技术领域technical field
本发明有关于一种气垫床的控制阀,尤其是一种有泄压与气流检测功能的充气式气垫床的控制阀。The invention relates to a control valve of an air bed, in particular to a control valve of an inflatable air bed with functions of pressure relief and air flow detection.
背景技术Background technique
一旦人体因为疾病导致长期躺卧在病床上时,往往会因为人体体重长时间压迫,造成人体与床面接触的部位因为长时间血液循环不良,而有组织坏死的褥疮现象。为避免病人得褥疮,最有效的办法就是让病人躺卧交换充气式气垫床,该种交换式气垫床中区分有可交换充气与排气的气囊条,利用气体交换充、排气,可对病人身体达到交替且暂时不接触的减压作用,借此降低褥疮发生的机率。Once the human body lies on the hospital bed for a long time due to disease, it will often be oppressed by the body weight for a long time, resulting in the phenomenon of decubitus ulcers with tissue necrosis at the parts in contact with the bed surface due to poor blood circulation for a long time. In order to prevent the patient from getting bedsore, the most effective way is to let the patient lie down and exchange the inflatable air mattress. The patient's body achieves alternating and temporarily non-contact decompression, thereby reducing the chance of decubitus ulcers.
气垫床的现有控制阀9,如图1,其结构中包括有进气管91、压力袋92、两开关推动板93与三叉管94。其中,当空气进入压力袋92后,若空气饱和,能将压力袋92撑大,借此推动两侧的开关推动板93位移,以使感应开关产生感应;但,传统压力袋92式结构,受限于材质与结构因素,常常有动作不确实、影响感应结果的困扰。再者,现有控制阀9都必须配组三叉管94,其整体功效、组装便利与成本降低等方面,都存有改进与提升的空间与必要。The existing control valve 9 of the air mattress, as shown in Figure 1, includes an air intake pipe 91, a pressure bag 92, two switch push plates 93 and a trident pipe 94 in its structure. Wherein, when the air enters the pressure bag 92, if the air is saturated, the pressure bag 92 can be expanded, thereby pushing the switch pushing plates 93 on both sides to move, so that the induction switch can generate induction; however, the traditional pressure bag 92 type structure, Limited by material and structural factors, there are often problems with inaccurate movements and affecting the sensing results. Furthermore, the existing control valve 9 must be equipped with a trident pipe 94, and there is room and necessity for improvement in terms of overall efficacy, convenience of assembly, and cost reduction.
发明内容Contents of the invention
本发明气垫床的控制阀,其主要目的在于:提供一种控制阀,其专供应用于充气式气垫床前端供气设备处。其将空气泵浦所产生的空气输入后,除具有感应作用外,更兼具有泄压功能,可使输出的空气压力合乎所需的设定范围。The main purpose of the control valve of the air bed of the present invention is to provide a control valve which is specially supplied to the air supply equipment at the front end of the inflatable air bed. After the air generated by the air pump is input, it not only has the function of induction, but also has the function of pressure relief, so that the output air pressure can meet the required setting range.
为达上述目的,本发明具体的内容为:结构主要由第一本体、膜片、第二本体、感应装置与泄压装置所组成。To achieve the above purpose, the specific content of the present invention is as follows: the structure is mainly composed of a first body, a diaphragm, a second body, an induction device and a pressure relief device.
该第一本体,内部具有相互连通的第一空间、第一气室、第二气室和第四气室;另,第一本体外部设置有第一管体与第二管体,其中,第一管体与第一气室连通,第二管体与第二气室连通;又,第一本体的第四气室外缘设有独立的第三气室,第三气室内部与第三管体连通;另该第一本体内侧缘边设有凹槽。The first body has a first space, a first air chamber, a second air chamber, and a fourth air chamber that communicate with each other inside; in addition, a first pipe body and a second pipe body are arranged outside the first body, wherein the first air chamber One pipe body communicates with the first air chamber, and the second pipe body communicates with the second air chamber; in addition, an independent third air chamber is provided on the outer edge of the fourth air chamber of the first body, and the inside of the third air chamber is connected with the third pipe The body is connected; in addition, the inner edge of the first body is provided with a groove.
该膜片,夹置于第一本体和第二本体内部间,膜片由主膜体和延伸体组成,主膜体呈圆形,对应设置于第一空间内侧;延伸体上设有穿孔,穿孔的位置对应于第四气室;延伸体接近外端缘另设有孔洞,孔洞的位置对应至第三气室;又膜片周围设有压合环体,压合环体对应置放于第一本体的凹槽处。The diaphragm is sandwiched between the first body and the interior of the second body. The diaphragm is composed of a main film body and an extension body. The main film body is circular and is correspondingly arranged inside the first space; The position of the perforation corresponds to the fourth air chamber; the extension body is provided with a hole close to the outer edge, and the position of the hole corresponds to the third air chamber; the groove of the first body.
该第二本体,内侧缘边设有凹槽,凹槽可配合第一本体的凹槽,使膜片夹置于第一本体与第二本体后呈现密合关系;第二本体内部对应于第一本体的第一空间设有第二空间,且该第二空间内组设有感应装置;另,第二本体设置有泄压管体,该泄压管体内部组设有泄压装置,其可调整压力;又泄压管体与一泄压空气排流管适当连通,超压的空气得以由此流出。The second body has a groove on the inner edge, and the groove can match the groove of the first body, so that the diaphragm is sandwiched between the first body and the second body to present a tight relationship; the interior of the second body corresponds to the first body The first space of a body is provided with a second space, and an induction device is arranged in the second space; in addition, the second body is provided with a pressure relief pipe body, and a pressure relief device is arranged inside the pressure relief pipe body. The pressure can be adjusted; and the pressure relief pipe body is properly communicated with a pressure relief air discharge pipe, so that the overpressured air can flow out.
前述感应装置,具体可由微动开关实施,其具有触发部,该触发部面对膜片的主膜体,当第一空间因有空气进入时将推动主膜体形变位移并碰触触发部,以使感应装置检测到有空气进入且饱和,将发出电子信号。The above-mentioned sensing device can be implemented by a micro switch, which has a trigger part, and the trigger part faces the main membrane body of the diaphragm. When air enters the first space, it will push the main membrane body to deform and displace and touch the trigger part. In order for the sensing device to detect air entry and saturation, an electronic signal will be sent.
前述泄压装置,具体包括有阀体、弹性元件、中心柱、固定套与调整栓,利用旋动调整栓,可改变阀体和弹性元件的位置,以决定泄压的压力。The above-mentioned pressure relief device specifically includes a valve body, an elastic element, a central column, a fixed sleeve and an adjustment bolt. By turning the adjustment bolt, the positions of the valve body and the elastic element can be changed to determine the pressure of the pressure relief.
前述第一管体,侧边更预设有与其呈垂直关系的第一副管体;且,该第二管体,侧边也预设有与其呈垂直关系的第二副管体;本发明实施时,可依需要选择第一管体或第一副管体、第二管体或第二副管体,目的在于提升配管的顺畅度与便利性,避免管路的弯折。同理,该泄压空气排流管内部与第二本体的第五气室连通,第五气室通过膜片的孔洞得以与第三气室连通,且第三气室与第三管体连通,实施时,可依需要选择泄压空气排流管或第三管体为泄压空气的输出。The side of the aforementioned first pipe body is further preset with a first auxiliary pipe body in a vertical relationship with it; and, the side of the second pipe body is also preset with a second auxiliary pipe body in a vertical relationship with it; the present invention During implementation, the first pipe body or the first auxiliary pipe body, the second pipe body or the second auxiliary pipe body can be selected according to the needs, the purpose is to improve the smoothness and convenience of the piping and avoid the bending of the pipeline. Similarly, the inside of the pressure relief air discharge pipe communicates with the fifth air chamber of the second body, the fifth air chamber communicates with the third air chamber through the hole in the diaphragm, and the third air chamber communicates with the third pipe body , During implementation, the pressure relief air discharge pipe or the third pipe body can be selected as the output of the pressure relief air as required.
本发明具体的有益效果在于:提供一功能整合性复合式的气垫床的控制阀,改善现有控制泄压结构分散设置的缺点,能有效提升组装速度与准确性,增进产品配置整齐度与维修便利性。The specific beneficial effects of the present invention are: to provide a function-integrated composite air bed control valve, which can improve the shortcomings of the existing control and pressure relief structure scattered settings, can effectively improve the speed and accuracy of assembly, and improve the uniformity and maintenance of product configuration. convenience.
附图说明Description of drawings
图1:为现有控制阀的立体分解图。Figure 1: An exploded perspective view of an existing control valve.
图2:为本发明的立体组合外观图。Fig. 2: It is the three-dimensional assembled exterior view of the present invention.
图3:为本发明的立体分解图。Fig. 3: is the three-dimensional exploded view of the present invention.
图4:为本发明的另一立体分解图。Fig. 4: Another three-dimensional exploded view of the present invention.
图5:为本发明第一本体的气流示意图。Fig. 5 is a schematic diagram of the air flow of the first body of the present invention.
图6:为本发明的膜片受气流推动使感应装置运作的示意图。Fig. 6: It is a schematic diagram showing that the diaphragm of the present invention is driven by the airflow to make the induction device operate.
图7:为本发明的超压空气进行泄压的示意图。Figure 7: A schematic diagram of depressurizing the overpressured air of the present invention.
其中:in:
1-----第一本体 11----第一管体 111---第一副管体1-----first body 11----first pipe body 111---first auxiliary pipe body
12----第二管体 121---第二副管体 13----第三管体12----Second pipe body 121---Second auxiliary pipe body 13----Third pipe body
14----第一空间 141---第一气室 142---第二气室14----the first space 141---the first air chamber 142---the second air chamber
143---第三气室 144---第四气室 15----凹槽143---the third air chamber 15 ---- groove
2-----膜片 21----主膜体 22----延伸体2-----diaphragm 21----main membrane body 22----extension body
221---穿孔 222---孔洞 23----压合环体221---Perforation 222---Hole 23----Pressing ring
3-----第二本体 331---泄压空气排流管 332---第五气室3-----second body 331---pressure relief air discharge pipe 332---fifth air chamber
33----泄压管体 34----第二空间 36----凹槽33----pressure relief pipe body 34----second space 36----groove
37----泄压气室 4-----感应装置 41----触发部37----Pressure relief chamber 4-----Sensing device 41----Trigger part
5-----泄压装置 51----阀体 52----弹性元件5-----pressure relief device 51----valve body 52----elastic element
53----中心柱 54----固定套 55----调整栓53----central column 54----fixed sleeve 55----adjusting bolt
9-----现有控制阀 91----进气管 92----压力袋9-----existing control valve 91----air intake pipe 92----pressure bag
93----开关推动板 94----三叉管。93----switch push plate 94----trident tube.
具体实施方式Detailed ways
此仅就本发明气垫床的控制阀的结构组成,及其所产生的功效,配合附图,举一本发明的较佳实施例详细说明如下:This is only with respect to the structural composition of the control valve of the air bed of the present invention, and the effect thereof produced, in conjunction with the accompanying drawings, a preferred embodiment of the present invention is described in detail as follows:
首请参阅图2、图3与图4所示,本发明气垫床的控制阀,主要由第一本体1、膜片2、第二本体3、感应装置4与泄压装置5所组成。First please refer to FIG. 2 , FIG. 3 and FIG. 4 , the control valve of the air mattress of the present invention is mainly composed of a first body 1 , a diaphragm 2 , a second body 3 , a sensing device 4 and a pressure relief device 5 .
其中:in:
该第一本体1,内部具有相互连通的第一空间14、第一气室141、第二气室142和第四气室144;另,第一本体1外部设置有第一管体11与第二管体12,其中,第一管体11与第一气室141连通,第二管体12与第二气室142连通;又,第一本体1的第四气室144外缘设有独立的第三气室143,第三气室143内部与第三管体13连通;另该第一本体1内侧缘边设有凹槽15。The first body 1 has a first space 14, a first air chamber 141, a second air chamber 142, and a fourth air chamber 144 that communicate with each other inside; Two pipe bodies 12, wherein, the first pipe body 11 communicates with the first air chamber 141, and the second pipe body 12 communicates with the second air chamber 142; The third air chamber 143 is connected inside the third air chamber 143 to the third pipe body 13 ; in addition, the inner edge of the first body 1 is provided with a groove 15 .
该膜片2,夹置于第一本体1和第二本体3内部间,膜片2由主膜体21和延伸体22组成;主膜体21呈圆形,对应设置于第一空间14内侧;延伸体22上设有穿孔221,穿孔221的位置对应于第四气室144;延伸体22接近外端缘另设有孔洞222,孔洞222的位置对应至第三气室143;又膜片2周围设有压合环体23,压合环体23对应置放于第一本体1的凹槽15处。The diaphragm 2 is sandwiched between the first body 1 and the interior of the second body 3, and the diaphragm 2 is composed of a main membrane body 21 and an extension body 22; the main membrane body 21 is circular and is correspondingly arranged inside the first space 14 The extension body 22 is provided with a perforation 221, and the position of the perforation 221 corresponds to the fourth air chamber 144; the extension body 22 is provided with a hole 222 near the outer edge, and the position of the hole 222 corresponds to the third air chamber 143; 2 is surrounded by a press-fit ring body 23, and the press-fit ring body 23 is correspondingly placed in the groove 15 of the first body 1.
该第二本体3,内侧缘边设有凹槽36,凹槽36可配合第一本体1的凹槽15,使膜片2夹置于第一本体1与第二本体3后呈现密合关系;第二本体3内部对应于第一本体1的第一空间14设有第二空间34,且该第二空间34内组设有感应装置4;另,第二本体3设置有泄压管体33,该泄压管体33内部组设有泄压装置5,其可调整压力;又泄压管体33与一泄压空气排流管331内部连通,超压的空气得以由此流出。The inner edge of the second body 3 is provided with a groove 36, the groove 36 can match the groove 15 of the first body 1, so that the diaphragm 2 is sandwiched between the first body 1 and the second body 3 to present a close relationship The inside of the second body 3 is provided with a second space 34 corresponding to the first space 14 of the first body 1, and an induction device 4 is set in the second space 34; in addition, the second body 3 is provided with a pressure relief pipe body 33. The pressure relief pipe body 33 is internally provided with a pressure relief device 5, which can adjust the pressure; and the pressure relief pipe body 33 communicates with a pressure relief air discharge pipe 331, so that the overpressured air can flow out.
前述感应装置4,具体可由微动开关实施,其具有触发部41,该触发部41外露于第二空间34,且面对膜片2的主膜体21。The above-mentioned sensing device 4 can be specifically implemented by a micro switch, which has a trigger portion 41 , and the trigger portion 41 is exposed to the second space 34 and faces the main membrane body 21 of the membrane 2 .
前述泄压装置5,具体包括有阀体51、弹性元件52、中心柱53、固定套54与调整栓55,利用旋动调整栓55,可改变阀体51的位置,以决定泄压的压力。The aforementioned pressure relief device 5 specifically includes a valve body 51, an elastic element 52, a central column 53, a fixed sleeve 54, and an adjustment bolt 55. By rotating the adjustment bolt 55, the position of the valve body 51 can be changed to determine the pressure relief pressure. .
前述第一管体11,侧边更预设有呈垂直关系的第一副管体111;且,该第二管体12,侧边也预设有呈垂直关系的第二副管体121;本发明实施配管时,可依需要选择第一管体11或第一副管体111其中之一、第二管体12或第二副管体121其中之一,目的在于提升配管的顺畅度与便利性,避免管路的弯折;当然,未被选用的管体需为封闭状。同理,该泄压空气排流管331内部与第二本体3的第五气室332连通,第五气室332通过膜片2的孔洞222得以与第三气室143连通,且第三气室143与第三管体13连通,实施时,可依需要选择泄压空气排流管331或第三管体13为泄压空气的输出;当然,未被选用的管体需为封闭状。The side of the aforementioned first pipe body 11 is further provided with a first auxiliary pipe body 111 in a vertical relationship; and, the second pipe body 12 is also preset with a second auxiliary pipe body 121 in a vertical relationship; When implementing piping in the present invention, one of the first pipe body 11 or the first auxiliary pipe body 111, one of the second pipe body 12 or the second auxiliary pipe body 121 can be selected according to the needs, the purpose is to improve the smoothness and smoothness of the piping. Convenience, avoiding the bending of the pipeline; of course, the unselected pipe body must be closed. Similarly, the inside of the pressure relief air discharge pipe 331 communicates with the fifth air chamber 332 of the second body 3, and the fifth air chamber 332 communicates with the third air chamber 143 through the hole 222 of the diaphragm 2, and the third air chamber The chamber 143 communicates with the third pipe body 13. During implementation, the pressure relief air discharge pipe 331 or the third pipe body 13 can be selected as the output of the pressure relief air; of course, the unselected pipe body must be closed.
借助上述零组件,将感应装置4和泄压装置5组置于第二本体3,膜片2组配于第一本体1和第二本体3间即可。By means of the above components, the sensing device 4 and the pressure relief device 5 are assembled on the second body 3 , and the diaphragm 2 is assembled between the first body 1 and the second body 3 .
实施时,使第一管体11为空气的输入端,也即将第一管体11与空气泵浦(图中未示)连接,而第二管体12为本发明空气的输出端。当空气经第一管体11进入第一气室141流到第一空间14时(如图5),饱和的空气与压力将推动膜片2的主膜体21形变(如图6),该形变的主膜体21中央将碰触到感应装置4的触发部41,触发部41受力内缩,感应装置4因检测到有空气进入,将发出电子信号;借此,获致感应与自动传送信息的功能。接着,部份空气自第一空间14流通到第四气室144,由于第四气室144可通过穿孔221与泄压气室37连通,且泄压气室37又与泄压管体33内部连通,因此空气来到泄压管体33(如图7)处,此处设置有泄压装置5,该泄压装置5包括有一被弹性元件52顶持的阀体51;若空气的气压小于弹性元件52施予阀体51的作用弹力,则阀体51呈关闭状态;但若空气的气压大于弹性元件52施予阀体51的作用弹力时,则阀体51会被推开,弹性元件52压缩,空气由阀体51旁通过往泄压空气排流管331送出;借此,得以获致泄压的功能。During implementation, make the first tube body 11 the input end of the air, that is, connect the first tube body 11 with an air pump (not shown in the figure), and the second tube body 12 is the output end of the air of the present invention. When the air enters the first air chamber 141 through the first tube body 11 and flows to the first space 14 (as shown in Figure 5), the saturated air and pressure will push the main membrane body 21 of the diaphragm 2 to deform (as shown in Figure 6). The center of the deformed main membrane body 21 will touch the trigger part 41 of the sensing device 4, and the trigger part 41 will shrink inwardly under the force, and the sensing device 4 will send out an electronic signal because it detects the entry of air; thereby, sensing and automatic transmission are obtained. information function. Then, part of the air flows from the first space 14 to the fourth air chamber 144. Since the fourth air chamber 144 can communicate with the pressure relief chamber 37 through the perforation 221, and the pressure relief chamber 37 communicates with the inside of the pressure relief pipe body 33, Therefore, the air comes to the pressure relief pipe body 33 (as shown in Figure 7), where a pressure relief device 5 is provided, and the pressure relief device 5 includes a valve body 51 supported by an elastic element 52; 52 exerts the elastic force on the valve body 51, and the valve body 51 is in a closed state; but if the air pressure is greater than the elastic force applied to the valve body 51 by the elastic element 52, the valve body 51 will be pushed open, and the elastic element 52 will be compressed , the air is bypassed by the valve body 51 and sent out to the pressure relief air discharge pipe 331; thereby, the function of pressure relief can be obtained.
前述由泄压空气排流管331所送出的超压气体,以送回空气泵浦内部再次利用为佳,不宜直接排放于环境中,可避免噪音的产生。The above-mentioned overpressure gas sent by the pressure relief air discharge pipe 331 is preferably sent back to the inside of the air pump for reuse, and should not be directly discharged into the environment, so as to avoid the generation of noise.
本发明为已周详考量商品化的务实设计,发明人基于以往气垫床配管时常发生空气管需弯折导致易于破损或脱落的缺失,本发明的空气输入或输出用管体,都设计有内部连通的纵向管体与横向管体。如图2与图3,该第一管体11的侧边预设有呈垂直关系、内部连通的第一副管体111,至于第二管体12侧边也预设有呈垂直关系、内部连通的第二副管体121,而泄压空气排流管331内部与第二本体3的第五气室332连通,第五气室332通过膜片2的孔洞222得以与第三气室143连通,且第三气室143与第三管体13连通;如此,实施配管时,可依方向顺畅性选择适当的管体连接。The present invention is a practical design that has been carefully considered for commercialization. Based on the fact that the air pipes of the air mattress often need to be bent to cause the air pipes to be easily damaged or fall off. The air input or output pipes of the present invention are all designed with internal connections. The vertical tube body and the horizontal tube body. As shown in Fig. 2 and Fig. 3, the side of the first pipe body 11 is preset with a first auxiliary pipe body 111 in a vertical relationship and internally communicated, and the side of the second pipe body 12 is also preset with a vertical relationship and an internal The second auxiliary pipe body 121 communicated, and the inside of the pressure relief air discharge pipe 331 communicates with the fifth air chamber 332 of the second body 3, and the fifth air chamber 332 is connected to the third air chamber 143 through the hole 222 of the diaphragm 2 In addition, the third air chamber 143 communicates with the third pipe body 13; in this way, when piping is implemented, an appropriate pipe body connection can be selected according to the smoothness of the direction.
本发明不限定只能将第一管体11为空气的输入端、第二管体12为空气的输出端,也可将之相反配置,也即改成第一管体11为空气的输出端、第二管体12为空气的输入端。The present invention does not limit only the first pipe body 11 to be the input end of the air, and the second pipe body 12 to be the output end of the air, and it can also be configured in reverse, that is, the first pipe body 11 is changed to be the output end of the air , The second pipe body 12 is the input end of the air.
本发明的第一管体11、第二管体12与第三管体13,都设计成内、外双层管接头结构,其优点在于可使配管接合后稳固连接、不易脱落,且能避免配管端部断裂或破损的情况发生。The first pipe body 11, the second pipe body 12 and the third pipe body 13 of the present invention are all designed as inner and outer double-layer pipe joint structures. Piping ends are broken or damaged.
另,传统空气泵、气垫床与控制阀的连组,中间都必须配置有三叉管接头,以利分配或转接气体;本发明的控制阀结构即内建包括有该三叉管的功能,因此不论配管或组装都较现有组构更为方便与简化。但,利用本发明实施时,当然也仍可配合三叉管接头使用。将本发明其中任一管体封塞,且于仅剩的单一管体外端连接三叉管接头,即可获致与空气泵或气垫床连通输气的目的。原则上,空气泵、控制阀与气垫床间的配置关系至少包括有:In addition, traditional air pumps, air mattresses, and control valves must be equipped with trident pipe joints in the middle to facilitate distribution or transfer of gas; the control valve structure of the present invention is built with the function of the trident pipe, so No matter piping or assembly, it is more convenient and simplified than the existing structure. However, when utilizing the present invention for implementation, it can still be used in conjunction with the three-prong pipe joint of course. By sealing any one of the tubes of the present invention, and connecting the outer end of the remaining single tube with a three-pronged pipe joint, the purpose of communicating with an air pump or an air mattress can be achieved. In principle, the configuration relationship between the air pump, control valve and air mattress includes at least:
一、 空气泵、控制阀与气垫床中间利用三叉管接头,放射状各别连接。1. The air pump, the control valve and the air bed are connected radially with three-prong pipe joints.
二、 空气泵单独连接至控制阀,且空气泵另单独连接至气垫床。2. The air pump is separately connected to the control valve, and the air pump is separately connected to the air mattress.
三、 空气泵单独连接至控制阀,且控制阀再单独连接至气垫床。3. The air pump is connected to the control valve separately, and the control valve is connected to the air mattress separately.
本发明虽借助前述实施例来描述,但仍可变化其形态与细节,于不脱离本发明的精神而达成,并由熟悉此项技艺的人士可了解。前述本发明的较佳实施例,仅借本发明原理可以具体实施的方式之一,但并不以此为限制,应依后附的申请专利范围所界定为准。Although the present invention has been described with the aid of the foregoing embodiments, the forms and details can still be changed without departing from the spirit of the present invention, and can be understood by those skilled in the art. The aforementioned preferred embodiments of the present invention are only one of the ways in which the principles of the present invention can be implemented, but are not limited thereto, and should be defined by the scope of the appended patent application.
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110347641.0ACN103083804B (en) | 2011-11-07 | 2011-11-07 | Control valve of air cushion bed |
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110347641.0ACN103083804B (en) | 2011-11-07 | 2011-11-07 | Control valve of air cushion bed |
| Publication Number | Publication Date |
|---|---|
| CN103083804A CN103083804A (en) | 2013-05-08 |
| CN103083804Btrue CN103083804B (en) | 2014-11-12 |
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201110347641.0AExpired - Fee RelatedCN103083804B (en) | 2011-11-07 | 2011-11-07 | Control valve of air cushion bed |
| Country | Link |
|---|---|
| CN (1) | CN103083804B (en) |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105581879A (en)* | 2014-10-20 | 2016-05-18 | 唐德工业股份有限公司 | Air bed exhaust recovery method and device |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2663756Y (en)* | 2003-09-03 | 2004-12-15 | 江丽美 | Charge and exhaust control valve device |
| CN2771586Y (en)* | 2005-01-31 | 2006-04-12 | 苏铭哲 | Air mattress control air valve structure |
| CN2781117Y (en)* | 2005-01-10 | 2006-05-17 | 刘承楚 | Distributing valve device of air cushion bed |
| CN101463917A (en)* | 2007-12-20 | 2009-06-24 | 深圳迈瑞生物医疗电子股份有限公司 | Pressure switch apparatus |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB9826133D0 (en)* | 1998-11-27 | 1999-01-20 | Kci Medical Ltd | Rotary valve |
| US8191578B2 (en)* | 2007-11-13 | 2012-06-05 | Mego Afek Ac Ltd. | Rotary disc valve |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2663756Y (en)* | 2003-09-03 | 2004-12-15 | 江丽美 | Charge and exhaust control valve device |
| CN2781117Y (en)* | 2005-01-10 | 2006-05-17 | 刘承楚 | Distributing valve device of air cushion bed |
| CN2771586Y (en)* | 2005-01-31 | 2006-04-12 | 苏铭哲 | Air mattress control air valve structure |
| CN101463917A (en)* | 2007-12-20 | 2009-06-24 | 深圳迈瑞生物医疗电子股份有限公司 | Pressure switch apparatus |
| Publication number | Publication date |
|---|---|
| CN103083804A (en) | 2013-05-08 |
| Publication | Publication Date | Title |
|---|---|---|
| US9278164B2 (en) | Negative pressure wound therapy system | |
| EP1920681A3 (en) | Inflatable bed having a build-in electric air pump unit for inflating a mattress assembly | |
| CN109009790A (en) | A kind of inflatable intelligence mattress | |
| WO2008033788A3 (en) | Medical fluid system with flexible sheeting disposable unit | |
| CN103083804B (en) | Control valve of air cushion bed | |
| WO2020200274A1 (en) | Pulse diagnosis device and control method therefor | |
| WO2021231407A8 (en) | Beds and other body support devices with individually controllable cells comprising one or more air bladders | |
| JP2017169911A (en) | Fluid cell-type mattress and its control method | |
| CN211433831U (en) | Control system of air mattress | |
| CN200999898Y (en) | Improved structure of throttle valve assembly of air cushion bed | |
| TW200305385A (en) | Inflatable support | |
| US11872152B2 (en) | Appendage pressurization devices comprising artificial muscles | |
| CN106555890A (en) | Air inlet switching valve with pressure relief adjusting function | |
| CN205118330U (en) | air flow control valve | |
| CN207871204U (en) | A kind of bilateral negative pressure adjusting device for breast | |
| US8651131B2 (en) | Control valve for air cushion bed | |
| CN201492438U (en) | Side-turning device for ultrasonic scan | |
| CN202821922U (en) | Inflatable mattress device for dialysis of low blood pressure patients | |
| CN202446403U (en) | A kind of medical inflatable mattress | |
| CN217041028U (en) | Anti-reflux automatic pressure-relief type intracardiac suction tube | |
| CN209136624U (en) | A kind of children's hearing detection auxiliary device | |
| WO2021127280A1 (en) | Support surface overlay with vacuum enclosure and method of operation | |
| CN213666282U (en) | Portable intelligent standing-lying and turning-over auxiliary device | |
| CN218420533U (en) | A device for gastrointestinal decompression | |
| CN211271835U (en) | Disposable Inflatable Pressure Ulcer Limb Gasket |
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee | Granted publication date:20141112 Termination date:20171107 |