CN104481398B - A kind of three-dimensional horizontal well drilling construction method - Google Patents

A kind of three-dimensional horizontal well drilling construction method
Download PDF

Info

Publication number
CN104481398B
CN104481398BCN201410758293.XACN201410758293ACN104481398BCN 104481398 BCN104481398 BCN 104481398BCN 201410758293 ACN201410758293 ACN 201410758293ACN 104481398 BCN104481398 BCN 104481398B
Authority
CN
China
Prior art keywords
well
drilling
section
drill
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410758293.XA
Other languages
Chinese (zh)
Other versions
CN104481398A (en
Inventor
闫吉曾
胡冠
邓红琳
屈玉凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp
China Petroleum and Chemical Corp
Original Assignee
Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp, China Petroleum and Chemical CorpfiledCriticalEngineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp
Priority to CN201410758293.XApriorityCriticalpatent/CN104481398B/en
Publication of CN104481398ApublicationCriticalpatent/CN104481398A/en
Application grantedgrantedCritical
Publication of CN104481398BpublicationCriticalpatent/CN104481398B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The invention discloses a kind of three-dimensional horizontal well drilling construction method, belong to oil and gas well drilling technical field.The method deviated directional drilling section uses four sections of systems, second segment three-dimensional increasing hole angle variable-azimuth well section drilling well build angle rate, first paragraph two dimension build section drilling well build angle rate, the 4th section of two-dimentional build section build angle rate are the most identical, during overcoming conventional construction method, build angle rate is continually changing, must often adjust instrument build angle rate, make a trip technological deficiency often;Meanwhile, second segment increasing hole angle variable-azimuth well section is turned round tool face azimuth, orientation and is remained constant, it is to avoid time that pendulum tool-face expends and construction work amount.Construction method of the present invention, drilling well and orientation easy construction, improve target probability in heterogeneous reservoir, using traditional drilling tool equipment, same case can shorten the engineering time more than 25%, efficiency of construction is greatly improved, reduce difficulty of construction, and saving operating expenses reaches more than 17%, substantial saving in cost, be suitable to actual production and use.

Description

A kind of three-dimensional horizontal well drilling construction method
Technical field
The invention belongs to oil natural gas drilling technology field, be specifically related to a kind of three-dimensional horizontal well drilling construction method.
Background technology
In petroleum gas technical field, in order to improve reservoir development degree, save well site land area, protection environment andReduce drilling cost, sometimes carry out three-dimensional well rail drill well construction, during platform cluster horizontal well is disposed, in order toImproving individual well draining (gas) area, each individual well horizontal segment is parallel to each other, and this is accomplished by carrying out three-dimensional well track construction,Difficulty of construction is big.And for the oil gas of effluent runner formation of deposits as DaNiuDi gas field, oil field, Red River and Jing He oil fieldField, reservoir heterogeneity is strong, and A target spot accurately lands difficulty, and its difficulty of construction is the most extremely difficult.
At present the successful construction method of a set of comparison also be there is no for heterogeneous reservoir horizontal well three-dimensional borehole track, be mostlyWith the experience of on-the-spot drilling engineer, it is mainly manifested in several aspect: (1) borehole track is usually according to inclined plane method or circlePost helical method designs, and tool face azimuth is in real time in change, and pendulum tool-face consumes plenty of time and energy;(2) instrument deflectingRate is continually changing along with the change of hole angle, it is necessary to often adjust instrument build angle rate, makes a trip often, drilling well timelinessLow, easily there is borehole well instability;(3) due to the anisotropism of reservoir, " feel unsure of " in landing mission, constructedJourney has blindness, is easily caused and misses the target;(4) in kickoff point (KOP) orientation work progress, directional bearing is typically based on experienceValue, causes extreme difficulties to follow-up three-dimensional orientation of turning round.
From the point of view of North China branch company Ordos Basin drilling practice, use at present traditional third generation deviating and directing instrument systemUnited construction well depth about the 2500m of heterogeneous reservoir horizontal well three-dimensional borehole track, extended horizontal depth 600~800m,Substantially needing more than 30 days, the engineering time is long, and construction work amount is big;Use forth generation orientation system, i.e. rotary steeringWell system, construction realizes real-time inspection and control, and the engineering time is short, but only this every day, construction expended more than 20 ten thousand yuan,Cost is high, is unfavorable for that oil field at home oil (gas) drilling well is actually used, and uses third generation phasing tools system, every dayExpending orientation day and be only about 20,000 yuan, only about 1/10th of forth generation orientation system, therefore research card develops onePlant and use conventional drilling equipment.The three-dimensional horizontal well drilling construction method of tradition directional orientation tool system, natural to China's oilThe development of the production technique of gas is significant.
Summary of the invention
In order to overcome the defect of prior art, it is an object of the invention to provide one fixed based on conventional drilling equipment, traditionTo the three-dimensional horizontal well drilling construction method of tool system, it is achieved construct safely and fast, save construction work amount, improve timeBetween utilization rate, and the most cost-effective, enter under subsequent casings, completion pressure break and recover the oil qualified well is provided.
To achieve these goals, the technical solution used in the present invention is as follows:
A kind of three-dimensional horizontal well drilling construction method, including following operating procedure:
1) straight well section drilling well;
2) deviated directional drilling section drilling well, its sequence of construction is: first paragraph two dimension build section drilling well, second segment three-dimensional increasing hole angleVariable-azimuth well section drilling well, the 3rd section of two dimension steady lower curved section drilling well, the 4th section of two-dimentional build section drilling well;Wherein second segment threeDimension increasing hole angle variable-azimuth well section drilling well build angle rate, first paragraph two dimension build section drilling well build angle rate, the 4th section of two-dimentional build sectionBuild angle rate is the most identical;Second segment increasing hole angle variable-azimuth well section is turned round tool face azimuth, orientation and is remained constant;
3) orientation horizontal segment drilling well.
The outside diameter a size of 311.2mm that described straight well section wellbore construction uses.
The outside diameter a size of 215.9mm that described deviated directional drilling section wellbore construction and orientation horizontal segment wellbore construction use.
Often creep into during described deviated directional drilling section wellbore construction 100~150m short next time, circulating fluid, untilReturn out landwaste content less than 0.2%.
Often creep into during described orientation horizontal segment wellbore construction 200~250m short next time, circulating fluid, untilReturn out landwaste content less than 0.2%.
During described first paragraph two dimension increasing hole angle section wellbore construction, according to initial drift azimuth and the tool-face angle swing instrument of designFace, controls drill speed than screw speed big 45~55r/min, and discharge capacity is 29~31L/s, adds the pressure of the drill 2~4 tons, creeps into 1After post, increasing the pressure of the drill is 14~16 tons, stops boring to two dimension borehole track maximum hole angle until creeping into, maximum hole angleControl between 10~45 °.
Described first paragraph two dimension increasing hole angle section wellbore construction uses the mode that oriented sliding drilling well combines with combined drilling.
During described second segment three-dimensional increasing hole angle variable-azimuth well section wellbore construction, according to design tool face angle swing tool-face, control to boreHead rotating ratio screw speed big 35~45r/min, discharge capacity is 28~30L/s, adds the pressure of the drill 14~16 tons, creeps into turning round orientationTerminating, at the end of turning round orientation, maximum hole angle is between 45~85 °.
Further, during the construction of described second segment three-dimensional increasing hole angle variable-azimuth well section, a deviational survey is often crept into once.
During described 3rd section of two-dimentional steady tilted section wellbore construction, control drill speed than screw speed big 50~60r/min, discharge capacityIt is 30~33L/s, adds the pressure of the drill 14~16 tons.
During described 3rd section of two-dimentional steady tilted section wellbore construction, according to the First terminal point of logging data real-time estimate borehole trackVertical depth changes, and determines steady tilted section segment length, carries out steady tilted section wellbore construction.
During described 4th section of two-dimentional increasing hole angle section wellbore construction, control drill speed than screw speed big 45~55r/min, discharge capacityBeing 28~30L/s, add the pressure of the drill 6~8 tons, until at borehole track A target spot, error control is vertical skew 0~1 meter, horizontalOffset 0~10 meter.
Described A target spot is the level segment start point of borehole track.
Described straight well section drilling well include following operating procedure:
1) dig deep 2.5~3m, the round well of diameter 2~2.5m, under enter a circular metal bucket, annular space sealing;
2) the top drilling well of straight well section is carried out;
3) straight well pars infrasegmentalis drilling well is carried out.
Described circular metal bucket internal diameter is at least bigger 0.3m than well control equipment external diameter.
During described straight well section top wellbore construction, controlling drill speed is 90~95r/min, and discharge capacity is 40L/s, adds the pressure of the drill2~4 tons, creeping into one and offer meter well depth, stop creeping into, well-flushing, layer sleeve pipe stays 0.5~1m pocket and carries out solidWell construction, cementing operation terminates rear Hou Ning 8~13h.
Described one opens as the top drilling well of straight well section.
Above-mentioned well-flushing maintains wellbore stability for adding weighted cement, and circulation well cleanup is to returning out without obvious granule.
During described straight well pars infrasegmentalis wellbore construction, controlling drill speed 55r/min bigger than screw speed, discharge capacity is30~35L/s, bore cement and control, at 2~3 tons, to treat that drill collar or heavy weight drill pipe all enter new stratum with the pressure of the drill during the interface of stratumRear the pressure of the drill controls at 6~8 tons, until kickoff point (KOP).
Further, during above-mentioned straight well pars infrasegmentalis wellbore construction, each post tilts once, if hole deviation and horizontal well displacement existIn design claimed range, continuation drilling well, to kickoff point (KOP), if hole deviation and horizontal well displacement be not in design claimed range, is enteredRow well straightening drilling well is to kickoff point (KOP).
Described orientation horizontal segment wellbore construction is straight for being oriented two-dimensional level section wellbore construction from borehole track First terminal pointTo borehole track the second terminal, controlling drill speed than screw speed big 40~45r/min, discharge capacity is 28~30L/s, adds brillPressing 6~8 tons, well track dog-leg severity is less than 3 °/30m;Control drilling fluid dehydration < 5ml, drilling liquid flow sex indexBeing 0.4~0.7, ratio of dynamic shear force/yield value to plastic viscosity is 0.36~0.55, coefficient of viscosity < 0.06.
BHA used in above-mentioned work progress be PDC drill bit+single bend PDM+non magnetic drill collar+measurement while drilling instrument+Centralizer+drill collar+heavy weight drill pipe+common drilling rod.
Described PDC drill bit wing >=5;Centralizer external diameter relatively outside diameter is to when young 3mm;Drilling rod and heavy weight drill pipe are newDegree for one-level and more than.
Three-dimensional horizontal well drilling construction method of the present invention, deviated directional drilling section uses four sections of systems, second segment three-dimensional increasing hole angle variable-azimuthWell section drilling well build angle rate, first paragraph two dimension build section drilling well build angle rate, the 4th section of two-dimentional build section build angle rate are the most identical,During overcoming conventional construction method, build angle rate is continually changing, it is necessary to often adjusts instrument build angle rate, makes a trip oftenTechnological deficiency;Meanwhile, second segment increasing hole angle variable-azimuth well section is turned round tool face azimuth, orientation and is remained constant, it is to avoid pendulum workThe time of tool face consuming and construction work amount.Construction method of the present invention, drilling well and orientation easy construction, improve heterogeneous bodyTarget probability in reservoir, uses traditional drilling tool equipment, can complete construction at about 20 days, be greatly improvedEfficiency of construction, reduces difficulty of construction, can save construction and expend 70~900,000 yuan, substantial saving in cost, be suitable to realityProduction and application.
Three-dimensional horizontal well drilling construction method of the present invention, is particularly suited for horizontal segment and uses Ф 81/2 " two grades of well bores knotStructure three-dimensional horizontal well construction.
Accompanying drawing explanation
Fig. 1 is the vertical planing surface schematic diagram of embodiment 1 borehole track;
Fig. 2 is embodiment 1 and conventional two-dimensional level well rate of penetration comparison diagram;
Fig. 3 is embodiment 1 and conventional two-dimensional level well drilling period comparison diagram;
Fig. 4 is the present embodiment 1 drilling period scattergram.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail, but does not constitute any limitation of the invention.
Embodiment 1
The present embodiment, with Jing He oil field a bite heterogeneous reservoir three-dimensional horizontal well for construction object, uses ZJ40 rig, nothingTop is driven, the vertical planing surface figure of borehole track as it is shown in figure 1, wherein A target spot be the level segment start point of borehole track;BTarget spot is the end point of borehole track, and BHA is " PDC drill bit+single bend PDM+non magnetic drill collar+measurement while drilling instrument+ centralizer+drill collar+heavy weight drill pipe+common drilling rod ".
The present embodiment three-dimensional horizontal well construction method is: concrete operation step is:
1) correction rotating disk, overhead traveling crane, well head three's central point is on same plumb line, and error is less than 5 millimeters;
2) dig what a deep 2.8 meters, the round well of diameter 3.2 meters, under enter a circular metal bucket, annular space cement concreteCarry out sealing;
3) carrying out one-dimensional straight well section top wellbore construction, outside diameter a size of 311.2mm, controlling drill speed is90~95r/min, discharge capacity is 40L/s, adds the pressure of the drill 2~4 tons, and drilling the 4th is that the soft layer of loess enters diagenesis stratum vertical depth100 meters, well depth 351.6m, stop creeping into and maintaining wellbore stability with weighted mud, circulation well cleanup is until vibrosieve is without brightTill aobvious solid phase particles returns out, setting of casing also carries out cementing operation, and cement slurry 22.1m is used in well cementation3, for slurry 12.9m3,Cement mortar proportion average out to 1.83, cement mortar returns out ground cementing operation to be terminated, and Hou Ning 13 hours, pressure testing is qualified;
4) one-dimensional straight well pars infrasegmentalis wellbore construction is carried out, outside diameter a size of 215.9mm, control drill speed and compare spiral shellThe big 55r/min of bar rotating speed, discharge capacity is 30~35L/s, bores cement and controls at 2~3 tons with the pressure of the drill during the interface of stratum, to be drilledAfter quickly fully entering new stratum, the pressure of the drill is at 6~8 tons, each deviational survey once, if hole deviation and horizontal displacement are wanted in designIn the range of asking, continue to creep into kickoff point (KOP), if hole deviation and horizontal well displacement be not in design claimed range, carry out well straighteningCreeping into until kickoff point (KOP), at kickoff point (KOP), hole angle is less than 2 degree, kickoff point (KOP) well depth 929m;
5) the first paragraph two dimension build section wellbore construction of lower curved section it is oriented, outside diameter a size of 215.9mm,According to initial orientation drift azimuth and tool-face angle swing tool-face, tool face azimuth error, within ± 1 degree, then locksRotating disk, spud in well pump, controls drill speed than screw speed big 45~55r/min, and discharge capacity is 29~31L/s, adds the pressure of the drill2~4 tons, after drilling well 1 post, increasing the pressure of the drill is 14~16 tons, uses oriented sliding drilling well to combine with combined drilling, directlyStopping boring to two dimension borehole track maximum hole angle to creeping into, vertical depth 1183.01m, maximum hole angle is 37.75 °.
6) second segment being oriented lower curved section is three-dimensional increasing hole angle variable-azimuth well section wellbore construction, first carries out drilling fluid and followsRing removes landwaste, and after termination of pumping, according to design tool face angle swing tool-face, tool face azimuth error, within ± 1 degree, locksRotating disk slipping drilling, build angle rate is identical with second segment two dimension build section, and outside diameter a size of 215.9mm, according to settingMeter tool-face angle swing tool-face, locks rotating disk slipping drilling, controls drill speed than screw speed big 35~45r/min, rowAmount is 28~30L/s, adds the pressure of the drill 14~16 tons, often creeps into single stopping and drilled through MWD measurement depth, hole angleAnd azimuth, creep into and terminate to torsion orientation, at the end of turning round orientation, maximum hole angle is 65.13 °, well depth 1522m.
7) the 3rd section that is oriented lower curved section is the steady lower curved section wellbore construction of two dimension, according to logging data real-time estimate AThe vertical depth change of target spot is carried out, and determines steady tilted section segment length 136m, carries out steady tilted section construction, well depth at the end of construction1658.2m;Outside diameter a size of 215.9mm, controls drill speed than screw speed big 50~60r/min, and discharge capacity is30~33L/s, add the pressure of the drill 14~16 tons.
8) the 4th section that is oriented lower curved section is two dimension build section wellbore construction, bit contour a size of 215.9mm,Controlling drill speed than screw speed big 45~55r/min, discharge capacity is 28~30L/s, adds the pressure of the drill 6~8 tons, until A targetPoint;Error control is in vertical skew 0~1 meter, crosstrall 0~10 meters, A target spot tiltedly deep 1845m, hole deviation 90.24 °, sideParallactic angle 358.96 °, vertical depth 1476.84m, close away from 596.36m, direction of closure 16.38m, transfer 3.70m, indulgeAway from 0.02m, target center is away from 3.70m.
9) two-dimensional level section wellbore construction is carried out, until creeping into B target spot, pull out of hole, outside diameter a size of 215.9mm,Controlling drill speed than screw speed big 40~45r/min, discharge capacity is 28~30L/s, adds the pressure of the drill 6~8 tons;B target spot is obliqueDeep 2604m, vertical depth 1466.23m, horizontal segment length 750m, hole deviation 89.87 °, 0 ° of azimuth, close away from 1332.93m,Advance 0.72m, transfer 0.46m, target center is away from 0.86m;The dog-leg severity of well track is less than 3 °/30m.
Embodiment 1 drilling well time-consuming 21 days to the whole work progress of B target spot, as shown in Figure 4, and uses traditional construction sideThe deep 2280m of a bite drilling well of method construction, the three-dimensional horizontal well of horizontal segment length 550m, engineering time needs 28.5 days, because ofThis compares traditional three-dimensional horizontal well drilling method, and the inventive method shortens drilling period 7.5 days, improves wellbore constructionEfficiency, takes saving 52.5 ten thousand yuan rig day, significantly reduces construction cost.
Contrast river, footpath in 2014 two-dimensional level well well data, as shown in Figures 2 and 3, oil field, river, footpath in 2014 is implementedTwo-dimensional level well average well depth 2160.01m, average rate of penetration 8.87m/h, average drilling period 30.26 days, implementExample 1 is comparing two-dimensional level well many drilling depths 443.99m, and three-dimensional horizontal well construction difficulty relatively two-dimensional level well more feelingsUnder condition, rate of penetration is 11.09m/h, improves 25.03%, and drilling period 21 days shortens 30.60%.
It should be noted last that: above example is only with illustrating and not to restriction technical scheme, although with reference to upperState embodiment the present invention has been described in detail, it will be understood by those within the art that;Still can be to thisBright modifying or equivalent, any modification or partial replacement without departing from the spirit and scope of the present invention, it is equalShould contain in the middle of scope of the presently claimed invention.

Claims (9)

2) deviated directional drilling section drilling well, its sequence of construction is: first paragraph two dimension build section drilling well, and second segment three-dimensional increasing hole angle becomesOrientation well section drilling well, the 3rd section of two dimension steady lower curved section drilling well, the 4th section of two-dimentional build section drilling well;Wherein second segment three-dimensional increasesTiltedly variable-azimuth well section drilling well build angle rate, first paragraph two dimension build section drilling well build angle rate, the 4th section of two-dimentional build section build angle rateThe most identical;Second segment increasing hole angle variable-azimuth well section is turned round tool face azimuth, orientation and is remained constant;
CN201410758293.XA2014-12-102014-12-10A kind of three-dimensional horizontal well drilling construction methodActiveCN104481398B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201410758293.XACN104481398B (en)2014-12-102014-12-10A kind of three-dimensional horizontal well drilling construction method

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201410758293.XACN104481398B (en)2014-12-102014-12-10A kind of three-dimensional horizontal well drilling construction method

Publications (2)

Publication NumberPublication Date
CN104481398A CN104481398A (en)2015-04-01
CN104481398Btrue CN104481398B (en)2016-08-24

Family

ID=52755990

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201410758293.XAActiveCN104481398B (en)2014-12-102014-12-10A kind of three-dimensional horizontal well drilling construction method

Country Status (1)

CountryLink
CN (1)CN104481398B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN105550412B (en)*2015-12-082018-09-28中国石油化工股份有限公司A kind of determination method and system of reality drilling well and planned well coincidence rate
CN105625944B (en)*2016-02-152018-03-13中国石油天然气股份有限公司Drilling method for sidetracking horizontal well with same diameter as original well shaft
CN106285479B (en)*2016-10-202020-05-05中国石油化工股份有限公司Three-dimensional GIS technology-based borehole trajectory control method
CN108661557B (en)*2017-03-272022-11-25中国石油化工股份有限公司Gas invasion prevention drilling method and control system for fracture-cavity gas reservoir
CN108798515B (en)*2017-05-042020-05-08中国石油天然气股份有限公司Directional drilling process for mudstone section
CN109902890B (en)*2017-12-072021-12-10中国石油化工股份有限公司华北油气分公司石油工程技术研究院Horizontal well landing target-in-target evaluation method and system
CN109915018B (en)*2017-12-072020-09-04中国石油化工股份有限公司华北油气分公司石油工程技术研究院Method for determining tool face angle in three-dimensional borehole trajectory control
CN108166927B (en)*2017-12-212019-06-04中国石油集团川庆钻探工程有限公司长庆钻井总公司It is a kind of for determining the appraisal procedure of horizontal well construction mode
CN108756746A (en)*2018-05-082018-11-06中国石油集团渤海钻探工程有限公司A kind of barefoot laterally drilling ultra-short radius controllable levels well boring method
CN109812256A (en)*2019-03-282019-05-28陕西延长石油(集团)有限责任公司研究院 A horizontal well structure and drilling method for low permeability shallow oil reservoir
CN111395975A (en)*2020-04-162020-07-10中国石油天然气集团有限公司Two-opening one-trip drilling tool combination suitable for construction of oil well horizontal well and construction method thereof
CN111594131B (en)*2020-05-142025-02-28广东石油化工学院 A T-type well group and a method for exploiting non-diagenetic natural gas hydrate
CN111550185B (en)*2020-05-152022-06-07洲际海峡能源科技有限公司Drilling method using screw and rotary steering tool combination system
CN112418650B (en)*2020-11-192024-08-06中国石油天然气集团有限公司Method and device for determining construction progress of petroleum drilling
CN113868951B (en)*2021-09-282024-12-10西南石油大学 A method for intelligently judging the best time for drilling short start
CN116341045A (en)*2021-12-232023-06-27中国石油天然气股份有限公司 Three-dimensional target horizontal well trajectory design method
CN116335535A (en)*2021-12-242023-06-27中国石油天然气股份有限公司 A speed-increasing method and speed-increasing system for compound drilling in long stable and inclined sections
CN114909119B (en)*2022-04-292023-03-24大庆辰平钻井技术服务有限公司Drilling method for converting original vertical well or inclined well into U-shaped geothermal well with ultra-short radius
CN116971724B (en)*2023-09-212024-01-12中国煤炭地质总局勘查研究总院 Composite multi-branch drilling method for carbon dioxide geological storage and monitoring

Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US4945994A (en)*1987-12-171990-08-07Standard Alaska Production CompanyInverted wellbore completion
CN201184130Y (en)*2008-04-172009-01-21中国石油天然气股份有限公司Oil gas well overflow and leakage experimental device
CN102392601A (en)*2011-10-092012-03-28中国石油化工股份有限公司Method for determining hole trajectory of multi-target horizontal well

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US4945994A (en)*1987-12-171990-08-07Standard Alaska Production CompanyInverted wellbore completion
CN201184130Y (en)*2008-04-172009-01-21中国石油天然气股份有限公司Oil gas well overflow and leakage experimental device
CN102392601A (en)*2011-10-092012-03-28中国石油化工股份有限公司Method for determining hole trajectory of multi-target horizontal well

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
红河油田水平井钻井提速难点与技术对策;李克智;《石油钻探技术》;20140325;第42卷(第2期);正文第3.1-3.2、3.5-3.7节,附图1*
镇泾油田HH37P1水平井钻完井技术;闫吉曾;《探矿工程(岩土钻掘工程)》;20120625;第39卷(第6期);正文第3.1-3.2节,表1-2*

Also Published As

Publication numberPublication date
CN104481398A (en)2015-04-01

Similar Documents

PublicationPublication DateTitle
CN104481398B (en)A kind of three-dimensional horizontal well drilling construction method
CN104481400B (en)A kind of three-dimensional horizontal well track control method
CN104265270B (en)A kind of carbonate rock fractured cave wellbore trace design and control method
CN105114059B (en)A kind of three-dimensional orientation well Trajectory Design and control parameter method of discrimination
CN103850711B (en)Salt hole air reserved storeroom twin-well banking process
CN104653172B (en)A kind of three-dimensional azimuthal determination method of the initial hole deviation of horizontal well borehole track
CN104832119A (en)Window opening and sidetrack drilling short-radius horizontal well and reverse circulation well cementing and water plugging method
CN107829683A (en)A kind of horizontal collecting well group well track of shale gas and boring method
CN110147588A (en)One kind is based on the shortest three-dimensional Study on Optimum Design of Horizontal Well Path of drilling time
CN109915018B (en)Method for determining tool face angle in three-dimensional borehole trajectory control
CN108086957A (en)A kind of method of the U-shaped coal bed gas well construction in double coal seams
CN103883255A (en)Horizontal well landing path control method based on continuously-oriented well drilling
CN107060642B (en) Wellbore Trajectory Control Method for Multi-connected Horizontal Wells in Trona Deep and Thin Layers
CN112081528A (en)Horizontal section efficient support-free oscillating drilling tool combination and method
CN105888549A (en)Kilometer-depth L-shaped ground pre-grouting drilling tool assembly applied to hole drilling and hole drilling process
CN107366531A (en)One kind is based on the horizontal docking style geothermal well borehole track of inclined shaft and design method
CN103993829B (en)Apart from the middle major radius track of horizontal well before the little target of a kind of two dimension
CN103422813B (en)Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN212428580U (en)Horizontal section efficient non-support oscillation drilling tool
CN103993830B (en)A kind of method determining the front middle major radius track apart from horizontal well of two-dimentional little target
CN103510855B (en)A kind of horizontal well logging guide track optimization method
Yang et al.Application of well factory drilling technology in shale gas development in the Sichuan basin
CN105625944B (en)Drilling method for sidetracking horizontal well with same diameter as original well shaft
CN116084838B (en) A method for determining the horizontal trajectory of a horizontal well in the roof of a surface coal seam
CN115075796B (en)Fishbone well track determining method and device

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C14Grant of patent or utility model
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp