Uh oh!
There was an error while loading.Please reload this page.
- Notifications
You must be signed in to change notification settings - Fork1.9k
feat(b-calendar): add a parameter to the calendar to display 6 weeks#7155
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to ourterms of service andprivacy statement. We’ll occasionally send you account related emails.
Already on GitHub?Sign in to your account
base:dev
Are you sure you want to change the base?
Uh oh!
There was an error while loading.Please reload this page.
Conversation
…weeksThis parameter will force the calendar to display 6 weeks, even when themonth cover only 5 weeks. This prevent any layout shift when navigatingfrom month to month.
vercelbot commentedJun 9, 2023 • edited
Loading Uh oh!
There was an error while loading.Please reload this page.
edited
Uh oh!
There was an error while loading.Please reload this page.
The latest updates on your projects. Learn more aboutVercel for Git ↗︎
|
codesandbox-cibot commentedJun 9, 2023 • edited
Loading Uh oh!
There was an error while loading.Please reload this page.
edited
Uh oh!
There was an error while loading.Please reload this page.
This pull request is automatically built and testable inCodeSandbox. To see build info of the built libraries, clickhere or the icon next to each commit SHA. Latest deployment of this branch, based on commit0707844:
|
codecovbot commentedJun 9, 2023 • edited
Loading Uh oh!
There was an error while loading.Please reload this page.
edited
Uh oh!
There was an error while loading.Please reload this page.
Codecov ReportAll modified and coverable lines are covered by tests ✅
Additional details and impacted files@@ Coverage Diff @@## dev #7155 +/- ##========================================= Coverage 100.00% 100.00% ========================================= Files 305 305 Lines 10453 10453 Branches 2551 2551 ========================================= Hits 10453 10453
Flags with carried forward coverage won't be shown.Click here to find out more. ☔ View full report in Codecov by Sentry. |
Uh oh!
There was an error while loading.Please reload this page.
Describe the PR
This parameter will force the calendar to display 6 weeks, even when the month cover only 5 weeks. This prevent any layout shift when navigating from month to month.
This is also a fix for#5326
PR checklist
What kind of change does this PR introduce? (check at least one)
fix(...)
, requires a patch version updatefeat(...)
, requires a minor version updatefeat(...)
, requires a minor version updatefix(...)
, requires a patch or minor version updatechore(docs)
, requires a patch version updateDoes this PR introduce a breaking change? (check one)
The PR fulfills these requirements:
dev
branch,not themaster
branch[...] (fixes #xxx[,#xxx])
, where "xxx" is the issue number)fix(alert): not alerting during SSR render
,docs(badge): update pill examples
,chore(docs): fix typo in README
, etc.).This is very important, as theCHANGELOG
is generated from these messages, and determines the next version type (patch or minor).If new features/enhancement/fixes are added or changed:
If adding a new feature, or changing the functionality of an existing feature, the PR's
description above includes: