terminal
CN107548070B (en)Data transmission method, device and system
KR102703804B1 (en)Zone-based sidelink communication method, and apparatus for the same
CN106160896B (en)Frequency spectrum sharing method based on cognitive database and frequency spectrum perception and device
CN101282576A (en)Method for distributing random access channel resource
CN109756949B (en)Resource allocation method and device
CN111770473B (en) A method and device for unlicensed spectrum access and carrier aggregation for cellular vehicle networking

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp