Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stara S A Ind De Implementos AfiledCriticalStara S A Ind De Implementos A
Priority to BRPI0605229priorityCriticalpatent/BRPI0605229A/en
Publication of BRPI0605229ApublicationCriticalpatent/BRPI0605229A/en
BRPI06052292006-11-292006-11-29 agricultural implement for soil decompression, with density mapping and geo referencing controlled executionBRPI0605229A (en)
Comparison of WaSiM-ETH 6.4 and 7.5 with regard to the influences of different landuse and tillage practice on runoff formation and runoff concentration