Summary of the invention
It is contemplated that at least solve technical problem present in prior art, the most innovatively propose oneComprehensive energy consumption for heavy construction manages system.
In order to realize the purpose of energy consumption monitoring management of the present invention, the invention provides a kind of for heavy constructionComprehensive energy consumption management system, including: cloud server, energy consumption monitoring terminal, power consumption monitoring system, useWater quantity monitoring system, monitoring of equipment terminal, fault alarm;
Cloud server data interaction end connects energy consumption monitoring terminal data transmission end respectively and monitoring of equipment is wholeEnd data transmission ends, energy consumption monitoring terminal power consumption amount data acquisition end connects power consumption monitoring system data and sendsEnd, energy consumption monitoring terminal water usage data collection terminal connects water consumption monitoring system data transmitting terminal, SupervisionSurvey terminal alarms signal end and connect fault alarm signal receiving end.
Technique scheme have the beneficial effect that by energy consumption monitoring terminal and monitoring of equipment terminal to building orPerson's heavy construction carries out energy consumption monitoring management, it is ensured that heavy construction internal unit safe and stable operation, supervises in real timeSurvey electricity consumption water state, and the steady running of building electrical equipment, it is achieved that comprehensive energy consumption manages, improveEnergy monitoring accuracy, it is provided that managing power consumption information accurately, helps user to make managing power consumption decision-making.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described energy consumption monitoring terminal bagInclude: electric substation's low-voltage distribution terminal, Building Power Distribution terminal;
Electric substation's low-voltage distribution terminal data transmission end connects the distribution number of energy consumption monitoring terminal by LANAccording to receiving terminal, Building Power Distribution terminal data transmission end connects the Building Power Distribution of energy consumption monitoring terminal by LANData receiver.
Electric substation's low-voltage distribution terminal, Building Power Distribution terminal are carried out by having the beneficial effect that of technique schemeData acquisition, convenient and swift.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described electric substation low-voltage distributionTerminal includes: power quality analyzer table, feeder line functional status instrument, network data instrument, three-phase electric energyMeasuring instrument;
Power quality analyzer table data receiver connects transmission cable, and power quality analyzer table data sendEnd connects electric substation's low-voltage distribution terminal data receiving terminal, and feeder line functional status instrumented data receiving terminal connects biographyTransmission cable, feeder line functional status instrumented data transmitting terminal connects electric substation's low-voltage distribution terminal data receiving terminal,Network data instrumented data receiving terminal connects ethernet server, and network data instrumented data transmitting terminal connects changeElectricity institute low-voltage distribution terminal data receiving terminal, three-phase electric energy metering instrumented data receiving terminal connects threephase cable,Three-phase electric energy metering instrumented data transmitting terminal connects electric substation's low-voltage distribution terminal data receiving terminal.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described Building Power Distribution terminal bagInclude: multifunctional network instrument, air-conditioning three-phase electric energy metering table, illumination three-phase electric energy metering table, elevator three-phaseElectric energy meter;
Multifunctional network instrumented data transmission ends connects Building Power Distribution terminal data receiving terminal, air-conditioning three-phase electric energyMeter data transmission ends connects Building Power Distribution terminal data receiving terminal, and illumination three-phase electric energy metering table data passDefeated end connects Building Power Distribution terminal data receiving terminal, and elevator three-phase electric energy metering table data transmission terminal connects buildingDistribution terminal data receiver.
Having the beneficial effect that of technique scheme is all equipped with corresponding electric energy acquisition for the terminal consuming the energyEquipment, and monitor network and the instrument of Operation Condition for Power Cable, this makes it possible to ensure that user getsInformation accurately.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that also include: refrigeration air-conditioner,View water pump, kitchen evacuation system, heating system water pump;
Refrigeration air-conditioner signal controls end and connects equipment monitoring system airconditioning control end, and landscape water pump signal controls endConnecting equipment monitoring system view water pump and control end, evacuation system ventilation signal end in kitchen connects monitoring of tools systemSystem ventilation controls end, and heating system water pump signal controls end and connects equipment monitoring system supplying hot water pump signal end.
Having the beneficial effect that refrigeration air-conditioner, view water pump, kitchen by monitoring system of technique schemeEvacuation system, heating system water pump carry out the monitoring concentrated, it is possible to ensure that heavy construction is indoor and outdoorFacility Centralizing inspection, and make whole system and various equipment therein be in optimal duty, thus reachTo the electromechanical equipment life-span extended in building, reduce management cost.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described power consumption monitoring systemIncluding: N number of Hall element, MCU controller, memory element, crystal oscillator unit, power circuit, N≥1;
Each Hall element data transmission terminal connects MCU controller data receiving terminal, MCU controllerStorage communication ends connects memory cell data transmission ends, is led to by the electric quantity data of collection by MCU controllerCrossing memory element to store, MCU controller crystal oscillator communication ends connects crystal oscillator unit communication end, and MCU is controlledDevice power end processed connects power subsystem feeder ear.
Technique scheme have the beneficial effect that the building that some Hall elements are arranged in heavy construction every layerSpace grid bus outfan, thus gather the output charge value of electrical network, can be accurate after charge value is gatheredCarrying out add up, thus obtain the overall power consumption of this heavy construction, compared to traditional ammeter metering, moreAccurately, circuit is energy-conservation, and cost reduces, and without manned surveys, saves human cost.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that also include steady-state circuit:
Connect steady-state circuit between Hall element and MCU controller, ensure MCU by steady-state circuitController receives stabling current data;
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described steady-state circuit includes:
Hall element signal cathode output end connects the 1st resistance one end and the 5th resistance one end respectively, and the 1stThe resistance other end connects the 1st electric capacity one end and the 1st transistor collector respectively, and the 5th resistance other end is respectivelyConnect the 1st electric capacity other end and the 2nd transistor base, the 1st emitter ground connection, the 1st transistorBase stage connects the 6th resistance one end and the 3rd resistance one end respectively, and the 3rd resistance other end connects Hall elementSignal cathode output end, the 6th resistance other end connects the 2nd resistance one end and the 2nd transistor collector respectively,The 2nd resistance other end connects the 1st diode cathode, and the 1st diode cathode connects the 1st resistance one end, the2 emitters ground connection and the 4th resistance one end respectively, the 4th resistance other end connects the 2nd electric capacity respectivelyOne end and the 2nd diode cathode, the 2nd diode cathode connect the 2nd transistor base, the 2nd electric capacity anotherEnd connects steady-state current outfan.
Technique scheme have the beneficial effect that this steady-state circuit is rationally distributed, deft design, it is ensured that circuitTransmission is stable.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described water consumption monitoring systemIncluding: N number of turbine flowmeter, MCU controller, memory element, crystal oscillator unit, power circuit, N≥1;
Each turbine flowmeter data transmission terminal connects MCU controller data receiving terminal, MCU controllerStorage communication ends connects memory cell data transmission ends, the water usage data that will be gathered by MCU controllerBeing stored by memory element, MCU controller crystal oscillator communication ends connects crystal oscillator unit communication end, MCUController power source end connects power subsystem feeder ear.
Technique scheme have the beneficial effect that the building that some turbine flowmeters are arranged in heavy construction every layerSpace water supply line output end of main, thus gather the output water yield value of pipeline, can after water yield value is gatheredAdding up accurately, thus obtain the overall water consumption of this heavy construction, the metering of this turbine flowmeter is more accurateReally, cost reduces, and without manned surveys, saves human cost.
The described comprehensive energy consumption for heavy construction manages system, it is preferred that described turbine flowmeter includes:
Effusion meter instrument 1, data transmission interface 2, data wire connecting tube 3, pipeline clutch disk 4, whirlpool oar6, divide water axle 8, connect pipeline 9;
Effusion meter instrument 1 connects described connection pipeline 9 by data wire connecting tube 3, connects pipeline 9 axialTwo ends are respectively welded pipeline clutch disk 4, and described connection pipeline 9 water inlet installs whirlpool oar 6, described whirlpool oar6 are arranged on point water axle 8, and a point water axle 8 is arranged on connection pipeline 9 water inlet centre, and water inlet hasPulse signal, by driving whirlpool oar 6 to rotate, is sent to by current by the data wire in data wire connecting tube 3Effusion meter instrument 1, effusion meter instrument 1 sidewall offers data transmission interface 2, by data transmission interface 2Water usage data is sent to MCU controller.
Technique scheme have the beneficial effect that this turbine flowmeter is reasonable in design, by installing on point water axleThe most small and weak current can be sensed out by three whirlpool oars, enhance the monitoring accuracy of the water yield, pass through whirlpoolOar rotates and calculates the water yield, transfers data to MCU controller.
In sum, owing to have employed technique scheme, the invention has the beneficial effects as follows:
Technique scheme have the beneficial effect that by energy consumption monitoring terminal and monitoring of equipment terminal to building orPerson's heavy construction carries out energy consumption monitoring management, it is ensured that heavy construction internal unit safe and stable operation, supervises in real timeSurvey electricity consumption water state, and the steady running of building electrical equipment, it is achieved that comprehensive energy consumption manages, improveEnergy monitoring accuracy, it is provided that managing power consumption information accurately, helps user to make managing power consumption decision-making.
The additional aspect of the present invention and advantage will part be given in the following description, and part will be retouched from followingBecome obvious in stating, or recognized by the practice of the present invention.
Detailed description of the invention
Embodiments of the invention are described below in detail, and the example of described embodiment is shown in the drawings, wherein certainlyBegin to same or similar label eventually represent same or similar element or there is the unit of same or like functionPart.The embodiment described below with reference to accompanying drawing is exemplary, is only used for explaining the present invention, and can notIt is interpreted as limitation of the present invention.
In describing the invention, it is to be understood that term " longitudinally ", " laterally ", " on ", D score, " front ",The orientation of the instruction such as " afterwards ", "left", "right", " vertically ", " level ", " top ", " end " " interior ", " outward " or positionRelation of putting, for based on orientation shown in the drawings or position relationship, is for only for ease of the description present invention and simplification is retouchedState rather than indicate or imply that the device of indication or element must have specific orientation, with specific orientationStructure and operation, be therefore not considered as limiting the invention.
In describing the invention, unless otherwise prescribed and limit, it should be noted that term " is installed "," be connected ", " connection " should be interpreted broadly, for example, it may be mechanically connected or electrical connection, it is also possible to be twoThe connection of individual element internal, can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, for thisFor the those of ordinary skill in field, the concrete meaning of above-mentioned term can be understood as the case may be.
As it is shown in figure 1, the invention provides a kind of comprehensive energy consumption for heavy construction to manage system, including:Cloud server, energy consumption monitoring terminal, power consumption monitoring system, water consumption monitoring system, monitoring of equipment are eventuallyEnd, fault alarm;
Cloud server data interaction end connects energy consumption monitoring terminal data transmission end respectively and monitoring of equipment is wholeEnd data transmission ends, energy consumption monitoring terminal power consumption amount data acquisition end connects power consumption monitoring system data and sendsEnd, energy consumption monitoring terminal water usage data collection terminal connects water consumption monitoring system data transmitting terminal, SupervisionSurvey terminal alarms signal end and connect fault alarm signal receiving end.
Technique scheme have the beneficial effect that by energy consumption monitoring terminal and monitoring of equipment terminal to building orPerson's heavy construction carries out energy consumption monitoring management, it is ensured that heavy construction internal unit safe and stable operation, supervises in real timeSurvey electricity consumption water state, and the steady running of building electrical equipment, it is achieved that comprehensive energy consumption manages, improveEnergy monitoring accuracy, it is provided that managing power consumption information accurately, helps user to make managing power consumption decision-making.
As in figure 2 it is shown, 1 be data center's layer, 2 be data monitoring transfer layer, 3 for data collection layer;
Data center's layer is cloud server, and cloud server data communication end is connected by first network busThe data interaction end of the monitoring terminal in data monitoring transfer layer, the data receiver of monitoring terminal passes through localNet connects the energy consumption consumption data acquisition terminal of data collection layer.By obtaining energy consumption consumption data acquisition terminalData be transferred to monitoring terminal, energy consumption consumption data acquisition terminal is controlled by monitoring terminal by LANSystem.
Described energy consumption consumption data acquisition terminal includes: electric substation's low-voltage distribution terminal, Building Power Distribution terminal,Electric substation's low-voltage distribution terminal data transmission end carries out data transmission with RS485 bus or MODBUS,Then the power dispatching data receiving terminal of energy consumption monitoring terminal, Building Power Distribution terminal data transmission is connected by LANHold the Building Power Distribution data receiver being connected energy consumption monitoring terminal by LAN.
Wherein electric substation's low-voltage distribution terminal is usually the large-scale controller switching equipments such as low-voltage distribution cabinet, and controller switching equipment leads toCrossing RS485 bus or MODBUS and track data is sent to monitoring terminal, Building Power Distribution terminal is usualFor small low-voltage power distribution cabinet, also it is to be sent to supervise by track data by RS485 bus or MODBUSSurvey terminal.
As it is shown on figure 3, described electric substation low-voltage distribution terminal includes: power quality analyzer table, feeder line meritCan status panel, network data instrument, three-phase electric energy metering instrument;
Power quality analyzer table data receiver connects transmission cable, and power quality analyzer table data sendEnd connects electric substation's low-voltage distribution terminal data receiving terminal, and feeder line functional status instrumented data receiving terminal connects biographyTransmission cable, feeder line functional status instrumented data transmitting terminal connects electric substation's low-voltage distribution terminal data receiving terminal,Network data instrumented data receiving terminal connects ethernet server, and network data instrumented data transmitting terminal connects changeElectricity institute low-voltage distribution terminal data receiving terminal, three-phase electric energy metering instrumented data receiving terminal connects threephase cable,Three-phase electric energy metering instrumented data transmitting terminal connects electric substation's low-voltage distribution terminal data receiving terminal.Electric substation is lowIt is press-fitted electric terminals and preferably employs high-performance computer or intelligent terminal.
Power quality analyzer table is used, such as than the American blend Fluke of higher-end in large-scale power distribution cabinet430 series, or use moderate domestic LCT-FB603 power quality analyzer table, by detectionAfter the quality of power supply, it is sent to monitoring terminal, transmits data to cloud server by monitoring terminal, shouldCloud server can be set up at different management levels, is passed to the cloud of national level by linking Internet oral instructionsEnd server or the cloud server of upgrading or city cloud server at county level.
Feeder line functional status instrument predominantly detects the duty of cable and wherein uses ADOWS-10 seriesCable feeder line test instrunment, by detecting the duty location event of this cable in real time to cable Sasser localBarrier point.
Network data instrument mainly uses T9000 family ethernet test instrunment that network carries out specialized surveyExamination, if the tester of other relative moderate price is also to be capable of network data test equally, will surveyExamination data are transferred to monitoring terminal.
Three-phase electric energy metering instrument mainly uses three-phase kilowatt-hour meter, and the data collected by ammeter are transferred to monitoringTerminal.
As shown in Figure 4, described Building Power Distribution terminal includes: multifunctional network instrument, air-conditioning three-phase electric energy meterScale, illumination three-phase electric energy metering table, elevator three-phase electric energy metering table;
Multifunctional network instrumented data transmission ends connects Building Power Distribution terminal data receiving terminal, air-conditioning three-phase electric energyMeter data transmission ends connects Building Power Distribution terminal data receiving terminal, and illumination three-phase electric energy metering table data passDefeated end connects Building Power Distribution terminal data receiving terminal, and elevator three-phase electric energy metering table data transmission terminal connects buildingDistribution terminal data receiver.
This multifunctional network instrument can use Agilent Agilent vector network analyzer table by this instrumentTest network state, is sent to monitoring terminal by network state;Air-conditioning three-phase electric energy metering table, illumination three-phaseElectric energy meter, elevator three-phase electric energy metering table use corresponding three-phase kilowatt-hour meter, carry out three-phase kilowatt-hour meterInformation about power is sent by repacking by network environment.
As it is shown in figure 5, also include: platinum resistance temperature sensor data transmission terminal connects monitoring by LANTerminal data receiving terminal.
Wherein energy consumption monitoring terminal also includes: user terminal and data storing platform;
Cloud server connects energy consumption monitoring terminal data interaction end, user eventually respectively by first network busEnd data interaction end, the data storage end of energy consumption monitoring terminal and user terminal connects data storing platform dataInteraction end.
The large server equipment ZI2TS4-8888V that the main serviceability of energy consumption monitoring terminal is stable, this productCategory type is two-way eight core tower server Xeon E5-2650 V2, inside saves as 16G DDR3 REG ECC,Hard disk uses HD SAS 600G, it is possible to complete the collection of whole energy consumption data.
Described user terminal can carry out data by the smart mobile phone of terminal use or other smart machinesUp-to-date data are shown by interconnection.
Certainly, product type mentioned above, product similar therewith are not limited in for corresponding functionEnergy consumption data acquisition and network monitor can be realized, and present product is connected to the Internet or officeTerritory net is all to be very easy to realize, and these energy consumptions and status data are sent out by the innovation of the application justDelivering to monitoring terminal, user can obtain this data in real time by monitoring terminal, and takes further to manageMovable.
As shown in Figure 6, wherein monitoring of equipment terminal includes: refrigeration air-conditioner, view water pump, kitchen pump drainage systemSystem, heating system water pump, monitoring system;
Refrigeration air-conditioner signal controls end and connects monitoring system airconditioning control end, and landscape water pump signal controls end and connectsMonitoring system view water pump controls end, and evacuation system ventilation signal end in kitchen connects monitoring system ventilation and controlsEnd, heating system water pump signal controls end and connects monitoring system supplying hot water pump signal end.
Having the beneficial effect that refrigeration air-conditioner, view water pump, kitchen by monitoring system of technique schemeEvacuation system, heating system water pump carry out the monitoring concentrated, it is possible to ensure that heavy construction is indoor and outdoorFacility Centralizing inspection, and make whole system and various equipment therein be in optimal duty, thus reachTo the electromechanical equipment life-span extended in building, reduce management cost.
Also include temperature sensor;Temperature sensor temperature signal collection end is arranged on architecture indoor, and temperature passesSensor temperature signal transmitting terminal connects refrigeration air-conditioner temperature acquisition end.
Technique scheme have the beneficial effect that temperature sensor Real-time Collection room temperature, transfer data to systemCold air-conditioning, carries out Automatic-cooling according to room ambient conditions air-conditioning.Carry out temperature judging refrigeration, belong to conventionalSoftware controlling technique.
Also include liquid level sensor and flow transducer;Liquid level sensor liquid level signal collection terminal is arranged on viewIn pond, liquid level sensor liquid level signal transmitting terminal connects landscape water pump signal collection terminal, flow transducer streamAmount signals collecting end is arranged on water pump pipeline, and flow transducer flow signal transmitting terminal connects view water pump streamAmount signal end.
Having the beneficial effect that by liquid level sensor and flow transducer in landscape pond of technique schemeWater pump operation state judge, if liquid level sensor to judge that water level occurs abnormal, by view water pumpCarry out moisturizing or draw water, if water pump pipeline flow occurs extremely to be detected by flow transducer, asFruit has obstruction can be reported to the police by fault alarm.
Also including that oil smoke watch-dog, oil smoke watch-dog oil smoke signals collecting end are arranged on kitchen indoor, oil smoke is supervisedControl device oil smoke signal sending end connects kitchen evacuation system signals collecting end.
Technique scheme have the beneficial effect that oil smoke watch-dog monitors kitchen fume situation in real time, if superCross the work of threshold value then kitchen evacuation system.
Also include pressure difference monitor;Pressure difference monitor pressure difference signal collection terminal is arranged on architecture indoor, and pressure reduction is supervisedControl device pressure difference signal transmitting terminal connects heating system water pump signal receiving terminal.
Technique scheme have the beneficial effect that pressure difference monitor is the most just judging heating system water-aspirator pressureOften.
Also include fault alarm;Temperature sensor fault signal end connects fault alarm, liquid level sensorFault-signal end connects fault alarm, and flow transducer fault-signal end connects fault alarm, and oil smoke is supervisedControl device fault-signal end connects fault alarm, and pressure difference monitor fault-signal end connects fault alarm.TheOne fault alarm signal end connects temperature sensor fault signal end, and the second fault alarm signal end connectsLevel sensor fault signal end, the 3rd fault alarm signal end connection traffic sensor failure signals end,4th fault alarm signal end connects oil smoke watch-dog fault-signal end, and the 5th fault alarm signal end is evenConnect pressure difference monitor fault-signal end, wherein the first to the 5th fault alarm connect corresponding sensor orWatch-dog carries out fault alarm and belongs to the technology that those skilled in the art know.
As it is shown in fig. 7, described refrigeration air-conditioner includes;
First refrigerating water pump freezing backwater end, the second refrigerating water pump freezing backwater end and the 3rd refrigerating water pump freezing backwater endConnect refrigeration air-conditioner backwater end respectively, the first cooling pump freezing for water end (W.E.), the second cooling pump freezing for water end (W.E.) and3rd cooling pump freezing connects refrigeration air-conditioner for water end (W.E.) and depends on respectively for water end (W.E.) with freezing for water end (W.E.), freezing backwater endSecondary first compressor in parallel, the second compressor and the 3rd compressor, high-pressure water tank connects first respectively for water end (W.E.)Cooling pump water acquisition end, the second cooling pump water acquisition end and the 3rd cooling pump water acquisition end, high-pressure water tank also divides for water end (W.E.)Do not connect the first compressor water acquisition end, the second compressor water acquisition end and the 3rd compressor water acquisition end.
Having the beneficial effect that by three cooling pumps and three compressors and the company of three refrigerating water pumps of technique schemeConnect mode, it is possible to carry out significantly more efficient refrigeration for heavy construction, it is ensured that under thermal extremes state, buildingBuild the office that the indoor personnel of thing can be comfortable, and can quickly regulate architecture indoor temperature, safe and efficient.
The described equipment monitoring system for heavy construction, it is preferred that described refrigeration air-conditioner includes electricity refrigerationAir-conditioning and lithium bromide refrigerating air-conditioning.
For refrigeration air-conditioner, flow transducer uses WFK5008 series, and discharge of pump is carried out realityTime monitoring.
Liquid level sensor uses AL200W series pressure-resistance type liquid level transmitters to be made by high performance pressure sensorFor measuring cell, by pressure transducer, the hydrostatic pressure being directly proportional to the liquid level degree of depth is accurately measuredCome, and be converted into the output of standard (curtage) signal through special signal modulate circuit.
Temperature sensor uses Study on Intelligent Sensors of Temperature (XL61) or pt100 temperature sensor,
Differential pressure pickup or pressure difference monitor use Seat 230 series or Seat 269,
Whole control connects application layer protocol: MODBUS/RTU,
Input, export technique parameter:
AI/DI/DO is at most combined as 12 tunnels.
Analog quantity parameter: 4~20mA optional two-wire systems, 0~20mA, 0~5V, 1~5V.The most optionalSensor inputs.Analog input precision: 0.1%F.S..Switching value: dry contact, pulse, input, defeatedGo out.
The On-off signal stabilization time can be set.
Output contact loads: AC250V, 5A;AC250V, DC30V,
Input contact parameter:
Contact resistance below 100m Ω,
Movement time below 10ms,
Resetting time below 5ms,
Special input, output parameter can be customized according to the requirement of user.
General parameters:
Supply voltage: DC12V/24V, AC/DC220V power supply mode,
Operating power consumption :≤0.5W (200mW);≤1W(500mW);≤ 2.5W (2000mW),
Sheathing material: PE or metal material,
Mounting means: guide rails assembling or screw fixed installation,
Degree of protection: pcb board processes optional through coating, it is adaptable to have the adverse circumstances such as burn into is moist;Shell protection grade IP66.Working environment humidity: relative humidity 95%, electromagnetism interference: IEC61000-6-2,GB/T 17799.2, goes out and shakes: GB/T 2423.10, IEC 60068-2-6.
Kitchen lampblack watch-dog is preferably rich control K29D.It is certainly not limited to above-mentioned type product.
The large server equipment ZI2TS4-8888V that the main serviceability of monitoring system is stable, this product classType is two-way eight core tower server Xeon E5-2650V2, inside saves as 16G DDR3 REG ECC, firmlyDish uses HD SAS 600G, it is possible to complete the collection of whole energy consumption data, stable and reliable operation.
By the electric power in building or groups of building, illumination, air-conditioning, plumbing, elevator, Cooling and Heat Source, ventilation,Deng equipment or system, by centralized watch, control and manage for the purpose of and constituted system.System is by buildingThe monitoring of various equipment Comprehensive Automations and the management of group, provides the user safe, comfortable, convenient and efficientWork and living environment, and make whole system and various equipment therein be in optimal duty, fromAnd reach the electromechanical equipment life-span in prolongation building, minimizing management cost, reduce building entirety energy consumptionTechnique effect.
1. power consumption monitoring
Present monitoring site ammeter real time execution parameter in real time, system interface monitored ammeter configuration information,Including coding, measurement scope, installation addresses, affiliated gateway, real check meter code value, no-load voltage ratio value etc..The most aobviousShow 24 hours electricity consumption situations, total electricity consumption, average power consumptions in the past, it is provided that ammeter real-time communication state is looked intoAsk the page, can real-time query and the current on off operating mode of all table meters in display query context.
As shown in Figure 8, power consumption monitoring system includes, N number of Hall element, MCU controller, depositsStorage unit, crystal oscillator unit, power circuit, N >=1;
Each Hall element data transmission terminal connects MCU controller data receiving terminal, MCU controllerStorage communication ends connects memory cell data transmission ends, is led to by the electric quantity data of collection by MCU controllerCrossing memory element to store, MCU controller crystal oscillator communication ends connects crystal oscillator unit communication end, and MCU is controlledDevice power end processed connects power subsystem feeder ear.
Technique scheme have the beneficial effect that the building that some Hall elements are arranged in heavy construction every layerSpace grid bus outfan, thus gather the output charge value of electrical network, can be accurate after charge value is gatheredCarrying out add up, thus obtain the overall power consumption of this heavy construction, compared to traditional ammeter metering, moreAccurately, circuit is energy-conservation, and cost reduces, and without manned surveys, saves human cost.
Also include: the 1st Hall element data transmission terminal passes through to N Hall element data transmission terminalCAN controller carries out data transmission.
Having the beneficial effect that of technique scheme is transmitted controlling by CAN, and its data are transmittedMore stable.
Also include: network interface and cloud server;
MCU controller network data transmission terminal connects cloud server data receiver by network interface.
Power consumption data is transferred to cloud service by network interface by having the beneficial effect that of technique schemeDevice, can remotely monitor electricity service condition.
Also include steady-state circuit:
Connect steady-state circuit between Hall element and MCU controller, ensure MCU by steady-state circuitController receives stabling current data.
Having the beneficial effect that of technique scheme ensures Hall element transmission electric quantity data by steady-state circuitTime, keep stable state to be difficult to burn the equipment such as sensor and MCU controller, extend product service life.
Have wire inlet loop monitoring in collection in worksite device, important feeder line is monitored, contact loop is monitored and commonPath monitoring, this energy consumption platform, comprise about power consumption monitoring system: ammeter, harvester, server platform,Harvester is exactly Multifunctional collector, gathers ammeter then harvester and uploads onto the server data base, platform handleThe data display of data base is out.
Ammeter connects harvester by 485 lines, gathers and sends data to server by netting twine TCP/IP,Data are carried out integrating and being displayed for inquiry by platform.
Loop monitoring gathers the ammeter in each loop, loop, feeder line, contact loop, common line exactlyIt is different tables, is all that harvester gathers ammeter.
Wherein measuring the preferred model of power consumption is HKA-F2 series Hall current sensor.
MCU is preferably STM32F107;
CAN controller is preferably MAX3483EESA.
Its network interface is preferably 13F-60FGYDPNW2.
The output amplitude of this sensor can need suitably to regulate according to user, and can be fixed by user's requestMake different specified input current and the sensor of output voltage.Current value can be measured, be used for measuring direct current,Exchange and pulse current.
485 directly link ammeter,
Harvester is connected to ammeter by 485 lines,
Ammeter data is read by the program in harvester,
Then the information received is resolved,
It is being transferred to server,
Harvester sends the coding reading ammeter data by DLT 645-1997 agreement,
Then ammeter returns data,
By DLT 645-1997 protocol analysis character string, obtain ammeter data,
DLT 645-1997 agreement is standard communication protocol.
As it is shown in figure 9, described steady-state circuit includes:
Hall element signal cathode output end connects the 1st resistance one end and the 5th resistance one end respectively, and the 1stThe resistance other end connects the 1st electric capacity one end and the 1st transistor collector respectively, and the 5th resistance other end is respectivelyConnect the 1st electric capacity other end and the 2nd transistor base, the 1st emitter ground connection, the 1st transistorBase stage connects the 6th resistance one end and the 3rd resistance one end respectively, and the 3rd resistance other end connects Hall elementSignal cathode output end, the 6th resistance other end connects the 2nd resistance one end and the 2nd transistor collector respectively,The 2nd resistance other end connects the 1st diode cathode, and the 1st diode cathode connects the 1st resistance one end, the2 emitters ground connection and the 4th resistance one end respectively, the 4th resistance other end connects the 2nd electric capacity respectivelyOne end and the 2nd diode cathode, the 2nd diode cathode connect the 2nd transistor base, the 2nd electric capacity anotherEnd connects steady-state current outfan.
After steady-state circuit stable state, G1 pipe turns on, and the cut-off of G2 pipe.Here it is the stable output of this circuitState.
When in the one pair of pulse of input Ui impact, by reverse-biased for the base stage that makes G2 pipe and by, the current collection of G2Pole tension is become high voltage from 0, by R2, R1, R3 dividing potential drop, make G1 pipe base voltage positively biased andBeing become conducting by cut-off, collector voltage=0 of G1, the right-hand member voltage making C1 is negative value, makes G2 because of its baseThe most reverse-biased holding, ends.+ 12V voltage will make C1 right-hand member by the charging anti-phase to C1 of R5 resistance simultaneouslyVoltage rises, and when voltage is higher than the G2 positive bias-voltage of pipe base stage, G2 pipe is by ending change conducting, G2 pipe collectionElectrode voltage=0, by R2, R1, R3 dividing potential drop, the base voltage making G1 pipe is reverse-biased and is become by conducting and cutsOnly, G1 pipe collector voltage is high level, owing to the voltage of C1 can not suddenly change, makes to be added in G2 pipe base stageVoltage is corrected, and G2 is held on.Subsequently by R1 Yu G2 base stage branch road to C1 positive charge.Do not havingHaving external signal input to trigger Ui end, circuit will always keep this output state.
2. water monitoring is used
Present monitoring site water meter real time execution parameter in real time, system interface monitored water meter configuration information,Including coding, measurement scope, installation addresses, affiliated gateway, real check meter code value, water meter multiplying power etc..DynamicallyDisplay 24 hours in the past regimen condition, total water consumption, average consumption, it is provided that water meter real-time communication stateQuery page, can real-time query and the current on off operating mode of all table meters in display query context.
Day, the moon, the energy statistics in year and analysis can be automatically provided, simultaneously by the data system of energy consumption monitoringCan be to power grid quality, power factor (PF), balancing the load, line loss parameter, Electrical Safety, air quality, air-conditioningThe data that the owner such as operation conditions, electricity consumption at night day water loss is concerned about automatically collect assessment drawing and commentEstimate report, need not designing institute professional by native system proprietor and instruct the use just each can itemizedSituation can be evaluated, and take the special conservation measures to property.
As shown in Figure 10, turbine flowmeter includes:
Effusion meter instrument 1, data transmission interface 2, data wire connecting tube 3, pipeline clutch disk 4, whirlpool oar6, divide water axle 8, connect pipeline 9;
Effusion meter instrument 1 connects described connection pipeline 9 by data wire connecting tube 3, connects pipeline 9 axialTwo ends are respectively welded pipeline clutch disk 4, and described connection pipeline 9 water inlet installs whirlpool oar 6, described whirlpool oar6 are arranged on point water axle 8, and a point water axle 8 is arranged on connection pipeline 9 water inlet centre, and water inlet hasPulse signal, by driving whirlpool oar 6 to rotate, is sent to by current by the data wire in data wire connecting tube 3Effusion meter instrument 1, effusion meter instrument 1 sidewall offers data transmission interface 2, by data transmission interface 2Water usage data is sent to MCU controller.
Technique scheme have the beneficial effect that this turbine flowmeter is reasonable in design, by installing on point water axleThe most small and weak current can be sensed out by three whirlpool oars, enhance the monitoring accuracy of the water yield, pass through whirlpoolOar rotates and calculates the water yield, transfers data to MCU controller.
Described turbine flowmeter also includes bolt hole 5;
Offering some bolt holes 5 along pipeline clutch disk 4 circumference, bolt passes water supply line and turbine streamThe bolt hole of gauge is connected with each other, it is ensured that supply water stable.
Technique scheme have the beneficial effect that bolt passes bolt hole and is fastenedly connected water supply line, it is ensured thatNo leakage.
Described turbine flowmeter also includes sealed groove 7;
Offering sealed groove 7 at pipeline clutch disk 4 circumference, described sealed groove 7 fills caulking gum.
Having the beneficial effect that of technique scheme prevents, by sealed groove, leakage of supplying water.
Described turbine flowmeter also includes LCD display 10;
LCD display 10 is installed in effusion meter instrument 1 side, is used for showing water consumption.
Have wire inlet loop monitoring in collection in worksite device, important feeder line is monitored, contact loop is monitored and commonPath monitoring, the energy consumption platform applied for a patent, comprise about water consumption monitoring system: turbine flowmeter,Harvester, server platform, harvester is exactly Multifunctional collector: gathers turbine flowmeter, then gathersDevice is uploaded onto the server data base, and platform is the data display of data base out.
Turbine flowmeter connects harvester by 485 lines, gathers and sends data to clothes by netting twine TCP/IPBusiness device, data are carried out integrating and being displayed for inquiry by platform.
485 directly link turbine flowmeter, read turbine flow by the program in harvester and count, soThe information that rear parsing receives, is being transferred to server, by DLT 645-1997 protocol analysis character string,Obtaining data, DLT 645-1997 agreement is standard communication protocol.
As shown in figure 11, water consumption monitoring system, including: N number of turbine flowmeter, MCU controller,Memory element, crystal oscillator unit, power circuit, N >=1;
Each turbine flowmeter data transmission terminal connects MCU controller data receiving terminal, MCU controllerStorage communication ends connects memory cell data transmission ends, the water usage data that will be gathered by MCU controllerBeing stored by memory element, MCU controller crystal oscillator communication ends connects crystal oscillator unit communication end, MCUController power source end connects power subsystem feeder ear.
Technique scheme have the beneficial effect that the building that some turbine flowmeters are arranged in heavy construction every layerSpace water supply line output end of main, thus gather the output water yield value of pipeline, can after water yield value is gatheredAdding up accurately, thus obtain the overall water consumption of this heavy construction, the metering of this turbine flowmeter is more accurateReally, cost reduces, and without manned surveys, saves human cost.
Also include: the 1st turbine flowmeter data transmission terminal passes through to N turbine flowmeter data transmission terminalCAN controller carries out data transmission.
Having the beneficial effect that of technique scheme is transmitted controlling by CAN, and its data are transmittedMore stable.
Also include: network interface and cloud server;
MCU controller network data transmission terminal connects cloud server data receiver by network interface.
Water usage data is transferred to cloud service by network interface by having the beneficial effect that of technique schemeDevice, can remotely monitor water consumption service condition.
Also include LCD display unit;
MCU controller video data end connects LCD display unit data receiver.
In the description of this specification, reference term " embodiment ", " some embodiments ", " example ",The description of " concrete example " or " some examples " etc. means to combine the concrete spy of this embodiment or example descriptionLevy, structure, material or feature are contained at least one embodiment or the example of the present invention.In this explanationIn book, the schematic representation of above-mentioned term is not necessarily referring to identical embodiment or example.And, retouchSpecific features, structure, material or the feature stated can be in any one or more embodiments or exampleCombine in an appropriate manner.
Although an embodiment of the present invention has been shown and described, those of ordinary skill in the art can manageSolve: these embodiments can be carried out in the case of without departing from the principle of the present invention and objective multiple change,Amendment, replacement and modification, the scope of the present invention is limited by claim and equivalent thereof.