Movatterモバイル変換


[0]ホーム

URL:


CN101105121A - Horizontal well machinery staged fracturing tool string - Google Patents

Horizontal well machinery staged fracturing tool string
Download PDF

Info

Publication number
CN101105121A
CN101105121ACNA2007101298183ACN200710129818ACN101105121ACN 101105121 ACN101105121 ACN 101105121ACN A2007101298183 ACNA2007101298183 ACN A2007101298183ACN 200710129818 ACN200710129818 ACN 200710129818ACN 101105121 ACN101105121 ACN 101105121A
Authority
CN
China
Prior art keywords
packer
horizontal well
tool string
staged fracturing
fracturing tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101298183A
Other languages
Chinese (zh)
Inventor
谢建华
李清中
吴恩成
刘兆权
李琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co LtdfiledCriticalDaqing Oilfield Co Ltd
Priority to CNA2007101298183ApriorityCriticalpatent/CN101105121A/en
Publication of CN101105121ApublicationCriticalpatent/CN101105121A/en
Pendinglegal-statusCriticalCurrent

Links

Landscapes

Abstract

A staged fracturing tool string for horizontal well machinery is provided, aiming to solve the problem of staged fracturing of horizontal well. The invention is characterized in that the lower end of an oil pipe (6) is sequentially connected with a safety joint (1), a centralizer (2), a packer (3), a pressure sand blower (4), and a guiding pipe plug (5). The inventive tool string is mainly used for staged fracturing of horizontal well in oil field. The utility model sets the packer (3) by using the throttling pressure difference of the pressure sand blower (4), and finishes fracturing of each stage by one pass using lifting manner. The sandblast nozzle of the pressure sand blower (4) has the shortest distance with the cartridge end surface of the right packer (3), so as to reduce the deposited sand at the upper end of the packer (3) and improve the safety feature of the fracturing technology and the development of the horizontal well.

Description

Horizontal well machinery staged fracturing tool string
Technical field:
The present invention relates to oil recovery field, oil field used downhole tool, especially horizontal well machinery staged fracturing tool string.
Background technology:
Fractured horizontal well has great importance to the volume increase transformation of low-permeability oil deposit, but because the horizontal well casing programme exists inclination section and horizontal segment, fracturing string and stressed and sand setting situation and straight well differ greatly, and the use of conventional fracturing tool is restricted.Existing fracturing tool string can only descend the straight well section, there is the restive shortcoming in crack in the general limited entry fracture treatment of carrying out horizontal well, in order to strengthen the specific aim of pressure break, raising has been studied horizontal well minor diameter staged fracturing technology to the control degree in fractured horizontal well crack.
Summary of the invention:
The purpose of this invention is to provide a kind of horizontal well machinery staged fracturing tool string that can be used for realizing the horizontal well in segments pressure break.
Technical scheme of the present invention is: this horizontal well machinery staged fracturing tool string comprises oil pipe, sleeve pipe, and oil pipe places in the sleeve pipe, and the oil pipe lower end is attachment security joint, centralizer, packer, pilot sandblaster, packer, guiding plug successively.
An oil pipe is arranged between centralizer and the packer.Left side packer is connected with oil pipe with the pilot sandblaster.Packer is an expansion type K344 type.The external diameter of safety joint is φ 95mm, and internal diameter is φ 48mm.
The present invention has following beneficial effect: utilize packer and the kit can be to desiring processing layer position fragment-force, the chock pressure difference by the pilot sandblaster sets the pressure break packer, takes the mode put forward, and one-trip string can be finished the pressure break of each interval.Pilot sandblaster sand jet outlet is short apart from right packing element end face distance, has reduced the sand setting of packer upper end, has improved the security performance of fracturing technology.This tool string is simple in structure, and the packer lower end is a movable end, and its pressure-bearing height is implemented the segmentation transformation for horizontal well means are provided.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present invention.
Form by safety joint 1, centralizer 2, packer 3, pilot sandblaster 4, guiding plug 5, oil pipe 6, sleeve pipe 7 among the figure.
The specific embodiment:
The invention will be further described below in conjunction with accompanying drawing:
By shown in Figure 1, this horizontal well machinery staged fracturing tool string comprises oil pipe 6, sleeve pipe 7, and oil pipe 6 places in the sleeve pipe 7, and oil pipe 6 lower ends are attachment security joint 1, centralizer 2, packer 3, pilot sandblaster 4, packer 3, guiding plug 5 successively.
An oil pipe 6 is arranged between centralizer 2 and the packer 3.Left side packer 3 is connected with pilot sandblaster 4 usefulness oil pipes.Packer 3 is an expansion type K344 type.The external diameter of safety joint 1 is φ 95mm, and internal diameter is φ 48mm.
Because the external diameter of safety joint 1 is φ 95mm, internal diameter is φ 48mm, after the pressure break in case on carry load than the kilocalorie tubing string, the steel ball that well head is thrown φ 52mm builds the pressure and opens inner sliding sleeve, safety joint 1 upper and lower joint is separated, thereby trip out top oil pipe 6.Centralizer 2 makes this tool string placed in the middle in playing the lower tubular column process, prevents that packer 3 is impaired, at horizontal segment packer 3 is better set between two parties.Packer 3 has the above sleeve pipe of protection target zone, the effect of separating oil reservoir.Pilot sandblaster 4 can produce chock pressure difference sets its left and right sides packer 3 simultaneously, also is the passage that fracturing fluid enters target zone simultaneously, also can be used as the anti-flushing well passage when the sand card, removes in the process at tubing string, and guiding plug 6 plays the effect of guiding.
During site operation, in oil pipe 6 carries under this tool string sleeve pipe 7 behind the precalculated position, seated well head, ground fluid injection then, pilot sandblaster 4 produces chock pressure difference sets left and right sides packer 3, realize separating the purpose of oil layer section, fracturing fluid enters into the stratum through the side opening of pilot sandblaster 4, presses off the stratum.Upper lifting pipe post behind the intact interval of pressure break makes this tool string advance to another interval and carries out pressure break, and one-trip string just can be finished the pressure break of each interval like this.

Claims (5)

CNA2007101298183A2007-07-272007-07-27Horizontal well machinery staged fracturing tool stringPendingCN101105121A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CNA2007101298183ACN101105121A (en)2007-07-272007-07-27Horizontal well machinery staged fracturing tool string

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CNA2007101298183ACN101105121A (en)2007-07-272007-07-27Horizontal well machinery staged fracturing tool string

Publications (1)

Publication NumberPublication Date
CN101105121Atrue CN101105121A (en)2008-01-16

Family

ID=38999180

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CNA2007101298183APendingCN101105121A (en)2007-07-272007-07-27Horizontal well machinery staged fracturing tool string

Country Status (1)

CountryLink
CN (1)CN101105121A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN102518418A (en)*2011-12-262012-06-27四机赛瓦石油钻采设备有限公司Unlimited layer fracturing process
CN102691495A (en)*2012-05-182012-09-26中国石油天然气股份有限公司Staged fracturing method for casing cementing well completion high-fracture stratum horizontal well
CN102691493A (en)*2012-06-052012-09-26中国石油化工股份有限公司Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN103032060A (en)*2012-11-082013-04-10中国石油天然气股份有限公司Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process
CN103195402A (en)*2013-04-122013-07-10中联煤层气国家工程研究中心有限责任公司Staged fracturing system and staged fracturing method of coal-bed gas well
CN103975116A (en)*2011-12-072014-08-06贝克休斯公司 Ball Seat Milling and Refracturing Methods
CN104213891A (en)*2013-06-052014-12-17中国石油天然气股份有限公司Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN109267987A (en)*2018-11-082019-01-25华鼎鸿基石油工程技术(北京)有限公司Pressure-guiding sand blower and double envelope single deck tape-recorder fracturing strings

Cited By (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN103975116A (en)*2011-12-072014-08-06贝克休斯公司 Ball Seat Milling and Refracturing Methods
CN102518418A (en)*2011-12-262012-06-27四机赛瓦石油钻采设备有限公司Unlimited layer fracturing process
CN102518418B (en)*2011-12-262014-07-16四机赛瓦石油钻采设备有限公司Unlimited layer fracturing process
CN102691495A (en)*2012-05-182012-09-26中国石油天然气股份有限公司Staged fracturing method for casing cementing well completion high-fracture stratum horizontal well
CN102691493A (en)*2012-06-052012-09-26中国石油化工股份有限公司Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN102691493B (en)*2012-06-052014-11-26中国石油化工股份有限公司Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN103032060A (en)*2012-11-082013-04-10中国石油天然气股份有限公司Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process
CN103195402A (en)*2013-04-122013-07-10中联煤层气国家工程研究中心有限责任公司Staged fracturing system and staged fracturing method of coal-bed gas well
CN103195402B (en)*2013-04-122015-12-09中联煤层气国家工程研究中心有限责任公司A kind of system and method for staged fracturing of coal bed gas well
CN104213891A (en)*2013-06-052014-12-17中国石油天然气股份有限公司Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN109267987A (en)*2018-11-082019-01-25华鼎鸿基石油工程技术(北京)有限公司Pressure-guiding sand blower and double envelope single deck tape-recorder fracturing strings
CN109267987B (en)*2018-11-082024-09-13南京鼎峰科技有限公司Pressure guiding sand ejector and double-sealing single-clamping fracturing string

Similar Documents

PublicationPublication DateTitle
CN101338663A (en)Horizontal well mechanical staged fracturing blocking-proof process pipe column
CN101105121A (en)Horizontal well machinery staged fracturing tool string
CN201802376U (en)Open hole well completion hydraulic sand blasting immovable pipe string staged fracturing pipe string
CN102022104B (en)Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN201902202U (en)Staged fracturing string of oil-gas horizontal well
CN103821489B (en)Horizontal well machinery layering is acidified combination process tubing string with hydraulic jetting fracturing
CN102168575A (en)Loose blasting gas extraction technology of horizontal branch well of coal seam floor
CN104213891B (en)Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN104632172A (en)Method for controlling annulus pressure of gas field horizontal well immovable pipe column hydraulic sand blasting fracturing
CN105971662A (en)Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing
CN108756884A (en)Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN108868734A (en)Soluble packer multi-layer fracturing well completion integrated partial pressure pipe column and method for gas well
CN103573241A (en)Horizontal well casing cementing pressure balance sliding sleeve annulus sand-adding multi-section fracturing process
CN203321474U (en)Gas field horizontal well immobile pipe column hydraulic sand blasting clustering multi-section fracturing pipe column
CN203961938U (en)Packer staged fracturing technology tube pillar in a kind of horizontal well tube
CN113404534A (en)Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well
CN103075139A (en)Immovable pipe column hydraulic jet process for fracture acidizing and pipe column thereof
CN105221094A (en)Horizontal well double-sealing single-clamp blowout prevention process
CN1401879A (en)Hydro-impact broken down method and device for oil-water well
CN203175505U (en)Directional hydraulic ejector and pipe string thereof
CN103089196B (en)Setting method and the device thereof joining work with abrasive perforating of bridging plug is carried out with oil pipe
CN201031679Y (en)Deep layer gas well multiple fracturing tools string
CN202659221U (en)Horizontal well fracturing string
CN109252813B (en) A parallel multi-main and branch horizontal well system
CN203808964U (en)Horizontal well multilevel ejection fracturing tool

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C02Deemed withdrawal of patent application after publication (patent law 2001)
WD01Invention patent application deemed withdrawn after publication

Open date:20080116


[8]ページ先頭

©2009-2025 Movatter.jp