技术领域:Technical field:
本发明涉及一种加强筋壁板共固化成型方法。The invention relates to a co-curing molding method for a rib wall plate.
背景技术:Background technique:
复合材料长桁种类主要包括“工”字桁件;“T”字桁件;“ω”桁件等;桁件预固化,通过整体定位实现桁件与壁板的共固化成型;现有的桁件壁板类零件的共固化成型方法有两种;一种常规的方法是通过金属组合模保证桁件的外形,金属组合模需要与壁板成型模进行可靠的定位,来保证桁件位置的准确性;用于桁件的定位组合模结构复杂,制造精度要求高,加工难度大,导致产品和成型模的成本高;The types of composite long trusses mainly include "I" trusses; "T" trusses; There are two co-curing molding methods for truss panel parts; one conventional method is to ensure the shape of the truss through the metal composite mold, and the metal composite mold needs to be reliably positioned with the panel forming mold to ensure the position of the truss accuracy; the structure of the positioning combination mold used for girders is complex, the manufacturing precision is high, and the processing is difficult, resulting in high cost of products and forming molds;
另一种成型方法是子母真空袋法:将预制好的、类似筒状的柱形真空袋填充到桁件与壁板之间形成的内腔中,在Ω型加强筋的外表面及壁板上铺覆外真空袋,将柱形真空袋外表面与Ω型加强筋的内表面之间的空间和外真空袋的内表面与Ω型加强筋、壁板的外表面之间的另一空间相连接并密封;此方法的优点是:降低成型成本。但对于操作者的技能水平要求高,一旦真空袋漏气,很容易造成零件的报废。Another molding method is the mother-in-law vacuum bag method: fill the prefabricated cylindrical vacuum bag similar to the cylindrical shape into the inner cavity formed between the stringer and the wall plate, and place it on the outer surface of the Ω-shaped rib and the wall. The outer vacuum bag is laid on the board, and the space between the outer surface of the cylindrical vacuum bag and the inner surface of the Ω-shaped rib and the other space between the inner surface of the outer vacuum bag and the outer surface of the Ω-shaped rib and the wall panel The space is connected and sealed; the advantage of this method is: reduce the molding cost. However, the skill level of the operator is high, and once the vacuum bag leaks, it is easy to cause the parts to be scrapped.
发明内容:Invention content:
本发明的目的是提供一种加强筋壁板共固化成型方法。The object of the present invention is to provide a method for co-curing and forming stiffener wall panels.
上述的目的通过以下的技术方案实现:Above-mentioned purpose realizes by following technical scheme:
一种加强筋壁板共固化成型方法,其方法包括以下步骤:A method for co-curing and forming stiffener wall panels, the method comprising the following steps:
(1)桁件预成型;(1) Truss preforming;
(2)壁板蒙皮的铺贴;(2) Laying of the skin of the wall panel;
(3)桁件的位置定位;(3) Positioning of trusses;
(4)共固化。(4) Co-curing.
所述的一种加强筋壁板共固化成型方法,所述的步骤(1)桁件预成型:In the co-curing molding method for ribbed panels, the step (1) pre-forming the trusses:
首先,在桁件预成型模具上采用刷胶及手工铺贴的方式,首先按预成型模具位置将桁件进行折弯;完成后,在折弯后的桁件的周围糊制真空袋,抽真空,真空度大于0.07 Mpa;在固化炉中进行预成型;预成型温度80 ± 5℃,恒温1小时,升温速率为2~5℃/min。Firstly, glue brushing and manual laying are used on the preforming mold of the truss, and the truss is first bent according to the position of the preforming mold; after completion, a vacuum bag is pasted around the bent truss and pumped Vacuum, the vacuum degree is greater than 0.07 Mpa; preform in a curing furnace; the preform temperature is 80 ± 5°C, the temperature is constant for 1 hour, and the heating rate is 2-5°C/min.
所述的一种加强筋壁板共固化成型方法,所述的步骤(2)壁板蒙皮的铺贴:按照设计图纸要求,按规定的铺层方向和顺序逐层铺放在模具(或平台)上。The above-mentioned method for co-curing molding of reinforced rib wall panels, the step (2) laying of the skin of the wall panels: according to the requirements of the design drawings, layer by layer in the mold (or on the platform.
所述的一种加强筋壁板共固化成型方法,所述的步骤(3)桁件的位置定位:在放好蒙皮的蒙皮成型工装上按需要放置预成型后的桁件及各种定位件,并通过激光投影仪确定各预成型后的桁件及各种定位件的位置,桁件的内部采用硬质硅橡胶芯作为支撑,保证桁件在共固化的过程中外形。同时在桁件外部使用定位硅橡胶防止在共固化过程中桁件产生位移。In the above-mentioned co-curing molding method for stiffener wall panels, the step (3) positioning of the trusses: place the preformed trusses and various Positioning parts, and determine the position of each preformed truss and various locating parts through a laser projector. The interior of the truss is supported by a hard silicone rubber core to ensure the shape of the truss during co-curing. At the same time, positioning silicone rubber is used on the outside of the truss to prevent the displacement of the truss during the co-curing process.
所述的一种加强筋壁板共固化成型方法,所述的步骤(4)共固化:在通过激光投影仪确定位置后的桁件及各种定位件的周围糊制真空袋,在固化炉中进行固化,固化温度为180±5℃,保温时间为150 +10 min,压力为0.4~0.6MPa,升降温速率1~3℃/min。In the co-curing molding method for ribbed wall panels, the step (4) co-curing: paste a vacuum bag around the beams and various positioning parts after the position is determined by a laser projector, and place them in a curing furnace Curing is carried out in the medium, the curing temperature is 180±5°C, the holding time is 150 +10 min, the pressure is 0.4-0.6MPa, and the heating and cooling rate is 1-3°C/min.
本发明的有益效果:Beneficial effects of the present invention:
1. 本发明针对传统技术中存在的不足而设计提供了一种用于桁件壁板共固化的成型方法,降低了工装成本,简化了成型操作工序。1. The present invention aims at the deficiencies in the traditional technology and provides a molding method for the co-curing of truss panels, which reduces the cost of tooling and simplifies the molding process.
本发明采用复合材料蒙皮与桁件共固化的方式,大大减少了连接件的数量,减少了装配工作量,同时减少了应力集中和铆钉孔对壁板截面的削弱,减轻了连接件本身的重量;另外,共固化不需要装配组件间的协调;共固化构件的结构整体性好。The present invention adopts the method of co-curing composite material skin and trusses, which greatly reduces the number of connectors, reduces the workload of assembly, reduces the stress concentration and the weakening of the section of the wall plate by the rivet holes, and reduces the stress of the connectors themselves. weight; in addition, co-curing does not require coordination between assembled components; the structural integrity of co-cured components is good.
附图说明:Description of drawings:
附图1是本发明的组合模结构示意图。图中1、2、3 —定位件;4、5、6、7 —桁件成型工装;8 —蒙皮成型工装;9 —产品Accompanying drawing 1 is the structural representation of the composite mold of the present invention. 1, 2, 3 in the figure—positioning parts; 4, 5, 6, 7—truss forming tooling; 8—skin forming tooling; 9—products
附图2是本发明的子母袋成型方法示意图。图中 10 —桁件;11 —壁板;12 —柱形真空袋;13 —内腔;14 —外真空袋;Accompanying drawing 2 is the schematic diagram of the mother-in-command bag molding method of the present invention. In the figure 10 - stringer; 11 - wall plate; 12 - cylindrical vacuum bag; 13 - inner cavity; 14 - outer vacuum bag;
附图3是本发明的桁件预成型真空袋图解。图中15 —模具;16 —脱模Figure 3 is a schematic illustration of the stringer preform vacuum bag of the present invention. 15 among the figure—mould; 16—demoulding
剂;17 —桁件;18 —隔离膜或织物;19 —透气毡;20 —真空袋;21 —边缘透气纤维; 22 —密封条agent; 17—truss; 18—isolating film or fabric; 19—breather felt; 20—vacuum bag; 21—edge breathable fiber; 22—sealing strip
附图4是本发明的加强筋壁板共固化成型流程图。Accompanying drawing 4 is the flow chart of the co-curing molding of the rib panel of the present invention.
具体实施方式:Detailed ways:
实施例1:Example 1:
一种加强筋壁板共固化成型方法,其方法包括以下步骤:A method for co-curing and forming stiffener wall panels, the method comprising the following steps:
(1)桁件预成型;(1) Truss preforming;
(2)壁板蒙皮的铺贴;(2) Laying of the skin of the wall panel;
(3)桁件的位置定位;(3) Positioning of trusses;
(4)共固化。(4) Co-curing.
实施例2:Example 2:
根据实施例1所述的一种加强筋壁板共固化成型方法,所述的步骤(1)桁件预成型:According to a co-curing molding method for stiffener wall panels described in Example 1, the step (1) preforming the girders:
首先,在桁件预成型模具上采用刷胶及手工铺贴的方式,首先按预成型模具位置将桁件进行折弯;完成后,在折弯后的桁件的周围糊制真空袋,抽真空,真空度大于0.07 Mpa;在固化炉中进行预成型;预成型温度80±5℃,恒温1小时,升温速率为2~5℃/min。Firstly, glue brushing and manual laying are used on the preforming mold of the truss, and the truss is first bent according to the position of the preforming mold; after completion, a vacuum bag is pasted around the bent truss and pumped Vacuum, the vacuum degree is greater than 0.07 Mpa; preform in a curing furnace; the preform temperature is 80±5°C, the temperature is constant for 1 hour, and the heating rate is 2-5°C/min.
实施例3:Example 3:
根据实施例1或2所述的一种加强筋壁板共固化成型方法,所述的步骤(2)壁板蒙皮的铺贴:According to the co-curing molding method of the rib wall panel described in embodiment 1 or 2, the step (2) laying of the wall panel skin:
按照设计图纸要求,按规定的铺层方向和顺序逐层铺放在模具(或平台)上。According to the requirements of the design drawings, lay them on the mold (or platform) layer by layer according to the specified layer direction and sequence.
实施例4:Example 4:
根据实施例1或2或3所述的一种加强筋壁板共固化成型方法,所述的步骤(3)桁件的位置定位:According to a co-curing molding method for stiffener wall panels described in Embodiment 1 or 2 or 3, the position positioning of the trusses in the step (3):
在放好蒙皮的蒙皮成型工装上按需要放置预成型后的桁件及各种定位件,并通过激光投影仪确定各预成型后的桁件及各种定位件的位置,桁件的内部采用硬质硅橡胶芯作为支撑,保证桁件在共固化的过程中外形。同时在长桁、短桁外部使用定位硅橡胶防止在共固化过程中桁件产生位移。Place the preformed stringers and various positioning parts on the skin forming tooling after the skin is placed, and determine the position of each preformed stringer and various positioning parts through a laser projector, and the position of the stringers A hard silicone rubber core is used as a support inside to ensure the shape of the girders during the co-curing process. At the same time, positioning silicone rubber is used outside the long and short girders to prevent the displacement of the girders during the co-curing process.
实施例5:Example 5:
根据实施例1或2或3或4所述的一种加强筋壁板共固化成型方法,所述的步骤(4)共固化:According to a co-curing molding method for ribbed wall panels described in Embodiment 1 or 2 or 3 or 4, the co-curing step (4) is as follows:
在通过激光投影仪确定位置后的桁件及各种定位件的周围糊制真空袋,在固化炉中进行固化,固化温度为180±5℃,保温时间为150 +10 min,压力为0.4~0.6MPa,升降温速率1~3℃/min。Vacuum bags are pasted around the trusses and various positioning parts after the position is determined by the laser projector, and then cured in a curing furnace at a curing temperature of 180±5°C, a holding time of 150 +10 min, and a pressure of 0.4~ 0.6MPa, heating and cooling rate 1 ~ 3 ℃ / min.
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510208287.1ACN104816488B (en) | 2015-04-29 | 2015-04-29 | Co-curing molding method of stiffened siding |
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510208287.1ACN104816488B (en) | 2015-04-29 | 2015-04-29 | Co-curing molding method of stiffened siding |
| Publication Number | Publication Date |
|---|---|
| CN104816488Atrue CN104816488A (en) | 2015-08-05 |
| CN104816488B CN104816488B (en) | 2019-05-07 |
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510208287.1AExpired - Fee RelatedCN104816488B (en) | 2015-04-29 | 2015-04-29 | Co-curing molding method of stiffened siding |
| Country | Link |
|---|---|
| CN (1) | CN104816488B (en) |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106273547A (en)* | 2016-09-09 | 2017-01-04 | 西安爱生技术集团公司 | One has cabin cover and Ω stringer deep camber unmanned plane wallboard manufacturing process |
| CN106273539A (en)* | 2016-08-29 | 2017-01-04 | 中航复合材料有限责任公司 | A kind of shape for hat Material Stiffened Panel co-curing moulding technique |
| CN107199714A (en)* | 2017-06-27 | 2017-09-26 | 中国航空工业集团公司基础技术研究院 | A kind of variable curvature Composite Material Stiffened Panel moulding technique of co-curing |
| CN108943766A (en)* | 2017-05-19 | 2018-12-07 | 中国商用飞机有限责任公司 | Co-bonding forming process for T-shaped reinforced wall plate made of composite material |
| CN109592003A (en)* | 2018-11-05 | 2019-04-09 | 中国航空工业集团公司西安飞机设计研究所 | A kind of band stringer, docking auricle integral composite aerofoil wall panel structure |
| CN110142985A (en)* | 2019-05-16 | 2019-08-20 | 江阴海达橡塑股份有限公司 | A kind of paving and solidification integral type core model and its application method |
| CN112571815A (en)* | 2020-10-29 | 2021-03-30 | 成都飞机工业(集团)有限责任公司 | Rib positioning method of reinforced wall plate |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102114706A (en)* | 2010-12-29 | 2011-07-06 | 江西昌河航空工业有限公司 | Method for forming frame, stringer and covering of composite material component through integrated co-curing |
| CN103802332A (en)* | 2014-03-03 | 2014-05-21 | 沈阳飞机工业(集团)有限公司 | Filled 0-degree carbon fiber prepreg preforming tooling and preforming process |
| CN103878993A (en)* | 2014-03-10 | 2014-06-25 | 成都飞机工业(集团)有限责任公司 | Method for checking locations of composite material parts folded by laser projection |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102114706A (en)* | 2010-12-29 | 2011-07-06 | 江西昌河航空工业有限公司 | Method for forming frame, stringer and covering of composite material component through integrated co-curing |
| CN103802332A (en)* | 2014-03-03 | 2014-05-21 | 沈阳飞机工业(集团)有限公司 | Filled 0-degree carbon fiber prepreg preforming tooling and preforming process |
| CN103878993A (en)* | 2014-03-10 | 2014-06-25 | 成都飞机工业(集团)有限责任公司 | Method for checking locations of composite material parts folded by laser projection |
| Title |
|---|
| 陈迎春: "《民用飞机设计和运营经济性及成本指数》", 30 November 2013, 上海交通大学出版社* |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106273539A (en)* | 2016-08-29 | 2017-01-04 | 中航复合材料有限责任公司 | A kind of shape for hat Material Stiffened Panel co-curing moulding technique |
| CN106273547A (en)* | 2016-09-09 | 2017-01-04 | 西安爱生技术集团公司 | One has cabin cover and Ω stringer deep camber unmanned plane wallboard manufacturing process |
| CN108943766A (en)* | 2017-05-19 | 2018-12-07 | 中国商用飞机有限责任公司 | Co-bonding forming process for T-shaped reinforced wall plate made of composite material |
| CN108943766B (en)* | 2017-05-19 | 2022-05-13 | 中国商用飞机有限责任公司 | Co-bonding forming process for T-shaped reinforced wall plate made of composite material |
| CN107199714A (en)* | 2017-06-27 | 2017-09-26 | 中国航空工业集团公司基础技术研究院 | A kind of variable curvature Composite Material Stiffened Panel moulding technique of co-curing |
| CN109592003A (en)* | 2018-11-05 | 2019-04-09 | 中国航空工业集团公司西安飞机设计研究所 | A kind of band stringer, docking auricle integral composite aerofoil wall panel structure |
| CN109592003B (en)* | 2018-11-05 | 2022-04-19 | 中国航空工业集团公司西安飞机设计研究所 | Integral composite material wing surface wallboard structure with stringer and butt joint lug |
| CN110142985A (en)* | 2019-05-16 | 2019-08-20 | 江阴海达橡塑股份有限公司 | A kind of paving and solidification integral type core model and its application method |
| CN110142985B (en)* | 2019-05-16 | 2024-04-19 | 江阴海达橡塑股份有限公司 | Paving and curing integrated core mold and application method thereof |
| CN112571815A (en)* | 2020-10-29 | 2021-03-30 | 成都飞机工业(集团)有限责任公司 | Rib positioning method of reinforced wall plate |
| CN112571815B (en)* | 2020-10-29 | 2022-06-14 | 成都飞机工业(集团)有限责任公司 | Rib positioning method of reinforced wall plate |
| Publication number | Publication date |
|---|---|
| CN104816488B (en) | 2019-05-07 |
| Publication | Publication Date | Title |
|---|---|---|
| CN104816488A (en) | Reinforcing rib wall plate co-curing forming method | |
| US9623620B2 (en) | Three-dimensional reuseable curing caul for use in curing integrated composite components and methods of making the same | |
| CN110171183B (en) | Positioning and pressure-equalizing device containing embedded part honeycomb sandwich structure and forming method | |
| CN105383072B (en) | A kind of carbon fiber/high tenacity epoxy composite material grid rib forming method | |
| CN104029397B (en) | The preparation facilities of a kind of technique for aircraft composite fuselage wallboard and preparation method | |
| CN102909866A (en) | Method for forming control of long joist axial line of composite material stiffened wall panel | |
| CN103434141B (en) | The forming method of the box-like reinforced structure of a kind of carbon fibre composite | |
| CN105965917B (en) | The co-curing moulding technique of composite material bilateral reinforcement fuselage framework | |
| CN101743117B (en) | Molds and methods for manufacturing aircraft frames from composite materials | |
| EP2052846B1 (en) | Method of forming a T-shaped composite structure comprising a radius filler and radius filler | |
| CN102056730A (en) | Method of manufacturing a turbine blade half, turbine blade half, method of manufacturing a turbine blade, and turbine blade | |
| CN113681937B (en) | Composite material cap-shaped stringer wallboard structure and preparation method | |
| CN106891548B (en) | Forming tool and forming method for T-shaped reinforced wallboard made of composite material | |
| CN103770341A (en) | Processing system for carbon fiber reinforced composite material and controllable carbon fiber self-heating method adopting liquid molding technology | |
| CN103407172B (en) | A kind of high efficiency integral forming method of fiber-reinforced resin matrix compound material T connector | |
| CN110509570B (en) | A new energy vehicle battery box box carbon fiber prepreg laying and molding method | |
| CN110116510A (en) | A kind of integrated molding method of composite material cabin | |
| CN104647771A (en) | K-cor foam sandwich enhanced composite material cap-shaped reinforcing rib wall plate structure and forming method thereof | |
| CN104527201A (en) | A carbon fiber sandwich inspection tool frame and preparation method thereof | |
| ES2890680T3 (en) | Assembly procedure by gluing parts, in particular composite parts with fibrous reinforcements | |
| US10611101B2 (en) | Mandrel forming for discrete wing skin stiffeners | |
| CN108215241B (en) | Rapid molding method of resin-based composite material | |
| CN206528102U (en) | A kind of T-shaped Material Stiffened Panel forming frock of composite | |
| RU2559446C1 (en) | Manufacturing method of three-layered panel from composite material | |
| CN108864995A (en) | A kind of polyaxial composite bend and preparation method |
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | Effective date of registration:20231117 Address after:Room 720, No. 180 Hongqi Street, Building 26, Nangang, High tech Entrepreneurship Center, High tech Industrial Development Zone, Harbin City, Heilongjiang Province, 150090 Patentee after:HARBIN WEITAISI ENERGY TECHNOLOGY Co.,Ltd. Address before:Room 305, Building F, Animation Base, Bohai Road, Pingfang District, Harbin City, Heilongjiang Province, 150000 yuan Patentee before:HARBIN DIANHANG TECHNOLOGY DEVELOPMENT CO.,LTD. | |
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee | Granted publication date:20190507 | |
| CF01 | Termination of patent right due to non-payment of annual fee |