Movatterモバイル変換


[0]ホーム

URL:


CA2766838A1 - Enhancing the start-up of resource recovery processes - Google Patents

Enhancing the start-up of resource recovery processes
Download PDF

Info

Publication number
CA2766838A1
CA2766838A1CA2766838ACA2766838ACA2766838A1CA 2766838 A1CA2766838 A1CA 2766838A1CA 2766838 ACA2766838 ACA 2766838ACA 2766838 ACA2766838 ACA 2766838ACA 2766838 A1CA2766838 A1CA 2766838A1
Authority
CA
Canada
Prior art keywords
well
fluid communication
injection
production well
injection well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CA2766838A
Other languages
French (fr)
Other versions
CA2766838C (en
Inventor
George R. Scott
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Imperial Oil Resources Ltd
Original Assignee
Imperial Oil Resources Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Imperial Oil Resources LtdfiledCriticalImperial Oil Resources Ltd
Priority to CA2766838ApriorityCriticalpatent/CA2766838C/en
Priority to US13/720,961prioritypatent/US20130199779A1/en
Publication of CA2766838A1publicationCriticalpatent/CA2766838A1/en
Application grantedgrantedCritical
Publication of CA2766838CpublicationCriticalpatent/CA2766838C/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

A method and systems are provided for the enhancement of a start-up of a resource recovery process. The system includes a well pair including a production well at a first elevation and an injection well at a higher elevation. The well pair is configured to force an initial fluid communication between the production well and the injection well to occur at a selected region along a completion of the production well and a completion of the injection well.

Description

iiiyi* ...-..1)õ,.0111.. 1.-. IIII, ,0 .41111111/P1.-:. . 104 .
f:: :: 1 ::4, til II 20 108 ii ii, 108-, 116 ---t 104 116I =--106 111 .:124 i---71"--------- = 138 ....:--,..-.----,¨ 102 130- 126-- 1 )134V\7-128 "" '-"<,=,:.,zz.... . ......::::::.:7 126 -Nik --% ¨ s ' -1--=,:,:'.: 'I f.:_:_E-.::-.7-_----t-- -ss 114 36 ' --124 \128 FIG. 1
2/10 210 206 ) p220 4( 212 204 ----x 1--- 1 r¨ 208 i 216 ¨, 214 ,-- 216 216 Q 216 202 ---A. 4¨ 4¨ r I ____+ __________________________ 210 ¨) Prior Art FIG. 2A
236¨ 228 ---) 226¨h _____________________________________ pow 232 ¨3, 230 ,¨ 232 ¨232, ----- r224¨k 234 --1 228 ¨I
Prior Art FIG. 2B
3/10 p316 304 ----h. 4- 4-.41 310 I 314->.._ 302 ---x- 4- 4- 4-i --+ -- -------+ .4 __ _________________________________________________________________ 306) 310 J 308 --) FIG. 3A
(320 [316 304 Thi, 4- 4-'4. ______________________________________________________________ 310 -) 314---3.>._ 302 --h. 4- 4- 4-I ---* --------* 41 1 310) 308-j FIG. 3B
4/10 (320 (316 304 ---h. 4-- 4- 4- 4- ______ 4-310 -) 314 Q>-312 302 --h. 4-- 4- 4-306 -) 310 -) 308 --) FIG. 30 ------------------------------------------- ..
404 --4. A- 4--408 -) .õ ______________ 410-]. *_____ 406 402 --h. 4-- 4- 4-408 ) FIG. 4A
5/10 ------------------------------------------- , 404 --e. 4-- 4-4081 .,õ _________ õõI
41O-3. >_406 FIG. 4B
404 ---4. 4-- 4- 4-1 _ _____________________________________________________________ 408--) 402 --11. 4-- 4--I

408 -) .--- 416 FIG. 4C
6/10 ç512 L{- 513 504 ---k. 4-- 4--I _____,,, ___0,. _____r_o. ______=. 411.

508 -) 506 -) - --Lf- 513 502 ----= 4- 4 510 -) 508) 506-"

FIG. 5 (618 f616 604 ---A. 1-I--10. 7-111- 1 --__ _____=,. 411 1 608 610 -) 614 602-*
606 --) FIG. 6
7/10 ------------------------------------------- , 704 ---a. 4-.4-- = ' =,õ
i ---+ -T--0. õ, ------------------------------------------- -,, õ , ----------, 7081}
NiIi'--.,, ----- ___________________________________________________ 1 712-J,. >-- 710 702 ---*.

FIG. 7A
7O4--*.
, ___1õ. =.. --4. ,,,, ..,, .,. ----------.._ 716 ) õ
.õ ______*, õ..
712---<> >-- 710 702 mt.

FIG. 7B
8/10 716) 712 >--716 ) FIG. 7C
9/10 810 -\
804 ----a. _____*

802-* 4---- 4-- 4 1_ 4--812 ) FIG. 8 904 906 ( 906. 906 40 4, FIG. 9
10/10 Drill Well Pair ¨ 1002 Through Reservoir .
Establish Fluid Communication ---- 1004 Between Production Well and Injection Well FIG. 10

Claims (30)

CA2766838A2012-02-062012-02-06Enhancing the start-up of resource recovery processesActiveCA2766838C (en)

Priority Applications (2)

Application NumberPriority DateFiling DateTitle
CA2766838ACA2766838C (en)2012-02-062012-02-06Enhancing the start-up of resource recovery processes
US13/720,961US20130199779A1 (en)2012-02-062012-12-19Enhancing the start-up of resource recovery processes

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CA2766838ACA2766838C (en)2012-02-062012-02-06Enhancing the start-up of resource recovery processes

Publications (2)

Publication NumberPublication Date
CA2766838A1true CA2766838A1 (en)2013-08-06
CA2766838C CA2766838C (en)2017-04-18

Family

ID=48901888

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CA2766838AActiveCA2766838C (en)2012-02-062012-02-06Enhancing the start-up of resource recovery processes

Country Status (2)

CountryLink
US (1)US20130199779A1 (en)
CA (1)CA2766838C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US9638000B2 (en)2014-07-102017-05-02Inflow Systems Inc.Method and apparatus for controlling the flow of fluids into wellbore tubulars
US10000998B2 (en)2013-12-192018-06-19Exxonmobil Upstream Research CompanyRecovery from a hydrocarbon reservoir

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CA2915596C (en)*2014-12-182023-04-25Chevron U.S.A. Inc.Method for upgrading in situ heavy oil
US10344204B2 (en)2015-04-092019-07-09Diversion Technologies, LLCGas diverter for well and reservoir stimulation
US10012064B2 (en)2015-04-092018-07-03Highlands Natural Resources, PlcGas diverter for well and reservoir stimulation
CA2900711A1 (en)2015-08-182017-02-18Statoil Canada LimitedPressure swing solvent assisted well stimulation
US10982520B2 (en)2016-04-272021-04-20Highland Natural Resources, PLCGas diverter for well and reservoir stimulation
CA2972203C (en)2017-06-292018-07-17Exxonmobil Upstream Research CompanyChasing solvent for enhanced recovery processes
CA2974712C (en)2017-07-272018-09-25Imperial Oil Resources LimitedEnhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
CA2978157C (en)2017-08-312018-10-16Exxonmobil Upstream Research CompanyThermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
CA2983541C (en)2017-10-242019-01-22Exxonmobil Upstream Research CompanySystems and methods for dynamic liquid level monitoring and control

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CA1130201A (en)*1979-07-101982-08-24Esso Resources Canada LimitedMethod for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids
US6230814B1 (en)*1999-10-142001-05-15Alberta Oil Sands Technology And Research AuthorityProcess for enhancing hydrocarbon mobility using a steam additive
US8151881B2 (en)*2009-06-022012-04-10Baker Hughes IncorporatedPermeability flow balancing within integral screen joints

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US10000998B2 (en)2013-12-192018-06-19Exxonmobil Upstream Research CompanyRecovery from a hydrocarbon reservoir
US9638000B2 (en)2014-07-102017-05-02Inflow Systems Inc.Method and apparatus for controlling the flow of fluids into wellbore tubulars

Also Published As

Publication numberPublication date
CA2766838C (en)2017-04-18
US20130199779A1 (en)2013-08-08

Similar Documents

PublicationPublication DateTitle
CA2766838A1 (en)Enhancing the start-up of resource recovery processes
RU2728615C2 (en)Underground geothermal energy extraction system
MX2019013507A (en)Well injection and production methods, apparatus and systems.
MX2017007495A (en)Compositions and methods of improving hydraulic fracture network.
WO2010092338A3 (en)Single well steam assisted gravity drainage
MX377371B (en) HYDROCARBON RECOVERY PROCESS.
WO2014116728A3 (en)Contingent continuous circulation drilling system
US20150285050A1 (en)Uplifted single well steam assisted gravity drainage system and process
MY187059A (en)Gravel pack service tool with enhanced pressure maintenance
MY192204A (en)A method of plugging and abandoning a well
SA516371568B1 (en)Well completion system and method
CN105756660A (en)Determination method of well killing occasion of pressing-back method for gas well
WO2012140445A3 (en)Subsea wellbore construction method and apparatus
CN105822257A (en)Intelligent sliding sleeve of horizontal well
CN105443098B (en)A kind of coal mine down-hole drilling segmentation fixed point hydraulic fracturing pore-fixing device and method
CN104213894A (en)Selective repeated fracturing process technology for old well of oil field
RU2019100629A (en) WELL DRILLING SYSTEM
ECSP11011128A (en) THERMAL RECOVERY OF LITTLE DEEP BETUN THROUGH PERMEABILITY INCLUSIONS.
CN104563997A (en)Hydraulic jet and bridge plug combined process pipe column and working method thereof
GB2534293A (en)Sand control assemblies including flow rate regulators
CN110344801B (en)Fracturing operation method for combustible ice exploitation, exploitation method and exploitation system
MX2015014461A (en)System and methods for recovering hydrocarbons.
WO2012112926A3 (en)Method for strengthening a wellbore
CN102182439B (en)Balanced-pressure perforation/negative-pressure backflow process
CN103541679A (en)Method for sealing underground hydraulic fracture drilled hole of coal mine in combined manner

Legal Events

DateCodeTitleDescription
EEERExamination request

Effective date:20150728


[8]ページ先頭

©2009-2025 Movatter.jp