技术领域technical field
本发明涉及一种颚式破碎机,尤其涉及一种具有高破碎比的超大型、液压控制的重型液压颚式破碎机及其操作方法。The invention relates to a jaw crusher, in particular to an ultra-large, hydraulically controlled heavy-duty hydraulic jaw crusher with a high crushing ratio and an operating method thereof.
背景技术Background technique
目前,现有的颚式破碎机已广泛应用于矿山、冶金、化学工业、建材、铁路、公路和水利工程等部门。颚式破碎机通常由机架、固定颚板、活动颚板、动颚、偏心轴、肘板和调整座组成,并通过电动机驱动而进行工作,其破碎力为200吨,可破碎抗压强度不超过320兆帕的各种物料,而且无论在国内或国外,被破碎物料可达的破碎比最大是1∶5。但是,随着国民生产的发展,在扩大规模化的矿山和冶金工业中,破碎物料的尺寸成倍的增加,例如需要破碎直径在1000~1300mm的物料-钢渣,破碎物质中含有非破碎物,破碎比要大于市场上可得到的或更大。这使得现有颚式破碎机的结构不能适应新的生产要求,所以必须对破碎机进行重新设计以满足生产的需要。At present, the existing jaw crusher has been widely used in mining, metallurgy, chemical industry, building materials, railways, highways and water conservancy projects and other departments. Jaw crushers usually consist of a frame, fixed jaws, movable jaws, movable jaws, eccentric shafts, toggle plates and adjustment seats, and are driven by a motor to work. The crushing force is 200 tons, and the compressive strength Various materials not exceeding 320 MPa, and no matter at home or abroad, the maximum crushing ratio of the crushed materials is 1:5. However, with the development of national production, the size of crushed materials has doubled in the scale-up of mining and metallurgical industries. For example, it is necessary to crush materials with a diameter of 1000-1300mm-steel slag, and the crushed materials contain non-broken materials. The crushing ratio is greater than or greater than that available in the market. This makes the structure of the existing jaw crusher unable to adapt to the new production requirements, so the crusher must be redesigned to meet the needs of production.
发明内容Contents of the invention
本发明的目的是为了适应大尺寸的破碎物料而提供一种重型液压颚式破碎机及其操作方法。The object of the present invention is to provide a heavy-duty hydraulic jaw crusher and its operating method for adapting to large-sized crushed materials.
实现上述目的的技术方案是:本发明重型液压颚式破碎机包括前墙、后墙、两侧墙构成的机架、偏心轴、在其后下部设有前肘板座和耳环并通过偏心轴可转动地架设在两侧墙上的动颚、固定在前墙上固定齿板、固定在动颚上并与固定齿板相对布置的活动齿板、肘板组件、电机传动装置、弹簧调整装置、液压过铁保护系统以及电器控制系统,其中,还包括:The technical solution to achieve the above object is: the heavy hydraulic jaw crusher of the present invention includes a front wall, a rear wall, a frame composed of two side walls, an eccentric shaft, and a front bracket seat and earrings are arranged at the rear lower part of the machine frame and pass through the eccentric shaft. The movable jaw rotatably erected on the walls on both sides, the fixed tooth plate fixed on the front wall, the movable tooth plate fixed on the movable jaw and arranged opposite to the fixed tooth plate, the toggle plate assembly, the motor transmission device, and the spring adjustment device , Hydraulic over-iron protection system and electrical control system, which also include:
两对导轨部件,分别相对倾斜地安装在两侧墙上,每对导轨部件的相对内侧为上下导轨部;Two pairs of guide rail parts are installed on the walls on both sides with relative inclination respectively, and the relative inner side of each pair of guide rail parts is the upper and lower guide rail parts;
一框形的液压缸安装箱架,以与导轨部件一样的倾斜度架设在导轨部件后面的两侧墙上,所述箱架的前板在同一高度上间隔设置有两个孔;A frame-shaped hydraulic cylinder is installed on the box frame, which is erected on the two side walls behind the guide rail component with the same inclination as the guide rail component, and the front plate of the box frame is provided with two holes at intervals at the same height;
一滑动导架,它包括一短的具有与导轨相匹配的两侧的活动板、一长的可移动地垂直安装在活动板上的第一支座、一长的并与第一支座间隔地固定在活动板上的第二支座、一固定的第二支座的后肘板座以及安装在第一支座后的调整部件;所述第一支座的长度方向具有间隔的两个孔,所述滑动导架可通过活动板架设在两侧墙的上下导轨间,此外,所述活动板的下侧设有一带有两个敞开的孔的座圈支承;A sliding guide frame, it comprises a short movable plate with two sides matched with the guide rail, a long first support vertically movably mounted on the movable plate, a long and spaced from the first support The second support fixed on the movable plate, the rear bracket seat of a fixed second support and the adjusting part installed behind the first support; the length direction of the first support has two intervals holes, the sliding guide frame can be erected between the upper and lower guide rails of the two side walls through the movable plate, in addition, the lower side of the movable plate is provided with a seat ring support with two open holes;
两主液压缸,并列地固定在液压缸安装箱架中,它们的活塞杆延伸过该箱架的前板上的两个孔;Two main hydraulic cylinders are fixed side by side in the hydraulic cylinder installation box frame, and their piston rods extend through two holes on the front plate of the box frame;
一回退连接器,它安置在液压缸和滑动导架之间,其前后端分别与主液压缸的活塞杆和滑动导架的调整部件相连接而其侧端通过连接件与上下导轨连接;A retraction connector, which is placed between the hydraulic cylinder and the sliding guide frame, its front and rear ends are respectively connected with the piston rod of the main hydraulic cylinder and the adjustment part of the sliding guide frame, and its side ends are connected with the upper and lower guide rails through the connecting piece;
两辅助液压缸,并列地安装在滑动导架中的第一支座和第二支座之间,其活塞杆分别伸入第一支座固定的两个孔中;Two auxiliary hydraulic cylinders are installed side by side between the first support and the second support in the sliding guide frame, and their piston rods respectively extend into the two fixed holes of the first support;
所述肘板组件包括一肘板和前后肘板垫,其中,前后肘板垫各自安置在动颚后下部的后肘板座和滑动导架中的前肘板座中,所述肘板通过其两端各自安放有前后肘板垫间以保持动颚和滑动导架的连接;The toggle assembly includes a toggle plate and front and rear toggle pads, wherein the front and rear toggle pads are respectively placed in the rear toggle seat at the rear lower part of the movable jaw and the front toggle seat in the sliding guide frame, and the toggle plate passes through The front and rear bracket pads are respectively placed at both ends to maintain the connection between the movable jaw and the sliding guide frame;
所述固定齿板和活动齿板各为2块或2块以上,它们具有不同圆弧齿形,而且都是以上大下小方式配置,并且在动颚安装好后它们相对的上下端之间形成进料口和可调整的排料口。The fixed tooth plate and the movable tooth plate are two or more pieces respectively, and they have different arc tooth shapes, and they are all configured in the way of the upper part and the lower part, and after the movable jaw is installed, the upper and lower ends of them are opposite to each other. Form feed port and adjustable discharge port.
如以上所述的重型液压颚式破碎机,其中,所述固定齿板和活动齿板各为2块,上固定齿板和上活动齿板具有相同大圆弧齿形,下固定齿板和下活动齿板具有相同的小圆弧齿形。The heavy-duty hydraulic jaw crusher as described above, wherein the fixed tooth plate and the movable tooth plate are two pieces each, the upper fixed tooth plate and the upper movable tooth plate have the same large arc tooth shape, and the lower fixed tooth plate and the movable tooth plate have the same large arc tooth shape. The lower movable tooth plate has the same small circular arc tooth profile.
如以上所述的重型液压颚式破碎机,其中,所述固定齿板和活动齿板是由高锰钢制成。As mentioned above, the heavy-duty hydraulic jaw crusher, wherein, the fixed tooth plate and the movable tooth plate are made of high manganese steel.
如以上所述的重型液压颚式破碎机,其中,所述上固定齿板和上活动齿板的下部和所述下固定齿板和下活动齿板的上部,即它们的上下连接部位具有从上至下逐渐减小的从大圆弧齿形到小圆弧齿形平滑过渡连接的中间连接圆弧齿形,并且该中间圆弧齿形具有直线减小或线性倾斜的过渡齿高。As the above-mentioned heavy hydraulic jaw crusher, wherein, the lower part of the upper fixed tooth plate and the upper movable tooth plate and the upper part of the lower fixed tooth plate and the lower movable tooth plate, that is, their upper and lower connection parts have from An intermediate connection arc tooth profile that gradually decreases from the large arc tooth profile to the small arc tooth profile with a smooth transition from top to bottom, and the intermediate arc tooth profile has a transitional tooth height that decreases linearly or linearly.
如以上所述的重型液压颚式破碎机,其中,所述上固定齿板和上活动齿板处在排料口最大位置70mm时,它们相间位置的夹角α1为23.09度,所述下固定齿板和下活动齿板在排料口最大位置70mm时它们相间位置的夹角α2为23.09度。As in the above-mentioned heavy-duty hydraulic jaw crusher, wherein, when the upper fixed tooth plate and the upper movable tooth plate are at the maximum position of 70 mm at the discharge opening, the angleα1 between them is 23.09 degrees, and the lower The angle α2 between the fixed tooth plate and the lower movable tooth plate is 23.09 degrees when the maximum position of the discharge opening is 70mm.
如以上所述的重型液压颚式破碎机,其中,所述偏心轴的偏心距设计得在动颚的进料口入点A和动颚的出料口落点B的运动轨迹是椭圆形的,其在y(y′)轴方向和x(x′)轴方向之间的摩擦力和作用力的比值y(y′)/x(x′)范围为2.5~3.0。As mentioned above, the heavy-duty hydraulic jaw crusher, wherein the eccentricity of the eccentric shaft is designed so that the movement trajectory at the entry point A of the feed port of the movable jaw and the drop point B of the discharge port of the movable jaw is elliptical The ratio y(y')/x(x') of the frictional force to the acting force between the y(y') axis direction and the x(x') axis direction is in the range of 2.5 to 3.0.
如以上所述的重型液压颚式破碎机,其中,所述固定齿板和活动齿板在动颚转动到距固定齿板最大位置时它们相间位置的平均夹角α为23~26度,而此时偏心轴的偏心圆中心与肘板在动颚一侧支承点的连线和肘板的夹角β是48~50度。In the heavy-duty hydraulic jaw crusher as mentioned above, the average angle α between the fixed tooth plate and the movable tooth plate when the movable jaw rotates to the maximum position from the fixed tooth plate is 23-26 degrees, and At this time, the angle β between the line connecting the center of the eccentric circle of the eccentric shaft and the support point of the toggle plate on one side of the movable jaw and the toggle plate is 48 to 50 degrees.
如以上所述的重型液压颚式破碎机,其中,所述滑动导架的调整部件包括若干调整垫和一一面为球面形和一面为平面的球面垫,所述回退连接器的前部为球面形的并与球面垫的球面部配合,所述调整垫安置在球面垫和第一支座之间。In the heavy-duty hydraulic jaw crusher as described above, the adjustment parts of the sliding guide frame include several adjustment pads and a spherical pad with a spherical surface and a flat surface, and the front part of the retraction connector It is spherical and cooperates with the spherical part of the spherical pad, and the adjusting pad is arranged between the spherical pad and the first support.
如以上所述的重型液压颚式破碎机,其中,所述偏心轴在与动颚和两侧的侧墙的支承轴孔部分上分别装有滚子轴承。In the heavy-duty hydraulic jaw crusher as mentioned above, the eccentric shaft is respectively equipped with roller bearings on the supporting shaft holes of the movable jaw and the side walls on both sides.
如以上所述的重型液压颚式破碎机,其中,所述两侧墙在其前部或在进料口和排料口相间的部分的表面上各设有上护板和下护板。As for the heavy-duty hydraulic jaw crusher mentioned above, the upper and lower guard plates are respectively provided on the front part of the two side walls or on the surface of the part between the feed port and the discharge port.
如以上所述的重型液压颚式破碎机,其中,所述电机传动装置包括电动机、一飞轮、一对槽轮和三角皮带,所述电动机安装在破碎机外水泥灌注的钢结构底座上并在电动机的输出轴上安装一槽轮,一飞轮和另一槽轮分别安装在偏心轴的两端,所述三角皮带围绕在两个槽轮上。As the above-mentioned heavy-duty hydraulic jaw crusher, wherein, the motor transmission device includes a motor, a flywheel, a pair of sheaves and a V-belt, and the motor is installed on the cement-filled steel structure base outside the crusher and A sheave is installed on the output shaft of the motor, a flywheel and another sheave are respectively installed at both ends of the eccentric shaft, and the V-belt is wound around the two sheaves.
如以上所述的重型液压颚式破碎机,其中,述弹簧调整装置包括一拉杆和一弹簧,所述拉杆的前端绞接地安装在动颚的耳环上,所述拉杆的后端具有螺纹,而通过其中部卡装在活动板下端的垫圈支承的孔中,所述弹簧为螺旋弹簧,从拉杆后部套装于拉杆上,并通过在拉杆的后端装入垫圈和拧入螺母将拉杆拉紧和使弹簧压缩以夹紧在动颚和滑动导架之间的肘板。As the heavy-duty hydraulic jaw crusher mentioned above, wherein, the spring adjustment device includes a pull rod and a spring, the front end of the pull rod is twistedly installed on the earring of the movable jaw, the rear end of the pull rod has threads, and The middle part is clamped in the hole supported by the washer at the lower end of the movable plate. The spring is a coil spring, which is fitted on the pull rod from the rear of the pull rod, and the pull rod is tightened by installing a washer and screwing in a nut at the rear end of the pull rod. And the spring is compressed to clamp the toggle plate between the movable jaw and the slide guide.
如以上所述的重型液压颚式破碎机,其中,两主液压缸和两辅助液压缸各自并联连接。As in the heavy-duty hydraulic jaw crusher mentioned above, the two main hydraulic cylinders and the two auxiliary hydraulic cylinders are respectively connected in parallel.
如以上所述的重型液压颚式破碎机,其中,所述液压过铁保护系统包括油箱、循环泵、泵源、冷却过滤液压控制回路、主液压缸控制回路和辅助液压缸控制回路,其中,所述循环泵和泵源分别与油箱连接以油泵送给过滤液压控制回路、主液压缸和辅助液压缸控制回路;The heavy-duty hydraulic jaw crusher as described above, wherein the hydraulic iron protection system includes an oil tank, a circulation pump, a pump source, a cooling and filtering hydraulic control circuit, a main hydraulic cylinder control circuit and an auxiliary hydraulic cylinder control circuit, wherein, The circulation pump and the pump source are respectively connected with the oil tank to pump the oil to the filter hydraulic control circuit, the main hydraulic cylinder and the auxiliary hydraulic cylinder control circuit;
冷却过滤液压控制回路包括空气滤油器、双桶过滤器、安全阀、油冷却器、液压信号器,其中,齿轮油泵的输出端连接双桶过滤器、安全阀,并经后者输送连接到油冷却器、空气滤油器、油冷却器,以在安全情况下对工作用油提供冷却过滤;The cooling and filtering hydraulic control circuit includes an air filter, a double-barrel filter, a safety valve, an oil cooler, and a hydraulic signal indicator. Oil cooler, air oil filter, oil cooler to provide cooling and filtration of working oil under safe conditions;
所述主液压缸控制回路包括第一换向阀、分别通过管道连接于第一换向阀的左位的蓄能器和单向阀、其输入端与单向阀连接而输出端分别与两主液压缸的无杆腔连接的同步分流阀、连接在第一换向阀的右位下并且其输出端直接与油箱连通的节流阀,以及连接在同步分流阀和单向阀液压回路上的溢流阀,两主液压缸的有杆腔连接于第一换向阀的右位和单向阀的输入端;The main hydraulic cylinder control circuit includes a first reversing valve, an accumulator and a one-way valve connected to the left side of the first reversing valve through pipelines, the input end of which is connected with the one-way valve and the output end is respectively connected with the two The synchronous diverter valve connected to the rodless cavity of the main hydraulic cylinder, the throttle valve connected under the right position of the first reversing valve and its output port directly communicates with the fuel tank, and the synchronous diverter valve and check valve hydraulic circuit The overflow valve of the two main hydraulic cylinders is connected to the right position of the first reversing valve and the input end of the one-way valve;
所述辅助液压缸控制回路包括第二和第三换向阀和两个单向阀,所述第二换向阀的左位连接于辅助液压缸的无杆腔,右位连接辅助液压缸的有杆腔,所述单向阀之一连接在油箱和该辅助液压缸的有杆腔之间,所述第三换向阀的左位分别经另一单向阀连接泵源和第一换向阀的左位下,右位与辅助液压缸的无杆腔连接以可回油至油箱。The auxiliary hydraulic cylinder control circuit includes second and third reversing valves and two one-way valves. The left position of the second reversing valve is connected to the rodless chamber of the auxiliary hydraulic cylinder, and the right position is connected to the rodless chamber of the auxiliary hydraulic cylinder. There is a rod cavity, one of the check valves is connected between the oil tank and the rod cavity of the auxiliary hydraulic cylinder, and the left position of the third directional valve is respectively connected to the pump source and the first directional switch through another check valve. Down to the left position of the valve, the right position is connected with the rodless cavity of the auxiliary hydraulic cylinder so that the oil can be returned to the oil tank.
如以上所述的重型液压颚式破碎机,其中,所述第一和第二换向阀是三位四通电磁换向阀,所述第三换向阀是二位四通电磁换向阀,所述泵源包括两台柱塞油泵和两个单向阀,它们以一柱塞油泵和一单向阀串联,再被并联成两组可选择使用的泵,所述循环泵为一齿轮油泵。The heavy-duty hydraulic jaw crusher as described above, wherein the first and second reversing valves are three-position four-way electromagnetic reversing valves, and the third reversing valve is two-position four-way electromagnetic reversing valves , the pump source includes two plunger oil pumps and two check valves, which are connected in series with a plunger oil pump and a check valve, and then connected in parallel to form two groups of optional pumps, the circulation pump is a gear oil pump .
如以上所述的重型液压颚式破碎机,其中,所述泵源和第三换向阀的下左位之间连接有滤油器。As in the heavy-duty hydraulic jaw crusher mentioned above, an oil filter is connected between the pump source and the lower left position of the third reversing valve.
如以上所述的重型液压颚式破碎机,其中,还包括一二位二通电磁换向阀和一液控单向阀,所述二位二通电磁换向阀的左位连接在主液压缸的并联管道上,所述液控单向阀的一端分别连接同步分流阀和主液压缸无杆腔的管路和二位二通电磁换向阀的下左位上。As mentioned above, the heavy hydraulic jaw crusher also includes a two-position two-way electromagnetic reversing valve and a hydraulic control check valve, the left position of the two-position two-way electromagnetic reversing valve is connected to the main hydraulic On the parallel pipeline of the cylinder, one end of the hydraulic control check valve is respectively connected to the pipeline of the synchronous diverter valve and the rodless cavity of the main hydraulic cylinder and the lower left position of the two-position two-way electromagnetic reversing valve.
如以上所述的重型液压颚式破碎机,其中,在油箱和泵源的管路上接有作为手动截止球阀的截止阀,并泵源的另一端通过单向阀连接一电磁溢流阀。As the heavy-duty hydraulic jaw crusher mentioned above, a cut-off valve as a manual cut-off ball valve is connected to the pipeline between the oil tank and the pump source, and the other end of the pump source is connected to an electromagnetic overflow valve through a one-way valve.
如以上所述的重型液压颚式破碎机,其中,还包括两个压力传感器,分别为第一和第二压力传感器,其中,第二压力传感器的测量头连接于所述液控单向阀,所述第一压力传感器测量头与在同步分流阀和单向阀之间的溢流阀连接。As mentioned above, the heavy-duty hydraulic jaw crusher also includes two pressure sensors, namely the first and second pressure sensors, wherein the measuring head of the second pressure sensor is connected to the hydraulic control check valve, The measuring head of the first pressure sensor is connected with the overflow valve between the synchronous diverter valve and the one-way valve.
如以上所述的重型液压颚式破碎机,其中,所述电器控制系统包括电动机、主液压缸和辅助液压缸的换向阀和其它所述控制阀、齿轮油泵和柱塞油泵的驱动电机的启闭以及传感器的供电。The heavy-duty hydraulic jaw crusher as mentioned above, wherein, the electrical control system includes the electric motor, the reversing valve of the main hydraulic cylinder and the auxiliary hydraulic cylinder, and the drive motors of other control valves, gear oil pumps and plunger oil pumps Opening and closing and sensor power supply.
如以上所述的重型液压颚式破碎机,其中,还包括润滑油的供给系统,它安装在机架后的底座上,包括贮油箱、电动润滑油泵、干油过滤器、管道、由子母分配器组成的递进式分配器、高压软管,通过管道从润滑油泵来的润滑油,经过干油过滤器达到相连接的递进式分配器,再由分配器经过管道送入机架轴承、动颚轴承、肘板与其座的接触点、液压缸球面垫和滑道板的润滑点。As mentioned above, the heavy-duty hydraulic jaw crusher also includes a lubricating oil supply system, which is installed on the base behind the frame, including an oil storage tank, an electric lubricating oil pump, a dry oil filter, pipelines, and is distributed by the child and the mother. The progressive distributor composed of a high-pressure hose, the lubricating oil from the lubricating oil pump through the pipeline, passes through the dry oil filter to the connected progressive distributor, and then the distributor is sent to the frame bearing through the pipeline, The contact point of the movable jaw bearing, the toggle plate and its seat, the lubrication point of the spherical pad of the hydraulic cylinder and the slideway plate.
如以上所述的重型液压颚式破碎机,其中,还包括冷却水的供给系统,它包括循环冷却水泵和管道,通过管道输送到机架轴承。As mentioned above, the heavy-duty hydraulic jaw crusher also includes a cooling water supply system, which includes a circulating cooling water pump and pipelines, which are delivered to the frame bearings through the pipelines.
如以上所述的重型液压颚式破碎机,其中,还包括液压制动装置,该装置包括两个可相对转动地分别位于与电动机直接驱动的槽轮两侧的支杆、一通过轴转动地安装在支杆之一上的偏心摆杆、一通过轴安装在另一支杆和偏心摆杆的一端之间的拉杆、一对分别相对地安装在两支杆中间的刹闸,其抱闸面与槽轮的一侧的平滑周面相对、一由两个支轴、两个安装于支轴上的保持件和一装在后者上的弹簧组成的弹簧装置,后者通过支轴安装在刹闸上方的两支杆之间以在偏心摆杆的推动下可使弹簧随支杆的相对向外移动而被拉伸和随支杆的复位而收缩,一设置在底座一侧的支撑件,一安装在支撑件上且其活塞杆与偏心摆杆的另一端连接制动液压缸,以及一,一连接制动液压缸输入和输出口的电磁换向阀。As mentioned above, the heavy-duty hydraulic jaw crusher also includes a hydraulic brake device, which includes two relatively rotatable support rods respectively located on both sides of the sheave directly driven by the motor, and a shaft rotatable An eccentric swing rod installed on one of the rods, a pull rod installed between the other rod and one end of the eccentric swing rod through a shaft, and a pair of brakes installed oppositely in the middle of the two rods. The surface is opposite to the smooth peripheral surface of one side of the sheave, a spring device consisting of two fulcrums, two retainers mounted on the fulcrums and a spring mounted on the latter, which is mounted through the fulcrum Between the two struts above the brake, under the push of the eccentric swing rod, the spring can be stretched with the relative outward movement of the struts and contracted with the reset of the struts, a support arranged on one side of the base One piece, one is installed on the support piece and its piston rod is connected to the brake hydraulic cylinder with the other end of the eccentric swing rod, and one, an electromagnetic reversing valve connected to the input port and the output port of the brake hydraulic cylinder.
一种重型液压颚式破碎机的操作方法,其中,包括下列步骤:A method for operating a heavy-duty hydraulic jaw crusher, including the following steps:
a,启动液压系统a, start the hydraulic system
-将液压系统的电源开关旋转到电源开的位置;-Turn the power switch of the hydraulic system to the power on position;
-选择地启动两个柱塞泵之一,即A、B泵之一;- Selectively activate one of the two plunger pumps, one of the A and B pumps;
-当柱塞泵运行时,齿轮泵(循环泵)同时运行;- When the plunger pump is running, the gear pump (circulation pump) is running at the same time;
b,系统自动工作运行b. The system works automatically
-就地控制,就地柜选择中控控制,选择中控控制就地操作无效;- On-site control, select the central control control for the local cabinet, and the local operation is invalid if the central control control is selected;
-在柱塞泵运行后,换向阀19、22、27的7DT、4DT、2DT同时得电,主液压缸退,退到排料口250mm处,压力传感器34压力信号达到19MPa,传感器34高压指示灯亮,换向阀的7DT、4DT、2DT电磁阀同时失电,主液压缸停;-After the plunger pump is running, the 7DT, 4DT, and 2DT of the reversing
-点动系统工作按钮,换向阀的7DT、4DT、1DT电磁阀同时得电主液压缸进,1分钟后,压力传感器30压力信号应达到18MPa(如≤18MPa声光报警),发出主机开信号,破碎机制动器松闸,破碎机运行,同时发出喂料机喂料信号;- Jog the working button of the system, and the 7DT, 4DT, and 1DT solenoid valves of the directional valve are simultaneously powered into the main hydraulic cylinder. After 1 minute, the pressure signal of the
-当破碎机运行后,压力传感器30压力信号达到18MPa时,换向阀的7DT、4DT、1DT可同时失电主液压缸停;如果一段时间工作后,压力传感器30压力信号下降到17.5MPa时,换向阀的7DT、4DT、1DT同时得电主液压缸进,压力传感器30压力信号达到18MPa时,换向阀的7DT、4DT、1DT同时失电主液压缸停,依次往复;- After the crusher is running, when the pressure signal of the
c,系统停止运行c, the system stops running
-按系统停止按钮;- press the system stop button;
-发出停止喂料信号;- signal to stop feeding;
-15秒钟后破碎机停止运行,2分钟后破碎机制动器抱闸;- The crusher stops running after 15 seconds, and the brake of the crusher is locked after 2 minutes;
-破碎机停稳后,换向阀的7DT、4DT、2DT同时得电,主液压缸退,当主液压缸退到排料口250mm处,压力传感器34压力信号>19MPa,换向阀的7DT、4DT、2DT同时失电主液压缸退停;- After the crusher stops, the 7DT, 4DT and 2DT of the reversing valve are energized at the same time, and the main hydraulic cylinder is retracted. When 4DT and 2DT lose power at the same time, the main hydraulic cylinder stops;
-系统退出自动控制状态。-The system exits the automatic control state.
如以上所述的重型液压颚式破碎机的操作方法,其中,所述步骤c,系统停止运行为系统急停,The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, in the step c, the stop of the system is an emergency stop of the system,
-在系统自动运行情况下,按急停按钮;- When the system is running automatically, press the emergency stop button;
-发出停止喂料信号;- signal to stop feeding;
-破碎机停止运行,2分钟后破碎机制动器抱闸;- The crusher stops running, and the brake of the crusher is locked after 2 minutes;
-全部电磁阀失电;- All solenoid valves are de-energized;
-系统退出自动控制状态。-The system exits the automatic control state.
如以上所述的重型液压颚式破碎机的操作方法,其中,The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein,
所述步骤b,系统自动工作运行中,破碎机在破碎过程中如果遇到非破碎物时,In step b, when the system is running automatically, if the crusher encounters non-broken objects during the crushing process,
-压力传感器30压力信号>18.5MPa,发出停止喂料信号,同时过铁声光报警,10秒钟后,液压缸的7DT、4DT、2DT同时得电,主液压缸退,当主液压缸退到排料口250mm处,压力传感器34压力信号>19MPa,换向阀的2DT失电,换向阀的7DT、4DT、1DT同时得电,主液压缸进;-The pressure signal of the
-主液压缸进1分钟后,压力传感器30压力信号≥18MPa,表明非破碎物已从排料口排出,发出喂料机喂料信号。- After the main hydraulic cylinder enters for 1 minute, the pressure signal of the
如以上所述的重型液压颚式破碎机的操作方法,其中,The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein,
所述步骤b,所述遇到非破碎物为超大破碎物时,In the step b, when the non-broken object is an oversized broken object,
-主液压缸进30秒钟内,压力传感器30压力信号>19MPa,表示碰到超大破碎物,破碎机马上停止运行,2分钟后破碎机制动器抱闸,- Within 30 seconds after the main hydraulic cylinder enters, if the pressure signal of the
-破碎机停稳后发出手动控制,就地手动按动按钮,退主液压缸到排料口250mm处,然后就地退50mm主液压缸退至行程终端,停止所有设备,把电门钥匙开关旋转到电源关位置,取下钥匙,人工取非破碎物。-After the crusher stops, manual control is issued, manually press the button on the spot, retract the main hydraulic cylinder to the discharge port 250mm, then retract the main hydraulic cylinder by 50mm to the end of the stroke, stop all equipment, and switch the electric door key Rotate to the power off position, take off the key, and manually remove non-broken objects.
如以上所述的重型液压颚式破碎机的操作方法,其中,所述步骤a,启动液压系统后,The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, in the step a, after starting the hydraulic system,
-当柱塞泵(液压泵)运行后,干油泵自动运行20分钟,停止300分钟;- When the plunger pump (hydraulic pump) is running, the dry oil pump will automatically run for 20 minutes and stop for 300 minutes;
-干油换向电磁阀得电20分钟后失电,当干油泵循环三周期,干油换向电磁阀循环一次。-The dry oil reversing solenoid valve is powered off after 20 minutes. When the dry oil pump cycles for three cycles, the dry oil reversing solenoid valve cycles once.
如以上所述的重型液压颚式破碎机的操作方法,其中,所述步骤a,在齿轮泵(循环泵)同时运行,当油温<25℃时,加热器加热,当油温≥32℃时,加热器停止加热,当油温≥65℃时,高温声光报警并停泵,发出停止喂料信号,破碎机停止运行,2分钟后破碎机制动器抱闸,全部电磁阀失电,系统退出自动控制状态。The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, in the step a, the gear pump (circulation pump) is operated at the same time, when the oil temperature is <25°C, the heater is heated, and when the oil temperature is ≥32°C When the oil temperature is ≥65°C, the heater will stop heating. When the oil temperature is ≥65°C, the high-temperature audible and visual alarm will stop the pump, send a signal to stop feeding, and the crusher will stop running. After 2 minutes, the brake of the crusher will be locked, and all solenoid valves will be de-energized. Exit the automatic control state.
如以上所述的重型液压颚式破碎机的操作方法,其中,所述步骤c,在系统停止运行或系统急停后,可对排料口调整,其步骤包括:The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, in the step c, after the system stops running or the system stops suddenly, the discharge port can be adjusted, and the steps include:
-破碎机停止,主液压缸退至排料口250mm处,34压力传感器高压指示灯亮。- The crusher stops, the main hydraulic cylinder retreats to 250mm from the discharge port, and the high pressure indicator light of the 34 pressure sensor is on.
-破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到关位置,取下钥匙随身携带,卸下活塞杆与调整垫片的机械连接;- Rotate the solenoid valve switch key switch on the on-site operation button box of the crusher to the off position, take off the key and carry it with you, and remove the mechanical connection between the piston rod and the adjusting gasket;
-插上钥匙,把破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到开位置;把破碎机现场操作按钮盒上的调整开关旋转到开位置,点动辅助液压缸进按钮,声光报警,再次点动辅助液压缸进按钮,7DT、5DT加电副缸进;-Insert the key, turn the solenoid valve switch key switch on the on-site operation button box of the crusher to the on position; turn the adjustment switch on the on-site operation button box of the crusher to the on position, and press the auxiliary hydraulic cylinder to enter the button. Light alarm, jog the auxiliary hydraulic cylinder advance button again, 7DT, 5DT power up the auxiliary cylinder to advance;
-破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到关位置,取下钥匙随身携带,手动调整垫片;- Rotate the solenoid valve switch key switch on the on-site operation button box of the crusher to the off position, take off the key and carry it with you, and manually adjust the gasket;
-插上钥匙,把破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到开位置;把破碎机现场操作按钮盒上的调整开关旋转到开位置,点动副缸退按钮,声光报警,再次点动副缸退按钮,7DT、6DT加电副缸退;-Insert the key, turn the solenoid valve switch key switch on the on-site operation button box of the crusher to the open position; turn the adjustment switch on the on-site operation button box of the crusher to the on position, and press the back button of the auxiliary cylinder, the sound and light Alarm, press the auxiliary cylinder back button again, 7DT, 6DT power on the auxiliary cylinder back;
-破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到关位置,取下钥匙随身携带,完成活塞杆与调整垫片的机械连接;- Rotate the solenoid valve switch key switch on the on-site operation button box of the crusher to the off position, take off the key and carry it with you, and complete the mechanical connection between the piston rod and the adjusting gasket;
-插上钥匙,把破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到开位置;把破碎机现场操作按钮盒上的调整开关旋转到关位置,排料口调整完毕。-Insert the key, turn the solenoid valve switch key switch on the on-site operation button box of the crusher to the open position; turn the adjustment switch on the on-site operation button box of the crusher to the off position, and the discharge opening is adjusted.
如以上所述的重型液压颚式破碎机的操作方法,其中,所述步骤b,系统自动工作运行中的就地控制,包括下列步骤:The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, the step b, the local control during the automatic operation of the system, includes the following steps:
-就地柜选择中控控制,选择中控控制就地操作无效;- Select the central control control for the local cabinet, and the local operation is invalid if the central control control is selected;
-可分别启动/停止A泵或B泵,A泵或B泵启动时,齿轮泵也启动,设备运行指示灯亮;- Pump A or pump B can be started/stopped separately, when pump A or pump B is started, the gear pump is also started, and the equipment running indicator light is on;
-干油泵启动/停止;干油换向电磁阀启动/停止,可以根据工况条件给设备加油,按钮按一下加油,指示灯亮,再按一下停止加油;- Start/stop the dry oil pump; start/stop the dry oil reversing solenoid valve, you can refuel the equipment according to the working conditions, press the button to refuel, the indicator light is on, press it again to stop refueling;
-点动主液压缸进按钮,换向阀的7DT、4DT、1DT同时得电主液压缸进,指示灯亮,点动主液压缸退按钮,换向阀的7DT、4DT、2DT同时得电主液压缸退,指示灯亮,当主液压缸已退至排料口250mm处,传感器34高压指示亮,点动主液压缸退按钮失效;-Jog the main hydraulic cylinder advance button, 7DT, 4DT, 1DT of the reversing valve are powered on at the same time. When the hydraulic cylinder is retracted, the indicator light is on. When the main hydraulic cylinder has retracted to 250mm from the discharge port, the high pressure indicator of the
-点动主液压缸退50mm按钮,换向阀的7DT、4DT、3DT、2DT同时得电主液压缸退,指示灯亮,退至行程终端。-Jog the main hydraulic cylinder back 50mm button, the 7DT, 4DT, 3DT, 2DT of the reversing valve will be energized at the same time, the main hydraulic cylinder will go back, the indicator light will be on, and it will go back to the end of the stroke.
如以上所述的重型液压颚式破碎机的操作方法,其中,所述主液压缸退至到排料口250mm处,传感器34高压指示亮,The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, the main hydraulic cylinder retreats to 250mm from the discharge port, the
-应该点动主液压缸退50mm按钮;- The main hydraulic cylinder should be moved back 50mm button;
-当主液压缸退到排料口250mm处,传感器34高压指示亮,主液压缸进指示灯灭。- When the main hydraulic cylinder retreats to the 250mm position of the discharge port, the high pressure indicator of the
如以上所述的重型液压颚式破碎机的操作方法,其中,所述步骤b,系统自动工作运行时压力传感器30测得的压力过低时进行报警,此时,当处在自动控制运行时,换向阀的7DT、4DT、1DT同时得电,主液压缸进,1分钟后压力传感器30压力没达到18MPa,考虑为油泵损坏或油管破裂,切换A、B泵,如未达到18.5MPa,则关闭油泵。The operation method of the heavy-duty hydraulic jaw crusher as described above, wherein, in the step b, when the pressure measured by the
由上可见,本发明的重型液压颚式破碎机为带有液压保险装置的大型复摆颚式破碎机,它由机械部分、液压过铁保护系统和电气控制三大部分组成,广泛适用于脱硫渣、无组织干渣和钢包废包衬的粗破。这种钢渣破碎机的处理粒度不大于1300mm,同时当破碎腔中落入≤250mm非破碎物(例如铁块)时,由特殊设计的液压过铁保护系统作用,使打开排料口,排出非破碎物,称为“过铁”,“过铁”延迟一个设定时间后,又由液压过铁保护系统作用,使破碎机回复到初始的闭边排料口位置,恢复到正常工作状态。It can be seen from the above that the heavy-duty hydraulic jaw crusher of the present invention is a large-scale compound pendulum jaw crusher with a hydraulic safety device. Coarse crushing of slag, disorganized dry slag and waste ladle lining. The processing particle size of this steel slag crusher is not more than 1300mm. At the same time, when non-broken objects (such as iron blocks) ≤ 250mm fall into the crushing cavity, the specially designed hydraulic iron protection system will open the discharge port and discharge non-broken objects. Broken objects are called "over-iron". After "over-iron" is delayed for a set time, the hydraulic over-iron protection system acts to make the crusher return to the initial position of the closed side discharge port and return to the normal working state.
本发明的操作方法由液压过铁保护系统和电器控制相结合,当破碎腔中落入>250mm非破碎物时,压力传感器发出信号,停止板喂机、液压泵,继续后退指示灯亮,人工操作按钮,主油缸后退50mm,使>250mm的非破碎物从排料口落下,人工予以清除,接着重复启动工作,循环周而复始。The operation method of the present invention is combined with the hydraulic iron protection system and electrical control. When the crushing chamber falls into a non-broken object > 250mm, the pressure sensor sends a signal, stops the plate feeder and hydraulic pump, and continues to retreat. The indicator light is on, and manual operation Press the button, the main oil cylinder retreats 50mm, so that the non-broken objects > 250mm fall from the discharge port, manually remove them, and then start the work repeatedly, and the cycle goes round and round.
本发明的重型液压颚式破碎机的进料粒度:0~1300mm,出料粒度:0~130mm,破碎比为1∶10,破碎力在1200T,处理能力:100~120t/h(用户要求)正常(瞬时)过铁排料粒度:≤250mm排料口尺寸:70~130mm,因此,破碎机具有设计先进、结构合理、操作可靠和使用方便等特点。The feed granularity of the heavy-duty hydraulic jaw crusher of the present invention: 0-1300mm, the discharge granularity: 0-130mm, the crushing ratio is 1:10, the crushing force is 1200T, and the processing capacity: 100-120t/h (required by the user) Normal (instantaneous) iron discharge granularity: ≤250mm discharge port size: 70-130mm, therefore, the crusher has the characteristics of advanced design, reasonable structure, reliable operation and convenient use.
附图的简要说明Brief description of the drawings
图1是本发明的重型液压颚式破碎机的主视剖视图;Fig. 1 is the front sectional view of heavy-duty hydraulic jaw crusher of the present invention;
图2是图1的俯视图;Fig. 2 is the top view of Fig. 1;
图3是图1的侧视图;Fig. 3 is a side view of Fig. 1;
图4a和图4b是重型液压颚式破碎机的机架和局部剖视图和在去除一侧墙后的侧视图,Figure 4a and Figure 4b are the frame and partial sectional view of the heavy-duty hydraulic jaw crusher and the side view after removing one side wall,
图5a、图5b和图5c分别是重型液压颚式破碎机的动颚的主视图、左右侧视剖视图;Figure 5a, Figure 5b and Figure 5c are the front view and left and right side sectional views of the movable jaw of the heavy-duty hydraulic jaw crusher, respectively;
图6是重型液压颚式破碎机的滑动导架的宽度方向的剖视图;Fig. 6 is a cross-sectional view in the width direction of the sliding guide frame of the heavy-duty hydraulic jaw crusher;
图7是动颚的腔型结构之一,表示具有过渡腔型结构的闭边排料口为70mm时的上下破碎腔的啮角尺寸;Figure 7 is one of the cavity structures of the movable jaw, showing the bite angle size of the upper and lower crushing cavity when the closed side discharge opening with a transitional cavity structure is 70mm;
图8是另一种动颚的腔型结构,表示具有直腔型结构的闭边排料口为74mm时的上下破碎腔的啮角尺寸;Figure 8 is another cavity structure of the movable jaw, showing the bite angle size of the upper and lower crushing cavity when the closed side discharge opening with a straight cavity structure is 74 mm;
图9a、图9b和图9c分别是图7的动颚的工作时给料口和排料的位置图和它们的运动轨迹图;Fig. 9a, Fig. 9b and Fig. 9c are respectively the position diagrams of the feed port and the discharge and their motion trajectory diagrams during the operation of the movable jaw of Fig. 7;
图10a、图10b和图10c分别是图8的动颚的工作时给料口和排料的位置图和它们的运动轨迹图;Fig. 10a, Fig. 10b and Fig. 10c are respectively the position diagrams of the feed port and the discharge and their motion track diagrams when the movable jaw of Fig. 8 is working;
图11是本发明的重型液压颚式破碎机的液压制动装置与槽轮的相对布置图;Fig. 11 is a relative arrangement diagram of the hydraulic braking device and the sheave of the heavy hydraulic jaw crusher of the present invention;
图12是图11的A-A剖视图,表示液压制动装置的安装结构;Fig. 12 is a sectional view of A-A of Fig. 11, showing the installation structure of the hydraulic braking device;
图13是本发明的重型液压颚式破碎机的液压过铁保护系统的现场布置图;Fig. 13 is a site layout diagram of the hydraulic iron protection system of the heavy hydraulic jaw crusher of the present invention;
图14是本发明的重型液压颚式破碎机的液压过铁保护系统的组成图;Fig. 14 is a composition diagram of the hydraulic iron protection system of the heavy-duty hydraulic jaw crusher of the present invention;
图15是液压过铁保护系统和润滑油(干油)系统的组合配置图;Fig. 15 is a combined configuration diagram of the hydraulic over-iron protection system and the lubricating oil (dry oil) system;
图16a和图16b是液压过铁保护系统和润滑油系统的现场布置的主视图和俯视图Figure 16a and Figure 16b are the front view and top view of the field layout of the hydraulic iron protection system and lubricating oil system
图17是液压过铁保护系统和润滑油系统的现场操作兼过渡箱,其内容、线号、端子的控制连接图;Figure 17 is the on-site operation and transition box of the hydraulic iron protection system and lubricating oil system, its content, line number, and terminal control connection diagram;
图18是液压过铁保护系统现场操作兼过渡箱指示灯和按钮面板布置主视图;Figure 18 is a front view of the on-site operation of the hydraulic over-iron protection system and the layout of the indicator lights and button panels of the transition box;
图19是图18的后视图,表示场操作兼过渡箱的端子安装位置图;Fig. 19 is a rear view of Fig. 18, showing the terminal installation position diagram of field operation and transition box;
图20是本发明的重型液压颚式破碎机的电器操作图。Fig. 20 is an electrical operation diagram of the heavy hydraulic jaw crusher of the present invention.
具体实施例的描述Description of specific embodiments
请参阅图1~图5,图中示出了本发明的重型液压颚式破碎机的机械结构,它包括机架40、动颚50、偏心轴60、固定齿板70、活动齿板80、滑动导架90、肘板100、回退连接器200、两主液压缸33、两辅助液压缸21、两个传感器30、34、弹簧调整装置300、电机传动装置400、液压过铁保护系统700、润滑油或干油润滑供给系统500、冷却水供给系统600、液压制动装置800以及电器控制系统,其中,机架40包括前墙41、后墙(图中未画出)、两侧墙42、43,它们通过方销连接而成,以便于运输和拆装。为能经受得住很大的冲击载荷,它具有足够的强度和刚度。此外,在机架的两侧墙42、43上设有相对布置的一对轴座孔44,而且在机架的两侧墙前部的相对内侧装有螺栓紧固的上边护板47和下边护板48,在两侧墙后部的相对内侧倾斜地设置两对导轨部件45,并且在该导轨部件45后两侧墙上以与导轨部件45相同的倾斜角度架设一框形的液压缸安装箱架46。Please refer to Fig. 1~Fig. 5, the mechanical structure of the heavy-duty hydraulic jaw crusher of the present invention is shown in the figure, it comprises
动颚50为焊接结构,是一大致的长方形件,在其两窄面板51上部具有内孔511以及槽512,在其两宽面板52、53之一的宽面板53上设有一具有前肘板座57并相对纵向轴线倾斜的斜板54,在前肘板座57的外侧设置两个耳环55,以及在前肘板座57和内孔511之间的两个相对宽面板52、53上各设有三排安装孔531、532、533和521、522、523,而在宽面板上设有加强筋56、58、59。The
偏心轴60为优质高强度锻钢,经多次精密的机械加工,热处理和探伤检查制成,因此具有足够的强度和刚度。动颚50可通过偏心轴60、键和四套球面滚子轴承61、62可转动地架设在两侧墙42、43上。The
固定齿板70通过板螺栓和楔块紧固定在前墙上,活动齿板80固定在动颚50上并与固定齿板相对布置,活动齿板和固定齿板均为优质高锰钢铸件。固定齿板70和活动齿板80采取上、下各一块,齿形各不相同。为应对大颗粒进料粒度(<1300mm)的咬入需要,上固定齿板701和上活动齿板801采用大圆弧齿形,例如齿高80~100mm;为应对出成品粒度(0~130mm)的需要,下固定齿板702和下活动齿板802采用小圆弧齿形,例如齿高40~60mm。因此上、下固定齿板和活动齿板是不能互换的。在一较佳实施例中,所述上固定齿板701和上活动齿板801的下部和所述下固定齿板702和下活动齿板802的上部,即它们的上下连接部位具有从上至下逐渐减小的从大圆弧齿形到小圆弧齿形平滑过渡连接的中间连接圆弧齿形703、803,并且该中间圆弧齿形具有直线减小或线性倾斜的过渡齿高。最好所述上边护板47和下边护板48设置在两侧墙在固定齿板70和活动齿板79相间的部分的表面上The fixed
请参阅图1和图6,滑动导架90包括一短的具有与导轨相匹配的两侧的活动板91、一长的可移动地垂直安装在活动板91上的第一支座92、一长的并与第一支座间隔地固定在活动板上的第二支座93、一固定在第二支座上的后肘板座96以及安装在第一支座后的调整部件94;所述第一支座的长度方向具有间隔的两个孔95,所述滑动导架90可通过活动板91架设在两侧墙的上下导轨45间。通常,调整部件94包括若干调整片941和一球面垫942,调整片941安装在球面垫942和第一支座92之间。另外,在活动板91的下侧的两横向相对外侧各设置一具有敞开的孔的座圈支承97、98,该支承是用作调整装置的肘板的松紧的调节,详细情况将在下文的说明中叙述。Referring to Fig. 1 and Fig. 6, sliding
肘板组件100包括肘板101和前后肘板垫102、103,其中,肘板101是一个传动构件,肘板101与肘板垫102、103槽底部采用滚动接触方式,正常使用情况下很少磨损。因此只需在其接触表面上涂一层润滑脂即可。前后肘板垫为槽钢形截面件,在其槽底部具有圆弧面,它安装在前后肘板座57和96的槽中,以便保持动颚50和滑动导架90的连接。The
两主液压缸33,并列地固定在滑动导架90后面的侧墙42、43之间的液压缸安装箱架46上。Two main
回退连接器200系用于连接液压缸33与滑动导架90的部件,为一前端设有球形表面201,后端设有两个保持孔202,在周壁上设有连接螺钉孔。回退连接器200安置在主液压缸和滑动导架之间,其前后端分别与主液压缸的活塞杆和滑动导架的调整部件94相连接并可通过螺钉可拆卸地固定于上下导轨45上。回退连接器200的球面形前部201与球面垫942的球面部配合,所述调整垫片941安置在球面垫942平面一侧和第一支座92之间。The
两辅助液压缸21,并列地安装在滑动导架90中并其缸体和活塞杆分别通过螺钉或安装孔固定在后肘板座96和第一支座92上;Two auxiliary
在工作中,当过铁时主液压缸后退,通过回退连接架使其移动,增加排料口尺寸,从而排除过铁。During work, when the iron is passing through, the main hydraulic cylinder retreats, and the connecting frame is moved back to increase the size of the discharge port, thereby eliminating the passing iron.
滑动导架90的装配过程。肘板垫102、103通过楔块和螺栓安装在滑动导架的前端,调整垫片941置于后端,中间装有二只辅助液压缸21,整个滑动导架90部件安装在上、下导轨45之间。前后肘板座57和96上部具有长的槽。The assembly process of the sliding
电机传动装置400包括电动机401、一飞轮402、一对槽轮403、404和三角皮带405,其中,电动机401安装在破碎机外水泥灌注后的钢架底座406上,如图3所示。一个槽轮403通过支承架408支承并通过联轴节407与电动机的输出轴连接,另一槽轮404和一个飞轮402分别安装在偏心轴的两端,所述三角皮带405围绕在两个槽轮403、404上。飞轮、槽轮由优质铸铁件制成,其重量和结构足够保证破碎机能平衡地工作。飞轮、槽轮在偏心轴60上的两端位置可以相互调配,并通过切向键联结。这样,本破碎机以电动机为动力,通过皮带轮,由三角皮带和槽轮403、404驱动偏心轴60,使动颚50按预定轨迹作往复运动,从而将进入由固定齿板70、活动齿板80和边护板组成的破碎腔内的物料予以破碎,并通过下部的排料口将成品物料排出。The
弹簧调整装置300有两个,安装在动颚的两侧,每一个包括一拉杆部件301和一弹簧302,其中,拉杆部件301的一端铰接于动颚下端的耳环53、54上,另一端通过在滑动导架的下端的垫圈支承97、98的敞开的孔,弹簧302套装拉杆部件301上并通过其自由端上的螺纹可将的弹簧用垫圈和螺母压紧。拉杆部件301系用来保证破碎机整个机构紧密结合,并部分平衡在动颚50与肘板工作时产生的惯性力。破碎机工作时弹簧需要一定的预紧力,以防止肘板在工作时脱落,但不宜过大,只要能消除肘板101与动颚50、滑动导架90间冲击响声即可,否则将影响弹簧302的使用寿命,甚至使弹簧断裂。There are two
在破碎机安装完成后,将需要对闭边排料口大小进行调整。闭边排料口大小的调整时,必须在主液压缸33回退到极限位置时方可进行。After the crusher is installed, the size of the closed side discharge opening will need to be adjusted. When adjusting the size of the closed side discharge opening, it must be carried out when the main
首先拧下滑动导架与回退连接架的连接螺母,然后点动辅助液压缸前进,液压缸顶杆顶住球面垫,使滑动导架向前移动,以使滑动导架、垫片组与球面垫之间产生间隙,若取出调整垫片,达到增大排料口的需要。反之,放入调整垫片时,达到减小排料口的需要。在达到所需的闭边排料口尺寸后,点动辅助液压缸,使其后退至极限位置,再拧上滑动导架与回退连接架的连接螺母,排料口调整结束。First unscrew the connecting nuts of the sliding guide frame and the retracting connecting frame, and then jog the auxiliary hydraulic cylinder to move forward. There is a gap between the spherical pads. If the adjusting gasket is taken out, the need to increase the discharge opening can be achieved. On the contrary, when the adjusting gasket is put in, the need to reduce the discharge opening can be achieved. After reaching the required size of the closed side discharge port, jog the auxiliary hydraulic cylinder to make it retreat to the limit position, and then screw on the connecting nut of the sliding guide frame and the retraction connecting frame, and the adjustment of the discharge port is completed.
请参阅图7~图10,对于排料口调整的调整范围:上固定齿板701和上活动齿板801在闭边排料口选定的最大位置70mm时它们相间位置的夹角α1为23.09度,所述下固定齿板702和下活动齿板802在闭边排料口选定的最大位置70mm时它们相间位置的夹角α2为23.09度。Please refer to Figures 7 to 10, for the adjustment range of the discharge port adjustment: the angle α1 between the upper fixed
所述固定齿板和活动齿板在动颚转动到距固定齿板最大位置时它们相间位置的平均夹角为α23~26度,而此时偏心轴60的中心与肘板101在动颚50一侧支承点的连线和肘板的夹角β是48~50度。When the movable jaw rotates to the maximum position from the fixed tooth plate, the average included angle between the fixed tooth plate and the movable tooth plate is α23-26 degrees. At this time, the center of the
所述偏心轴的偏心距设计得在动颚的出料口落点B和动颚进料口入点A的运动轨迹是椭圆形的,其在y(y′)轴方向和x(x′)轴方向之间的摩擦力和作用力的比值范围为2.5~3.0。The eccentricity of the eccentric shaft is designed so that the motion track at the discharge point B of the movable jaw and the entry point A of the movable jaw inlet is elliptical, and it is in the direction of the y (y') axis and x (x' ) The ratio of the friction force to the force between the axial directions ranges from 2.5 to 3.0.
请参阅图11至图14,液压过铁保护系统700包括油箱1、一台循环泵,例如齿轮油泵9、泵源,后者包括两台柱塞油泵15(或A泵和B泵)和两个单向阀16,冷却过滤液压控制回路、主液压缸控制回路和辅助液压缸控制回路,其中,所述循环泵和泵源各自与油箱连接以将油泵送给过滤液压控制回路和主、辅助液压缸控制回路。本实施例中,两主液压缸33和两辅助液压缸21各自并联连接。;Referring to Fig. 11 to Fig. 14, the hydraulic pressure
冷却过滤液压控制回路包括液位计4、液压信号器5、空气滤油器6、点接触温度计7、油冷却器12,双桶过滤器13、安全阀37、连接在安全阀37上的电接点压力表38,以及分别用于调节空气滤油器6和油冷却器12的球阀2、11和电加热器3等,其中,齿轮油泵9的输出端连接双桶过滤器13、安全阀37,并经后者输送连接到油冷却器12、空气滤油器6、油冷却器12,以在安全压力下对工作用油提供冷却过滤。为了使破碎机适应寒冷或比较低温度下工作,还可在油箱周围或油箱中安装电加热器3,以便对油箱的油加热。The cooling and filtering hydraulic control circuit includes a
主液压缸控制回路包括第一换向阀27、蓄能器28、单向阀29、同步分流阀32、溢流阀31和节流阀26,其中,蓄能器28和单向阀29分别由管道连接于第一换向阀的左位,、同步分流阀32的输入端与单向阀29连接而输出端分别与两主液压缸的无杆腔连接,节流阀26的两端分别连接第一换向阀的右位下和油箱1之间,溢流阀31连接在同步分流阀32和单向阀29之间的管路上,两主液压缸的有杆腔连接到第一换向阀的右位和单向阀29的输入端。The main hydraulic cylinder control circuit includes a first reversing
较佳,在主液压缸控制回路中还包括一二位二通电磁换向阀36和一液控单向阀35,其中,二位二通电磁换向阀36的左位连接在主液压缸33的并联管道上,所述液控单向阀35的两端分别连接于同步分流阀32至主液压缸33的无杆腔的管路和二位二通电磁换向阀36的下左位上。Preferably, a two-position two-way electromagnetic reversing
辅助液压缸控制回路包括第二和第三换向阀19、22和单向阀20、25,其中,第二换向阀19的左位连接于辅助液压缸21的无杆腔,右位连接辅助液压缸21的有杆腔,而单向阀20连接在油箱1和该辅助液压缸有杆腔之间,所述第三换向阀22左位分别经单向阀25连接泵源和第一换向阀27的左位下,右位与辅助液压缸21的无杆腔连接,以回油到油箱。The auxiliary hydraulic cylinder control circuit includes second and third reversing
第一和第二换向阀27、19是三位四通电磁换向阀,所述第三换向阀22是二位四通电磁换向阀。而且,柱塞油泵15之一和第三换向阀22下左位之间连接有滤油器18。所述泵源的两台柱塞油泵15和两个单向阀16,它们以一柱塞油泵和一单向阀串联,再被并联成两组可选择使用的泵A、B。The first and second reversing
在油箱和各柱塞油泵15的输入管路上接有截止阀8,并柱塞油泵的输出上通过单向阀16连接有电磁溢流阀17,其中,截止阀8是一手动截止球阀,此外,在所述泵源和第三换向阀22的下左位之间连接有滤油器18。On the input pipeline of oil tank and each
两个压力传感器30、34分别为第一和第二压力传感器。在较佳实施例中,第一压力传感器30的测量头安置在单向阀29和同步分流阀32之间通过管道所装的溢流阀31中,第二压力传感器34的测量头安置在液控单向阀35中。The two
电器控制系统包括电动机401、主液压缸33和辅助液压缸21的换向阀和其它电控制阀、齿轮油泵9和柱塞油泵15的驱动电机的启闭以及传感器30、34的供电的电路和过渡箱电器如指示灯39、按钮49和继电器等等,如图17、18所示。The electrical control system includes
请参阅图15和图16,润滑油供给系统500它包括一贮油桶501、一干油过滤器503、一连接在贮油桶501和干油过滤器503之间电动润滑油泵502、一通过管道与干油过滤器的出口连接的递进式分配器504、一通过管道与递进式分配器的输出口514连接的电磁阀505和一时间继电器507,所述递进式分配器504具有若干供油接口515,所述供油接口通高压软管或管道516连接到需要润滑的机架轴承、动颚轴承、肘板与其座的接触点、液压缸球面垫和滑道板的润滑点的位置。Please refer to Fig. 15 and Fig. 16, lubricating
在本发明的另一个实施例中,破碎机采用自动单线递进式母子分配系统5041、5042。此母子分配系统可提供12个润滑点,其工作情况如下:启动电动润滑泵502,把贮油桶的润滑脂通过柱塞泵输送到管道,经干油过滤器503进入母分配器5041。母分配器工作,分别将大油量润滑脂通过管道5151送入机架轴承(2个点)、动颚轴承(2个点),同时母分配器有一个出油口,通过管道连接子分配器5042,进入子分配器的润滑油,进行二次分配。通过管道5152分别将小油量润滑脂送到肋板(2个点)、液压缸球面垫(2个点)、滑道板(4个点)进行润滑。当电动润滑泵运行,母子分配器不断循环地工作,把油脂不断地按需要量的大小定点输送到各个润滑点。分配器带有指示杆,工作时指示杆往复运动用来监视分配器的工作情况,同时可通过发讯开关在故障发出报警讯号。In another embodiment of the present invention, the crusher adopts an automatic single-line progressive mother-
这个系统采用时间继电器控制开机和停机,开机时间为20分钟,停机时间为300分钟。当然用户也可根据工况条件自行调整开机和停机的时间。This system uses a time relay to control start and stop, the start time is 20 minutes, and the stop time is 300 minutes. Of course, the user can also adjust the start and stop time according to the working conditions.
润滑油供给系统500通常和液压控制系统邻近布置以可共用贮油桶和便于安排管路,如图16a和图16b所示。润滑油供给系统500和液压控制系统的电气部分是集中控制的,它们都接到液压站现场操作兼过渡箱,由中央控制室进行电控,如图13所示。The lubricating
冷却水供给系统600包括循环冷却水泵和管道,主要通过管道输送到机架轴承。水冷却系统由钢厂统一提供,系循环冷却本机的机架轴承(2个点)和动颚轴承(2个点)。The cooling water supply system 600 includes a circulating cooling water pump and pipes, which are mainly delivered to the frame bearings through the pipes. The water cooling system is uniformly provided by the steel mill, which circulates and cools the frame bearing (2 points) and movable jaw bearing (2 points) of the machine.
请参阅图11和图12,液压制动装置800包括两个支杆811、812、一偏心摆杆813、一拉杆814、一对刹闸815、一弹簧装置816、一支撑件817和一制动液压缸818,其中,所述两个支杆811、812安装在电动机一侧底座406上并可相对转动地位于与电动机直接驱动的槽轮两侧。较佳,还包括一连接板819,在两端各设有一轴孔829,所述连接板固定在底座406上,所述两个支杆811、812的下部各自与连接板819枢轴连接。Referring to Fig. 11 and Fig. 12, the
偏心摆杆813的一端是向上倾斜的,在该倾斜端设有一位于上面的上孔823和位于下面的下孔833并且上孔823和下孔833相间一小的距离,其另一端设有一与活塞杆连接的安装孔834,所述偏心摆杆813是通过下孔833中的轴安装于支杆811的。One end of the eccentric swing rod 813 is inclined upwards, and the inclined end is provided with an upper hole 823 positioned above and a lower hole 833 positioned below and a small distance between the upper hole 823 and the lower hole 833, and the other end is provided with a The mounting hole 834 where the piston rod is connected, the eccentric swing rod 813 is installed on the
所述拉杆814的一端枢轴安装在另一支杆812,另一端通过轴与偏心摆杆813的上孔833连接,由于偏心摆杆813的上孔823和下孔833相间一小的距离,所以偏心摆杆在绕下孔833的轴转动时,向着支杆812方向推动拉杆814,同时使两个支杆811、812上端之间的距离扩大。One end of the
一对刹闸815各自安装在两个支杆811、812上,每一刹闸815的抱闸面为圆弧面。较佳,刹闸上各自设有一橡胶垫,该橡胶垫最好与抱闸面有同样的面积,并通过热压施贴到刹闸815的表面上,使用时可直接与槽轮接触。A pair of brakes 815 are respectively mounted on two
弹簧装置816安装在刹闸815上方两支杆811、812之间。弹簧装置816包括两个支轴826和836、两个保持件846、856和一弹簧866,其中,保持件646、856为圆形盘,它们各自固定于支轴626、836的一端上,支轴另一端则通过紧固件分别固定在两支杆811、812上,所述弹簧为螺旋弹簧866,其两端分别固定在两个保持件646、856上并位于它们之间。The spring device 816 is installed between the two
支撑件817安装在底座406的一侧,安装方向是向着底座外。The supporting member 817 is installed on one side of the
制动液压缸818安装在支撑件817上,该液压缸的活塞杆828与偏心摆杆813的另一端的安装孔834连接,所述制动液压缸连接的液压系统的电磁阀。The brake hydraulic cylinder 818 is installed on the support member 817, the piston rod 828 of the hydraulic cylinder is connected with the mounting hole 834 at the other end of the eccentric swing rod 813, and the brake hydraulic cylinder is connected with the solenoid valve of the hydraulic system.
该液压制动装置的工作原理是:在破碎机运行时,液压系统的电磁阀或换向阀通电,制动液压缸的活塞杆因无杆腔进油而伸出,并推动偏心摆杆813挠着与支杆的轴转动,进而通过偏心摆杆813与拉杆814的连接轴的偏心转动使两个支杆811、812之间的距离增大,同时使支杆811、812相对地绕其下的轴孔829中的轴向外转动,以拉动支轴817相对向外移动,并对弹簧818进行拉伸以及使两刹闸815各自脱离与槽轮404的接合面414而分离一定距离,以便槽轮404的正常转动。在破碎机工作时遇到非破碎物等需要制动时,电磁阀失电,制动液压缸回油,活塞杆缩进液压缸的同时偏心摆杆813被下拉,弹簧818拉伸被解除,并依靠弹簧818的回复力将两个支杆811、812相对地向内移动,在弹簧818拉伸被解除的瞬时,使偏心摆杆813快速顺时钟方向转动,接着弹簧818将弹性力完全释放而压紧刹闸而抱住槽轮404。整个制动时间,设定在破碎机主机停止运行后2分钟以内,以保证设备的安全性。所述刹闸815的抱闸面上设有橡胶垫,橡胶垫附装抱闸面并在制动上其可与槽轮404一侧的光滑的表面414相对柔性紧密结合。The working principle of the hydraulic brake device is: when the crusher is running, the solenoid valve or reversing valve of the hydraulic system is energized, and the piston rod of the brake hydraulic cylinder is stretched out due to the oil entering the rodless chamber, and pushes the eccentric swing rod 813 Rotate with the axis of the pole, and then the distance between the two
制动液压缸连接的换向阀,在压力传感器30压力信号达到或大于18MPa时,或在系统自动运行情况下,按急停按钮;使换向阀同时失电,主液压缸停,在15秒钟后破碎机停止运行,2分钟后破碎机制动器抱闸。For the reversing valve connected to the brake hydraulic cylinder, when the pressure signal of the
其下通过轴可转动地安装在电动机一侧基础的底座406上并位于槽轮404两侧的两根支杆811、812,通过轴架设在支杆811(812)之一上的一偏心摆杆813、通过轴安装在另一支杆812(811)和偏心摆杆813之间的一拉杆814、分别相对地安装在两支杆811、812中间的一对刹闸815和安装在刹闸上方两支杆之间的一弹簧装置,该弹簧装置包括一固定在偏心摆杆813一侧的支杆之一上固定板816,一固定在另一支杆上的带突出头部的支轴817,一套在支轴上的弹簧818、一一端安装在基础的底座406上而另一端、即其活塞杆连接于偏心摆杆813的液压缸819以及通过管道连接液压缸819的有杆和无杆腔的电磁阀820。该液压制动装置的工作原理是:在破碎机运行时,电磁阀820通电,液压缸819的活塞杆因无杆腔进油而伸出,并推动偏心摆杆813挠着与支杆的安装轴转动,进而通过偏心摆杆813与拉杆814的连接轴的偏心转动使两个支杆811、812之间的距离增大,同时使支杆811、812相对地绕其下的轴向外转动,以拉动支轴817由其突出头对弹簧818进行压缩以及使两刹闸815各自与槽轮404的接合面分离一定距离,以便槽轮404的正常转动。在破碎机工作时遇到非破碎物等需要制动时,电磁阀失电,除弹簧818压缩被解除,两支杆811、812以使支杆绕其下的轴向外转动的相反方向将它们向内拉,同时使偏心摆杆813顺时钟方向转动和使推动活塞杆下移,弹簧818将完全压紧刹闸。整个制动时间,设定在破碎机停止运行后2分钟以内,以保证设备的安全性。It is rotatably installed on the
所述刹闸815包括抱闸825和橡胶垫835,橡胶垫835附装抱闸825上并在制动上其可与槽轮404一侧的光滑的表面相对柔性紧密结合。The brake 815 includes a brake 825 and a rubber pad 835. The rubber pad 835 is attached to the brake 825 and can be tightly combined with the smooth surface on one side of the
请参阅图14至图18,图中示出了液压过铁保护系统的工作原理图,其中,两个主液压缸33并联,由分流集流阀32和机械导向共同控制其运动的同步性。Please refer to FIG. 14 to FIG. 18 , which show the working principle diagram of the hydraulic over-iron protection system, in which two main
主换向阀27的左位接入工作时,活塞前行,遇阻停止后,泵继续向蓄能器28充液,压力随之升高,直至达到设定压力,使双液压缸的前推力达到预定的2.68×106N,此时控制系统根据压力传感器21的压力信号令全部电磁铁失电,电磁溢流阀卸荷(可考虑关闭泵,调试中视泵启停频率决定)。如果一段时间工作后,蓄能器中蓄能不足,压力降低,根据压力传感器30的压力信号使主换向阀27左位接入,泵源重新向蓄能器充液。When the left position of the main reversing
在破碎过程中,如主液压缸因破碎力增大而产生后退趋势,因液控单向阀29封堵了油路,使液压缸无杆腔压力升高,达到溢流阀31的调定压力后,方可由该阀溢流而允许主液压缸后退,此时后退的阻力由溢流阀31的调压决定(最高可达到3.54×106N,)。此压力信号由压力传感器30传输至控制系统,控制系统执行“过铁”动作。During the crushing process, if the main hydraulic cylinder tends to retreat due to the increase of the crushing force, the oil circuit is blocked by the hydraulic
主换向阀27右位接入工作时,供油压力打开液控单向阀,主液压缸有杆腔进油后退,由节流阀26控制其合适的后退速度。如果此时主液压缸33受到很大的后退外力,则节流阀26能阻止其快速后退,而当后退外力更大,至液压缸无杆腔压力达到溢流阀31调定压力时,则主液压缸仍会因溢流阀31溢流而快速后退,这就可保证系统免受损坏。When the right position of main reversing
泵源14~16设置两套,分别独立工作。一套工作,另一套备用。There are two sets of pump sources 14-16, which work independently. One set works and the other is spare.
液压过铁保护系统动作及其控制方式:The action and control mode of the hydraulic iron protection system:
在正常工作过程中,先使主换向阀左位接入(IDT“+”),主缸33右行,行至行程终端后,蓄能器充压至设定压力,压力传感器30的压力信号确定破碎机主机可以开始工作。In the normal working process, the main reversing valve is first connected to the left (IDT "+"), and the
在过铁工作过程中,若主缸因破碎力过大而退让,则压力传感器30出现高压(>18.5MPa)信号,说明有非破碎物存在,控制系统将执行“过铁”动作。其过程为:关闭进料口,并使液压过铁保护系统主换向阀27切换至右位工作,使主缸33后退,至主缸活塞左侧的突柱(另附说明)进入左缸盖沉孔时,压力传感器34出现高压(>19MPa)信号,说明已“退至排料口250mm”,然后立即使主缸恢复前行并计时,至压力传感器30达到设定压力后,进料口恢复进料。During the working process of iron passing, if the main cylinder retreats due to excessive crushing force, a high pressure (>18.5MPa) signal will appear on the
在清除超大非破碎物中,在“过铁”后主缸前行动作的30秒(调试确定)内,若压力传感器30又出高压信号(>18.5MPa),说明主缸前行遇阻,非破碎物并未排出,则控制系统立即使主机停止运转和制动。主机停止后(由调试确定主机停车制动时间),液压过铁保护系统转为手动控制,点动按钮控制主液压缸后退,及电磁换向阀26左位接入,可使主液压缸后退至行程终端,然后由人工清除超大的非破碎物。完成后整个系统即可恢复“正常工作”。In the process of clearing oversized non-broken objects, if the
在需要停止工作(或急停)时,先控制进料口关闭、再使主机停转,液压过铁保护系统换向阀的电磁铁全部处于“失电”状态,并转为手动控制。When it is necessary to stop working (or emergency stop), firstly control the closing of the feed inlet, and then stop the main machine, and all the electromagnets of the reversing valve of the hydraulic iron protection system are in the "power-off" state, and turn to manual control.
在工作过程中,如果泵源发生故障,可由压力信号使控制系统关闭故障泵的电机,启动备用泵电机,立即恢复工作。During the working process, if the pump source fails, the pressure signal can make the control system shut down the motor of the faulty pump, start the standby pump motor, and resume work immediately.
在调整颚板出料口尺寸时,先点动控制使主缸33后退至行程终端(电磁换向阀27左位接入),松开活塞杆与调整垫片的机械连接(见机械结构图)后,控制换向阀22右位和19左位接入,使双辅助缸21伸出顶起颚板(此前需确定主缸33已处退后位置),换向阀19切至中位锁住辅助缸21,全部电磁铁失电,液压过铁保护系统处于卸荷状态,然后可进行更换垫片操作。操作完成后,必须先将换向阀19切换至右位,控制辅助缸21缩回至行程终端,再切回中位,机械连接完成后,可将电磁换向阀22切换至左位,主系统恢复工作。When adjusting the size of the discharge port of the jaw plate, first jog the control to make the
有关液压过铁保护系统操作说明:通过换向阀19和22所接的辅助液压缸20,是为调整出料口尺寸时所用,辅助缸伸出时顶开动颚,以便更换垫片。Instructions for the operation of the hydraulic over-iron protection system: the auxiliary
有关闭边排料口的调整:闭边排料口为100±30mm,通过调整垫片的增、减来进行调整。Adjustment of the discharge opening on the closed side: the discharge opening on the closed side is 100±30mm, and it is adjusted by adjusting the increase or decrease of the shim.
在主机停止,主液压缸33退回的状态下,先卸下活塞杆与调整垫片的机械连接,然后换向阀22右位接入(4DT“-”),此时可点动控制换向阀19左位接入(5DT“+”),使两个辅助缸21伸出顶起肘板及动颚,释放点动按钮后,换向阀19处于中位,将辅助缸21锁住,即可手动调整垫片。When the main engine is stopped and the main
调整完成后,点动控制换向阀19右位接入(6DT“+”),使辅助缸21退回,释放点动按钮后,换向阀19仍回中位,锁住辅助缸33,完成活塞杆与调整垫片的机械连接后,再将换向阀22左位接入(4DT“+”),此时两个辅助缸处于“退回浮动、前进锁定”状态。After the adjustment is completed, the right position of the jog
主系统自动控制运行:The main system automatically controls the operation:
先人工开启液压泵电源,注意观察液压泵运转是否正常。First manually turn on the power supply of the hydraulic pump, and pay attention to observe whether the hydraulic pump is running normally.
启动“破碎机运行”后,控制系统执行如下操作程序。After the "crusher operation" is started, the control system executes the following operating procedures.
(1)换向阀22左位接入(4DT“+”)。(1) The reversing
(2)换向阀27左位接入(1DT“+”)使主液压缸伸出。(2) The left position of the reversing
(3)等待一分钟(调试确定),检测压力传感器30是否达到预定工作压力。(3) Wait for one minute (commissioning is confirmed), and check whether the
“Y”——进入下一步,同时切换电磁铁“全失电”"Y"——Go to the next step, and switch the electromagnet to "all power off" at the same time
“N”——报警"N" - alarm
(4)主电机起动(动颚运行)。(4) The main motor starts (moving jaw runs).
(5)进料口放料。(5) Discharging at the feed port.
有关“过铁”控制:Regarding the "over iron" control:
在破碎机自动运行过程中,若压力传感器30出现高压信号(溢流阀31的调定压力),说明被破碎物料中存在非破碎物,主液压缸已因破碎力过大而开始出现被动后退的过载保护动作,则控制系统执行“过铁”动作。其过程如下:During the automatic operation of the crusher, if the
1)控制进料口关闭,停止放料。1) Control the feed port to close and stop discharging.
2)换向阀27右位接入(2DT“+”),主液压缸后退。2) The right position of the reversing
3)检测压力传感器34的压力信号,出现稳定的高压信号(>19MPa)时,说明主液压缸后退至排料口250mm已经到位,立即控制主换向阀27左位接入(1DT“+”),使主液压缸前行。3) Detect the pressure signal of the
4)在液压缸前行时进行计时监视,30秒(调试确定)内压力传感器30、34均无高压信号,30秒后,压力传感器信号达到设定工作压力时,进料口恢复放料,系统继续“自动运行”。4) Timing monitoring is carried out when the hydraulic cylinder is moving forward. There is no high-pressure signal from the
5)如果上款动作过程中,压力传感器30、34中任意之一在30秒(调试确定)内出现高压信号,则立即控制主机停转、制动,控制系统退出“自动运行”状态,切换为人工控制,并发出声光信号,警示有超大非破碎物(>250mm)存在。5) If any one of the
有关人工清除超大非破碎物:For manual removal of oversized non-broken objects:
控制系统发出声光信号,表示存在超大非破碎物时,待主机停稳,点动控制主换向阀27右位接入(2DT“+”),使主液压缸后退,同时按钮控制换向阀36左位接入(3DT“+”),使主液压缸退至行程最左端,然后关闭液压过铁保护系统控制电源,即可进行人工清除超大非破碎物。完成后重复“2.主系统自动控制运行”。The control system sends out sound and light signals, indicating that there are super large non-broken objects, wait for the main engine to stop, jog the right position of the main reversing
系统停止工作:System stops working:
破碎机需要停止工作时,按钮“停止工作”,控制系统控制如下动作:When the crusher needs to stop working, press the button "stop working", and the control system controls the following actions:
关闭进料口停止放料;Close the feed port to stop discharging;
主机停止运转;The host stops working;
主机制动停稳后,控制换向阀27右位接入(2DT“+”),使主液压缸后退;After the main engine brakes and stops, control the right position of the reversing
压力传感器34出高压信号时,全部电磁铁均切至失电状态,退出“自动控制运行”状态;When the
人工按钮控制关闭液压泵电源及液压过铁保护系统控制电源。The manual button control shuts down the power supply of the hydraulic pump and the control power supply of the hydraulic over-iron protection system.
有关采取急停:Regarding taking an emergency stop:
遇非常状况,按“急停”按钮,控制系统控制如下动作:In case of abnormal situation, press the "emergency stop" button, and the control system will control the following actions:
关闭进料口停止放料;Close the feed port to stop discharging;
主机停止运转;The host stops working;
全部电磁铁均切至失电状态,退出“自动控制运行”状态。All the electromagnets are switched to the power-off state and exit the "automatic control operation" state.
有关急停后恢复工作:For returning to work after an emergency stop:
按主液压缸“后退”按钮(4DT“+”、点动2DT“+”),使主液压缸后退至停止,再启动“破碎机运行”,系统即恢复工作。Press the "back" button of the main hydraulic cylinder (4DT "+", jog 2DT "+") to make the main hydraulic cylinder back to stop, and then start the "crusher operation", and the system will resume working.
对液压过铁保护系统对电气控制的要求:Requirements for electrical control of the hydraulic over-iron protection system:
控制对象;control target;
控制电磁铁:1DT、2DT、3DT、4DT、5DT、6DT、7DT,Control solenoid: 1DT, 2DT, 3DT, 4DT, 5DT, 6DT, 7DT,
控制电源:DC24V。Control power supply: DC24V.
控制电机:电机A、电机B,Control motor: motor A, motor B,
电源:380V、22KW,Power supply: 380V, 22KW,
控制油箱加热器电源。Controls fuel tank heater power.
过滤冷却循环泵电源。Filter cooling circulation pump power supply.
液压过铁保护系统输出信号:Output signal of hydraulic over-iron protection system:
压力传感器30简称YC30)、压力传感器34简称YC34)
电源:输出信号:——待压力传感器型号选定Power supply: output signal: - to be selected by the pressure sensor model
精滤器18的压差发讯器——提示更换精滤器的滤芯The differential pressure transmitter of the
电源:输出信号——待型号选定Power supply: output signal - to be selected by model
液位计4输出开关信号——提示液位超低,液压过铁保护系统锁住,不起动。
循环过滤器之压力继电器信号——提示更换循环过滤器的滤芯。电点温度计7信号——提示油温超越上限或下限,电接点压力表38信号——提示循环过滤器故障。电磁铁动列于表1:The pressure relay signal of the circulation filter—prompts to replace the filter element of the circulation filter. The signal of
表1Table 1
注:Note:
①动作]~4为程序控制自动运行状态,设定压力a。设定压力b在调试后确定。① Action] ~ 4 is the program control automatic operation state, set the pressure a. The set pressure b is determined after commissioning.
②电磁铁1~6全为“-”时,电磁铁7也为“-”;电磁铁1~6中任意出现“+”的,电磁铁7为“+”。② When
请参阅图18,控制面板按钮设置:See Figure 18, Control Panel Button Settings:
启动液压控制电源,输入密码后或用钥匙方可开启,开启时发出持续秒钟的声光信号。Start the hydraulic control power supply, enter the password or use the key to open it, and send out a sound and light signal that lasts for a few seconds when it is opened.
关闭液压控制电源。Turn off hydraulic control power.
泵A、泵B电源启停(旋钮切换,左、中、右,中为关闭)。Pump A, pump B power start and stop (knob switch, left, middle, right, middle is off).
破碎机自动运行开始(动作1)。Crusher automatic operation starts (action 1).
破碎机自动运行停止(动作4)——放料口未停止放料时无效。Crusher automatic operation stop (action 4) - invalid when the discharge port does not stop discharging.
缸33手控前行(1DT+、4DT+、7DT+)点动。
缸33手控后退(2DT+、4DT+、7DT+)点动。
缸33退55mm(2DT+、3DT+、4DT+、7DT+)点动。
缸21进(5DT+、7DT+)点动。
缸21退(6DT+、7DT+)点动。
急停。Emergency stop.
液压油加热(时间控制?温度控制?),达到温度后自动关闭。Hydraulic oil heating (time control? temperature control?), automatically shut off after reaching the temperature.
有关辅助逻辑功能:For auxiliary logic functions:
主缸退回至终端(手工退50mm之前)时,YC34出高压信号,控制面板上亮灯光信号,此信号在1DT+状态出现后消失。When the master cylinder is retracted to the terminal (before manual retraction of 50mm), YC34 sends out a high-voltage signal, and the light signal is on on the control panel. This signal disappears after the 1DT+ state appears.
在缸21进(5DT+、7DT+)点动按钮按下时,出现“嘟——嘟”声和“警告:检查主缸是否已退回“字样。再次按下时才实现其动作。When the inching button of cylinder 21 (5DT+, 7DT+) is pressed, there will be a "beep-beep" sound and the words "Warning: Check whether the master cylinder has returned". Its action is only realized when it is pressed again.
在任意按钮4DT+时,控制系统进入“4DT-、6DT+、7DT”状态,持续5秒,确保辅助缸21退回。When any button 4DT+ is pressed, the control system enters the state of "4DT-, 6DT+, 7DT" for 5 seconds to ensure that the
在条按钮按下后均锁住,直到YC34出现高压信号后释放,此按钮未释放时,其它按钮按下无效。After the button is pressed, it will be locked until the YC34 has a high-voltage signal and released. When the button is not released, the other buttons are invalid.
有关破碎机的报警:Alarms about the crusher:
自动运行状态的故障报警(声光警告信号):Fault alarm in automatic running state (sound and light warning signal):
(1)YC30低于设定压力a(压力值在调试后设定,考虑为泵损坏或油管破裂),同时切换泵A、B,持续一定时间(调试确定)后压力仍未达到,则关闭泵(是否修改?)。(1) YC30 is lower than the set pressure a (the pressure value is set after debugging, it is considered that the pump is damaged or the oil pipe is broken), and the pump A and B are switched at the same time, and the pressure is still not reached after a certain period of time (determined by debugging), then it is closed Pump (revised?).
(2)动作1、2、3持续1分钟后未达到设定压力a和设定压力b。(2) After
(3)1DT启停频率过高(限度由调试确定,考虑为主缸33的密封件损坏)。(3) 1DT start-stop frequency is too high (the limit is determined by debugging, considering that the seal of the
(4)主机故障(另行处理)。(4) Host failure (handled separately).
(5)放料口故障(另行处理)。(5) The discharge port is faulty (handled separately).
精滤器的压差发讯器灯光信号报警,提示更换滤芯。The light signal of the differential pressure transmitter of the fine filter gives an alarm, prompting to replace the filter element.
循环过滤器的压力继电器发讯,提示更换滤芯。The pressure relay of the circulating filter sends a signal to prompt to replace the filter element.
有关程序控制自动运行:For program-controlled automatic operation:
运作序号1点启后,YC30达设定上限压力a(初定18.5MPa),起动主机。After the
电磁铁全为一,液压过铁保护系统卸荷(是否关闭电机?调试确定)。The electromagnets are all one, and the hydraulic iron protection system is unloaded (whether to turn off the motor? Debug to confirm).
YC30出现下限压力(初定17.5MPa),重复动作序号1充压,达到18.5MPa后重复上条动作,电磁铁全为一。YC30 has a lower limit pressure (preliminarily set at 17.5MPa),
上条动作持续15秒而YC30显示压力不能达到18.5MPa,转为报警信号1)/a)。The upper movement lasts for 15 seconds and YC30 shows that the pressure cannot reach 18.5MPa, which turns into an alarm signal 1)/a).
上条动作3)、4)出现频率过高(调试确定其限度),转为报警信号1)/c)。Actions 3) and 4) in the previous article have too high frequency (debugging to determine the limit), and turn into alarm signal 1)/c).
YC30出现高压信号(暂定大于19MPa),执行“过铁”动作:YC30 has a high-voltage signal (tentatively greater than 19MPa), and executes the "over-iron" action:
(1)放料口关闭,10秒(暂定)后2DT+、4DT+、7DT+。(1) The discharge port is closed, 2DT+, 4DT+, 7DT+ after 10 seconds (tentative).
(2)此状态下YC34发出高压信号(暂定为19MPa),1DT+、4DT+、7DT+并计时。(2) In this state, YC34 sends out a high-voltage signal (19MPa tentatively), 1DT+, 4DT+, 7DT+ and timing.
(3)上条动作30秒(暂定)内,YC30和YC34再出高压信号(18.5MPa),执行停机,主机停止,液压过铁保护系统保持状态,声光信号报警,转为人工控制。(3) Within 30 seconds (tentative) of the winding operation, YC30 and YC34 send out a high-voltage signal (18.5MPa) to execute the shutdown, the main engine stops, the hydraulic iron over-iron protection system remains in the state, the sound and light signal alarms, and it is switched to manual control.
(4)上条动作b)30秒后发出高压信号,放料口恢复放料,继续运行。(4) Winding action b) After 30 seconds, a high-voltage signal is sent out, and the discharge port resumes discharging and continues to run.
自动运行停止。Automatic operation stops.
先关闭放料口,延时15秒(暂定)后主机停止,再延时2分钟后主液压缸退回(2DT+、4DT+、7DT+)至YC34发出高压信号后全部电磁铁切至“-”。First close the discharge port, delay for 15 seconds (tentative), and then the main engine stops, and after a delay of 2 minutes, the main hydraulic cylinder retreats (2DT+, 4DT+, 7DT+) until YC34 sends out a high-voltage signal, and all the electromagnets switch to "-".
急停时,自动运行中按下“急停”按钮后,放料口关闭,液压过铁保护系统保持状态。In case of emergency stop, after pressing the "emergency stop" button during automatic operation, the discharge port will be closed, and the hydraulic over-iron protection system will remain in the state.
关于人身和设备安全的措施:Measures for personal and equipment safety:
人身安全问题主要出现在操作人员进入机器进行调整和清除超大非破碎物的操作过程中,此时需要避免机器设备的任何误动作。对此,本设计具有以下措施:The problem of personal safety mainly occurs when the operator enters the machine to adjust and remove oversized non-broken objects. At this time, it is necessary to avoid any malfunction of the machine equipment. In this regard, this design has the following measures:
垫片调整时,必须确保双辅助缸21必须锁定,主缸33位于退回位置,且不能有任何动作的可能,要求操作人员在进入机器时,必须关闭液压过铁保护系统控制电源和关闭液压泵,在所有换向阀的电磁铁均处失电状态时,正好能保证上述要求,同时也保证在操作过程中,突然的断电亦不会出现误动作。When adjusting the gasket, it must be ensured that the double
操作人员在靠近机器进行操作时,其他人不得开启液压控制电源。规定开启液压过铁保护系统的控制电源时,必须用钥匙开启,并要求有持续数秒钟的声光信号。万一由他人误开启了液压过铁保护系统控制电源,此时液压过铁保护系统尚不会立即产生动作变化,而声光信号可以提醒操作人员立即采取自我保护措施。When the operator is operating close to the machine, others are not allowed to turn on the hydraulic control power. It is stipulated that when the control power supply of the hydraulic over-iron protection system is turned on, it must be turned on with a key, and an audible and visual signal that lasts for several seconds is required. In case someone accidentally turns on the control power of the hydraulic iron over-iron protection system, the hydraulic over-iron protection system will not immediately change its action, but the sound and light signal can remind the operator to take immediate self-protection measures.
本发明的重型液压颚式破碎机的操作方法包括下列步骤:The operation method of the heavy hydraulic jaw crusher of the present invention comprises the following steps:
a,启动液压过铁保护系统a. Start the hydraulic over-iron protection system
将液压过铁保护系统的电源开关旋转到电源开的位置;Turn the power switch of the hydraulic over-iron protection system to the power on position;
-选择地启动两个柱塞泵之一,即A、B泵之一;- Selectively activate one of the two plunger pumps, one of the A and B pumps;
-当柱塞泵运行时,齿轮泵(循环泵)同时运行;- When the plunger pump is running, the gear pump (circulation pump) is running at the same time;
b,系统自动工作运行b. The system works automatically
-就地控制,就地柜选择中控控制,选择中控控制就地操作无效;- On-site control, select the central control control for the local cabinet, and the local operation is invalid if the central control control is selected;
-在柱塞泵运行后,换向阀19、22、27的7DT、4DT、2DT同时得电,主液压缸退,退到排料口250mm处,压力传感器34压力信号达到19MPa,传感器34高压指示灯亮,换向阀的7DT、4DT、2DT电磁阀同时失电,主液压缸停;-After the plunger pump is running, the 7DT, 4DT, and 2DT of the reversing
-点动系统工作按钮,换向阀的7DT、4DT、1DT电磁阀同时得电主液压缸进,1分钟后,压力传感器30压力信号应达到18MPa(如≤18MPa声光报警),发出主机开信号,破碎机制动器松闸,破碎机运行,同时发出喂料机喂料信号;- Jog the working button of the system, and the 7DT, 4DT, and 1DT solenoid valves of the directional valve are simultaneously powered into the main hydraulic cylinder. After 1 minute, the pressure signal of the
-当破碎机运行后,压力传感器30压力信号达到18MPa时,换向阀的7DT、4DT、1DT可同时失电主液压缸停;如果一段时间工作后,压力传感器30压力信号下降到17.5MPa时,换向阀的7DT、4DT、1DT同时得电主液压缸进,压力传感器30压力信号达到18MPa时,换向阀的7DT、4DT、1DT同时失电主液压缸停,依次往复;- After the crusher is running, when the pressure signal of the
c,系统停止运行c, the system stops running
-按系统停止按钮;- press the system stop button;
-发出停止喂料信号;- signal to stop feeding;
-15秒钟后破碎机停止运行,2分钟后破碎机制动器抱闸;- The crusher stops running after 15 seconds, and the brake of the crusher is locked after 2 minutes;
-破碎机停稳后,换向阀的7DT、4DT、2DT同时得电,主液压缸退,当主液压缸退到排料口250mm处,压力传感器34压力信号>19MPa,换向阀的7DT、4DT、2DT同时失电主液压缸退停;- After the crusher stops, the 7DT, 4DT and 2DT of the reversing valve are energized at the same time, and the main hydraulic cylinder is retracted. When 4DT and 2DT lose power at the same time, the main hydraulic cylinder stops;
-系统退出自动控制状态。-The system exits the automatic control state.
所述步骤c,系统停止运行为系统急停,In the step c, the system stop operation is an emergency stop of the system,
-在系统自动运行情况下,按急停按钮;- When the system is running automatically, press the emergency stop button;
-发出停止喂料信号;- signal to stop feeding;
-破碎机停止运行,2分钟后破碎机制动器抱闸;- The crusher stops running, and the brake of the crusher is locked after 2 minutes;
-全部电磁阀失电;- All solenoid valves are de-energized;
-系统退出自动控制状态。-The system exits the automatic control state.
所述步骤b,系统自动工作运行中,破碎机在破碎过程中如果遇到非破碎物时,In step b, when the system is running automatically, if the crusher encounters non-broken objects during the crushing process,
-压力传感器30压力信号>18.5MPa,发出停止喂料信号,同时过铁声光报警,10秒钟后,液压缸的7DT、4DT、2DT同时得电,主液压缸退,当主液压缸退到排料口250mm处,压力传感器34压力信号>19MPa,换向阀的2DT失电,换向阀的7DT、4DT、1DT同时得电,主液压缸进;-The pressure signal of the
-主液压缸进1分钟后,压力传感器30压力信号≥18MPa,表明非破碎物已从排料口排出,发出喂料机喂料信号。- After the main hydraulic cylinder enters for 1 minute, the pressure signal of the
所述步骤b,所述遇到非破碎物为超大破碎物时,In the step b, when the non-broken object is an oversized broken object,
-主液压缸进30秒钟内,压力传感器30压力信号>19MPa,表示碰到超大破碎物,破碎机马上停止运行,2分钟后破碎机制动器抱闸,- Within 30 seconds after the main hydraulic cylinder enters, if the pressure signal of the
-破碎机停稳后发出手动控制,就地手动按动按钮,退主液压缸到排料口250mm处,然后就地退50mm主液压缸退至行程终端,停止所有设备,把电门钥匙开关旋转到电源关位置,取下钥匙,人工取非破碎物。-After the crusher stops, manual control is issued, manually press the button on the spot, retract the main hydraulic cylinder to the discharge port 250mm, then retract the main hydraulic cylinder by 50mm to the end of the stroke, stop all equipment, and switch the electric door key Rotate to the power off position, take off the key, and manually remove non-broken objects.
所述步骤a,启动液压过铁保护系统后,In step a, after starting the hydraulic over-iron protection system,
-当柱塞泵(液压泵)运行后,干油泵自动运行20分钟,停止300分钟;- When the plunger pump (hydraulic pump) is running, the dry oil pump will automatically run for 20 minutes and stop for 300 minutes;
-干油换向电磁阀得电20分钟后失电,当干油泵循环三周期,干油换向电磁阀循环一次。-The dry oil reversing solenoid valve is powered off after 20 minutes. When the dry oil pump cycles for three cycles, the dry oil reversing solenoid valve cycles once.
所述步骤a,在齿轮泵(循环泵)同时运行,当油温<25℃时,加热器加热,当油温≥32℃时,加热器停止加热,当油温≥65℃时,高温声光报警并停泵,发出停止喂料信号,破碎机停止运行,2分钟后破碎机制动器抱闸,全部电磁阀失电,系统退出自动控制状态。In the step a, the gear pump (circulation pump) is running at the same time. When the oil temperature is <25°C, the heater is heated; when the oil temperature is ≥32°C, the heater is stopped; when the oil temperature is ≥65°C, the high-temperature Light alarm and stop the pump, send a signal to stop feeding, the crusher stops running, and after 2 minutes, the brake of the crusher is locked, all solenoid valves are de-energized, and the system exits the automatic control state.
所述步骤c,在系统停止运行或系统急停后,可对排料口调整,其步骤包括:In the step c, after the system stops running or the system stops suddenly, the discharge port can be adjusted, and the steps include:
-破碎机停止,主液压缸退至排料口250mm处,34压力传感器高压指示灯亮。- The crusher stops, the main hydraulic cylinder retreats to 250mm from the discharge port, and the high pressure indicator light of the 34 pressure sensor is on.
破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到关位置,取下钥匙随身携带,卸下活塞杆与调整垫片的机械连接;Rotate the solenoid valve switch key switch on the on-site operation button box of the crusher to the off position, take off the key and carry it with you, and remove the mechanical connection between the piston rod and the adjusting gasket;
-插上钥匙,把破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到开位置;把破碎机现场操作按钮盒上的调整开关旋转到开位置,点动辅助液压缸进按钮,声光报警,再次点动辅助液压缸进按钮,7DT、5DT加电副缸进;-Insert the key, turn the solenoid valve switch key switch on the on-site operation button box of the crusher to the on position; turn the adjustment switch on the on-site operation button box of the crusher to the on position, and press the auxiliary hydraulic cylinder to enter the button. Light alarm, jog the auxiliary hydraulic cylinder advance button again, 7DT, 5DT power up the auxiliary cylinder to advance;
-破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到关位置,取下钥匙随身携带,手动调整垫片;- Rotate the solenoid valve switch key switch on the on-site operation button box of the crusher to the off position, take off the key and carry it with you, and manually adjust the gasket;
-插上钥匙,把破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到开位置;把破碎机现场操作按钮盒上的调整开关旋转到开位置,点动副缸退按钮,声光报警,再次点动副缸退按钮,7DT、6DT加电副缸退;-Insert the key, turn the solenoid valve switch key switch on the on-site operation button box of the crusher to the open position; turn the adjustment switch on the on-site operation button box of the crusher to the on position, and press the back button of the auxiliary cylinder, the sound and light Alarm, press the auxiliary cylinder back button again, 7DT, 6DT power on the auxiliary cylinder back;
-破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到关位置,取下钥匙随身携带,完成活塞杆与调整垫片的机械连接;- Rotate the solenoid valve switch key switch on the on-site operation button box of the crusher to the off position, take off the key and carry it with you, and complete the mechanical connection between the piston rod and the adjusting gasket;
-插上钥匙,把破碎机现场操作按钮盒上的电磁阀电门钥匙开关旋转到开位置;把破碎机现场操作按钮盒上的调整开关旋转到关位置,排料口调整完毕。-Insert the key, turn the solenoid valve switch key switch on the on-site operation button box of the crusher to the open position; turn the adjustment switch on the on-site operation button box of the crusher to the off position, and the discharge opening is adjusted.
所述步骤b,系统自动工作运行中的就地控制,包括下列步骤:Said step b, the local control in the automatic work operation of the system, comprises the following steps:
-就地柜选择中控控制,选择中控控制就地操作无效;- Select the central control control for the local cabinet, and the local operation is invalid if the central control control is selected;
-可分别启动/停止A泵或B泵,A泵或B泵启动时,齿轮泵也启动,设备运行指示灯亮;- Pump A or pump B can be started/stopped separately, when pump A or pump B is started, the gear pump is also started, and the equipment running indicator light is on;
-干油泵启动/停止;干油换向电磁阀启动/停止,可以根据工况条件给设备加油,按钮按一下加油,指示灯亮,再按一下停止加油;- Start/stop the dry oil pump; start/stop the dry oil reversing solenoid valve, you can refuel the equipment according to the working conditions, press the button to refuel, the indicator light is on, press it again to stop refueling;
-点动主液压缸进按钮,换向阀的7DT、4DT、1DT同时得电主液压缸进,指示灯亮,点动主液压缸退按钮,换向阀的7DT、4DT、2DT同时得电主液压缸退,指示灯亮,当主液压缸已退至排料口250mm处,传感器34高压指示亮,点动主液压缸退按钮失效;-Jog the main hydraulic cylinder advance button, 7DT, 4DT, 1DT of the reversing valve are powered on at the same time. When the hydraulic cylinder is retracted, the indicator light is on. When the main hydraulic cylinder has retracted to 250mm from the discharge port, the high pressure indicator of the
-点动主液压缸退50mm按钮,换向阀的7DT、4DT、3DT、2DT同时得电主液压缸退,指示灯亮,退至行程终端。-Jog the main hydraulic cylinder back 50mm button, the 7DT, 4DT, 3DT, 2DT of the reversing valve will be energized at the same time, the main hydraulic cylinder will go back, the indicator light will be on, and it will go back to the end of the stroke.
所述主液压缸退至到排料口250mm处,传感器34高压指示亮,The main hydraulic cylinder retreats to 250mm from the discharge port, the
-应该点动主液压缸退50mm按钮;- The main hydraulic cylinder should be moved back 50mm button;
-当主液压缸退到排料口250mm处,传感器34高压指示亮,主液压缸进指示灯灭。- When the main hydraulic cylinder retreats to the 250mm position of the discharge port, the high pressure indicator of the
所述步骤b,系统自动工作运行时压力传感器30测得的压力过低时进行报警,此时,当处在自动控制运行时,换向阀的7DT、4DT、1DT同时得电,主液压缸进,1分钟后压力传感器30压力没达到18MPa,考虑为油泵损坏或油管破裂,切换A、B泵,如未达到18.5MPa,则关闭油泵。In the step b, when the pressure measured by the
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2007100378782ACN100569375C (en) | 2007-03-07 | 2007-03-07 | Heavy-duty hydraulic jaw crusher and its operation method |
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2007100378782ACN100569375C (en) | 2007-03-07 | 2007-03-07 | Heavy-duty hydraulic jaw crusher and its operation method |
| Publication Number | Publication Date |
|---|---|
| CN101259443A CN101259443A (en) | 2008-09-10 |
| CN100569375Ctrue CN100569375C (en) | 2009-12-16 |
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2007100378782AExpired - Fee RelatedCN100569375C (en) | 2007-03-07 | 2007-03-07 | Heavy-duty hydraulic jaw crusher and its operation method |
| Country | Link |
|---|---|
| CN (1) | CN100569375C (en) |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102210948B (en)* | 2010-04-01 | 2013-06-05 | 张民良 | Key component of flexible tube squeezer |
| US9372482B2 (en)* | 2010-05-14 | 2016-06-21 | Harnischfeger Technologies, Inc. | Predictive analysis for remote machine monitoring |
| CN102950045A (en)* | 2011-08-23 | 2013-03-06 | 洛阳宇航重工机械有限公司 | Special crusher for crushing whole anode scrap block |
| CN102889271A (en)* | 2012-11-01 | 2013-01-23 | 连云港天明装备有限公司 | Brake fluid cooling device |
| CN103846120A (en)* | 2013-05-16 | 2014-06-11 | 洛阳宇航重工机械有限公司 | Environment-friendly and energy-saving jaw type crushing machine |
| FI124752B (en)* | 2013-06-10 | 2015-01-15 | Metso Minerals Inc | REDUCTION OF SIDELIFIED DISTORTION OF THE PENDANT AT A MINERAL MATERIAL PROCESSING PLANT |
| CN103480446B (en)* | 2013-09-30 | 2015-06-17 | 唐山汇力科技有限公司 | Novel jaw crusher for crushing calcium carbide at high temperature of 400 DEG C |
| CN103934056A (en)* | 2014-03-28 | 2014-07-23 | 广西华锡集团股份有限公司再生资源分公司 | Device for fixing static jaw plate of jaw crusher |
| CN105317788B (en)* | 2014-07-25 | 2017-12-05 | 中联重科股份有限公司 | Concrete pumping equipment, and stroke control system, method and device for series oil cylinders |
| CN104646094B (en)* | 2015-02-16 | 2017-01-04 | 浙江浙矿重工股份有限公司 | A kind of jaw breaks machine |
| CN104646093B (en)* | 2015-02-16 | 2017-01-11 | 浙江浙矿重工股份有限公司 | Compound pendulum jaw type crusher |
| CN104624286B (en)* | 2015-02-16 | 2017-03-01 | 浙江浙矿重工股份有限公司 | Jaw crusher |
| CN104624287B (en)* | 2015-02-16 | 2017-03-01 | 浙江浙矿重工股份有限公司 | Jaw breaks machine |
| CN104607266B (en)* | 2015-02-16 | 2017-01-11 | 浙江浙矿重工股份有限公司 | Novel jaw crusher |
| CN105689046A (en)* | 2016-02-23 | 2016-06-22 | 海安欣凯富机械科技有限公司 | Crushing machine |
| CN108114767A (en)* | 2017-11-22 | 2018-06-05 | 徐工集团工程机械有限公司 | A kind of material crusher and its control method |
| CN110985638A (en)* | 2019-12-02 | 2020-04-10 | 中国铁道科学研究院集团有限公司通信信号研究所 | A hydraulic vehicle decelerator monitoring system |
| CN111482223A (en)* | 2020-05-09 | 2020-08-04 | 台州市久鼎金属贸易有限公司 | Jaw mechanism of jaw crusher |
| CN111468215A (en)* | 2020-05-18 | 2020-07-31 | 北京金隅琉水环保科技有限公司 | Jaw crusher |
| CN112145495B (en)* | 2020-10-28 | 2025-01-24 | 潍坊力创电子科技有限公司 | Hydraulic distributor with shut-off valve function |
| CN112547169B (en)* | 2020-12-24 | 2022-07-05 | 江西核工业建设有限公司 | Stone crusher for open-air quarries |
| CN112947618B (en)* | 2021-01-12 | 2022-08-26 | 厦门瞳川智能科技有限公司 | Intelligent socket for controlling temperature of electric blanket |
| CN112705299B (en)* | 2021-01-29 | 2022-06-07 | 宁阳辰信建材有限公司 | Outdoor mine crusher for building stone processing and assembling and using method |
| CN114130455B (en)* | 2021-11-19 | 2023-04-18 | 安徽理工大学 | Coal gangue crushing and screening integrated device and use method thereof |
| CN114439786A (en)* | 2021-12-30 | 2022-05-06 | 江苏盛鑫气动液压设备有限公司 | Small-sized hydraulic magnesium forging system |
| CN114377750B (en)* | 2022-01-17 | 2023-05-23 | 中国铁建重工集团股份有限公司 | Hydraulic control system of jaw crusher |
| CN118218100B (en)* | 2024-05-27 | 2024-08-09 | 安徽太平矿业有限公司 | Device for crushing cupronite for geological survey |
| Publication number | Publication date |
|---|---|
| CN101259443A (en) | 2008-09-10 |
| Publication | Publication Date | Title |
|---|---|---|
| CN100569375C (en) | Heavy-duty hydraulic jaw crusher and its operation method | |
| CN201020372Y (en) | Hydraulic passing-iron protective system for heavy hydraulic jaw crusher | |
| CN201020371Y (en) | Heavy hydraulic jaw crusher | |
| CN110801885B (en) | A multi-cylinder hydraulic cone crusher | |
| US7048214B2 (en) | Gyratory crusher with hydrostatic bearings | |
| US7077348B2 (en) | Vertical shaft impactor with suspended impeller | |
| CN102996146A (en) | Early warning hydraulic prop device | |
| CN107199074A (en) | A kind of double-roll crusher | |
| CN104056680A (en) | Width regulating device for discharging hole of novel cone crusher | |
| CN101259444B (en) | Discharge outlet adjustment device for heavy type hydraulic jaw crusher | |
| CN106975712A (en) | A kind of slider of hydraulic press anti-falling mechanism | |
| CN202942949U (en) | Overload protection device of jaw crusher | |
| CN204583284U (en) | The hydraulic regulation opening of jaw crusher and safeties | |
| CN203990727U (en) | A kind of Novel conical crushing machine width of discharge opening adjusting device | |
| CN201040250Y (en) | Discharge outlet adjustment device for heavy type hydraulic pressure jawbreaker | |
| CN201516537U (en) | Narrow gap automatic welding rail | |
| CN201223801Y (en) | Hydraulic jaw crusher | |
| CN207129895U (en) | Shearing type lifter | |
| CN217774230U (en) | Multi-cylinder heavy cone crusher adjusting ring assembly | |
| CN213160965U (en) | An automatic iron-passing jaw crusher | |
| CN108940418B (en) | Jaw breaker discharge gate width adjusting device and jaw breaker | |
| CN203061222U (en) | Annular hammer crusher with hydraulic cover opening mechanism | |
| CN204671952U (en) | Filter press Hydraulic Double screw rod locking pressurizer | |
| CN204261707U (en) | A kind of slag crushing hydro cone-crusher | |
| CN209023744U (en) | Salt ability of swimming ice brick machine pushes away ice production apparatus |
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee | Granted publication date:20091216 Termination date:20130307 |