Movatterモバイル変換


[0]ホーム

URL:


CN103949569A - Preparation method of structure steel forging - Google Patents

Preparation method of structure steel forging
Download PDF

Info

Publication number
CN103949569A
CN103949569ACN201410219676.XACN201410219676ACN103949569ACN 103949569 ACN103949569 ACN 103949569ACN 201410219676 ACN201410219676 ACN 201410219676ACN 103949569 ACN103949569 ACN 103949569A
Authority
CN
China
Prior art keywords
forging
steel
preparation
molten steel
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410219676.XA
Other languages
Chinese (zh)
Other versions
CN103949569B (en
Inventor
范承祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to CN201410219676.XApriorityCriticalpatent/CN103949569B/en
Publication of CN103949569ApublicationCriticalpatent/CN103949569A/en
Application grantedgrantedCritical
Publication of CN103949569BpublicationCriticalpatent/CN103949569B/en
Expired - Fee Relatedlegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Landscapes

Abstract

The invention particularly relates to an improvement of a preparation method of a structure steel forging, and aims at providing a forging preparation method with the advantages that the energy source is saved, the utilization rate of material is improved, the production cost is reduced, and the labor condition is improved. The method comprises the following steps of using waste steel as raw material, smelting into high-quality molten steel in a medium-frequency electric furnace, carrying out hydraulic forging on a hydraulic press, and demolding at the temperature of about 1200 DEG C; after demolding, immediately carrying out upsetting, blank making, final forging forming and edge cutting. The heat energy of molten steel is utilized for hydraulic forging; the demolding is carried out at high temperature, and then the forging forming is immediately carried out; the quenching is carried out by residual heat; the intermediate procedure does not need the reheating, so the production of forgings is realized. The method has the advantages that the utilization rate of material is high, the energy consumption is low, the production cycle is short, and the production cost is low; the automatic production is realized, and the labor condition is improved; the whole production process is completed by a plurality of single machines on one flow production line; blanks can be automatically conveyed by manipulators and conveying belts between the single machines.

Description

A kind of preparation method of structural steel forging
Technical field
The present invention relates to a kind of preparation method of structural steel forging, particularly relate to a kind of forging preparation method who saves the energy, improves stock utilization, reduces production costs, improves working conditions.
Background technology
Producing at present automobile forging manufacturing technique method, is to become one section one section with high quality round bar sawing mostly, then in stove, is heated to 1200 DEG C of left and right, carries out forging molding after coming out of the stove on forcing press.This production technology stock utilization is low, consumes energy high, and production efficiency is low, and cost is high, and the production cycle is long, relatively requires high to direct labor's technical merit.
Summary of the invention
The object of this invention is to provide the forging preparation method that a kind of energy consumption is low, steel utilization ratio is high, production cost is low, working condition is good.
For achieving the above object, the technical solution adopted in the present invention is: a kind of preparation method of structural steel forging, and employing steel scrap is raw material, smelts into high-quality molten steel at middle frequency furnace, then on hydraulic press, carries out liquid forging, and 1200 DEG C of left and right demouldings; Upsetting on forcing press, base, finish forging, trimming immediately after the demoulding, detailed step is as follows:
S1, select materials: choose the steel scrap that is applicable to this technique, do raw material;
S2, intermediate frequency furnace are smelted: the steel scrap of choosing is put into intermediate frequency furnace and smelt into high-quality molten steel;
S3, liquid forging: the molten steel of having smelted is poured in the air pressure casting holding furnace that is full of argon gas and is incubated; Again molten steel casting in holding furnace is carried out to liquid forging in liquid forging machine mould, before casting, mould will be preheated to 150~200 DEG C, when the demoulding immediately 1200 DEG C of left and right time of blank temperature;
S4, forcing press die forging: the high temperature blank after the demoulding is sent into upsetting in forcing press, base, finish forging, trimming immediately.
Preferred: after the trimming technology of step S4, to carry out following steps: S5, immediate quenching: the temperature of forging stock after utilizing trimming, carry out Quenching Treatment.
Preferred: the forging obtaining by step S1 to S5 is carried out to temper.
Aforementioned arbitrary structures can be further preferred: in described S1 step, the steel scrap of choosing is carbon structural steels or low-alloy structural steel steel scrap.
Aforementioned arbitrary structures can be further preferred: in described S2 step, after smelting molten steel, carry out Argon purification, improve Molten Steel Cleanliness.
Aforementioned arbitrary structures can be further preferred: the mould in described step S3 adopts the composite die that internal layer is high temperature alloy, is cooled with circulating water mould in casting cycle, by regulating cooling water flow, pressure that mold temperature is controlled in 400 DEG C.
The present invention has following beneficial effect: the present invention utilizes molten steel heat energy, carries out liquid forging, in high temperature (forging temperature) demoulding, carry out immediately forging molding, immediate quenching (while needs adopt), above-mentioned technical process, centre does not need to heat again and can complete forging and produce.Utilize technique, as long as change molten steel chemical composition and mould geometry, size can be produced the forging such as gear, axle class, forked type class.Owing to being directly connected to production cost the service life of liquid-state forging die, preferably adopt composite die, i.e. internal layer high temperature alloy, the general material in outside, modified rear use; Be cooled with circulating water mould, by regulating cooling water flow, pressure that mold temperature is controlled in 400 DEG C.Above-mentioned way can improve die life greatly; Calcining temperature, coordinate with finish forging temperature, can not be too low or too high; Final forging temperature height, calcining temperature should reduce, on the contrary calcining temperature should improve; While starting to forge, all moulds all will be preheated to 150~200 DEG C; After the liquid forging demoulding, the calendering of blank ratio is answered > 3.
The invention has the advantages that:
1, stock utilization of the present invention is high, consumes energy low (in the middle of except tempering, not needing to heat) again, and with short production cycle, production cost is low.Can realize automated production, improve working conditions.
2, above technical process is by some units, is combined on a flow production line and completes whole production process.Between unit (operation), robotic arm, conveyer belt transmit blank automatically.
Novel technique and the contrast of existing technology:
?Existing technologyNovel techniqueNovel technique effect
Cost of raw and processed materialsHigh quality round bar expense is highSteel scrap → molten steel expense is lowReduce by 15% left and right
Utilization rate of raw materialsSteel utilization ratio 85% left and rightMolten steel Utilization rate 95% left and rightImprove 10% left and right
Energy consumptionHeating steel billet, blanking power consumptionDo not heat, utilize the distortion of molten steel heatMore than forging economize on electricity 300 degree per ton
Production efficiencyBe subject to human factor control largeAbout productive temp 50 secondsBe enhanced about more than once
Production costProduction cost is highProduction cost is lowReduce more than 20%
Labor costForger operation80% left and right robotic armReduce by 80% left and right
To operator's technical requirementHighLowSkilled worker
InvestmentLowHighInitial cost is higher
Detailed description of the invention
A preparation method for structural steel forging, employing steel scrap is raw material, smelts into high-quality molten steel at middle frequency furnace, then on hydraulic press, carries out liquid forging, and 1200 DEG C of left and right demouldings; Upsetting on forcing press immediately after the demoulding, base, finish forging, trimming, immediate quenching (just using while needs), detailed step is as follows:
S1, select materials: choose the steel scrap that is applicable to this technique, do raw material, the steel scrap of choosing is carbon structural steels or low-alloy structural steel steel scrap, this scrap resources is abundant.Steel scrap in this step, by inspection, to determine its chemical composition contamination, and then is chosen the raw material of applicable steel scrap as this processes forging.
S2, intermediate frequency furnace smelt: the steel scrap of choosing is put into intermediate frequency furnace and smelt into high-quality molten steel (high-quality molten steel refers to that the chemical composition contamination of molten steel all reaches the requirement that will prepare forging, meet standard GB/T/T3077-1999 requirement, scrap smelting becomes after molten steel, the chemical composition of molten steel is carried out to real-time inspection, be up to the standards and be high-quality molten steel; The chemical composition of passing through containing quantity not sufficient of disqualified upon inspection is added, the excessive chemical composition of the content mode such as dilute is adjusted, until the chemical composition of molten steel reaches requirement, become high-quality molten steel), the chemical composition of molten steel requires material with auto parts and determines.After smelting molten steel, carry out Argon purification, improve Molten Steel Cleanliness.
S3, liquid forging: the molten steel of having smelted is poured in the air pressure casting holding furnace that is full of argon gas and is incubated; Again molten steel casting in holding furnace is carried out to liquid forging in liquid forging machine mould, before casting, mould to be preheated to 150~200 DEG C, in casting cycle, be cooled with circulating water mould, by regulating cooling water flow, pressure that mold temperature is controlled in 400 DEG C, when the demoulding immediately 1200 DEG C of left and right time of blank temperature; Mould in this step adopts composite die, it is internal layer high temperature alloy, high temperature alloy is preferably heated die steel 3W23Cr4 or H13, the general material in outside, general material is preferably steel No. 45, modified rear use, is cooled with circulating water mould in casting cycle, by regulating cooling water flow, pressure that mold temperature is controlled in 400 DEG C.
S4, forcing press die forging: the high temperature blank after the demoulding is sent into upsetting in forcing press, base, finish forging, trimming immediately;
S5, immediate quenching: after trimming technology, select whether part to be quenched according to the requirement that will prepare forging, quenching step is utilized the temperature of forging stock after trimming, carry out Quenching Treatment, the temperature of forging stock after trimming, generally 850 DEG C of >, utilize this temperature can carry out Quenching Treatment.
According to the parameter needs of part, the forging obtaining by above-mentioned steps S1 to S5 is carried out to temper.Temper processing technology is used prior art means, and the temperature of tempering is selected according to the requirement that will prepare forging.
Be described further with steering knuckle forging below: knuckle material: 40C (GB3077-1999)
Part weight: 20Kg.
One, technical process: operation is just use while needing in steel scrap → intermediate frequency furnace smelting → air pressure holding furnace → liquid forging → upsetting → base → finish-forging → trimming → (immediate quenching) → (tempering) bracket.
Detailed process process is shown in S1~S5.
Two, a production line main production equipments: 1 ton of intermediate frequency converter 3 (3 refining 2), one of 3 tons of air pressure quantitative casting holding furnace, 3 of 400 t hydraulic press, one of each one, 200 tons clipping press of electric screw press (630 tons, 1000 tons, 1600 tons), heat treatment tank (cooling medium temperature control circulation).
Test of many times testing result below:
Chemical component table (%)
?CSiMnPSCrCu
Required value0.37-0.440.17-0.370.50-0.80≤0.035≤0.0350.80-1.10≤0.3
Measured value0.38-0.440.19-0.350.56-0.75≤0.025≤0.0250.85-1.05≤0.2
Mechanical property detects table (condition of heat treatment: modified)
The knuckle forging of producing according to above-mentioned technical process, through Dissection test repeatedly repeatedly, the requirement that chemical composition and mechanical property all can be up to state standards.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that the present invention is the mature technology that utilizes this area: intermediate frequency furnace smelting, liquid forging, forcing press die forging, immediate quenching are combined in and on a production line, complete forging and produce; Round rolling, saw material, heating process are reduced.The object that reaches energy-saving and cost-reducing, reduces costs, improves stock utilization, realizes automated production, improves working conditions.Those of ordinary skill just can design according to the present invention be made many modifications and variations without creative work.Therefore, all technical staff in the art, all should be in by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (6)

CN201410219676.XA2014-05-232014-05-23A kind of preparation method of structural steel forgingExpired - Fee RelatedCN103949569B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201410219676.XACN103949569B (en)2014-05-232014-05-23A kind of preparation method of structural steel forging

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201410219676.XACN103949569B (en)2014-05-232014-05-23A kind of preparation method of structural steel forging

Publications (2)

Publication NumberPublication Date
CN103949569Atrue CN103949569A (en)2014-07-30
CN103949569B CN103949569B (en)2016-09-14

Family

ID=51326992

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201410219676.XAExpired - Fee RelatedCN103949569B (en)2014-05-232014-05-23A kind of preparation method of structural steel forging

Country Status (1)

CountryLink
CN (1)CN103949569B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104894462A (en)*2015-06-172015-09-09永仁县金风冶铸机械制造有限公司Preparation method of efficient multi-planar cylindrical steel forging
CN105671280A (en)*2016-01-272016-06-15南京工程学院Manufacturing method for steel forging used for critical component of deep sea Christmas tree
CN106011395A (en)*2016-07-122016-10-12山东鲁联机械制造有限公司Heat treatment technology of alloy structure steel through remnant forging thermal quenching
CN106270357A (en)*2016-08-312017-01-04芜湖市和蓄机械股份有限公司A kind of automotive hub and casting technique thereof
CN108774672A (en)*2018-07-272018-11-09庆铃汽车(集团)有限公司A method of utilizing forging part waste heat rapid heating and quenching
CN113828756A (en)*2020-06-242021-12-24石家庄腾鹄锻造有限责任公司Novel production process of steel casting

Citations (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JPS60247453A (en)*1984-05-211985-12-07Yasubumi KosegiForming mold for liquid metal forging
CN1647871A (en)*2004-12-032005-08-03李远发 Metal liquid die-casting and forging double-control one-time forming method
CN101011792A (en)*2007-02-082007-08-08范承祥Manufacturing method for annular forging piece
CN102416557A (en)*2011-10-252012-04-18马鞍山市威龙科工贸有限公司Integrated production process of ring casting and forging
CN102699635A (en)*2012-06-182012-10-03西南大学Liquid die-forging and rolling composite forming method for bearing ring piece
CN102861903A (en)*2011-07-072013-01-09吴玉荣Connecting rod liquid-state die forging process
CN103203602A (en)*2013-04-152013-07-17中国兵器工业第五二研究所Production method of magnesium alloy hub
CN103230997A (en)*2013-04-012013-08-07安徽安簧机械股份有限公司Production device and production technology for non-quenched and tempered steel forge piece automatic forging

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
JPS60247453A (en)*1984-05-211985-12-07Yasubumi KosegiForming mold for liquid metal forging
CN1647871A (en)*2004-12-032005-08-03李远发 Metal liquid die-casting and forging double-control one-time forming method
CN101011792A (en)*2007-02-082007-08-08范承祥Manufacturing method for annular forging piece
CN102861903A (en)*2011-07-072013-01-09吴玉荣Connecting rod liquid-state die forging process
CN102416557A (en)*2011-10-252012-04-18马鞍山市威龙科工贸有限公司Integrated production process of ring casting and forging
CN102699635A (en)*2012-06-182012-10-03西南大学Liquid die-forging and rolling composite forming method for bearing ring piece
CN103230997A (en)*2013-04-012013-08-07安徽安簧机械股份有限公司Production device and production technology for non-quenched and tempered steel forge piece automatic forging
CN103203602A (en)*2013-04-152013-07-17中国兵器工业第五二研究所Production method of magnesium alloy hub

Cited By (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104894462A (en)*2015-06-172015-09-09永仁县金风冶铸机械制造有限公司Preparation method of efficient multi-planar cylindrical steel forging
CN105671280A (en)*2016-01-272016-06-15南京工程学院Manufacturing method for steel forging used for critical component of deep sea Christmas tree
CN106011395A (en)*2016-07-122016-10-12山东鲁联机械制造有限公司Heat treatment technology of alloy structure steel through remnant forging thermal quenching
CN106270357A (en)*2016-08-312017-01-04芜湖市和蓄机械股份有限公司A kind of automotive hub and casting technique thereof
CN108774672A (en)*2018-07-272018-11-09庆铃汽车(集团)有限公司A method of utilizing forging part waste heat rapid heating and quenching
CN113828756A (en)*2020-06-242021-12-24石家庄腾鹄锻造有限责任公司Novel production process of steel casting

Also Published As

Publication numberPublication date
CN103949569B (en)2016-09-14

Similar Documents

PublicationPublication DateTitle
CN104046921B (en)Super-section Pre-Bainitic sclerosis plastic mould steel and preparation method thereof
CN103949569A (en)Preparation method of structure steel forging
CN106363352B (en)A kind of manufacturing process of high-strength aluminum alloy ring forging
CN101011792A (en)Manufacturing method for annular forging piece
CN101709423B (en)Method for improving properties of H13 die steel by adding nitrogen
CN102418042A (en)Novel process for manufacturing round steel by forging high-carbon high-chromium cold-working die steel with diameter phi of 300-700 mm
CN102284835B (en)Method for producing 10.9-class vehicle bolt of above M12
CN105177258A (en)Production method of high-toughness high-isotropy large-section hot working die steel
CN103469092A (en)Production method for main shaft of fan by using 34CrNiMo6 steel as raw material
CN104148428B (en)A kind of cold-extrusion shaping method of axial symmetry rod head part
CN103753116A (en)Method for manufacturing working roll of sendzimir mill
CN105132637A (en)Two-liquid quenching tempering local strengthening heat treatment technology for oil press 5CrMnMo upper die
CN102284670A (en)Heavy truck balance shaft forging method
CN104476145B (en)The manufacture method of pad
CN102191358A (en)GCr15 high-carbon chromium bearing steel hot forging billet waste heat temperature control ball annealing technology
CN104841792A (en)Molding process of reverse cylinder workpiece having flange at end
CN105316575A (en) Cold heading wire for resonant rod and production method thereof
CN107365948A (en)A kind of cold working die steel material and preparation method thereof
CN209664812U (en)Full-automatic intelligent annular forging piece production line
CN103981447B (en)Low-cost Mo-free plastic die steel plate and production process thereof
CN101549459B (en) Single hydraulic prop piston production process
CN102974729A (en)Machining method of automobile engine left plate
CN108326215A (en)A kind of frivolous class conjunction gear closed-die forging technique
CN108746440A (en)A kind of high cylindrical forged piece segmentation milling method of large-sized high-temperature alloy
CN100345982C (en)Prehardening treatment method of NAK80 mould steel

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C14Grant of patent or utility model
GR01Patent grant
CF01Termination of patent right due to non-payment of annual fee
CF01Termination of patent right due to non-payment of annual fee

Granted publication date:20160914

Termination date:20190523


[8]ページ先頭

©2009-2025 Movatter.jp