Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102556907ACN101944763B (zh) | 2010-08-16 | 2010-08-16 | 一种控制负载电流分配的方法及装置 |
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102556907ACN101944763B (zh) | 2010-08-16 | 2010-08-16 | 一种控制负载电流分配的方法及装置 |
Publication Number | Publication Date |
---|---|
CN101944763A CN101944763A (zh) | 2011-01-12 |
CN101944763Btrue CN101944763B (zh) | 2012-11-14 |
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102556907AActiveCN101944763B (zh) | 2010-08-16 | 2010-08-16 | 一种控制负载电流分配的方法及装置 |
Country | Link |
---|---|
CN (1) | CN101944763B (zh) |
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI509402B (zh)* | 2014-04-21 | 2015-11-21 | Fsp Technology Inc | 電源供應裝置及其電源供應方法 |
CN106127349B (zh)* | 2016-06-30 | 2019-10-18 | 温州大学 | 并联供电系统最优点确定方法 |
WO2018035810A1 (zh)* | 2016-08-25 | 2018-03-01 | 深圳市大疆创新科技有限公司 | 一种读卡器 |
WO2018043319A1 (ja)* | 2016-09-05 | 2018-03-08 | 株式会社村田製作所 | 電源システム |
CN107844185B (zh)* | 2016-09-19 | 2020-01-31 | 华为数字技术(成都)有限公司 | 一种电源管理方法及装置 |
CN111208460B (zh)* | 2020-01-23 | 2021-10-29 | 上海东软医疗科技有限公司 | 延长梯度功放寿命的方法及梯度功放的监控装置 |
CN116722636B (zh)* | 2023-08-02 | 2023-11-03 | 苏州浪潮智能科技有限公司 | 供电装置、供电控制方法、控制装置、服务器及存储介质 |
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5521809A (en)* | 1993-09-17 | 1996-05-28 | International Business Machines Corporation | Current share circuit for DC to DC converters |
CN1351401A (zh)* | 2000-10-30 | 2002-05-29 | 古河电池株式会社 | 电源系统 |
CN1423389A (zh)* | 2001-12-07 | 2003-06-11 | 广东志成冠军电子实业有限公司 | 总线控制的并联不间断电源(ups)系统 |
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2006269496A1 (en)* | 2005-07-06 | 2007-01-18 | Liebert Corporation | Maximized battery run-time in a parallel UPS system |
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5521809A (en)* | 1993-09-17 | 1996-05-28 | International Business Machines Corporation | Current share circuit for DC to DC converters |
CN1351401A (zh)* | 2000-10-30 | 2002-05-29 | 古河电池株式会社 | 电源系统 |
CN1423389A (zh)* | 2001-12-07 | 2003-06-11 | 广东志成冠军电子实业有限公司 | 总线控制的并联不间断电源(ups)系统 |
Publication number | Publication date |
---|---|
CN101944763A (zh) | 2011-01-12 |
Publication | Publication Date | Title |
---|---|---|
CN101944763B (zh) | 一种控制负载电流分配的方法及装置 | |
US9276402B2 (en) | Photovoltaic system power optimization | |
US8253271B2 (en) | Home power supply system | |
US20150216007A1 (en) | Control circuit for reducing of total harmonic distortion (thd) in the power supply to an electric load | |
JP6162523B2 (ja) | 電源システムおよびその制御方法ならびに電源制御プログラム | |
US12062918B2 (en) | Power systems with inverter input voltage control | |
JP2013034372A (ja) | 電力ネットワーク内での出力抑制のためのシステムおよび方法 | |
KR20180032480A (ko) | 전력보상장치 및 이의 제어 방법 | |
Manandhar et al. | Enhanced energy management system for isolated microgrid with diesel generators, renewable generation, and energy storages | |
CN104006479A (zh) | 光伏空调系统及其控制方法 | |
CN103887826A (zh) | 多台常规发电机组系统消耗燃料最少的有功功率分配方法 | |
Kumar et al. | A battery integrated three‐port bidirectional charger/discharger for light electric vehicles with G2V and V2G power flow capability | |
JP2004274912A (ja) | 直流配電ネットワークの信頼性を高く維持する電力供給システム、及びプログラム | |
CN106786803A (zh) | 独立运行光伏发电系统供大于需时的一种无损功率平衡法 | |
Korada et al. | Adaptive power management algorithm for multi-source DC microgrid system | |
JP6738930B2 (ja) | スマートグリッド統合システム及びその電力情報処理方法 | |
Choi et al. | Development and reliability assessment of Si and SiC power devices-based solid-state transformer for urban railway vehicle | |
US20140139027A1 (en) | Control device for hybrid electric power system | |
KR20200079606A (ko) | 부하 분산을 위한 dc ups 제어 시스템 | |
CN108306353A (zh) | 一种改进式多模块并联的数字均流系统及方法 | |
Tian et al. | A new single-staged bi-directional high frequency link inverter design | |
KR101415769B1 (ko) | 그룹 병합 발전 장치 및 그 방법 | |
CN103677062A (zh) | 太阳能功率调节系统及方法 | |
CN202183079U (zh) | 备援电力系统 | |
Panda et al. | A flexible power management strategy for pv-battery based interconnected dc microgrid |
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | Owner name:HUAWEI DIGITAL TECHNOLOGY (CHENGDU) CO., LTD. Free format text:FORMER NAME: CHENGDU HUAWEI SYMANTEC TECHNOLOGIES CO., LTD. | |
CP01 | Change in the name or title of a patent holder | Address after:611731 Chengdu high tech Zone, Sichuan, West Park, Qingshui River Patentee after:HUAWEI DIGITAL TECHNOLOGIES (CHENG DU) Co.,Ltd. Address before:611731 Chengdu high tech Zone, Sichuan, West Park, Qingshui River Patentee before:CHENGDU HUAWEI SYMANTEC TECHNOLOGIES Co.,Ltd. | |
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right | Effective date of registration:20211222 Address after:518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee after:HUAWEI TECHNOLOGIES Co.,Ltd. Address before:611731 Qingshui River District, Chengdu hi tech Zone, Sichuan, China Patentee before:HUAWEI DIGITAL TECHNOLOGIES (CHENG DU) Co.,Ltd. Effective date of registration:20211222 Address after:450046 Floor 9, building 1, Zhengshang Boya Plaza, Longzihu wisdom Island, Zhengdong New Area, Zhengzhou City, Henan Province Patentee after:xFusion Digital Technologies Co., Ltd. Address before:518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee before:HUAWEI TECHNOLOGIES Co.,Ltd. |