CN104779562A - Temporary positioning and containing system for pulling out crawler data center data transmission lines - Google Patents

Temporary positioning and containing system for pulling out crawler data center data transmission lines
Download PDF

Info

Publication number
CN104779562A
CN104779562ACN201510200108.XACN201510200108ACN104779562ACN 104779562 ACN104779562 ACN 104779562ACN 201510200108 ACN201510200108 ACN 201510200108ACN 104779562 ACN104779562 ACN 104779562A
Authority
CN
China
Prior art keywords
data line
line
data transmission
data
data center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510200108.XA
Other languages
Chinese (zh)
Inventor
严澜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Chuan Hang Information technology company limited
Suzhou Chong Xing Mdt InfoTech Ltd
Original Assignee
Chengdu Chuan Hang Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Chuan Hang Information Technology Co LtdfiledCriticalChengdu Chuan Hang Information Technology Co Ltd
Priority to CN201510200108.XApriorityCriticalpatent/CN104779562A/en
Publication of CN104779562ApublicationCriticalpatent/CN104779562A/en
Pendinglegal-statusCriticalCurrent

Links

Landscapes

Abstract

The invention discloses a temporary positioning and containing system for pulling out crawler data center data transmission lines. The system comprises an installing substrate, a plurality of installing grooves are formed in the front side of the installing substrate, and a plurality of groove wall protrusions are arranged on the inner walls of the installing grooves. The system further comprises a plurality of positioning blocks, data transmission line positioning grooves are formed in the back sides of the positioning blocks, two extension columns are further arranged on the back side of each positioning block, each data transmission line positioning groove is located between every two extension columns, a plurality of friction protrusions are arranged on the outer diameter faces of every two extension columns, every two extension columns correspondingly extend into two installing grooves, the friction protrusions and the groove wall protrusions are connected together in a pressed mode, and the data transmission lines are clamped in the data transmission line positioning grooves. The system has the advantages of being simple in structure, low in cost, favorable for later-stage overhaul and capable of shortening data transmission line inserting time.

Description

Reptile data center data line pulls out the interim positions discharge system of line
Technical field
The present invention relates to the capital construction technical field of large data center, specifically reptile data center data line pulls out the interim positions discharge system of line.
Background technology
In the capital construction technology of large data center, the amount of the data line used is very large, the data line of a FPDP can reach tens, and all according to carrying out matrix spread configuration by rows, when port damages or server damage, when needing to change whole equipment, original data line being connected to port is then needed to pull up, then wait after more finishing changing server, predetermined port place is inserted into again by former data outlet one one, at this moment data line is then mixed and disorderly discharge, need to confirm that correct data line inserts correct corresponding ports place again according to the label on data line, because former data line is in mixed and disorderly laying state after pulling out, therefore, operating personnel need the label of the confirmation data line of one one, such operation very elapsed time.
Summary of the invention
A kind of reptile data center data line is the object of the present invention is to provide to pull out the interim positions discharge system of line, can the data line after pulling out be placed in this system, the data line that shape is in a row, avoid data line after pulling out, be in mixed and disorderly state, like this, when restoring, fast the data line pulled out can be inserted on corresponding port, a large amount of time can be saved.
Object of the present invention is achieved through the following technical solutions: reptile data center data line pulls out the interim positions discharge system of line, comprises installation base plate, and the front of installation base plate is provided with some mounting grooves, and the inwall of mounting groove is provided with some cell walls projection; Also comprise multiple locating piece, the back side of locating piece is provided with data line location notch, the back side of locating piece is also provided with 2 extending columns, data line location notch is between 2 extending columns, the outer diameter face of 2 extending columns is provided with some friction protrusion, 2 extending column one_to_one corresponding extend in 2 mounting grooves, and friction protrusion and cell wall projection are crimped together, and data line is stuck in data line location notch.
The principle that realizes of said system is: remove data line due to tradition and do not adopt this structure, therefore after tradition removes data line, all data lines are in mixed and disorderly state, data line after dismounting is entwined mutually together, when at this moment will reinsert data line, need according to the label on data line for find out for FPDP, therefore, process is gone in this operation very elapsed time, after utilizing native system, during operation, the data line of dismounting can be inserted corresponding data line location notch one to one, then locating piece is utilized to be fixed on according between transmission line location notch and installation base plate by the data line after dismounting, the data line of such maintenance corresponding ports be arranged on for transmission line location notch on, such as, the port of data line has 4, corresponding has 4 data lines, and also correspondingly in native system be provided with 4 locating pieces, 8 mounting grooves, at this moment, we are by after 1 number transmission line dismounting, be placed in the data line location notch of first locating piece, then 2 of first locating piece friction protrusion are inserted in 2 corresponding mounting grooves, 1 number transmission line is made to be fixed on installation base plate, in like manner, 3 remaining single data transmission lines are fixed on installation base plate together, what make all data line yi word patterns is arranged on installation base plate, and arrange according to the position of port, when reinstalling data line line, we only need to pull out locating piece, then the data line of correspondence is taken out and insert corresponding FPDP, like this in whole operation, we go to find corresponding data line without the need to removing the label on data-driven line, whole operation is very simple, elapsed time is also very short, in order to reach time-saving object, simultaneously, because native system is an interim fixture, therefore extending column and mounting groove is adopted to carry out frictional fit in native system, namely the cell wall projection that the friction protrusion arranged on extending column and mounting groove are arranged carries out frictional fit, extruding contact is formed between friction protrusion and cell wall projection, cause certain frictional force, therefore whole operation is very easy, can complete within a second, afterwards when pulling out locating piece, also larger strength is only used just can to extract, without the need to adopting other instruments, to reach the shortest dismounting time.
Preferably, described friction protrusion and cell wall projection are all rubber bumps part, thus increase frictional force.
Preferably, described friction protrusion and cell wall projection are all rubber ring, thus increase frictional force.
Preferably, described locating piece is block rubber, protected data transmission line, prevents data line from being crushed.
Preferably, preferably, described mounting groove is blind round hole or manhole.
Preferably, preferably, described extending column is round rubber post.
The invention has the advantages that: structure is simple, and cost is low, utilizes the later stage to overhaul, shorten the time of data inserting transmission line.
Accompanying drawing explanation
Fig. 1 is the schematic side view of locating piece.
Fig. 2 is schematic side view of the present invention.
Fig. 3 is the enlarged diagram in I region in Fig. 2.
Fig. 4 is schematic top plan view of the present invention.
Reference numeral in figure is expressed as: 1, locating piece; 11, data line location notch; 12, extending column; 13, friction protrusion; 2, installation base plate; 21, mounting groove; 22, cell wall is protruding; 3, data line.
Embodiment
Below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not limited thereto.
Embodiment 1:
As shown in Figure 1 to Figure 2.Reptile data center data line pulls out the interim positions discharge system of line, comprises installation base plate 2, and the front of installation base plate 2 is provided with some mounting grooves 21, and the inwall of mounting groove 21 is provided with some cell wall projections 22; Also comprise multiple locating piece 1, the back side of locating piece 1 is provided with data line location notch 11, the back side of locating piece 1 is also provided with 2 extending columns 12, data line location notch 11 is between 2 extending columns 12, the outer diameter face of 2 extending columns 12 is provided with some friction protrusion 13,2 extending column 12 one_to_one corresponding extend in 2 mounting grooves 21, and friction protrusion 13 and cell wall projection are crimped together, and data line 3 is stuck in data line location notch 11.
The principle that realizes of said system is: remove data line due to tradition and do not adopt this structure, therefore after tradition removes data line, all data lines are in mixed and disorderly state, data line after dismounting is entwined mutually together, when at this moment will reinsert data line, need according to the label on data line for find out for FPDP, therefore, process is gone in this operation very elapsed time, after utilizing native system, during operation, the data line of dismounting can be inserted corresponding data line location notch 11 one to one, then locating piece 1 is utilized to be fixed on according between transmission line location notch 11 and installation base plate 2 by the data line after dismounting, the data line of such maintenance corresponding ports be arranged on for transmission line location notch 11 on, such as, the port of data line has 4, corresponding has 4 data lines, and also correspondingly in native system be provided with 4 locating pieces 1, 8 mounting grooves 21, at this moment, we are by after 1 number transmission line dismounting, be placed in the data line location notch 11 of first locating piece 1, then 2 of first locating piece 1 friction protrusion 13 are inserted in 2 corresponding mounting grooves 21, 1 number transmission line is made to be fixed on installation base plate 2, in like manner, 3 remaining single data transmission lines are fixed on installation base plate 2 together, what make all data line yi word patterns is arranged on installation base plate 2, and arrange according to the position of port, when reinstalling data line line, we only need to pull out locating piece 1, then the data line of correspondence is taken out and insert corresponding FPDP, like this in whole operation, we go to find corresponding data line without the need to removing the label on data-driven line, whole operation is very simple, elapsed time is also very short, in order to reach time-saving object, simultaneously, because native system is an interim fixture, therefore extending column 12 and mounting groove 21 is adopted to carry out frictional fit in native system, namely the cell wall projection 22 that the friction protrusion 13 arranged on extending column 12 and mounting groove 21 are arranged carries out frictional fit, extruding contact is formed between friction protrusion 13 and cell wall projection 22, cause certain frictional force, therefore whole operation is very easy, can complete within a second, afterwards when pulling out locating piece 1, also larger strength is only used just can to extract, without the need to adopting other instruments, to reach the shortest dismounting time.
Preferably, described friction protrusion 13 and cell wall projection are all rubber bumps part, thus increase frictional force.
Preferably, described friction protrusion 13 and cell wall projection are all rubber ring, thus increase frictional force.
Preferably, described locating piece is block rubber, protected data transmission line, prevents data line from being crushed.
Preferably, preferably, described mounting groove is blind round hole or manhole.
Preferably, preferably, described extending column is round rubber post.
As mentioned above, then well the present invention can be realized.

Claims (6)

1. reptile data center data line pulls out the interim positions discharge system of line, it is characterized in that: comprise installation base plate (2), the front of installation base plate (2) is provided with some mounting grooves (21), and the inwall of mounting groove (21) is provided with some cell wall projections (22); Also comprise multiple locating piece (1), the back side of locating piece (1) is provided with data line location notch (11), the back side of locating piece (1) is also provided with 2 extending columns (12), data line location notch (11) is positioned between 2 extending columns (12), the outer diameter face of 2 extending columns (12) is provided with some friction protrusion (13), 2 extending column (12) one_to_one corresponding extend in 2 mounting grooves (21), friction protrusion (13) and cell wall projection are crimped together, and data line (3) is stuck in data line location notch (11).
CN201510200108.XA2015-04-262015-04-26Temporary positioning and containing system for pulling out crawler data center data transmission linesPendingCN104779562A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201510200108.XACN104779562A (en)2015-04-262015-04-26Temporary positioning and containing system for pulling out crawler data center data transmission lines

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201510200108.XACN104779562A (en)2015-04-262015-04-26Temporary positioning and containing system for pulling out crawler data center data transmission lines

Publications (1)

Publication NumberPublication Date
CN104779562Atrue CN104779562A (en)2015-07-15

Family

ID=53620875

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201510200108.XAPendingCN104779562A (en)2015-04-262015-04-26Temporary positioning and containing system for pulling out crawler data center data transmission lines

Country Status (1)

CountryLink
CN (1)CN104779562A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN113421176A (en)*2021-07-162021-09-21昆明学院Intelligent abnormal data screening method

Citations (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
GB1134255A (en)*1966-11-091968-11-20Westland Aircraft LtdImprovements in or relating to clip arrangements for pipes, cables, and the like
CN2462174Y (en)*2000-09-202001-11-28吴东兴 Multi-line side-by-side spacing and direction change fixture
EP1241758A1 (en)*2001-03-132002-09-18Rupert Jun. GatterbauerFastening assembly for cable
CN2678218Y (en)*2003-12-052005-02-09彭元晖 cable management rack
CN202231369U (en)*2011-05-242012-05-23郑凯仁Wire binding clamp
CN204230797U (en)*2014-09-272015-03-25安徽省亿嘉弘电器有限公司Integrated electronic wire harness
CN204633024U (en)*2015-04-262015-09-09成都创行信息科技有限公司Large data center data line pulls out line exhaust system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
GB1134255A (en)*1966-11-091968-11-20Westland Aircraft LtdImprovements in or relating to clip arrangements for pipes, cables, and the like
CN2462174Y (en)*2000-09-202001-11-28吴东兴 Multi-line side-by-side spacing and direction change fixture
EP1241758A1 (en)*2001-03-132002-09-18Rupert Jun. GatterbauerFastening assembly for cable
CN2678218Y (en)*2003-12-052005-02-09彭元晖 cable management rack
CN202231369U (en)*2011-05-242012-05-23郑凯仁Wire binding clamp
CN204230797U (en)*2014-09-272015-03-25安徽省亿嘉弘电器有限公司Integrated electronic wire harness
CN204633024U (en)*2015-04-262015-09-09成都创行信息科技有限公司Large data center data line pulls out line exhaust system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN113421176A (en)*2021-07-162021-09-21昆明学院Intelligent abnormal data screening method
CN113421176B (en)*2021-07-162022-11-01昆明学院Intelligent screening method for abnormal data in student score scores

Similar Documents

PublicationPublication DateTitle
CN103682702B (en)Utilize the method for surface mounting technology cap component locating surface mounting technology connector
ES2643124T3 (en) Connection terminal
CN103221833A (en)Tester having an application specific electronics module, and systems and methods that incorporate or use same
CN104779562A (en)Temporary positioning and containing system for pulling out crawler data center data transmission lines
CN204633024U (en)Large data center data line pulls out line exhaust system
US20160370549A1 (en)Optical fiber distribution apparatus
CN114270718A (en) Addressing based on load center location
CN102830545A (en)Liquid crystal display device and rear panel component
CN203760829U (en)Railway signal indoor combined side terminal wiring positioning plate
CN104037653A (en)Material box for repairing 10kV distribution line poles and towers
US20170105305A1 (en)Cable Assembly Management Elements and Fixture
CN204946488U (en)LED display unit and Grand LED Screen
US20110045691A1 (en)Easily installable network wiring device
CN210376668U (en)Radar high-low temperature testing device
CN209150357U (en)A kind of wire harness connecting device
CN203590997U (en)Novel key box
CN201657569U (en)Server combination
CN203623939U (en)Detachable water desilting platform
CN104858848A (en)Simple base
Schiefer et al.Creating a self-configuring finite state machine out of memory look-up tables
CN203026732U (en)Needle-type plug fixing mechanism
CN221177205U (en)Weak current wiring transfer equipment
CN105655761B (en)Connector and communication equipment
CN210222074U (en)Split type electronic motherboard test carrier
CN202663075U (en)Novel tail tube for GIS (Geographic Information System) terminal

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
TA01Transfer of patent application right

Effective date of registration:20170621

Address after:610000 Chengdu high tech Zone, Sichuan Tianyi street, No. 3, building 38

Applicant after:Chengdu Chuan Hang Information technology company limited

Applicant after:Suzhou Chong Xing Mdt InfoTech Ltd

Address before:610000 Chengdu high tech Zone, Sichuan Tianyi street, No. 3, building 38

Applicant before:Chengdu Chuan Hang Information technology company limited

TA01Transfer of patent application right
RJ01Rejection of invention patent application after publication

Application publication date:20150715