Construction method for support structure of coal tower template for tamping type coke oven
Download PDF

Info

Publication number
CN101886466A
CN101886466ACN 201010224364CN201010224364ACN101886466ACN 101886466 ACN101886466 ACN 101886466ACN 201010224364CN201010224364CN 201010224364CN 201010224364 ACN201010224364 ACN 201010224364ACN 101886466 ACN101886466 ACN 101886466A
Authority
CN
China
Prior art keywords
steel
template
girder
support platform
bracing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010224364
Other languages
Chinese (zh)
Other versions
CN101886466B (en
Inventor
刘明
崔忠辉
张华骞
杨康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp LtdfiledCriticalChina 22MCC Group Corp Ltd
Priority to CN201010224364XApriorityCriticalpatent/CN101886466B/en
Publication of CN101886466ApublicationCriticalpatent/CN101886466A/en
Application grantedgrantedCritical
Publication of CN101886466BpublicationCriticalpatent/CN101886466B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Landscapes

Abstract

The invention relates to a construction method for a support structure of a coal tower template for a tamping type coke oven, which comprises the following steps of 1, treating a base of a steel structure supporting platform; 2, manufacturing and installing the steel structure supporting platform; 3, prepressing the steel structure supporting platform: the prepressing materials are a resistance wall for the coke oven and a precast slab for a basement, the steel structure supporting platform is overloaded and prepressed according to 110% design load, an observing point is arranged, and the prepressing time is seven days, and the observation is carried out once a day; 4, installing each falsework of the template; and 5, removing the falsework and the steel structure supporting platform. The construction method can realize effective monitoring by well design of a large-span, high-support and heavy-load template support system, particularly is the first in the country in coal towers with a span of 34.045 meters but the beam does not have cracks, solves the difficult problem of construction of a large-span, high-support and heavy-load structure, adapts to the coking technique to be developed in large size and tamping type coke ovens, and has the advantages of short construction period, revolving material saving, safety, reliability, easy quality control and high concrete strength.

Description

The job practices of support structure of coal tower template for tamping type coke oven
Technical field
The present invention relates to the template construction method used in a kind of large-scale coking engineering projects work progress, particularly a kind of large span, high, the job practices of the support structure of coal tower template for tamping type coke oven of heavy burden.
Background technology
Stamp charging coke oven coal tower large span, height prop up, the heavy burden formwork bracing system has the space-load complexity, scaffolding height big (15.49m and 26.3m cornice), span big (34.045m), load big (dead load 1600T), and exist inhomogeneous stressed etc. in the work progress.There is following drawback in the domestic fastener type steel pipe scaffold that generally adopts as formwork bracing system at present:
1, contacting piece formula steel pipe scaffold is also very insufficient as the research of three-D space structure, and the time and the expense cost of similar calculating are high, and a lot of enterprises more do not possess such condition;
2, form bracing system rigidity is poor, is easy to generate the crack under the beam, has a strong impact on concrete structural strength and durability;
3, globality, poor stability support coal tower 1600T deadweight and have potential safety hazard, threat to life safety;
4, the steel pipe spacing is close, needs a large amount of steel pipes, and workload is big, the construction period is long, the operating expenses height.
Summary of the invention
The present invention be directed to the many deficiencies that exist in the existing construction technology, the stamp charging coke oven coal tower large span that a kind of duration is short, safe and reliable, cost of manufacture is low, high, load cast board construction method are provided.
Realize that the technical scheme that above-mentioned purpose adopts is: a kind of job practices of support structure of coal tower template for tamping type coke oven, the braced structures of this template comprises the steel work support platform that is used for support shuttering integral body, also comprise the bracing frame that is used to support each template, described job practices is carried out according to following steps:
1. the processing on steel work support platform basis:
A, base treatment: will be as the backfill compaction in layers of substrate, the thickness≤250mm of each layer, coefficient of consolidation 〉=0.96;
B, built-in fitting are handled: after base treatment was intact, building thickness was the thick steel concrete of 250mm, did at the steel column foot place to deepen to handle, and unwrapping wire is measured in the position of pressing steel column in the steel work Support Platform Design scheme, installs and makes pre-buried anchor slab in advance;
C, health handle: conditioned time 〉=7d, treat that the intensity of steel concrete in the substrate reaches 75% o'clock of design strength, installs the steel work support platform;
2. the making of steel work support platform and installation:
A, according to the setting-out of steel work form bracing system working drawing, number material, and check size and direction between the drawing one by one, sawing is adopted in the blanking of H shaped steel, i iron;
B, steel column adopt unit vertically to lift by crane, and girder steel adopts 2 colligation level liftings, and steel column all is fixed on the pre-buried anchor slab;
C, in the crane output scope, steel column is become lifting elements with girder steel at the ground spelling, a hoisted in position;
Firm welding between d, steel column and the girder steel;
3. the precompressed of steel work support platform: prepressing materials adopts coke oven resistance wall and basement precast plate, and the design load according to 110% is carried out surcharge preloading, and squeeze time is 7 days, establishes observation point, observes every day 1 time;
4. the installation of each template scaffold:
Figure BSA00000186375700021
Slab form andThe bracing frame of the template of cornicing:
The bracing frame of a, this two places template all adopts fastener type steel pipe scaffold, and the precompressed of steel work support platform begins to set up after finishing
Figure BSA00000186375700023
Slab form and
Figure BSA00000186375700024
The bracing frame of the template of cornicing; During scaffold building, weld a plurality of reinforcing bars at the center, the edge of a wing of steel work support platform time girder steel earlier;
B, bracing frame are set up according to the code requirement of fastener type steel pipe scaffold;
The bracing frame of Reinforced Concrete Double curved funnels template, hyperbola funnel template comprise hyperbola template and funnel girder template:
A, Reinforced Concrete Double template curve, main joist is fixed on the scaffold by fastener and supporting steel pipe, to bend in advance again and be pressed into the secondary joist of hyp reinforcing bar as inside and outside hopper walls wooden form, spacing according to 150mm is fixed on the main joist, main joist and secondary joist is fixed with split bolt according to the spacing of 500mm;
The below of b, funnel girder template is supported on steel pipe scaffold
Figure BSA00000186375700025
On the floor, vertical rod in the scaffold is arranged and is horizontal spacing 470mm, longitudinal pitch 500mm, step pitch 1000mm, and the vertical rod bottom vertically is provided with channel-section steel, and rod end is provided with jackscrew, and the i iron that is provided with on the jackscrew is as the main joist of girder template, secondary joist then is arranged on the flitch of main joist top, and adjacent flitch spacing is 200mm;
The bracing frame of slab form:
When the concrete strength for the treatment of Reinforced Concrete Double curved funnels girder template reaches design strength 100%, can remove the bracing frame and the funnel girder beam bottom board plate of support shuttering, begin to set up
Figure BSA00000186375700027
The bracing frame of slab form, this supports and adopts fastener type steel pipe scaffold, and sets up according to the code requirement of fastener type steel pipe scaffold;
5. the dismounting of scaffold and steel work support platform:
A, when the concrete strength of Reinforced Concrete Double template curve and funnel girder template reaches design strength 100%, remove whole scaffolds, and in time the concrete structure of high-altitude long-span checked, checked and accepted;
B, treat the exterior decoration acceptance(check) after, remove the steel work support platform comprehensively, according to after set up tear the orderly release of tearing open after setting up earlier, the and in time material that removes being cleared outside the appearance earlier open.
Compared with prior art, the job practices of this engineering is by well-designed to large span, high, heavy burden formwork bracing system, and effectively monitoring has obtained good effect, has especially started the beginning that the crack does not appear in domestic 34.045 meters span coal tower beams; Large span, high, the difficult problem of heavy load structure construction have been solved; Adapt to the developing direction of coking engineering projects to the coke oven that maximizes, fiddles with, it is as follows that it obtains effect:
1, the duration is short: the steel work support platform can be processed prefabricated outside the field, does not take the leading duration, does not take the construction plant, and the condition of interchange operation can be provided;
2, circulation material is economized: utilize the steel work support platform, convert high-supported formwork to the common templates support system, saved the input of a large amount of steel pipe scaffold materials, wherein shaped steel can reclaim repeated use;
3, safe and reliable: stressed clear and definite, the dependable performance of steel work support platform, and steel pipe scaffold is difficult to once set up put in place, has potential safety hazard, and existing high-supported formwork with work high above the ground converts the operating condition with reliable and secure protection to, improve safety factor, safe and reliable;
4, be convenient to quality control: engineering such as construction high-altitude long-span concrete structure and outer Decorating Project, equipment installation on the steel platform, the operating condition safe ready is convenient to check, examination, helps improving construction quality;
5, concrete structural strength height, good endurance: steel work support platform rigidity is big, good integrity, and beam can downwarp not produce the crack during construction, so the concrete structural strength height, good endurance.
Description of drawings
Fig. 1 is a formwork bracing system overall structure schematic diagram of the present invention.
Fig. 2 is a formwork bracing system layout plan of the present invention.
Fig. 3 is that A-A among Fig. 1 is to sectional view.
Fig. 4 is that B-B among Fig. 1 is to sectional view.
Fig. 5 is a hyperbola funnel formwork structural representation.
Fig. 6 is the C portion partial enlarged drawing among Fig. 5.
Wherein: support platform 1, the bracing frame 2 that cornices cornices 3,
Figure BSA00000186375700031
Floor 4, hyperbola template 5,funnel girder template 6,
Figure BSA00000186375700032
Floor 7,
Figure BSA00000186375700033
Floor bracing frame 8,steel column 9,main girder steel 10,inferior girder steel 11,purlin 12,angle steel 13, channel-section steel 14, girder formwork-support 15, channel-section steel 16, jackscrew 17,i iron 18,flitch 19, funnel girderbeam sill template 20, threeword cards 21,secondary joist 22, splitbolt 23,main joist 24, hopper wallswooden form 25.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples.
Referring to accompanying drawing 1-6, in the present embodiment, this stamp charging coke oven coal tower large span, height prop up, the job practices of load cast board supporting structure, the braced structures of this template comprises the steel work support platform 1 that is used for support shuttering integral body, also comprise the bracing frame that is used to support each template, these bracing frames comprise and are used for supportingSlab form 4,
Figure BSA00000186375700035
Slab form 7,
Figure BSA00000186375700036
Hyperbola template 5 in the template of cornicing 3, the hyperbola funnel template, the formwork-support offunnel girder template 6.
Wherein: thesteel column 9 of steel work support platform 1 adopts H shaped steel H250 * 250 * 14 * 14, welds with anchor slab.L75 * 6angle steel 13, gusset plate δ 8 are adopted in the support that steel column is 9.The girder steel of steel work support platform 1 comprisesmain girder steel 10,inferior girder steel 11,purlin 12, andmain girder steel 10 adopts i iron I 32a, lateral arrangement;Inferior girder steel 11 adopts i iron I25a spacing 1250mm; Purlin 12 adopts i iron I10a@500 lateral arrangement.Steel work support platform 1 springing height is 1/1000 of a span.There are a large amount of pre-embedded bolts at coal tower spout of funnel place, and set bolt is spread δ 4 steel plates at the bottom of adopting beam.
Described job practices is carried out according to following steps:
1. the processing on steel work support platform 1 basis:
A, base treatment: will be as the backfill compaction in layers of substrate, the thickness≤250mm of layering, coefficient of consolidation 〉=0.96;
B, built-in fitting is handled: after base treatment is intact, building thickness on substrate is the C25 steel concrete of 250mm, do to deepen to handle at the steel column foot place, it is exactly to make dark 500mm that general intensification is handled, long 1000mm, the foundation pit of wide 800mm, press the plan-position of steel column in the design scheme of steel work support platform, measure the embedded part position, control the embedded part absolute altitude with level gauge during installation, the pre-buried anchor slab of making in advance is installed in foundation pit, this anchor slab is of a size of 600 * 800 * 16 (mm), the anchor slab top plug is welded with anchor fluke, and the anchor fluke of each anchor slab bottom is that 12 diameters are 22mm, the screw-thread steel of long 450mm;
C, health handle: conditioned time 〉=7d, treat that the intensity of steel concrete in the substrate reaches 75% o'clock of design strength, installs steel work support platform 1.
2. the making of steel work support platform 1 and installation:
A, according to the setting-out of steel work form bracing system working drawing, number the material, and check size and direction between the drawing one by one, tie point between each parts, connection dimension and connected mode are corresponding one by one with working drawing, and sawing is adopted in the blanking of H shaped steel, i iron, prevent distortion;
B,steel column 9 adopt unit vertically to lift by crane, and accomplish to turn round and hold up directly, should avoid in the lifting turning course with other mounted structure collisions, hoist cable should be reserved effective height,steel column 9 hold up the cat ladder of ascending a height should be hung on the steel column preposition before straight and colligation firm, lift by crane back temporary fixed, correction verticality in place, steel column is in place, and just can unclamp hoist cable after alignment axis, the fixation; Girder steel adopts 2 colligation levels liftings, must guarantee in the hoisting process that girder steel keeps level, when hanging many girder steels colligation firm, and install one by one, during installation, steel column all is fixed on the pre-buried anchor slab, guarantees the stability that steel column supports; Channel-section steel 14 is adopted in support between steel column and the girder steel, and theangle steel 13 of L75 * 6 is adopted in the support between the steel column, guarantees stability;
C, in the crane output scope, steel column is become lifting elements with girder steel at the ground spelling, as steel column and steel support, girder steel spelling etc., a hoisted in position;
Firm welding between d, steel column and each girder steel, the main weld two ends of joint must dispose run-on tab and end tab, and its material should be with identical by the weldering mother metal, and groove type should ban use of the material of other materials to serve as run-on tab and end tab with identical by welding line.
3. the precompressed of steel work support platform 1: prepressing materials adopts coke oven resistance wall and basement precast plate, and the design load according to 110% is carried out surcharge preloading, and squeeze time is 7 days, establishes observation point, observes every day 1 time.
4. the installation of each formwork-support:
Figure BSA00000186375700041
Slab form 4 Hes
Figure BSA00000186375700042
The bracing frame of the template of cornicing 3:
The bracing frame of a, this two places template all adopts fastener type steel pipe scaffold, and 1 precompressed of steel work support platform begins to set up after finishing
Figure BSA00000186375700043
Slab form bracing frame 8 reaches
Figure BSA00000186375700044
Bracing frame 2 cornices.During scaffold building, on the edge of a wing center line of theinferior girder steel 11 of steel structure platform 1, according to vertical pole ' sspan welding φ 25 reinforcing bars of setting up in the bracing frame, long 100mm, its effect is to prevent the vertical rod slippage, avoids the i iron eccentric force;
B, bracing frame are set up according to the fastener type steel pipe scaffold code requirement;
The bracing frame of Reinforced Concrete Double curved funnels template, hyperbola funnel template comprise hyperbola template 5 and funnel girder template 6:
A, Reinforced Concrete Double template curve 5main joists 24 adopt steel pipe Φ 48 * 3.5, andmain joist 24 is fixed on the girder formwork-support 15 by fastener and supporting steel pipe, its spacing 500mm; To bend in advance and be pressed into thesecondary joist 22 of hyp reinforcing bar as inside and outsidehopper walls template 25, reinforcing bar adopts screw-thread steel Φ 22 its spacing 150mm colligations onmain joist 24;Split bolt 23 usefulness threeword cards 21 are fixedly on themain joist 24, and it is that the round steel of 12mm is made that splitbolt 21 adopts diameters;
The below of b, funnelgirder template 6 is supported on the steel pipe scaffold tubes
Figure BSA00000186375700051
On the floor, the specification of steel pipe is Φ 48 * 3.5 in this bracingframe 15, and the vertical rod in the scaffold tubes is arranged and is horizontal spacing 470mm, longitudinal pitch 500mm, and step pitch 1000mm, and the vertical rod bottom vertically is provided with channel-section steel 16, is used for diffusion pressure; Rod end is provided withjackscrew 17, and No. 10 thei iron 18 that is provided with on the jackscrew 17 is as the main joist of girder template, and secondary joist then is arranged on theflitch 19 of main joist top, and the specification of thisflitch 19 is 50 * 100mm, and the spacing ofadjacent flitch 19 is 200mm; Vertical rod is the steel pipe of vertical setting, must not overlap between each vertical rod, must calculate and cut size accurately according to the size of drawing, to guarantee the stability of scaffold.
The bracing frame offloor 7 templates:
When the concrete strength for the treatment of Reinforced Concrete Double curvedfunnels girder template 6 reaches design strength 100%, can remove the bracing frame and the funnel girder beambottom board plate 20 of support shuttering, begin to set up
Figure BSA00000186375700053
The bracing frame ofslab form 7, this bracing frame adopts fastener type steel pipe scaffold, and it is set up according to the fastener type steel pipe scaffold code requirement.
5. the dismounting of bracing frame and steel work support platform:
A, when the concrete strength of Reinforced Concrete Double template curve and funnel girder template reaches design strength 100%, remove whole bracing frames, and in time the concrete structure of high-altitude long-span checked, checked and accepted;
B, treat the exterior decoration acceptance(check) after, remove the steel work support platform comprehensively, according to after set up tear the orderly release of tearing open after setting up earlier, the and in time material that removes being cleared outside the appearance earlier open.
On the steel work support platform, close purpose safety net and scaffold floor should be set do dual security protection, should have the special messenger to be responsible for the timely foreign material of clearing up on the platform, prevent that the high-altitude object from causing security incident.The periphery of steel work support platform also should set in advance safe protective railing.

Claims (1)

1. the job practices of a support structure of coal tower template for tamping type coke oven, it is characterized in that, the braced structures of this template comprises the steel work support platform that is used for support shuttering integral body, also comprises the bracing frame that is used to support each template, and described job practices is carried out according to following steps:
1. the processing on steel work support platform basis:
A, base treatment: will be as the backfill compaction in layers of substrate, the thickness≤250mm of each layer, coefficient of consolidation 〉=0.96;
B, built-in fitting are handled: after base treatment was intact, building thickness was the thick steel concrete of 250mm, did at the steel column foot place to deepen to handle, and unwrapping wire is measured in the position of pressing steel column in the steel work Support Platform Design scheme, installs and makes pre-buried anchor slab in advance;
C, health handle: conditioned time 〉=7d, treat that the intensity of steel concrete in the substrate reaches 75% o'clock of design strength, installs the steel work support platform;
2. the making of steel work support platform and installation:
A, according to the setting-out of steel work form bracing system working drawing, number material, and check size and direction between the drawing one by one, sawing is adopted in the blanking of H shaped steel, i iron;
B, steel column adopt unit vertically to lift by crane, and girder steel adopts 2 colligation level liftings, and steel column all is fixed on the pre-buried anchor slab;
C, in the crane output scope, steel column is become lifting elements with girder steel at the ground spelling, a hoisted in position;
Firm welding between d, steel column and the girder steel;
3. the precompressed of steel work support platform: prepressing materials adopts coke oven resistance wall and basement precast plate, and the design load according to 110% is carried out surcharge preloading, and squeeze time is 7 days, establishes observation point, observes every day 1 time;
4. the installation of each template scaffold:
Slab form and
Figure FSA00000186375600012
The bracing frame of the template of cornicing:
The bracing frame of a, this two places template all adopts fastener type steel pipe scaffold, and the precompressed of steel work support platform begins to set up after finishing
Figure FSA00000186375600013
Slab form andThe bracing frame of the template of cornicing; During scaffold building, weld a plurality of reinforcing bars at the center, the edge of a wing of steel work support platform time girder steel earlier;
B, bracing frame are set up according to the code requirement of fastener type steel pipe scaffold;
The bracing frame of Reinforced Concrete Double curved funnels template, hyperbola funnel template comprise hyperbola template and funnel girder template:
A, Reinforced Concrete Double template curve, main joist is fixed on the scaffold by fastener and supporting steel pipe, to bend in advance again and be pressed into the secondary joist of hyp reinforcing bar as inside and outside hopper walls wooden form, spacing according to 150mm is fixed on the main joist, main joist and secondary joist is fixed with split bolt according to the spacing of 500mm;
The below of b, funnel girder template is supported on steel pipe scaffold
Figure FSA00000186375600015
On the floor, vertical rod in the scaffold is arranged and is horizontal spacing 470mm, longitudinal pitch 500mm, step pitch 1000mm, and the vertical rod bottom vertically is provided with channel-section steel, and rod end is provided with jackscrew, and the i iron that is provided with on the jackscrew is as the main joist of girder template, secondary joist then is arranged on the flitch of main joist top, and adjacent flitch spacing is 200mm;
Figure FSA00000186375600021
The bracing frame of slab form:
When the concrete strength for the treatment of Reinforced Concrete Double curved funnels girder template reaches design strength 100%, can remove the bracing frame and the funnel girder beam bottom board plate of support shuttering, begin to set up
Figure FSA00000186375600022
The bracing frame of slab form, this supports and adopts fastener type steel pipe scaffold, and sets up according to the code requirement of fastener type steel pipe scaffold;
5. the dismounting of scaffold and steel work support platform:
A, when the concrete strength of Reinforced Concrete Double template curve and funnel girder template reaches design strength 100%, remove whole scaffolds, and in time the concrete structure of high-altitude long-span checked, checked and accepted;
B, treat the exterior decoration acceptance(check) after, remove the steel work support platform comprehensively, according to after set up tear the orderly release of tearing open after setting up earlier, the and in time material that removes being cleared outside the appearance earlier open.
CN201010224364XA2010-07-092010-07-09Construction method for support structure of coal tower template for tamping type coke ovenActiveCN101886466B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN201010224364XACN101886466B (en)2010-07-092010-07-09Construction method for support structure of coal tower template for tamping type coke oven

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN201010224364XACN101886466B (en)2010-07-092010-07-09Construction method for support structure of coal tower template for tamping type coke oven

Publications (2)

Publication NumberPublication Date
CN101886466Atrue CN101886466A (en)2010-11-17
CN101886466B CN101886466B (en)2011-09-14

Family

ID=43072539

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN201010224364XAActiveCN101886466B (en)2010-07-092010-07-09Construction method for support structure of coal tower template for tamping type coke oven

Country Status (1)

CountryLink
CN (1)CN101886466B (en)

Cited By (42)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102094524A (en)*2010-12-282011-06-15山东万鑫建设有限公司Construction method of high-altitude large-span beam-slab template steel support system
CN104695692A (en)*2015-02-132015-06-10中国五冶集团有限公司Scaffold on basis of resistance wall of coke oven
CN105544873A (en)*2015-12-162016-05-04中国建筑第二工程局有限公司Wave-shaped hollow roof and construction method thereof
CN109098441A (en)*2018-09-032018-12-28江苏省建筑工程集团有限公司H profile steel rail mounted moulding bed with stopper
CN109610461A (en)*2019-01-242019-04-12中建筑港集团有限公司A kind of module type inspection well concrete grout device and method
CN111206768A (en)*2020-01-162020-05-29天津鼎维固模架工程股份有限公司Light beam plate structure platform and construction method thereof
WO2020140092A1 (en)*2018-12-282020-07-02Suncoke Technology And Development LlcHeat recovery oven foundation
CN112177323A (en)*2020-09-092021-01-05中国一冶集团有限公司Cell body structure assembled support system
US10968393B2 (en)2014-09-152021-04-06Suncoke Technology And Development LlcCoke ovens having monolith component construction
US10968395B2 (en)2014-12-312021-04-06Suncoke Technology And Development LlcMulti-modal beds of coking material
US11008518B2 (en)2018-12-282021-05-18Suncoke Technology And Development LlcCoke plant tunnel repair and flexible joints
US11008517B2 (en)2012-12-282021-05-18Suncoke Technology And Development LlcNon-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods
US11053444B2 (en)2014-08-282021-07-06Suncoke Technology And Development LlcMethod and system for optimizing coke plant operation and output
US11071935B2 (en)2018-12-282021-07-27Suncoke Technology And Development LlcParticulate detection for industrial facilities, and associated systems and methods
CN113216696A (en)*2021-06-022021-08-06中铁二十一局集团第二工程有限公司Supporting system for SRC beam integrated construction and construction method thereof
US11098252B2 (en)2018-12-282021-08-24Suncoke Technology And Development LlcSpring-loaded heat recovery oven system and method
US11117087B2 (en)2012-12-282021-09-14Suncoke Technology And Development LlcSystems and methods for removing mercury from emissions
US11214739B2 (en)2015-12-282022-01-04Suncoke Technology And Development LlcMethod and system for dynamically charging a coke oven
US11359145B2 (en)2012-12-282022-06-14Suncoke Technology And Development LlcSystems and methods for maintaining a hot car in a coke plant
US11359146B2 (en)2013-12-312022-06-14Suncoke Technology And Development LlcMethods for decarbonizing coking ovens, and associated systems and devices
US11395989B2 (en)2018-12-312022-07-26Suncoke Technology And Development LlcMethods and systems for providing corrosion resistant surfaces in contaminant treatment systems
US11441077B2 (en)2012-08-172022-09-13Suncoke Technology And Development LlcCoke plant including exhaust gas sharing
US11486572B2 (en)2018-12-312022-11-01Suncoke Technology And Development LlcSystems and methods for Utilizing flue gas
US11508230B2 (en)2016-06-032022-11-22Suncoke Technology And Development LlcMethods and systems for automatically generating a remedial action in an industrial facility
CN116025150A (en)*2023-01-312023-04-28中国核工业华兴建设有限公司Nuclear power station spent fuel pool roof/conversion layer floor slab supporting system and construction method
CN116044157A (en)*2023-01-312023-05-02中国三冶集团有限公司Construction method of inner formwork support structure of coke oven flue side wall
US11643602B2 (en)2018-12-282023-05-09Suncoke Technology And Development LlcDecarbonization of coke ovens, and associated systems and methods
CN116201163A (en)*2023-02-132023-06-02中交第二航务工程局有限公司Frame type variable cross-section wind tower construction structure and method
US11692138B2 (en)2012-08-172023-07-04Suncoke Technology And Development LlcAutomatic draft control system for coke plants
US11746296B2 (en)2013-03-152023-09-05Suncoke Technology And Development LlcMethods and systems for improved quench tower design
US11760937B2 (en)2018-12-282023-09-19Suncoke Technology And Development LlcOven uptakes
US11767482B2 (en)2020-05-032023-09-26Suncoke Technology And Development LlcHigh-quality coke products
US11788012B2 (en)2015-01-022023-10-17Suncoke Technology And Development LlcIntegrated coke plant automation and optimization using advanced control and optimization techniques
US11845898B2 (en)2017-05-232023-12-19Suncoke Technology And Development LlcSystem and method for repairing a coke oven
US11851724B2 (en)2021-11-042023-12-26Suncoke Technology And Development Llc.Foundry coke products, and associated systems, devices, and methods
US11939526B2 (en)2012-12-282024-03-26Suncoke Technology And Development LlcVent stack lids and associated systems and methods
US11946108B2 (en)2021-11-042024-04-02Suncoke Technology And Development LlcFoundry coke products and associated processing methods via cupolas
US12110458B2 (en)2022-11-042024-10-08Suncoke Technology And Development LlcCoal blends, foundry coke products, and associated systems, devices, and methods
CN118933404A (en)*2024-08-022024-11-12中国二十二冶集团有限公司 Construction method of aerial high and heavy load formwork support system
US12227699B2 (en)2019-12-262025-02-18Suncoke Technology And Development LlcOven health optimization systems and methods
US12325828B2 (en)2012-12-282025-06-10Suncoke Technology And Development LlcExhaust flow modifier, duct intersection incorporating the same, and methods therefor
US12410369B2 (en)2023-11-212025-09-09Suncoke Technology And Development LlcFlat push hot car for foundry coke and associated systems and methods

Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
GB915207A (en)*1958-04-241963-01-09Holzmann Philipp AgImprovements in or relating to formwork
DE20318912U1 (en)*2003-12-052004-03-04Doka Industrie Gmbh formwork table
CN100537975C (en)*2007-07-312009-09-09龙信建设集团有限公司Construction method of cable-stayed steel truss high-formwork structural system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
GB915207A (en)*1958-04-241963-01-09Holzmann Philipp AgImprovements in or relating to formwork
DE20318912U1 (en)*2003-12-052004-03-04Doka Industrie Gmbh formwork table
CN100537975C (en)*2007-07-312009-09-09龙信建设集团有限公司Construction method of cable-stayed steel truss high-formwork structural system

Cited By (67)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102094524B (en)*2010-12-282012-07-04山东万鑫建设有限公司Construction method of high-altitude large-span beam-slab template steel support system
CN102094524A (en)*2010-12-282011-06-15山东万鑫建设有限公司Construction method of high-altitude large-span beam-slab template steel support system
US12195671B2 (en)2012-08-172025-01-14Suncoke Technology And Development LlcAutomatic draft control system for coke plants
US11441077B2 (en)2012-08-172022-09-13Suncoke Technology And Development LlcCoke plant including exhaust gas sharing
US11692138B2 (en)2012-08-172023-07-04Suncoke Technology And Development LlcAutomatic draft control system for coke plants
US11117087B2 (en)2012-12-282021-09-14Suncoke Technology And Development LlcSystems and methods for removing mercury from emissions
US11008517B2 (en)2012-12-282021-05-18Suncoke Technology And Development LlcNon-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods
US12325828B2 (en)2012-12-282025-06-10Suncoke Technology And Development LlcExhaust flow modifier, duct intersection incorporating the same, and methods therefor
US11359145B2 (en)2012-12-282022-06-14Suncoke Technology And Development LlcSystems and methods for maintaining a hot car in a coke plant
US11845037B2 (en)2012-12-282023-12-19Suncoke Technology And Development LlcSystems and methods for removing mercury from emissions
US11939526B2 (en)2012-12-282024-03-26Suncoke Technology And Development LlcVent stack lids and associated systems and methods
US11746296B2 (en)2013-03-152023-09-05Suncoke Technology And Development LlcMethods and systems for improved quench tower design
US11359146B2 (en)2013-12-312022-06-14Suncoke Technology And Development LlcMethods for decarbonizing coking ovens, and associated systems and devices
US11053444B2 (en)2014-08-282021-07-06Suncoke Technology And Development LlcMethod and system for optimizing coke plant operation and output
US10968393B2 (en)2014-09-152021-04-06Suncoke Technology And Development LlcCoke ovens having monolith component construction
US11795400B2 (en)2014-09-152023-10-24Suncoke Technology And Development LlcCoke ovens having monolith component construction
US10968395B2 (en)2014-12-312021-04-06Suncoke Technology And Development LlcMulti-modal beds of coking material
US10975311B2 (en)2014-12-312021-04-13Suncoke Technology And Development LlcMulti-modal beds of coking material
US12338394B2 (en)2014-12-312025-06-24Suncoke Technology And Development LlcMulti-modal beds of coking material
US10975310B2 (en)2014-12-312021-04-13Suncoke Technology And Development LlcMulti-modal beds of coking material
US11788012B2 (en)2015-01-022023-10-17Suncoke Technology And Development LlcIntegrated coke plant automation and optimization using advanced control and optimization techniques
CN104695692A (en)*2015-02-132015-06-10中国五冶集团有限公司Scaffold on basis of resistance wall of coke oven
CN105544873A (en)*2015-12-162016-05-04中国建筑第二工程局有限公司Wave-shaped hollow roof and construction method thereof
CN105544873B (en)*2015-12-162017-12-26中国建筑第二工程局有限公司Construction method of wave-shaped hollow roof
US11214739B2 (en)2015-12-282022-01-04Suncoke Technology And Development LlcMethod and system for dynamically charging a coke oven
US12190701B2 (en)2016-06-032025-01-07Suncoke Technology And Development LlcMethods and systems for automatically generating a remedial action in an industrial facility
US11508230B2 (en)2016-06-032022-11-22Suncoke Technology And Development LlcMethods and systems for automatically generating a remedial action in an industrial facility
US11845898B2 (en)2017-05-232023-12-19Suncoke Technology And Development LlcSystem and method for repairing a coke oven
CN109098441B (en)*2018-09-032020-11-20江苏省建筑工程集团有限公司H-shaped steel jig frame
CN109098441A (en)*2018-09-032018-12-28江苏省建筑工程集团有限公司H profile steel rail mounted moulding bed with stopper
US11505747B2 (en)2018-12-282022-11-22Suncoke Technology And Development LlcCoke plant tunnel repair and anchor distribution
US11365355B2 (en)2018-12-282022-06-21Suncoke Technology And Development LlcSystems and methods for treating a surface of a coke plant
US11071935B2 (en)2018-12-282021-07-27Suncoke Technology And Development LlcParticulate detection for industrial facilities, and associated systems and methods
US11597881B2 (en)2018-12-282023-03-07Suncoke Technology And Development LlcCoke plant tunnel repair and flexible joints
US11845897B2 (en)2018-12-282023-12-19Suncoke Technology And Development LlcHeat recovery oven foundation
US12305119B2 (en)2018-12-282025-05-20Suncoke Technology And Development LlcDecarbonization of coke ovens and associated systems and methods
US11643602B2 (en)2018-12-282023-05-09Suncoke Technology And Development LlcDecarbonization of coke ovens, and associated systems and methods
US12060525B2 (en)2018-12-282024-08-13Suncoke Technology And Development LlcSystems for treating a surface of a coke plant sole flue
US11680208B2 (en)2018-12-282023-06-20Suncoke Technology And Development LlcSpring-loaded heat recovery oven system and method
US11008518B2 (en)2018-12-282021-05-18Suncoke Technology And Development LlcCoke plant tunnel repair and flexible joints
US11261381B2 (en)2018-12-282022-03-01Suncoke Technology And Development LlcHeat recovery oven foundation
US11760937B2 (en)2018-12-282023-09-19Suncoke Technology And Development LlcOven uptakes
WO2020140092A1 (en)*2018-12-282020-07-02Suncoke Technology And Development LlcHeat recovery oven foundation
US11193069B2 (en)2018-12-282021-12-07Suncoke Technology And Development LlcCoke plant tunnel repair and anchor distribution
US11098252B2 (en)2018-12-282021-08-24Suncoke Technology And Development LlcSpring-loaded heat recovery oven system and method
US11819802B2 (en)2018-12-312023-11-21Suncoke Technology And Development LlcMethods and systems for providing corrosion resistant surfaces in contaminant treatment systems
US11486572B2 (en)2018-12-312022-11-01Suncoke Technology And Development LlcSystems and methods for Utilizing flue gas
US11395989B2 (en)2018-12-312022-07-26Suncoke Technology And Development LlcMethods and systems for providing corrosion resistant surfaces in contaminant treatment systems
CN109610461A (en)*2019-01-242019-04-12中建筑港集团有限公司A kind of module type inspection well concrete grout device and method
US12227699B2 (en)2019-12-262025-02-18Suncoke Technology And Development LlcOven health optimization systems and methods
CN111206768A (en)*2020-01-162020-05-29天津鼎维固模架工程股份有限公司Light beam plate structure platform and construction method thereof
US11767482B2 (en)2020-05-032023-09-26Suncoke Technology And Development LlcHigh-quality coke products
US12215289B2 (en)2020-05-032025-02-04Suncoke Technology And Development LlcHigh-quality coke products
CN112177323A (en)*2020-09-092021-01-05中国一冶集团有限公司Cell body structure assembled support system
CN113216696A (en)*2021-06-022021-08-06中铁二十一局集团第二工程有限公司Supporting system for SRC beam integrated construction and construction method thereof
US12319976B2 (en)2021-11-042025-06-03Suncoke Technology And Development LlcFoundry coke products, and associated systems, devices, and methods
US11946108B2 (en)2021-11-042024-04-02Suncoke Technology And Development LlcFoundry coke products and associated processing methods via cupolas
US12331367B2 (en)2021-11-042025-06-17Suncoke Technology And Development LlcFoundry coke products, and associated systems, devices, and methods
US11851724B2 (en)2021-11-042023-12-26Suncoke Technology And Development Llc.Foundry coke products, and associated systems, devices, and methods
US12110458B2 (en)2022-11-042024-10-08Suncoke Technology And Development LlcCoal blends, foundry coke products, and associated systems, devices, and methods
US12286591B2 (en)2022-11-042025-04-29Suncoke Technology And Development LlcCoal blends, foundry coke products, and associated systems, devices, and methods
CN116044157A (en)*2023-01-312023-05-02中国三冶集团有限公司Construction method of inner formwork support structure of coke oven flue side wall
CN116025150A (en)*2023-01-312023-04-28中国核工业华兴建设有限公司Nuclear power station spent fuel pool roof/conversion layer floor slab supporting system and construction method
CN116201163A (en)*2023-02-132023-06-02中交第二航务工程局有限公司Frame type variable cross-section wind tower construction structure and method
US12410369B2 (en)2023-11-212025-09-09Suncoke Technology And Development LlcFlat push hot car for foundry coke and associated systems and methods
CN118933404B (en)*2024-08-022025-06-13中国二十二冶集团有限公司 Construction method of aerial high and heavy load formwork support system
CN118933404A (en)*2024-08-022024-11-12中国二十二冶集团有限公司 Construction method of aerial high and heavy load formwork support system

Also Published As

Publication numberPublication date
CN101886466B (en)2011-09-14

Similar Documents

PublicationPublication DateTitle
CN101886466B (en)Construction method for support structure of coal tower template for tamping type coke oven
CN104141383B (en)A kind of Bailey beam pendent form support system and construction thereof
CN103452311B (en)A kind of erection method of shaped steel suspended structural support frame
CN106337555A (en)Method for constructing triangular steel support for cantilever structure of outer wall of building
CN109779225A (en)A kind of change overhanging type external scaffold and construction method
CN102444203A (en)High-altitude large-span cantilever corridor type steel concrete structure and construction method
CN103206089A (en)Fabricated aluminum alloy formwork system construction method
CN102535845A (en)Construction method of bearing frame of corridor structure
CN104652813A (en)Tower crane construction technology used for super high-rise building steel structure
CN111236604A (en)Safe construction method for cantilever platform on cylinder main body structure
CN109457814B (en)Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN205036072U (en)A shaped steel formwork support that encorbelments for high altitude structure of encorbelmenting
CN106592962A (en)Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN110409624A (en) A large-scale equipment installation and main structure reverse calculation and construction method
CN107165281A (en)A kind of high-altitude long-span overhung steel platform mould bases construction
CN114658214A (en)High-rise building disc buckle type high-altitude large-cantilever support frame support and anchor pressing integrated construction method
CN113605771A (en)Prestress assembly type frame structure system
CN116837889A (en) A kind of basement roof construction elevator foundation construction method
CN102691267A (en)High pier construction method for external whole operation platform
CN217151150U (en)Overhanging steel truss formwork supporting platform for aluminum mould-full concrete outer wall
CN205348761U (en)Basement does not have reinforced structure of no basic lift of installation on back board
CN210025768U (en)A operation platform system for caisson template installation
CN104989092A (en)Construction method of high-altitude overhang superposition type steel truss bearing platform
CN201339320Y (en)High-altitude overhanging hanging reinforced concrete hanging bracket
CN113047609A (en)Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C14Grant of patent or utility model
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp