CN104052159A - Energy management controller used for wind and light storage micro-grid system - Google Patents

Energy management controller used for wind and light storage micro-grid system
Download PDF

Info

Publication number
CN104052159A
CN104052159ACN201410288149.4ACN201410288149ACN104052159ACN 104052159 ACN104052159 ACN 104052159ACN 201410288149 ACN201410288149 ACN 201410288149ACN 104052159 ACN104052159 ACN 104052159A
Authority
CN
China
Prior art keywords
wind
power
grid
light storage
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410288149.4A
Other languages
Chinese (zh)
Other versions
CN104052159B (en
Inventor
刘征宇
田军
唐健
于海坤
舒军
吴建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGFANG ELECTRIC Co Ltd
Original Assignee
Dongfang Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfang Electric CorpfiledCriticalDongfang Electric Corp
Priority to CN201410288149.4ApriorityCriticalpatent/CN104052159B/en
Publication of CN104052159ApublicationCriticalpatent/CN104052159A/en
Application grantedgrantedCritical
Publication of CN104052159BpublicationCriticalpatent/CN104052159B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The invention discloses an energy management controller used for a wind and light storage micro-grid system. The energy management controller comprises an energy management monitoring system, a generating and energy storing system, a factory load, distribution and protection system, a data collection system and a remote dispatching and monitoring system, an energy management system, a remote client and a power grid dispatching center can obtain real-time work data and system power distribution parameters of wind and light storage equipment in the micro-grid system in time, so that grid connection output power of the whole micro-grid system is consumed by factory loads, layering dispatching is received by the energy management system and a power grid, electricity utilization cost of a factory is reduced, and meanwhile stable grid connection operation for a long time of the wind and light storage micro-grid system is achieved.

Description

A kind of energy management controller for wind-light storage micro-grid system
Technical field
The invention belongs to the technical field of electric power system distributed power generation micro-grid system, relate to a kind of energy management controller for wind-light storage micro-grid system.
Background technology
In the past few decades, electrical network scale constantly expands, and progressively develops into the super large internet system of centralized power generation, long distance power transmission.But the continuous increase of long distance power transmission, the degree of dependence that makes receiving end electrical network externally carry out electric power improve constantly, the stability of operation of power networks and fail safe are tending towards declining, and are difficult to meet diversified power demands.On the other hand, the worry of the problems such as the petering out of global conventional energy resource, environmental pollution is but highlighted day by day.Given this, environmental protection, efficiently and flexibly distributed power generation is extensively favored.
Distributed power generation generally refer to by relatively small-sized Blast Furnace Top Gas Recovery Turbine Unit (TRT) (general 50MW following) dispersed placement at user/load on-the-spot or contiguous place, thereby realize the mode of the energy supply of generating electricity.Distributed power generation have position flexibly, the feature of disperseing, adapted to admirably dispersion electricity needs and resource distribution, delayed the transmission and distribution network required huge investment that upgrades; For subsequent use each other with large electrical network, also make power supply reliability be improved; General also have pollution less, advantage that efficiency of energy utilization is high.
In recent years, the wind-light storage micro-grid system of employing includes the energy storage device of at least one wind turbine generator, at least one photovoltaic generation unit, at least one lithium battery, and corresponding distribution system.Wherein, wind turbine generator, photovoltaic generation unit, energy storage device are connected to ac bus by converter system, are connected with large electrical network, meanwhile, are also connected with plant area's load on large electrical network.This system has adopted a large amount of advanced persons electric electronic current change technology, the various new energy and diversified energy storage device etc. fast, there is high efficiency of energy utilization, increase economic efficiency, improve the advantages such as environmental benefit, but also bring the many and diverse feature of electric power system, as of a great variety in distributed power generation unit, response is fast, overload capacity is poor, controls difficulty; Trend two-way flow, original protective relaying device must upgrade; Energy characteristics differs, economic optimization complexity etc.; Therefore, microgrid stable optimal operation not only depends on advanced cell level distributed power generation unit controls, also depends on efficient system integration control and energy management technology.
Summary of the invention
The object of the invention is to propose a kind of energy management controller of the wind-light storage micro-grid system that is applicable to integrated mill, can make EMS, Terminal Server Client and grid dispatching center obtain in time wind-light storage equipment real-time working data and the system power parameter in this micro-grid system, the grid-connected power output of being convenient to realize whole micro-grid system is by plant area's load consumption, and the layering of accepting EMS and electrical network is allocated, reduce plant area's electric cost, the long-term stability that simultaneously meets wind-light storage micro-grid system is incorporated into the power networks.
For this reason, the present invention is by the following technical solutions:
A kind of energy management controller for wind-light storage micro-grid system, it is characterized in that: comprise energy management supervisory control system, generating and energy-storage system, plant area's load, distribution and protection system, data acquisition system, remote scheduling and supervisory control system, wherein, energy management supervisory control system is by the network switch and generating and energy-storage system, distribution and protection system, data acquisition system is set up communication and is connected, energy management supervisory control system by remote scheduling and supervisory control system to generating and energy-storage system, plant area's load, distribution and protection system, data acquisition system is carried out remote scheduling and monitoring,
Described energy management supervisory control system according to the main switch of current wind-light storage micro-grid system as the cutting and the difference of state and power control enabler flags position of high voltage bus switch, wind power generation set grid-connection switch, the grid-connected switch of photovoltaic generation unit and the grid-connected switch of energy storage device, carry out corresponding master control flow process or troubleshooting process, determine the interior each power supply of wind-light storage micro-grid system and load under different operating modes, all can reach the effective control to microgrid internal power, guarantee that power flow direction meets the demands;
Normally work in order not affect on-site important load, according to plant area's operating mode difference, reality is the load power Pload of plant area, in the time that energy management supervisory control system detects that electrical network input active-power P 1 is less than setting threshold, reduce immediately exerting oneself of wind turbine generator and photovoltaic generation unit, wherein: in the time that exerting oneself of wind turbine generator and photovoltaic generation unit is reduced to 0, electrical network input active-power P 1 excises wind-light storage micro-grid system while being still less than setting threshold.
Except wind turbine generator, photovoltaic generation unit, energy storage device, described energy management controller detects the electric energy, voltage, electric current, frequency of plant area electrical network inlet wire point, wind-light storage micro-grid system access point, wind-light storage micro-grid system low-voltage bus bar, meritorious, idle, power factor etc. by electric power relay equipment, also to detect the energy output of wind turbine generator, photovoltaic generation unit, energy storage device, and the signal detecting is inputted to energy management supervisory control system by Ethernet mode, by grid-connected control logic to the each unit of wind-light storage open, stop, power control; In addition, in plant area, electrical network inlet wire point is provided with reverse power protection device, prevents from being greater than plant area's electric energy adverse current phenomenon causing of loading because of wind-light storage experimental system energy output.
Described generating and energy-storage system include the energy storage device of at least one wind turbine generator, at least one photovoltaic generation unit, at least one lithium battery; Wind turbine generator, photovoltaic generation unit, energy storage device are all connected to ac bus by converter system, then are connected with large electrical network, connect plant area's load on large electrical network;
Described plant area load comprises that factory building is produced load and load in living area;
Described distribution and protection system are for the protection of power flow direction and the grid-connected switch of wind-light storage micro-grid system, the active power that generating and energy-storage system are sent only flows into the load on ac bus, and in protection in the time there is inverse probability situation, tripping wind-light storage micro-grid system electrical network connecting valve, to prevent that wind-light storage micro-grid system from falling power transmission to electrical network;
Described data acquisition system is for analog signal and digital signal, wherein analog signal comprises generating and the signal of telecommunication of the each generating equipment of energy-storage system, the signal of telecommunication of plant area's load each point, and digital signal comes from the on off operating mode of each circuit breaker or the operate condition of protective device in wind-light storage micro-grid system;
Described remote scheduling and supervisory control system are to utilize remote pages to set up remote scheduling and monitor workstation realization.
According to the described energy management controller for wind-light storage micro-grid system, it is characterized in that control principle is as follows:
1) generated output of wind-light storage system is less than plant area's load power, taking electrical network input active-power P 1 as reference signal, dynamically adjust the generated output P3 of wind-light storage system according to load power Pload, meet the requirement that electrical network input active-power P 1 is greater than setting threshold;
2) photovoltaic generation moves according to MPPT;
3) higher limit of wind power generation maximum power is that Pwind-max is discharged and recharged the calculating acquisitions such as power by generated output P3, photovoltaic generation power, the energy storage of wind-light storage system, in the time of wind-powered electricity generation unit generated output Pwind < Pwind-max, wind-powered electricity generation unit moves according to MPPT, in the time of wind-powered electricity generation unit generated output Pwind >=Pwind-max, wind-powered electricity generation unit is according to Pwind-max output-constant operation;
4) according to stabilizing, algorithm is stabilized honourable output pulsation to energy storage device and peak load shifting algorithm reclaims and offered load needs.
According to the described energy management controller for wind-light storage micro-grid system, it is characterized in that the grid-connected control flow of this system control wind-light storage micro-grid system is as follows:
A) emergency shutdown, off-grid are shut down, and control room is powered by UPS; After safe shutdown, closed wind-light storage micro-grid system access switch, 10Kv/690V low-pressure side bus switch successively, system re-powers, and central controller initialization, judges whether manual operation;
B) judge whether No starting wind-light storage system of plant area;
C) under the pattern of being incorporated into the power networks, detection of grid point active power of output P1; Determine whether the operating time, in the time of the operating time, judge whether the meritorious P1 of electrical network input is greater than setting threshold, satisfies condition, according to setting selection, according to stabilizing, algorithm is stabilized honourable output pulsation to energy storage device or peak load shifting algorithm reclaims and offered load needs;
D), when in the operating time, judge whether the meritorious P1 of electrical network input is greater than setting threshold;
E) P1 is greater than setting threshold, and the charged initialization of the each cell controller of wind-light storage is limited to Pwind-max in setting wind-powered electricity generation unit peak power output and is discharged and recharged the calculating acquisitions such as power by generated output P3, photovoltaic generation power, the energy storage of wind-light storage system;
F) aweather group of motors controller transmission Pwind-max instruction of supervisory control system, judges whether wind-powered electricity generation unit receives Pwind-max;
G) wind-powered electricity generation unit receives Pwind-max, enters control system of wind turbines, waits for wind-powered electricity generation set grid-connection condition, satisfy condition, and closed wind-powered electricity generation unit switch; Meanwhile, photovoltaic operates in routine work state, waits for grid-connected condition, satisfies condition, closed photovoltaic switch;
H) in the time of wind power generation, photovoltaic power generation grid-connecting operation, energy storage device is set and operates in grid-connected mode of operation, wait for the grid-connected condition of energy storage, closed energy storage device switch;
I) wind-light storage is incorporated into the power networks, the generated output P3 of detection of grid point active power of output P1, wind-light storage system;
J) determine whether the operating time, not in the time of the operating time, wind-powered electricity generation unit, photovoltaic safe shutdown, disconnect wind-powered electricity generation unit switch, photovoltaic switch;
K) when in the operating time, judge whether the generated output of wind-light storage system is less than plant area's load power, i.e. P3<P1, meets the demands, and judges the meritorious P1 >=setting threshold of electrical network input; Energy storage device is selected to stabilize honourable output pulsation or the recovery of peak load shifting algorithm and offered load needs according to stabilizing algorithm according to setting;
L), in the time of P1 >=setting threshold, set Pwind-max;
M) when P1≤setting threshold, set Pwind-max and judge whether Pwind-max calculated value is less than or equal to 0, satisfies condition, set aerogenerator unit safe and shut down;
N) after aerogenerator unit safe is shut down, while again judging P1≤setting threshold, photovoltaic and energy storage device safe shutdown.
The dispatch command of described energy management supervisory control system is delivered to the generating equipment of generating and energy-storage system, the operational factor of the generating equipment of generating and energy-storage system is read in timing simultaneously, for example: the operational factors such as real-time active power, reactive power, output frequency, malfunction.Energy management supervisory control system will be carried out coordinated scheduling control according to wind-light storage micro-grid system load condition and current each generating equipment.
Described generating with the generating equipment access way of energy-storage system is: wind-driven generator is connected with low-voltage bus bar by step-down transformer, and photovoltaic generation group is connected to low-voltage bus bar.
Described distribution and protection system:
1 power control
Normally work in order not affect on-site important load, according to plant area's operating mode difference, reality is the load power Pload of plant area, in the time that energy management supervisory control system detects that electrical network input active-power P 1 is less than setting threshold, reduce immediately exerting oneself of wind turbine generator and photovoltaic generation unit, wherein: in the time that exerting oneself of wind turbine generator and photovoltaic generation unit is reduced to 0, electrical network input active-power P 1 excises wind-light storage micro-grid system while being still less than setting threshold.To ensure normal power flow direction.
2 reverse power protection measures
Install the power relay with directivity in wind-light storage micro-grid system lead-in circuit breaker side, power relay is used for judging power direction, the electric current of power relay comes from the electric current at wind-light storage micro-grid system switch cubicle lead-in circuit breaker place, and the voltage of power relay comes from the primary voltage at the lead-in circuit breaker place of generating and energy-storage system; In the time occurring that wind-light storage micro-grid system falls the inverse probability situation of power transmission to electrical network, reverse power protection action, disconnects generating and energy-storage system.
Described data acquisition system comprises digital analog I O harvester, relay equipment and electric energy meter, protection measure and control device and automatic weather station, wherein:
Analog signal IO acquisition function is mainly realized by PLC, the main analog signal gathering comes from the power transducer of wind, light, the each generating equipment of storage and plant area's load place each point, transformer both sides voltage, current transformer, the signal of telecommunication of passing back with dry Transformer Temperature Controller case; Main number signal comes from each circuit breaker on off operating mode or protective device operate condition in system, and PLC drives digital output port to realize the telemechanical operation of the circuit breaker to bus in system simultaneously;
Relay equipment and electric energy meter, protection measure and control device transmit the distribution system parameters such as the each node power of wind-light storage micro-grid system, voltage, electric current, electric energy, fault for timing, the foundation as energy management supervisory control system to the monitoring of wind-light storage micro-grid system and control;
Automatic weather station is used for gathering real-time meteorological data, as: wind speed, wind direction, temperature, humidity, radiation; Provide Data support to generated power forecasting; Meanwhile, occurring in bad weather condition situation, as the foundation of energy management supervisory control system starting protection function.
Electrical network remote scheduling power distribution automation solution is, by optical-fibre communications, energy management computer set up to communication with ownership transformer station and is connected, realizes belonging to transformer station, by the present invention, whole wind-light storage micro-grid system being carried out to scheduling controlling.
Beneficial effect of the present invention is as follows:
The present invention sets up actual wind-light storage micro-grid system in somewhere; EMS; by generating and energy-storage system in data acquisition acquisition system; plant area's load; real time execution parameter and the state of distribution and protection system etc., and according to running status, complete the power control of wind generator system, photovoltaic generating system, energy-storage system; guarantee that power is that electrical network flows to power load, and ensure the stable of frequency, active power.The each unit of wind-light storage can safety grid-connection operation, in the time of plant area's load variations, EMS to the each unit of wind-light storage open, stop, power control, the each unit of wind-light storage can safe and stable operation, only to plant area's load power supply, not to large grid transmission.Receive electrical network remote scheduling simultaneously, and can issue the page by Internet remote access.
Brief description of the drawings
Fig. 1 is wind-light storage micro-grid system structure chart
Fig. 2 is reverse power protection trend schematic diagram of the present invention
Fig. 3 is system group network structural representation of the present invention.
Embodiment
Wind-light storage micro-grid system is substantially by energy management supervisory control system, and six parts such as generating and energy-storage system, plant area's load, distribution and protection system, data acquisition system, system group network form.Setting up communication by the network switch with electricity generation system, energy-storage system, distribution and protection system, data acquisition system and remote scheduling and supervisory control system by energy management supervisory control system is connected.
Energy management supervisory control system is the control core of whole wind-light storage micro-grid system, mainly comprises fault detect flow process, master control flow process and troubleshooting process aspect Functional Design.According to cutting and the difference of state and power control enabler flags position of current main switch, monitoring software is in different states.The different conditions of corresponding monitoring software, carries out corresponding master control flow process or troubleshooting process, determines the interior each power supply of microgrid and loads under different operating modes, all can reach the effective control to microgrid internal power, guarantees that power flow direction meets the demands.EMS (being structured on database server), remote scheduling are all connected with switch with supervisory control system, remote server, realize the object with micro-grid system Communication Control.Remote monitoring work station can be accessed remote server by Internet, and then accessing database server, realizes the object of the ruuning situation of monitoring wind-light storage experimental system.
As shown in Figure 1, in wind-light storage micro-grid system, include the energy storage device of at least one wind turbine generator, at least one photovoltaic generation unit, at least one lithium battery, be connected with energy management supervisory control system by switch.The dispatch command of energy management supervisory control system is delivered to each generating equipment, and each generating equipment such as the operational factor such as active power, reactive power, output frequency, malfunction is in real time read in simultaneously timing.Energy management supervisory control system will be carried out coordinated scheduling control according to wind-light storage micro-grid system load condition and current each generating equipment.
Generating equipment access way is: wind-driven generator is connected with low-voltage bus bar by step-down transformer.Photovoltaic generation group is connected to low-voltage bus bar.
The power-supply system of wind-light storage micro-grid system, is attracted by local power network line.Plant area's load mainly comprises that complex factories are produced load and load in living area.
Being incorporated into the power networks is the conventional operation mode of this pilot system.Blower fan, photovoltaic generation group and energy-storage system of accumulator are incorporated to plant area's electrical network.Blower fan and photovoltaic generation group, to the power supply of on-site load, because its energy output is subject to such environmental effects very large, are stabilized intrasystem meritorious fluctuation by energy-storage system of accumulator, and the each switch of system is controlled according to grid-connected operating state by energy management supervisory control system.
1) power flow direction
From power balance result, on weekdays daytime, night and nonworkdays daytime, the energy output of wind-powered electricity generation and photoelectricity is less than the burden requirement of full factory.In nonworkdays night, restriction system inner blower maximum power, blower fan is exerted oneself and can not be greater than load aggregate demand.Therefore can accomplish that in pilot system, renewable energy power generation amount is only personal for plant area's load, can be to electrical network electricity sent outside.Specifically, on direction of tide, gaining merit that blower fan and photovoltaic send only can flow into the load on bus, and can not flow into electric power system through bus.
2) power control
Normally work in order not affect on-site important load, according to plant area's operating mode difference, reality is the load power Pload of plant area, in the time that energy management supervisory control system detects that electrical network input active-power P 1 is less than setting threshold, reduce immediately exerting oneself of wind turbine generator and photovoltaic generation unit, wherein: in the time that exerting oneself of wind turbine generator and photovoltaic generation unit is reduced to 0, electrical network input active-power P 1 excises wind-light storage micro-grid system while being still less than setting threshold.To ensure normal power flow direction.
3) inverse probability
As shown in Figure 2, the electrical main connecting wire of whole system is simplified as follows: regard bus as a voltage node 1, wind-light storage electricity generation system high-pressure side is regarded a voltage node 2 as, load on whole 1 bus is equivalent to a branch road, load bus is 3, and whole system can abbreviation be a two ends Power supply network.
In the time there is inverse probability phenomenon, intrasystem trend flow direction is as an accompanying drawing 2(left side) as shown in.Now wind-light storage electricity generation system has been carried power to grid side.Therefore, the trend flow direction allowing in system while being incorporated into the power networks can only be as shown in Fig. 2 (right side), that is: load branch circuit obtains meritorious and idle from two voltage nodes.Owing to only having a load branch circuit in this equivalent system, there is no other branch, therefore, load bus 3 is exactly the power branch in network, is also the voltage minimum point in network; In Fig. 2, CB1 is that electrical network service entrance switch, CB2 are that the grid-connected switch of wind-light storage, P1+ Q1 are the generating gross power (active power+reactive power) of electrical network electrical network input general power (active power+reactive power), P2+Q2 wind-light storage system.
From above tidal current analysis, as long as ensure that the voltage (being busbar voltage) of load bus 3, lower than the voltage of 1,2 two voltage node, just there will not be electric power to send outside.And the voltage of voltage node 1 belongs to the scope of dispatching of power netwoks, uncontrollable, the voltage of load bus 3 also can change according to the fluctuation of network load etc., unadjustable, therefore can only be by controlling the voltage of voltage node 2, by controlling wind-light storage low-pressure side bus voltage, prevent inverse probability phenomenon.
4) reverse power protection measure
In order in monitor network, whether inverse probability to have occurred in real time, can judge power direction with the power relay of directivity in lead-in circuit breaker installing.In the time there is inverse probability situation, reverse power protection action tripping, disconnect wind-light storage system.In conjunction with actual conditions, can further adopt low forward power protection to obtain larger protection range.
Wind-light storage micro-grid system key data collecting device has: digital analog I O harvester, relay equipment and electric energy meter, protection measure and control device and automatic weather station
Simulation with I O acquisition function is mainly realized by PLC, main collection analog signal comes from the power transducer of wind, light, the each generating equipment of storage and plant area's load place each point, transformer both sides voltage, current transformer, the signal of telecommunication of passing back with dry Transformer Temperature Controller case; Main number signal comes from each circuit breaker on off operating mode or protective device operate condition in system, and PLC drives digital output port to realize the telemechanical operation of the circuit breaker to bus in system simultaneously.
Relay equipment and electric energy meter, protection measure and control device major function are the each node powers of timing transmission system, voltage, electric current, electric energy, the distribution system health parameters such as fault, as EMS to system monitoring with control foundation.
Automatic weather station major function is: gather real-time meteorological data as wind speed, wind direction, temperature, humidity, radiation; Provide Data support to wind power generation and photovoltaic generation power prediction; Simultaneously occurring in bad weather condition situation, as the foundation of EMS starting protection function.
Electrical network remote scheduling power distribution automation solution is, by optical-fibre communications, energy management computer set up to communication with ownership transformer station and is connected, realizes belonging to transformer station, by the present invention, whole wind-light storage micro-grid system being carried out to scheduling controlling.
EMS selects corresponding remote pages to carry out long-range issue remote monitoring work station the running status of the wind generator system in wind-light storage micro-grid system, photovoltaic generating system, energy-storage battery system and distribution and protection can access remote server by Internet; and then accessing database server, the object of the ruuning situation of realization monitoring wind-light storage micro-grid system.
System of the present invention is for realizing equipment centralized control in system, corresponding electrical network remote scheduling simultaneously, and possess Internet remote access function.

Claims (9)

1. the energy management controller for wind-light storage micro-grid system, it is characterized in that: comprise energy management supervisory control system, generating and energy-storage system, plant area's load, distribution and protection system, data acquisition system, remote scheduling and supervisory control system, wherein, energy management supervisory control system is by the network switch and generating and energy-storage system, distribution and protection system, data acquisition system is set up communication and is connected, energy management supervisory control system by remote scheduling and supervisory control system to generating and energy-storage system, plant area's load, distribution and protection system, data acquisition system is carried out remote scheduling and monitoring,
5. a kind of energy management controller for wind-light storage micro-grid system according to claim 1, it is characterized in that: the lead-in circuit breaker side at wind-light storage micro-grid system is installed the power relay with directivity, power relay is used for judging power direction, the electric current of power relay comes from the electric current at wind-light storage micro-grid system switch cubicle lead-in circuit breaker place, and the voltage of power relay comes from the primary voltage at the lead-in circuit breaker place of generating and energy-storage system; In the time occurring that wind-light storage micro-grid system falls the inverse probability situation of power transmission to electrical network, reverse power protection action, disconnects generating and energy-storage system.
CN201410288149.4A2014-06-252014-06-25A kind of energy management controller for wind-light storage micro-grid systemActiveCN104052159B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201410288149.4ACN104052159B (en)2014-06-252014-06-25A kind of energy management controller for wind-light storage micro-grid system

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201410288149.4ACN104052159B (en)2014-06-252014-06-25A kind of energy management controller for wind-light storage micro-grid system

Publications (2)

Publication NumberPublication Date
CN104052159Atrue CN104052159A (en)2014-09-17
CN104052159B CN104052159B (en)2016-08-24

Family

ID=51504678

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201410288149.4AActiveCN104052159B (en)2014-06-252014-06-25A kind of energy management controller for wind-light storage micro-grid system

Country Status (1)

CountryLink
CN (1)CN104052159B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104283212A (en)*2014-10-112015-01-14广西大学 A physical simulation platform for doubly-fed wind turbine generator set based on CompactRIO
CN104333042A (en)*2014-11-172015-02-04国网上海市电力公司Energy storage current transformer grid connection and grid disconnection seamless switching device and method
CN104505849A (en)*2015-01-052015-04-08国家电网公司Access mode of energy storage device on 0.4KV power distribution network side and operation mode thereof
CN105048455A (en)*2015-07-302015-11-11国网山东省电力公司烟台供电公司Wind power generation and adjustable load unified operation system
CN105676820A (en)*2016-02-222016-06-15天津大学Urban garden layered distributed temperature control load demand response control strategy
CN106972626A (en)*2017-03-272017-07-21国网山东省电力公司夏津县供电公司The running status inspection method of power equipment, apparatus and system
CN107306031A (en)*2016-04-152017-10-31中国电力科学研究院A kind of direct current sends ring topology and control method outside
CN107317356A (en)*2017-07-142017-11-03国网河南省电力公司内黄县供电公司Micro-capacitance sensor control device and power system
CN107370168A (en)*2016-05-112017-11-21Ls 产电株式会社Electrical energy storage
CN107947150A (en)*2017-10-232018-04-20北京科诺伟业科技股份有限公司A kind of wind-light storage micro-capacitance sensor simulation experiment platform
CN108352807A (en)*2015-09-282018-07-31法国电力公司The improvement power control of one group of photovoltaic panel contributes to frequency to adjust and without using storage medium
CN108432117A (en)*2015-12-232018-08-21张大明Voltage source DC/AC converter circuits with LCCL or LCC filters He other modifications, and the operation of the micro-capacitance sensor with this circuit
CN108964038A (en)*2018-07-192018-12-07国网上海市电力公司Active distribution network state smooth sliding control method and power distribution network based on energy storage
CN110176783A (en)*2019-05-292019-08-27湖南力宇新能源科技有限公司The power regulating method and device of generating set
CN111525609A (en)*2020-04-232020-08-11国电科学技术研究院有限公司 A method for directly connecting wind-solar power storage to a thermal power plant to supply power to the thermal power plant
CN112271761A (en)*2020-11-202021-01-26中国电建集团江西省电力建设有限公司 An energy storage frequency modulation system for thermal power units
CN113036809A (en)*2021-04-212021-06-25国网山东省电力公司枣庄供电公司Novel rural distribution network based on integration is stored up to scene
CN113283881A (en)*2021-07-192021-08-20广东电网有限责任公司东莞供电局Automatic auditing method and system for telecontrol information source
CN113644686A (en)*2021-08-042021-11-12中船动力研究院有限公司Energy feedback system and control method
CN114865650A (en)*2021-11-162022-08-05中国电力科学研究院有限公司Method and system for energy storage system to participate in frequency emergency control
CN115133576A (en)*2022-07-262022-09-30西安热工研究院有限公司 A hydropower energy storage system with recyclable energy and working fluid
WO2025007378A1 (en)*2023-07-062025-01-09上海思格源智能科技有限公司Optical storage power control method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20110115295A1 (en)*2009-11-192011-05-19Chong-Sop MoonEnergy management system and grid-connected energy storage system including the energy management system
CN102591278A (en)*2012-02-012012-07-18天津市电力公司Microgrid control system having power generation and load forecast functions and microgrid control method
CN102684215A (en)*2012-03-272012-09-19中国东方电气集团有限公司Energy management system for grid-connected operation of wind and photovoltaic power storage micro-grid system
CN103427430A (en)*2013-04-082013-12-04深圳市天智系统技术有限公司Hybrid energy storage system and energy management method thereof in micro-grid
CN103532158A (en)*2013-10-282014-01-22浙江南都电源动力股份有限公司Micro-grid new energy hybrid energy storage system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20110115295A1 (en)*2009-11-192011-05-19Chong-Sop MoonEnergy management system and grid-connected energy storage system including the energy management system
CN102591278A (en)*2012-02-012012-07-18天津市电力公司Microgrid control system having power generation and load forecast functions and microgrid control method
CN102684215A (en)*2012-03-272012-09-19中国东方电气集团有限公司Energy management system for grid-connected operation of wind and photovoltaic power storage micro-grid system
CN103427430A (en)*2013-04-082013-12-04深圳市天智系统技术有限公司Hybrid energy storage system and energy management method thereof in micro-grid
CN103532158A (en)*2013-10-282014-01-22浙江南都电源动力股份有限公司Micro-grid new energy hybrid energy storage system

Cited By (29)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104283212A (en)*2014-10-112015-01-14广西大学 A physical simulation platform for doubly-fed wind turbine generator set based on CompactRIO
CN104333042A (en)*2014-11-172015-02-04国网上海市电力公司Energy storage current transformer grid connection and grid disconnection seamless switching device and method
CN104505849A (en)*2015-01-052015-04-08国家电网公司Access mode of energy storage device on 0.4KV power distribution network side and operation mode thereof
CN104505849B (en)*2015-01-052017-06-06国家电网公司Access way and its method for operation of the energy storage device in 0.4KV distribution net sides
CN105048455A (en)*2015-07-302015-11-11国网山东省电力公司烟台供电公司Wind power generation and adjustable load unified operation system
CN105048455B (en)*2015-07-302017-10-13国网山东省电力公司烟台供电公司A kind of wind-power electricity generation and deferrable load combined operation system
CN108352807A (en)*2015-09-282018-07-31法国电力公司The improvement power control of one group of photovoltaic panel contributes to frequency to adjust and without using storage medium
CN108352807B (en)*2015-09-282020-03-10法国电力公司Improved power control method for photovoltaic panels
CN108432117B (en)*2015-12-232021-08-27张大明Method of operating a microgrid and method of operating an interconnected microgrid in a management island mode
CN108432117A (en)*2015-12-232018-08-21张大明Voltage source DC/AC converter circuits with LCCL or LCC filters He other modifications, and the operation of the micro-capacitance sensor with this circuit
CN105676820B (en)*2016-02-222017-09-12天津大学City garden layered distribution type temperature control workload demand response control strategy
CN105676820A (en)*2016-02-222016-06-15天津大学Urban garden layered distributed temperature control load demand response control strategy
CN107306031A (en)*2016-04-152017-10-31中国电力科学研究院A kind of direct current sends ring topology and control method outside
CN107370168B (en)*2016-05-112020-04-10Ls 产电株式会社Electrical energy storage device
CN107370168A (en)*2016-05-112017-11-21Ls 产电株式会社Electrical energy storage
CN106972626A (en)*2017-03-272017-07-21国网山东省电力公司夏津县供电公司The running status inspection method of power equipment, apparatus and system
CN107317356A (en)*2017-07-142017-11-03国网河南省电力公司内黄县供电公司Micro-capacitance sensor control device and power system
CN107947150A (en)*2017-10-232018-04-20北京科诺伟业科技股份有限公司A kind of wind-light storage micro-capacitance sensor simulation experiment platform
CN108964038A (en)*2018-07-192018-12-07国网上海市电力公司Active distribution network state smooth sliding control method and power distribution network based on energy storage
CN110176783A (en)*2019-05-292019-08-27湖南力宇新能源科技有限公司The power regulating method and device of generating set
CN111525609A (en)*2020-04-232020-08-11国电科学技术研究院有限公司 A method for directly connecting wind-solar power storage to a thermal power plant to supply power to the thermal power plant
CN112271761A (en)*2020-11-202021-01-26中国电建集团江西省电力建设有限公司 An energy storage frequency modulation system for thermal power units
CN113036809A (en)*2021-04-212021-06-25国网山东省电力公司枣庄供电公司Novel rural distribution network based on integration is stored up to scene
CN113283881A (en)*2021-07-192021-08-20广东电网有限责任公司东莞供电局Automatic auditing method and system for telecontrol information source
CN113644686A (en)*2021-08-042021-11-12中船动力研究院有限公司Energy feedback system and control method
CN113644686B (en)*2021-08-042024-04-23中船动力研究院有限公司Energy feedback system and control method
CN114865650A (en)*2021-11-162022-08-05中国电力科学研究院有限公司Method and system for energy storage system to participate in frequency emergency control
CN115133576A (en)*2022-07-262022-09-30西安热工研究院有限公司 A hydropower energy storage system with recyclable energy and working fluid
WO2025007378A1 (en)*2023-07-062025-01-09上海思格源智能科技有限公司Optical storage power control method and system

Also Published As

Publication numberPublication date
CN104052159B (en)2016-08-24

Similar Documents

PublicationPublication DateTitle
CN104052159B (en)A kind of energy management controller for wind-light storage micro-grid system
Sayed et al.SCADA and smart energy grid control automation
EP2721710B1 (en)Hybrid electric generating power plant that uses a combination of real-time generation facilities and energy storage system
CN202651785U (en) An AC-DC Hybrid Microgrid System
US11949237B2 (en)Systems and methods for firming power generation from multiple renewable energy sources
CN105337301B (en)The selection method and device of micro-grid connection point
CN106329522A (en)Multi-energy flexible control system and method for urban and rural residents based on demand side response
KR101109187B1 (en)Operation method for power system using real-time power information
CN104779634B (en) A microgrid energy storage scheduling method
Ahmed et al.Integration of renewable energy resources in microgrid
CN102916442A (en)Building photovoltaic grid-connected system
CN203312825U (en)Off-grid distributed power supply system
Blesslin et al.Microgrid optimization and integration of renewable energy resources: innovation, challenges and prospects
CN108173267B (en)Offshore wind power plant and island microgrid combined monitoring system
CN202888859U (en)Building photovoltaic grid-connected system
CN205123282U (en)Little electric wire netting
Nikolic et al.Fast demand response as spinning reserve in microgrids
CN112713520A (en)Off-grid wind-solar energy storage intelligent power supply system
CN112909997B (en)Distributed photovoltaic remote control based grid connection and disconnection device
Jiang et al.Research on collaborative control and optimization of energy storage units under the high proportion of wind power infiltration
CN115207918A (en)Real-time stable control device suitable for new forms of energy grid-connected system
Clarke et al.Development of Demand and Supply Management Control Systems for Network Connected Photovoltaic Systems
Huang et al.A Sustainable Power Supply Method for a Photovoltaic-Storage Substation System
Yu et al.Study on black start strategy of multi-microgrids with PV and energy storage systems considering general situations
AU2021103175A4 (en)Solar Energy Management for Agriculture and Rural Transformation (SMART)

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C14Grant of patent or utility model
GR01Patent grant
TR01Transfer of patent right
TR01Transfer of patent right

Effective date of registration:20180425

Address after:610000 18 West core road, hi-tech West District, Chengdu, Sichuan

Patentee after:Dongfang Electric Co., Ltd.

Address before:610036 Shu Han Road, Jinniu District, Chengdu, Sichuan Province, No. 333

Patentee before:Dongfang Electric Corporation