Movatterモバイル変換


[0]ホーム

URL:


CN102248955B - Automatic alarm receiving method - Google Patents

Automatic alarm receiving method
Download PDF

Info

Publication number
CN102248955B
CN102248955BCN 201110195130CN201110195130ACN102248955BCN 102248955 BCN102248955 BCN 102248955BCN 201110195130CN201110195130CN 201110195130CN 201110195130 ACN201110195130 ACN 201110195130ACN 102248955 BCN102248955 BCN 102248955B
Authority
CN
China
Prior art keywords
prediction scheme
match
execution
threshold
successful
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110195130
Other languages
Chinese (zh)
Other versions
CN102248955A (en
Inventor
董阳
陈红萍
李德逸
张吉英
程力南
李吉生
邵晓风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Boyuan Rongtian information Polytron Technologies Inc
Original Assignee
SUZHOU BOYUAN RONGTIAN INFORMATION TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU BOYUAN RONGTIAN INFORMATION TECHNOLOGY CO LTDfiledCriticalSUZHOU BOYUAN RONGTIAN INFORMATION TECHNOLOGY CO LTD
Priority to CN 201110195130priorityCriticalpatent/CN102248955B/en
Publication of CN102248955ApublicationCriticalpatent/CN102248955A/en
Application grantedgrantedCritical
Publication of CN102248955BpublicationCriticalpatent/CN102248955B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Landscapes

Abstract

The invention provides an automatic alarm receiving method, which comprises the following steps of: 1, matching a subject field in alarm information with a failure name in a history library and acquiring a successful matching plan; 2, recording information corresponding to the successful matching plan in the history library and starting the plan; and 3, recording an execution result of the plan in a status bar corresponding to the plan in the history library. In the method, the subject field in the alarm information transmitted by a locomotive and the failure name in the history library are matched to obtain the successful matching plan for realizing automatic selection and starting of the plan when the locomotive transmits the alarm information, and a reliable plan is adopted in a short period of time, so that a failure can be eliminated immediately, and safe running of the locomotive can be recovered.

Description

Automatically the method for receiving a crime report
Technical field
The present invention relates to the locomotive failure control technology, relate in particular to the method for automatically receiving a crime report that the automatic prediction scheme of alarm message is selected and started.
Background technology
Along with the lasting acceleration of national economy development and city, Development of China's Urbanization, Chinese Railway also in without a stop development to adapt to more passenger flow, faster speed and safer running.
Because it is various and affect greatly affect factor that the locomotive on the railway normally moves, locomotive often breaks down.When locomotive breaks down, at first need the staff to carry out specialty analysis and draw prediction scheme; then eliminate fault through staff's rigorous operation, can not more in time eliminate fault although the prediction scheme that staff's specialty analysis draws can be guaranteed the safe operation of locomotive.
Summary of the invention
For defects, the invention provides a kind of method of automatically receiving a crime report.
Automatically the method for receiving a crime report provided by the invention comprises:
Step 1: the subject field in the alarm message and the fault title in the history library mated and obtain the prediction scheme that the match is successful;
Step 2: information recording/corresponding to prediction scheme that will the match is successful and starts described prediction scheme in described history library;
Step 3: the execution result of described prediction scheme is recorded to status bar corresponding with described prediction scheme in the described history library.
Automatic selection and the startup of prediction scheme when obtaining the prediction scheme that the match is successful and realizing that locomotive sends alarm message mated in the present invention by the subject field in the alarm message that locomotive is sent and the fault title in the history library, adopt at short notice the failure-free prediction scheme, thereby can eliminate in time fault, recover the safe operation of locomotive.
Description of drawings
Fig. 1 is automatically the receive a crime report diagram of circuit of method of the present invention;
Fig. 2 is the constructional drawing of forecast model decision tree of the present invention.
The specific embodiment
Further specify the technical scheme of the embodiment of the invention below in conjunction with the drawings and specific embodiments.
Fig. 1 is automatically the receive a crime report diagram of circuit of method of the present invention, and as shown in Figure 1, the method mainly may further comprise the steps:
Step 1: the subject field in the alarm message and the fault title in the history library mated and obtain the prediction scheme that the match is successful;
Step 2: information recording/corresponding to prediction scheme that will the match is successful and starts described prediction scheme in described history library;
Step 3: the execution result of described prediction scheme is recorded to status bar corresponding with described prediction scheme in the described history library.
The information recording/that the prediction scheme that the match is successful is corresponding is in described history library, and start described prediction scheme, particularly, with the fault title of the prediction scheme that the match is successful, use the fault title of prediction scheme number record in history library, use in the prediction scheme numbered bin, and prediction scheme that will the match is successful is presented on the display terminal, checks for the staff; The execution result of described prediction scheme is recorded to status bar corresponding with described prediction scheme in the described prediction scheme storehouse, particularly, the execution result of the prediction scheme that the match is successful comprises " success ", " unsuccessful ", if execution result is " success ", then will " finish " and add in the status bar corresponding with described prediction scheme in the history library, if execution result is " unsuccessful ", then will " finish " and add in the status bar corresponding with described prediction scheme in the history library.In step 2, also can with the fault number record in the fault numbered bin of history library, in step 3, can be added in the dateline corresponding with this prediction scheme in the history library execution date of prediction scheme.
The startup of the automatic selection of prediction scheme when obtaining the prediction scheme that the match is successful and realizing that locomotive sends alarm message is mated in the present invention by the subject field in the alarm message that locomotive is sent and the fault title in the history library, adopt at short notice the failure-free prediction scheme, thereby can eliminate in time fault, recover the safe operation of locomotive.
Step 1 can specifically comprise the steps:
Step 11: go out the historical operation record that conforms to subject field in the alarm message according to fault title exact-match lookup from history library, and the record that obtains the historical operation number counts Rs, if Rs=1, then the match is successful, execution in step 2; If Rs>1, then execution in step 12; If Rs=0, then execution in step 13.
From history library, go out the historical operation record that conforms to subject field in the alarm message according to fault title exact-match lookup, belong to the exact matching process, in history library, search the situation of in historical operation, eliminating this fault by this exact matching process, the prediction scheme that comprises use is used implementation status of prediction scheme etc.
Historical operation in the history library has recorded historical failure and has eliminated process, and this also is the main authority of real-time fault analysis.The content of historical operation record includes but not limited in the history library: fault numbering, fault title, use prediction scheme numbering, date and state, and as shown in table 1, certainly comprise the fault title in the history library, use prediction scheme numbering, state to get final product.
Table 1
The fault numberingThe fault titleUse prediction scheme numberingDateState
SysA-P0-9878Be subjected to the electric work fault EQ-P0-23554 2010-9-12Finish
SysB-Win-0980The strong wind early warning Sec-Win-98778 2010-11-21Finish
Step 12: the content in the described alarm message is added that adeditive attribute and content summary carry out fuzzy matching in text library, wherein, described content summary is present in the prediction scheme storehouse, and prediction scheme numbering corresponding to described content summary is same as use prediction scheme numbering corresponding to the fault title corresponding with described subject field, if the match is successful, then execution in step 2;
Hypernym, hyponym, polysemant are recorded in the text library.Hypernym refers to the descriptor that conceptive extension is wider, and for example the vehicle are exactly the hypernym of train; Hyponym refers to the descriptor that conceptive intension is narrower, and for example motor-car is exactly the hyponym of train; Polysemant is the word with several meanings that differ from one another and be mutually related.
Comprise the descriptor of describing content summary in the text library.When the distance between the common hypernym refers to find the common hypernym of two words, find each word this common hypernym desired seek number of times and, even the hypernym of A is a, the hypernym of B is b, the hypernym of a is d, the hypernym of b is a, then a is the common hypernym of A and B, the number of times that finds this common hypernym to search from A is 1, and the number of times that finds this common hypernym to search from B is 2, and then the distance between the common hypernym of A and B is 1+2=3, also as: car is the hypernym of train, distance between them is 1, and train is the hypernym of motor-car, and the distance between car and the motor-car is 2 so.In fact, in text library, search the hypernym that content summary and content add adeditive attribute, when in text library, finding content summary and content to add the common hypernym of adeditive attribute, from content add adeditive attribute find number of times that this common hypernym need to search and from content summary find number of times that this common hypernym need to search and be exactly C2.
Have mapping relations between alarm message and the prediction scheme storehouse, alarm message represents with C, and the prediction scheme storehouse represents with D.Alarm message is sent by peripheral system, and alarm message includes but not limited to: message subject, message content, type of message and adeditive attribute etc., wherein message subject belongs to subject field, type of message belongs to the type of alarm field, adeditive attribute belongs to the adeditive attribute field, and message content belongs to content field; The prediction scheme storehouse includes but not limited to: content summary field, prediction scheme number field, header field.
The adeditive attribute field of content field+C of C and the content summary field of D form corresponding relation.
Step 13: described content is added the above adeditive attribute mate in described text library, if the match is successful, then execution in step 2.
Need to prove, Rs=1 means two kinds of situations: only have one with the fault title in the history library that subject field in the alarm message conforms to; With more than one of fault title in the history library that subject field in the alarm message conforms to, but be the same with use prediction scheme numbering corresponding to each fault title.
When Rs>1, the detailed process of execution in step 12 can be described below:
Step 121: for each content summary, search the common hypernym that described content adds the above adeditive attribute and described content summary in described text library, and obtain the number C3 of described common hypernym, if C3=0, then it fails to match; If C3>0, then execution in step 122;
Because Rs>1 o'clock, the number of the content summary that the fault title that conforms to subject field in the history library is corresponding is greater than 1, so need to will add that adeditive attribute carries out fuzzy matching in text library with content for each content summary.
Step 122: obtain the distance C 2 between the described common hypernym, if C2 is not more than the 3rd threshold value, then calculate the prediction scheme reference value of prediction scheme corresponding to qualified described content summary; If C2 is greater than the 3rd threshold value, then execution in step 123;
Step 123: in described text library, search described content and add respectively corresponding polysemant of the above adeditive attribute and described content summary, and obtain the summation C4 of described polysemant, if C4 greater than first threshold, then it fails to match; If C4 is not more than first threshold, then execution in step 124;
Step 124: for each content summary corresponding with described polysemant in the described prediction scheme storehouse, in described text library, search the common hypernym that described content adds the above adeditive attribute and described content summary, and obtain distance C 2 between the described common hypernym, if C2 is greater than Second Threshold, then it fails to match; If C2 is not more than Second Threshold, then execution in step 125;
Step 125: the prediction scheme reference value of calculating prediction scheme corresponding to qualified content summary;
Wherein, step 121-step 125 belongs to the process of fuzzy matching, and the algorithm that fuzzy matching is adopted is: (Latent Semantic Analysis is called for short: LSA), can find out a plurality of prediction schemes by this fuzzy matching latent semantic analysis.
Step 126: the described prediction scheme reference value of all that will calculate compares and selects prediction scheme corresponding to maximum prediction scheme reference value as the prediction scheme that the match is successful, and the match is successful, execution in step 2.
Step 126 belongs to the exact matching process, selects a prediction scheme conduct prediction scheme that the match is successful in this exact matching process from a plurality of prediction schemes that find out by fuzzy matching.
Be accurate to by employing and fuzzy arrive again accurate matching way, guaranteeing to mate under the prerequisite of particularity, can improve the speed of coupling.
It should be noted that, content summary and content add that the common hypernym of adeditive attribute in text library might be for a plurality of, at this moment, the value of the distance between the common hypernym is a plurality of certainly, and this will select the distance between the minimum common hypernym to compare with the 3rd threshold value or Second Threshold.
Can be to show error message at display terminal to mentioning the processing mode that it fails to match in the literary composition among the present invention, remind the staff that it fails to match, thereby the alarm message that the manual analysis locomotive sends is formulated prediction scheme, to eliminate fault, guarantee the safe operation of locomotive.
First threshold, Second Threshold and the 3rd threshold value all are that the staff sets according to the experience of oneself, first threshold is between 6 and 10, Second Threshold is between 3 and 6, when content summary and content add that adeditive attribute is totally 148 pairs the time, the first threshold preferred value is 8, the Second Threshold preferred value is 5, and in addition, the preferred value of the 3rd threshold value is 2.
Wherein, calculate prediction scheme reference value: RV=0.4*UR+0.6*PR according to following rule, wherein, RV is the prediction scheme reference value, UR is the prediction scheme frequency of utilization, PR is the accurate implementation rate of prediction scheme, UR=(summation of these prediction scheme access times/the type warning frequency) * 100%, PR=(this prediction scheme successful execution number of times/these prediction scheme access times) * 100%.By qualified content summary, can be in the prediction scheme storehouse correspondence go out the prediction scheme numbering, the number of times of the use prediction scheme numbering generation that statistics is consistent with this corresponding prediction scheme numbering that goes out in history library can be learnt this prediction scheme access times; By qualified content summary, can in the prediction scheme storehouse, correspondence go out the prediction scheme numbering, this prediction scheme numbering that goes out according to the correspondence title that can correspondence in history library be out of order, can correspondence go out type of alarm in alarm message according to the fault title, the number of this fault title of statistics can be learnt the summation of the warning frequency of the type in history library; Can in the prediction scheme storehouse, correspondence go out the prediction scheme numbering by qualified content summary, the prediction scheme numbering that goes out according to this correspondence is the corresponding state that goes out this prediction scheme in history library, and the number of times that statistics " finishing " state occurs in history library can be learnt this prediction scheme successful execution number of times.Need to prove, drawing the weight ratio of UR and PR according to experiment and business diagnosis should be between 0.60-0.75, and it is comparatively accurate being preferably the result who drew at 4: 6 o'clock.
When Rs=0, the detailed process of execution in step 13 can be described below:
Step 131: search in described text library with described content and add descriptor corresponding to the above adeditive attribute, obtain the number R of the described descriptor that finds, if R=0, then it fails to match; If R=1, then the match is successful; If R>1, then execution in step 132;
Step 132: for each content summary in the described prediction scheme storehouse, in described text library, search the common hypernym that described content summary and described content add the above adeditive attribute, and obtain the number C3 of described common hypernym, if C3=0, then it fails to match; If C3>0, then execution in step 133;
Step 133: obtain the distance C 2 between the described common hypernym, if C2 is not more than the 3rd threshold value, then calculate the prediction scheme reference value of prediction scheme corresponding to qualified described content summary; If C2 is greater than the 3rd threshold value, then execution in step 134;
Step 134: in described text library, search described content and add respectively corresponding polysemant of the above adeditive attribute and described content summary, and obtain the summation C4 of described polysemant, if C4 greater than first threshold, then it fails to match; If C4 is not more than first threshold, then execution in step 135;
Step 135: for each content summary corresponding with described polysemant in the described prediction scheme storehouse, in described text library, search the common hypernym that described content summary and described content add the above adeditive attribute, and obtain distance C 2 between the described common hypernym, if C2 is greater than Second Threshold, then it fails to match; If C2 is not more than Second Threshold, then execution in step 136;
Step 136: the prediction scheme reference value of calculating prediction scheme corresponding to qualified content summary;
Step 131-step 136 belongs to the fuzzy matching process, and the LSA algorithm is adopted in fuzzy matching, finds out a plurality of prediction schemes by this fuzzy matching process.
Step 137: the described prediction scheme reference value of all that will calculate compares and selects prediction scheme corresponding to maximum prediction scheme reference value as the prediction scheme that the match is successful, and the match is successful, execution in step 2.
Step 137 belongs to the exact matching process, selects a prediction scheme conduct prediction scheme that the match is successful in this exact matching process from a plurality of prediction schemes that find out by the fuzzy matching process.
Equally, it should be noted that more than one situation of common hypernym that adds adeditive attribute and content summary for content, select the distance between the minimum common hypernym to compare with the 3rd threshold value or Second Threshold.
The method of wherein calculating the prediction scheme reference value can with reference to aforementioned, repeat no more herein.
Used the forecast model decision tree structure when adopting the LSA algorithm, specifically referring to Fig. 2, decision tree has been explained a kind of tree, and each decision tree can rely on carrying out data test cutting apart of source database.This process can recursion tree is pruned, when the class that can not cut apart again or one is independent can be applied to a certain branch, recursive procedure had just been finished, and adopted prediction model decision tree to mate rapidly.
It should be noted that at last: above embodiment only in order to technical scheme of the present invention to be described, is not intended to limit; Although with reference to previous embodiment the present invention is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (7)

CN 2011101951302011-05-252011-07-13Automatic alarm receiving methodActiveCN102248955B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN 201110195130CN102248955B (en)2011-05-252011-07-13Automatic alarm receiving method

Applications Claiming Priority (3)

Application NumberPriority DateFiling DateTitle
CN201110136314.02011-05-25
CN2011101363142011-05-25
CN 201110195130CN102248955B (en)2011-05-252011-07-13Automatic alarm receiving method

Publications (2)

Publication NumberPublication Date
CN102248955A CN102248955A (en)2011-11-23
CN102248955Btrue CN102248955B (en)2013-02-13

Family

ID=44976613

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN 201110195130ActiveCN102248955B (en)2011-05-252011-07-13Automatic alarm receiving method

Country Status (1)

CountryLink
CN (1)CN102248955B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN106155055B (en)*2016-07-132019-05-24百度在线网络技术(北京)有限公司Method for early warning and device for automatic driving vehicle
CN106274991A (en)*2016-08-232017-01-04四川网达科技有限公司Railway fail analysis device and method
CN110275992B (en)*2019-05-172023-08-29创新先进技术有限公司Emergency processing method, device, server and computer readable storage medium
CN117572808A (en)*2024-01-152024-02-20埃睿迪信息技术(北京)有限公司Equipment monitoring method, device and equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101383027A (en)*2008-09-122009-03-11同济大学 A method and system for generating an emergency plan for environmental emergencies
CN201319224Y (en)*2008-12-092009-09-30广州市地下铁道总公司Simulation system for subway signal fault simulation rehearsal
US20090282272A1 (en)*2008-05-082009-11-12Bestgen Robert JOrganizing Databases for Energy Efficiency
CN102013083A (en)*2010-12-012011-04-13深圳市天维尔通讯技术有限公司Method and system for generating emergency action plan based on pre-arranged plan

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20090282272A1 (en)*2008-05-082009-11-12Bestgen Robert JOrganizing Databases for Energy Efficiency
CN101383027A (en)*2008-09-122009-03-11同济大学 A method and system for generating an emergency plan for environmental emergencies
CN201319224Y (en)*2008-12-092009-09-30广州市地下铁道总公司Simulation system for subway signal fault simulation rehearsal
CN102013083A (en)*2010-12-012011-04-13深圳市天维尔通讯技术有限公司Method and system for generating emergency action plan based on pre-arranged plan

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"基于小波变换和模糊聚类分析的交通事件信息发布系统的设计";杨珍珍 等;《计算机时代》;20101231(第10期);53-54*
杨珍珍 等."基于小波变换和模糊聚类分析的交通事件信息发布系统的设计".《计算机时代》.2010,(第10期),53-54.

Also Published As

Publication numberPublication date
CN102248955A (en)2011-11-23

Similar Documents

PublicationPublication DateTitle
US10705863B2 (en)IoT based method and system for processing information
TWI735537B (en) Computer readable storage medium and data cleaning device
CN102248955B (en)Automatic alarm receiving method
CN112650848A (en)Urban railway public opinion information analysis method based on text semantic related passenger evaluation
CN103186662B (en)A kind of dynamically public sentiment keyword abstraction system and method
CN105468468B (en)Data error-correcting method towards question answering system and device
CN111435366A (en)Equipment fault diagnosis method and device and electronic equipment
CN114416703B (en) Data integrity automatic monitoring method, device, equipment and medium
CN113987001A (en) Method, device and electronic equipment for fault analysis of rail transit signal system
EP4155974A1 (en)Knowledge graph construction method and apparatus, check method and storage medium
US9104729B2 (en)Querying spatial events in a vehicle network, and optimized querier
CN102279889A (en)Question pushing method and system based on geographic information
CN108255839B (en)User travel management system and related method
US20110314009A1 (en)Method and Device for Extracting Characteristic Relation Circle From Network
CN103353893A (en)Intelligent diagnosis method for distributed data acquisition fault of dispatching automation system
CN115935642A (en) Method and system for automatic generation of extreme test scenarios for intelligent vehicles based on accident information
IL274250B2 (en) A computer-implemented method and system for discovering a set of relevant communities
CN117041269A (en)Real-time bidirectional synchronization system for synchronizing sub-database data
CN112433759A (en)Standardized maintenance terminal for train control center system and implementation method thereof
CN117640338A (en) Troubleshooting method, device and storage medium thereof
CN108132976B (en)Emergency handling method and system for railway station emergency
CN119150035A (en)Exception handling and model training method thereof, electronic device, computer storage medium, and program product
CN106096804B (en)Monitoring method for whole maintenance process of intelligent power grid dispatching control system model
CN116703075B (en)Power scheduling decision method, device, electronic equipment and storage medium
CN114157553B (en)Data processing method, device, equipment and storage medium

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C14Grant of patent or utility model
GR01Patent grant
C56Change in the name or address of the patentee
CP03Change of name, title or address

Address after:215153, Qingcheng Mountain Road, hi tech Zone, Jiangsu, Suzhou, 350

Patentee after:Suzhou Boyuan Rongtian information Polytron Technologies Inc

Address before:Kolding road high tech Zone of Suzhou City, Jiangsu province 215163 No. 2 Su Gaoxin Software Park 4 Building 4 layer

Patentee before:Suzhou Boyuan Rongtian Information Technology Co.,Ltd.


[8]ページ先頭

©2009-2025 Movatter.jp