CN105256684A - Embankment transverse draining construction method - Google Patents

Embankment transverse draining construction method
Download PDF

Info

Publication number
CN105256684A
CN105256684ACN201510565242.XACN201510565242ACN105256684ACN 105256684 ACN105256684 ACN 105256684ACN 201510565242 ACN201510565242 ACN 201510565242ACN 105256684 ACN105256684 ACN 105256684A
Authority
CN
China
Prior art keywords
moisture content
embankment
soakaway trench
construction
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510565242.XA
Other languages
Chinese (zh)
Other versions
CN105256684B (en
Inventor
马玉伟
苗双全
夏军杰
徐春广
喻慧
贾长海
秦敬敏
丁一飞
党小红
李丽
任亚军
王光涛
姜帅
温丽娜
夏青
李红旗
赵路遥
陈锐
张彩丽
魏娟
周小飞
盛云超
吴强
苗志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Wanli Transportation Technology Group Co., Ltd.
Original Assignee
Henan Wanli Road&bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Wanli Road&bridge Group Co LtdfiledCriticalHenan Wanli Road&bridge Group Co Ltd
Priority to CN201510565242.XApriorityCriticalpatent/CN105256684B/en
Publication of CN105256684ApublicationCriticalpatent/CN105256684A/en
Application grantedgrantedCritical
Publication of CN105256684BpublicationCriticalpatent/CN105256684B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Landscapes

Abstract

The invention relates to the embankment draining engineering field, and concretely relates to an embankment transverse draining construction method without excavation and being capable of recycling. The method can be used when road pavements have phenomena of pits, cracks, nonuniform settlement, fracture, rainwater in an embankment, capillary water and rainwater which cannot be drained in a medial strip. According to an embankment water content and disease degree, a position of a water seepage pipe is determined, drilling is carried out, and a water seepage pipe is installed. A three-dimensional porous resin filter core is arranged in the water seepage pipe, a hole opening is sealed, the scene is cleaned after construction, and the embankment water content is monitored again after a period of time. The method is advantaged by simple construction, short cycle and low engineering cost.

Description

A kind of embankment transverse drainage construction method
Technical field
The present invention relates to embankment drainage works field, be specifically related to highway pavement when there is the phenomenons such as the rainwater that rainwater in hole groove, be full of cracks, differential settlement, fracture and embankment, capillary water and median strip can not drain completely, a kind of without the need to excavation and the embankment transverse drainage construction method that can be recycled.
Background technology
Along with the development of communication and the fast development of traffic science technology, the quality and quantity of highway, all in raising, is also more and more paid attention to the drainage works of highway simultaneously, also more and more higher to its requirement.And traditional roadbed transverse drainage facility, that transverse drainage duct is set at roadbed top place, to discharge the infiltration of the median strip collected, this drainage pattern cannot solve the moisture being seeped into embankment inside by median strip, earth shoulder, side slope etc., also cannot discharge the capillary water in the embankment of wet soft section; Also have now and adopt that the push pipe mode of no-dig technique is constructed, draining, but the drainage effect duration is short after its construction, water often after time of about 1 year in gutter is just because blocking cannot be discharged, need the gutter more renewed, cost can increase thereupon, also increases the workload of road maintenance workman.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art and provide a kind of without the need to excavating and the embankment transverse drainage construction method that can be recycled.
Technical scheme of the present invention is achieved in that
A kind of embankment transverse drainage construction method, it is characterized in that, construction method is as follows:
Step one), construction material prepares: construction machinery comprises dry drilling machine, generating set, rig advance bracket track, drill bit, auger stem, soakaway trench, three-dimensional porous resin filter element, mixing water, PC32.5 sacked cement, medium grained sand, according to check evaluation criterion, construction material is detected, carry out aperture record, the hole of " product " font or " rice " font is got out thereon before job site moved into by PVC-U pipe, aperture is 2.5mm, plays infiltration effect in whole work progress; Wherein, described check evaluation criterion goes out the qualified examining report of certificate and ocular estimate inspection for the third party provided by manufacturer, and described three-dimensional porous resin filter element wraps up filter cloth by plastic core external body and forms and have filtering function;
Step 2), field investigation: carry out field investigation before construction, detect embankment moisture content, whether the moisture content analyzing embankment observes " disease " degree on road surface higher than the optimum moisture content detecting area, described optimum moisture content represents soil its corresponding moisture content when maximum dry density, be the ratio of the weight of weight and the dry ground particle divided with water in soil, represent with percentage; Described road surface " disease " is seriously road surface long-term existence frost boiling phenomenon or crack, the hole groove occurring 0.5cm ~ 1cm;
Step 3), location: according to step one) in the analysis of embankment moisture content and the observation of road surface " disease ", determine the position of construction site, soakaway trench, if embankment moisture content higher than detect area optimum moisture content 60%-75% and road surface " disease " is serious, then soakaway trench every 20m transverse direction setting together; If embankment moisture content higher than detect regional optimum moisture content 60%-75% and without road surface " disease ", then soakaway trench every 30m-50m transverse direction setting together;
Step 4), in place: the construction machinery needed for construction is stopped in place, the mechanical car being mounted with hanging device is rested in the construction point determined, fix mechanical car's support, start loop wheel machine, bracket track of being advanced by rig works the road slope place winching to and choose, the bracket track and rigging up is advanced, pin rig with latch closure to advance the horizontal fixed bar of bracket track, rig advance the both sides drill rod screw rod of bracket track hit real on silk, prevent rig advance work progress medium-height trestle track occur tilt, rock, finally with spirit level, rig to be advanced the transverse direction of bracket track, vertically carry out leveling,
Rig is laid steadily in place, and rig drilling rod used arranges placement, soakaway trench, the smooth placement of three-dimensional porous resin filter element by number, meanwhile, the supporting placement of drilling rod of generating set, drill bit, numbering, borehole trajectory is fixed;
Step 5), boring: install drill bit, drilling rod by number order is installed, starter-generator group trial run rig, rig normal operation then starts construction, every 5min-10min cleaning once assorted soil in work progress, and forbid in work progress to add water, avoid roadbed to be subject to water soaking, structure is destroyed, and wherein said drill bit is the drill bit of D90mm;
Step 6), the configuration of soakaway trench, three-dimensional porous resin filter element: select three-dimensional porous resin filter element according in advance selected soakaway trench, the diameter 10mm-20mm less of the internal diameter of soakaway trench of three-dimensional porous resin filter element, invest in soakaway trench in three-dimensional porous resin filter element, and length is identical with soakaway trench length;
Step 7), soakaway trench, three-dimensional porous resin filter element are installed: select soakaway trench, three-dimensional porous resin filter element according to the one-tenth hole length of drilling rod, the soakaway trench of a caliber caliber larger than soakaway trench is being installed apart from hole mouth 0.5m place, wherein, described soakaway trench is the pipe of D90mm or D110mm, the pipe of a corresponding large caliber is the pipe of D100mm or D120mm, the pipe of this large caliber as the sealer between hole and soakaway trench, by soakaway trench jacking hole;
Step 8), close: with mortar or C15 concrete, hole is made Seal treatment; Wherein, the proportioning of the mortar of every cube is cement: sand: water=242:1655:270, and the proportioning of the C15 concrete of every cube is cement: sand: water: stone=185:247:768:1200;
Step 9), cleaning job site: hole close terminate after, cleaning job site construction rubbish, remove machinery, bracket track, move to next position, hole continue construction;
Step 10), two after thoughtful one month, again detect embankment moisture content, as moisture content is less than the optimum moisture content detecting area, then engineering terminates; If moisture content is higher than the optimum moisture content detecting area, then according to step 2) again continue process.
Step one) described in medium grained sand be the sand that granular mass that particle diameter is greater than 0.25mm exceedes 50% of gross mass.
Step one) described in mixing water be drinking water.
Good effect of the present invention is: 1, applied range, is applicable to Expressway Embankment, the national highway of median strip and high roadbed and provincial highway;
2, easy construction, the cycle is short; Support set up by traditional drainage construction steel pipe needs 2h, and bracket track integration only needs 55min; Total engineering time shortens 1.5h than conventional construction method;
3, can not traffic be blocked, not destroy greenery patches vegetation;
4, engineering cost is low, and three-dimensional porous resin filter element can filter the impurity in draining, reaches permanence operation, and the time, longer cost advantage was more obvious; And in traditional drainage and construction method, set up the steel pipe wearing and tearing meeting constantly minimizing for a long time of support, blocking up of tubing can be all that cost increases.
Accompanying drawing explanation
Fig. 1 is process chart of the present invention.
Detailed description of the invention
As shown in Figure 1, a kind of embankment transverse drainage construction method, it is characterized in that, construction method is as follows:
Step one), construction material prepares: construction machinery comprises dry drilling machine, generating set, rig is advanced bracket track, drill bit, auger stem, soakaway trench, three-dimensional porous resin filter element, mixing water, PC32.5 sacked cement, medium grained sand, mixing water is drinking water, medium grained sand is the sand that granular mass that particle diameter is greater than 0.25mm exceedes 50% of gross mass, according to check evaluation criterion, construction material is detected, carry out aperture record, the hole of " product " font or " rice " font is got out thereon before job site moved into by PVC-U pipe, aperture is 2.5mm, infiltration effect is played in whole work progress, wherein, described check evaluation criterion goes out the qualified examining report of certificate and ocular estimate inspection for the third party provided by manufacturer, and described three-dimensional porous resin filter element wraps up filter cloth by plastic core external body and forms and have filtering function,
Step 2), field investigation: carry out field investigation before construction, detect embankment moisture content, whether the moisture content analyzing embankment observes " disease " degree on road surface higher than the optimum moisture content detecting area, described optimum moisture content represents soil its corresponding moisture content when maximum dry density, be the ratio of the weight of weight and the dry ground particle divided with water in soil, represent with percentage; Described road surface " disease " is seriously road surface long-term existence frost boiling phenomenon or crack, the hole groove occurring 0.5cm ~ 1cm;
Step 3), location: according to step one) in the analysis of embankment moisture content and the observation of road surface " disease ", determine the position of construction site, soakaway trench, if embankment moisture content is higher than detect regional optimum moisture content 60%-75% and road surface " disease " is serious, then soakaway trench every 20m transverse direction setting together; If embankment moisture content higher than detect regional optimum moisture content 60%-75% and without road surface " disease ", then soakaway trench every 30m-50m transverse direction setting together;
Step 4), in place: the construction machinery needed for construction is stopped in place, the mechanical car being mounted with hanging device is rested in the construction point determined, fix mechanical car's support, start loop wheel machine, bracket track of being advanced by rig works the road slope place winching to and choose, the bracket track and rigging up is advanced, pin rig with latch closure to advance the horizontal fixed bar of bracket track, rig advance the both sides drill rod screw rod of bracket track hit real on silk, prevent rig advance work progress medium-height trestle track occur tilt, rock, finally with spirit level, rig to be advanced the transverse direction of bracket track, vertically carry out leveling,
Rig is laid steadily in place, and rig drilling rod used arranges placement, soakaway trench, the smooth placement of three-dimensional porous resin filter element by number, meanwhile, the supporting placement of drilling rod of generating set, drill bit, numbering, borehole trajectory is fixed;
Step 5), boring: install drill bit, drilling rod by number order is installed, starter-generator group trial run rig, rig normal operation then starts construction, every 5min-10min cleaning once assorted soil in work progress, and forbid in work progress to add water, avoid roadbed to be subject to water soaking, structure is destroyed, and wherein said drill bit is the drill bit of D90mm;
Step 6), the configuration of soakaway trench, three-dimensional porous resin filter element: select three-dimensional porous resin filter element according in advance selected soakaway trench, the diameter 10mm-20mm less of the internal diameter of soakaway trench of three-dimensional porous resin filter element, invest in soakaway trench in three-dimensional porous resin filter element, and length is identical with soakaway trench length;
Step 7), soakaway trench, three-dimensional porous resin filter element are installed: select soakaway trench, three-dimensional porous resin filter element according to the one-tenth hole length of drilling rod, the pipe of a caliber caliber larger than soakaway trench is being installed apart from hole mouth 0.5m place, wherein, described soakaway trench is the pipe of D90mm or D110mm, the pipe of a corresponding large caliber is the pipe of D100mm or D120mm, the pipe of this large caliber as the sealer between hole and soakaway trench, by soakaway trench jacking hole;
Step 8), close: with mortar or C15 concrete, hole is made Seal treatment; Wherein, the proportioning of the mortar of every cube is cement: sand: water=242:1655:270, and the proportioning of the C15 concrete of every cube is cement: sand: water: stone=185:247:768:1200;
Step 9), cleaning job site: hole close terminate after, cleaning job site construction rubbish, remove machinery, bracket track, move to next position, hole continue construction;
Step 10), two after thoughtful one month, again detect embankment moisture content, as moisture content is less than the optimum moisture content detecting area, then engineering terminates; If moisture content is higher than the optimum moisture content detecting area, then according to step 2) again continue process.

Claims (3)

Step one), construction material prepares: construction machinery comprises dry drilling machine, generating set, rig advance bracket track, drill bit, auger stem, soakaway trench, three-dimensional porous resin filter element, mixing water, PC32.5 sacked cement, medium grained sand, according to check evaluation criterion, construction material is detected, carry out aperture record, the hole of " product " font or " rice " font is got out thereon before job site moved into by PVC-U gutter, aperture is 2.5mm, plays infiltration effect in whole construction; Wherein, described check evaluation criterion goes out the qualified examining report of certificate and ocular estimate inspection for the third party provided by manufacturer, and described three-dimensional porous resin filter element wraps up filter cloth by plastic core external body and forms and have filtering function;
CN201510565242.XA2015-09-082015-09-08A kind of embankment transverse drainage construction methodActiveCN105256684B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201510565242.XACN105256684B (en)2015-09-082015-09-08A kind of embankment transverse drainage construction method

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201510565242.XACN105256684B (en)2015-09-082015-09-08A kind of embankment transverse drainage construction method

Publications (2)

Publication NumberPublication Date
CN105256684Atrue CN105256684A (en)2016-01-20
CN105256684B CN105256684B (en)2017-07-11

Family

ID=55096600

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201510565242.XAActiveCN105256684B (en)2015-09-082015-09-08A kind of embankment transverse drainage construction method

Country Status (1)

CountryLink
CN (1)CN105256684B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN108978502A (en)*2018-08-132018-12-11朱晓颖A kind of induction type roadbed transverse drainage construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN1107643A (en)*1993-04-221995-08-30弗洛特克斯水平凿岩机组有限公司及两合公司 Laying of underground water and gas mains, in particular the process of constructing horizontal filter wells and the tools to achieve this process
JP2001172951A (en)*1999-12-212001-06-26Nippon Concrete Ind Co LtdSeepage water drainage structure and its construction method
JP2006194044A (en)*2005-01-172006-07-27Ohbayashi CorpInstallation method for water drain pipe in toe of slope on back of levee body, water draining method for seepage water on back of levee body, and water drain structure for seepage water
CN101748734A (en)*2008-12-042010-06-23中国二十冶建设有限公司Foundation pit side slope sandy soil drainage method
CN104727319A (en)*2015-04-072015-06-24兰州理工大学Slope self-drainage anchor rod and construction method
CN204510192U (en)*2014-12-302015-07-29重庆市永川区老科学技术工作者协会Double-level Reticulated eye gutter

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN1107643A (en)*1993-04-221995-08-30弗洛特克斯水平凿岩机组有限公司及两合公司 Laying of underground water and gas mains, in particular the process of constructing horizontal filter wells and the tools to achieve this process
JP2001172951A (en)*1999-12-212001-06-26Nippon Concrete Ind Co LtdSeepage water drainage structure and its construction method
JP2006194044A (en)*2005-01-172006-07-27Ohbayashi CorpInstallation method for water drain pipe in toe of slope on back of levee body, water draining method for seepage water on back of levee body, and water drain structure for seepage water
CN101748734A (en)*2008-12-042010-06-23中国二十冶建设有限公司Foundation pit side slope sandy soil drainage method
CN204510192U (en)*2014-12-302015-07-29重庆市永川区老科学技术工作者协会Double-level Reticulated eye gutter
CN104727319A (en)*2015-04-072015-06-24兰州理工大学Slope self-drainage anchor rod and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
章普标等: "超长距离水平排水滤管在高速公路边坡滑坡处治中的应用", 《公路》*

Cited By (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN108978502A (en)*2018-08-132018-12-11朱晓颖A kind of induction type roadbed transverse drainage construction method

Also Published As

Publication numberPublication date
CN105256684B (en)2017-07-11

Similar Documents

PublicationPublication DateTitle
CN105422170B (en)Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN103147442B (en)Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN108755716A (en)A kind of integrated protection administering method of aqueous eugeogenous rock matter bedding rock sloper
Zhou et al.Engineering issues on karst
CN108166513B (en)Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope
CN107237650A (en)A kind of drilling siphon drainage system and method for being used to handle the infiltration of Tunnel wall
Ou et al.Hydrogeological analysis and remediation strategies for water inrush hazards in highway karst tunnels
Wei et al.Seepage in Water‐Rich Loess Tunnel Excavating Process and Grouting Control Effect
CN105220590A (en)Many karst collapses roadbed injecting treatment method
CN114738050A (en)Seepage-proofing drainage construction method for complex soft rock tunnel
CN105603892B (en)A kind of construction method of water staple water system for Railway Bed Slope
CN104775438B (en)The method of tower position foundation pit construction in karst landform basis rainy season
CN210238157U (en)Plateau permafrost region high-speed railway roadbed structure
CN204551510U (en)A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN110410001A (en)A kind of construction method of superhard rock stratum pile foundation pore-forming
Alexandris et al.Remediation of the Pissouri landslide in Cyprus
CN110259456B (en) A kind of cave treatment method for tunnel construction
CN105256684A (en)Embankment transverse draining construction method
CN205474898U (en)A water nail drainage system for railway roadbed side slope
CN106703013A (en)Water-proof curtain for treating built loess roadbed subsidence damages
CN107012865A (en)The construction method of the anti-collapse hole of anchor pole
CN110924380A (en)Mountain area high-speed pavement accumulated water treatment construction method based on anchor rod drilling technology
CN205277454U (en)Hole stake method undercut tunnel stagnant water curtain
CN115030165B (en)Under-penetration highway structure for ultra-shallow buried tunnel and construction method
CN108570998A (en)The construction method of lowering of watertable during a kind of subgrade construction

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
CB03Change of inventor or designer information
CB03Change of inventor or designer information

Inventor after:Ma Yuwei

Inventor after:Ren Yajun

Inventor after:Wang Guangtao

Inventor after:Jiang Shuai

Inventor after:Wen Lina

Inventor after:Xia Qing

Inventor after:Li Hongqi

Inventor after:Zhao Luyao

Inventor after:Chen Rui

Inventor after:Zhang Caili

Inventor after:Wei Juan

Inventor after:Miao Shuangquan

Inventor after:Zhou Xiaofei

Inventor after:Sheng Yunchao

Inventor after:Wu Qiang

Inventor after:Liu Changhong

Inventor after:Chen Wei

Inventor after:Li Ye

Inventor after:Xu Chunguang

Inventor after:Yu Hui

Inventor after:Jia Changhai

Inventor after:Qin Jingmin

Inventor after:Wang Zhibin

Inventor after:Dang Xiaohong

Inventor after:Li Li

Inventor before:Ma Yuwei

Inventor before:Li Li

Inventor before:Ren Yajun

Inventor before:Wang Guangtao

Inventor before:Jiang Shuai

Inventor before:Wen Lina

Inventor before:Xia Qing

Inventor before:Li Hongqi

Inventor before:Zhao Luyao

Inventor before:Chen Rui

Inventor before:Zhang Caili

Inventor before:Miao Shuangquan

Inventor before:Wei Juan

Inventor before:Zhou Xiaofei

Inventor before:Sheng Yunchao

Inventor before:Wu Qiang

Inventor before:Miao Zhijie

Inventor before:Xia Junjie

Inventor before:Xu Chunguang

Inventor before:Yu Hui

Inventor before:Jia Changhai

Inventor before:Qin Jingmin

Inventor before:Ding Yifei

Inventor before:Dang Xiaohong

GR01Patent grant
GR01Patent grant
CP03Change of name, title or address
CP03Change of name, title or address

Address after:461000 Yongchang West Road, Xuchang City, Henan Province

Patentee after:Henan Wanli Transportation Technology Group Co., Ltd.

Address before:461000 Lunan, East Section of North Ring West Road, Xuchang City, Henan Province

Patentee before:HENAN WANLI ROAD&BRIDGE GROUP CO., LTD.