| General information | ||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Location | Jianguomen Outer Street and Dongdaqiao Road (东大桥路) Jianwai Subdistrict,Chaoyang District,Beijing China | |||||||||||||||||||||||||
| Coordinates | 39°54′30″N116°27′02″E / 39.908454°N 116.450497°E /39.908454; 116.450497 | |||||||||||||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited (Line 1) Beijing MTR (Line 17) | |||||||||||||||||||||||||
| Lines | ||||||||||||||||||||||||||
| Platforms | 4 (2island platforms) | |||||||||||||||||||||||||
| Tracks | 4 | |||||||||||||||||||||||||
| Construction | ||||||||||||||||||||||||||
| Structure type | Underground | |||||||||||||||||||||||||
| Accessible | Yes | |||||||||||||||||||||||||
| Other information | ||||||||||||||||||||||||||
| Station code | 121 | |||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||
| Opened | ||||||||||||||||||||||||||
| Services | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
Yong'an Li station[1] (Chinese:永安里站;pinyin:Yǒng'ān Lǐ zhàn) is aninterchange station betweenLine 1 andLine 17 of theBeijing Subway. The Line 1 station opened on September 28, 1999, and the Line 17 station opened on December 27, 2025.[2]Automatic platform gates were installed on the Line 1 platforms on July 18, 2016, making it the first station on Line 1 to install platform gates.
The station has undergroundisland platforms for both Line 1 and Line 17.
There are 7 exits, lettered A, B, C, E, F and G. Exit C is accessible via a stairlift and Exits E and F are accessible via elevators. There is also an unlettered exit that leads to The Exchange Twin Towers. (Chinese: 汇京双子座大厦)[3]
In long-term planning,Line 20 will stop at this station.[4]
2025年12月27日(周六)首班车起,地铁17号线中段(工人体育场—十里河)、18号线(马连洼—天通苑东)、6号线南延(潞城—潞阳)等3条(段)城市轨道交通新线将开通试运营[Starting from the first train on Saturday, December 27, 2025, three new urban rail transit lines (sections) will open for trial operation:the middle section of Metro Line 17 (Workers' Stadium - Shilihe), Line 18 (Malianwa - Tiantongyuandong), and the southern extension of Line 6 (Lucheng - Luyang).]
This article related to theBeijing Subway is astub. You can help Wikipedia byadding missing information. |