2022 July 13, Howard Johnston, “Regional News: Eastern”, inRAIL, number961, page32:
Barrow Haven: The replacement £1.3 million single platform, alongside the installation of waiting shelter andcycle racks at the Barton-on-Humber branch station, should be operational by early August.