Summary of the invention
The object of the invention is to: for the above-mentioned defect of prior art, provide little three casees data processing methods and system under a kind of nuclear power station EPC pattern.
In order to realize foregoing invention object, the invention provides little three casees data processing methods under a kind of nuclear power station EPC pattern, described method comprises:
Design data, procurement data and the construction data of little three casees under nuclear power station EPC pattern imported to database;
In described database, set up the incidence relation of described design data and described procurement data, construction data;
According to described design data, by described incidence relation, procurement data, construction data are upgraded.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, described database is connected with design document production management system, described the design data of little three casees under nuclear power station EPC pattern is imported to described database by described design document production management system.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, and described method also comprises:
If design data changes, send prompting message.
Improve as the one of little three casees data processing methods under nuclear power station EPC pattern of the present invention, described design data at least comprises version information, status information, the publication time information of design document.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, and described procurement data at least comprises purchase order information and procurement contract information.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, and described construction data at least comprises site operation information and scraps management information.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, and described method also comprises:
User right grade is set, according to described user right grade, described database is carried out to corresponding operating.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, and by described incidence relation, procurement data, construction data is upgraded, and comprising:
According to described prompting message, procurement data and construction data are carried out to corresponding renewal.
One as little three casees data processing methods under nuclear power station EPC pattern of the present invention is improved, and described prompting message sends by the one in mail, short message and Multimedia Message.
In order to realize foregoing invention object, the present invention also provides little three casees data handling systems under a kind of nuclear power station EPC pattern, and system comprises:
Import module, for design data, procurement data and the construction data of little three casees under nuclear power station EPC pattern imported to database;
Relating module, for setting up the incidence relation of described design data and described procurement data, construction data at described database;
Update module, for according to described design data, upgrades procurement data, construction data by described incidence relation;
Database, for preserving described design data, procurement data and construction data.
Improve as the one of little three casees data handling systems under nuclear power station EPC pattern of the present invention, described importing module imports described database by the design data of little three casees under nuclear power station EPC pattern by described design document production management system.
One as little three casees data handling systems under nuclear power station EPC pattern of the present invention is improved, and described system also comprises:
Sending module, if change for design data, sends prompting message.
Improve as the one of little three casees data handling systems under nuclear power station EPC pattern of the present invention, described update module also for:
User right grade is set, according to described user right grade, described database is carried out to corresponding operating.
Improve as the one of little three casees data handling systems under nuclear power station EPC pattern of the present invention, described update module also for:
The prompting message sending according to described sending module carries out corresponding renewal to procurement data and construction data.
Compared with prior art, under nuclear power station EPC pattern of the present invention, little three casees data processing methods and system have following useful technique effect: carry out data processing by little three casees databases under nuclear power station EPC pattern, realize little three casees data upgrading in time between E, P, C plate, guarantee accuracy, the promptness of data., upgrade and the data change function such as prompting automatically by little three casees data sharings,, Data Dynamic associated with design document meanwhile, optimized management process, effectively realized little three casees efficiently to manage, guaranteed accuracy and the integrality of little three casees data.Realize technically breakthrough, obtained good technique effect.
Embodiment
In order to make goal of the invention of the present invention, technical scheme and useful technique effect thereof more clear, below in conjunction with the drawings and specific embodiments, the present invention is further elaborated.It should be emphasized that, the embodiment of describing in this instructions is only used to explain the present invention, is not intended to limit use occasion of the present invention.
Fig. 1 provides little three casees data processing methods under a kind of nuclear power station EPC pattern, specifically comprises:
Step 101, imports database by design data, procurement data and the construction data of little three casees under nuclear power station EPC pattern.
Database is connected with design document production management system, described the design data of little three casees under nuclear power station EPC pattern is imported to described database by described design document production management system.
Design data at least comprises version information, status information, the publication time information of design document.
Concrete, the template of design data can be as shown in table 1.Data Source mainly comprises design document progress monitoring system, design document production management system and the manual typing of designer.
Table 1
| Bin numbering |
| Box standard No. |
| Factory building |
| Island is other |
| System |
| Installation site |
| Safe class |
| Antidetonation grade |
| Quality guarantee grade |
| Label color |
| Whether LOT88 |
| Communications conduit number |
| Document No. |
| FileVersion |
| Change coding |
| Change version |
| Type of cable and quantity |
Procurement data at least comprises purchase order information and procurement contract information.Construction data at least comprises site operation information and scraps management information.Concrete, purchase order information template is as shown in table 2, and procurement contract information model is as shown in table 3.Purchase order is mainly used in the little three casees order relevant informations of management maintenance, facilitates other plates to understand in real time buying progress simultaneously.Contract information is mainly managed supplier's relevant information.
Table 2
| Bin numbering |
| Box standard No. |
| Installation site |
| Safe class |
| Antidetonation grade |
| Quality guarantee grade |
| Label color |
| Document No. |
| Communications conduit number |
| Change coding |
| Change version |
| Version |
| Type of cable and quantity |
| LOT88 |
| Batch of orders |
| Place an order the time |
| Order number |
| Packing list number |
| Delivery availability |
| The pre-arrival time |
| Arrival time |
| Modification time |
| The EESR time |
Table 3
| Engineering code |
| Contract number |
| Machine group number |
| Buying Bale No. |
| Communications conduit code |
| Addressee |
| Vendor code |
| Vendor name |
| Contact person |
| Fax number |
| Telephone number |
| E-mail address |
| Mailing address |
| Postcode |
| Author's code |
| Person in charge of the technology aspect |
| Commercial affairs responsible official |
Construction data at least comprises site operation information and scraps management information.Whether concrete, construction information and the information of scrapping comprise: little three casees arrival times, Shake-out Time, installation site, set-up time, scrap etc.Facilitate procurement staff to understand in time the on-the-spot demand to little three casees simultaneously.Its template can be as shown in table 4.
Table 4
| Bin numbering |
| Box standard No. |
| Installation site |
| System |
| Data mode |
| Circulation state |
| Whether LOT88 |
| Arrival time |
| Shake-out Time |
| Set-up time |
Step 103 is set up the incidence relation of described design data and described procurement data, construction data in described database.
For design data, procurement data and the construction data of guaranteeing little three casees keep consistency, can set up three's incidence relation.
Step 105, according to described design data, upgrades procurement data, construction data by described incidence relation.
Further, if design data changes, send prompting message.This prompting message sends by the one in mail, short message and Multimedia Message.
Data change management is set, guarantees the consistance of design data and database, while rising version, can rise version by reminder-data database data; Mail management is set, has the careful task in school or data to rise version and automatically remind by outlook; Data sheet is set, for web end subscriber provides intelligent report forms.
Optionally, according to described prompting message, procurement data and construction data are carried out to corresponding renewal.
Concrete, E data link by interface and design document production management system, facilitate user to inquire about the every finished product file that data are corresponding, save heap file and search the time; By document change administration module, realize the automatic prompting of design document liter version, guarantee the consistance of design document and database data; By Integrated design file progress monitoring system data, version, state, the publication time of obtaining file, the promptness of assurance data.Set up relationship maps relation due to design data and procurement data and construction data, when design data changes, triggered prompting message, database is upgraded automatically, also can be by artificial regeneration database.
Further, user right grade is set, according to described user right grade, described database is carried out to corresponding operating.
Concrete, by user right grade is set, can realizes database is carried out to different operations according to different user right grades, as alter operation, deletion action, increase operation, query manipulation etc.
The embodiment of the present invention is carried out data processing by little three casees databases under nuclear power station EPC pattern, realizes little three casees data upgrading in time between E, P, C plate, guarantees accuracy, the promptness of data., upgrade and the data change function such as prompting automatically by little three casees data sharings,, Data Dynamic associated with design document meanwhile, optimized management process, effectively realized little three casees and efficiently managed.Meanwhile, can carry out corresponding renewal to procurement data and construction data by the variation of design data, realize design data command each plate data coordinate.On unified data platform, carry out little three casees management, reduce the number of times of data circulation and the quantity of interface, improved data transmission and shared efficiency.In addition, propose EPC adopt a set of unified user authorization management, and adopt press role authorization, realized the unified management and control of authority.
Incorporated by reference to Fig. 2, Fig. 2 provides an embodiment of little three casees data handling systems under a kind of nuclear power station EPC pattern.Comprise: import module 201, relating module 203, update module 205 and database 207.Concrete,
Import module 201, for design data, procurement data and the construction data of little three casees under nuclear power station EPC pattern imported to database;
Database 207 is connected with design document production management system, described the design data of little three casees under nuclear power station EPC pattern is imported to described database by described design document production management system.
Design data at least comprises version information, status information, the publication time information of design document.
Relating module 203, for setting up the incidence relation of described design data and described procurement data, construction data at described database;
Update module 205, for according to described design data, upgrades procurement data, construction data by described incidence relation;
Database 207, for preserving described design data, procurement data and construction data.
Further, import module 201 also for the design data of little three casees under nuclear power station EPC pattern is imported to described database by described design document production management system.
Further, update module 205 also, for user right grade is set, is carried out corresponding operating according to described user right grade to described database.
Further, update module 205 is also carried out corresponding renewal for the prompting message sending according to described sending module to procurement data and construction data.
Optionally, under nuclear power station EPC pattern, little three casees data handling systems can also comprise sending module, if change for design data, send prompting message.
The implementation method of system and flow process can, referring to the embodiment of the method for introducing in previous embodiment, repeat no more herein.
Can find out in conjunction with above detailed description of the present invention, with respect to prior art, the present invention at least has following useful technique effect: carry out data processing by little three casees databases under nuclear power station EPC pattern, realize little three casees data upgrading in time between E, P, C plate, guarantee accuracy, the promptness of data., upgrade and the data change function such as prompting automatically by little three casees data sharings,, Data Dynamic associated with design document meanwhile, optimized management process, effectively realized little three casees and efficiently managed.Meanwhile, can carry out corresponding renewal to procurement data and construction data by the variation of design data, realize design data command each plate data coordinate.On unified data platform, carry out little three casees management, reduce the number of times of data circulation and the quantity of interface, improved data transmission and shared efficiency.In addition, propose EPC adopt a set of unified user authorization management, and adopt press role authorization, realized the unified management and control of authority.Visible, the technology of the present invention is obtaining good effect aspect the management optimizing application of little three casees of nuclear power station.
According to above-mentioned principle, the present invention can also carry out suitable change and modification to above-mentioned embodiment.Therefore, the present invention is not limited to embodiment disclosed and described above, also should fall in the protection domain of claim of the present invention modifications and changes more of the present invention.Although used some specific terms in this instructions, these terms just for convenience of description, do not form any restriction to the present invention.