Renewable energy technology in Scotland

Whitelee Wind Farm with theIsle of Arran in the background.
Ardrossan Wind Farm from Portencross, just after sunrise

Wind power is the fastest-growingrenewable energy technology inScotland, with 17,7 megawatts (MW) of installed wind powercapacity by Q2 2025. This included 10,4 MW from onshore wind in Scotland and 4,3 MW of offshore wind generators.[1] The largest onshore wind farm in the UK isWhitelee, just south ofGlasgow, with 215 turbines and a total capacity of 539 MW.

There is further potential for expansion, especially offshore given the high average wind speeds, and a number of large offshore wind farms are planned. As offshore wind farms are moving into deeper water,floating wind turbines are being used.Hywind Scotland off the coast of Peterhead was the world's first floating offshore wind farm, commissioned in October 2017.[2]

Targets

[edit]

TheScottish Government has achieved its target of generating 50% of Scotland's electricity fromrenewable energy by 2015, and hoped to achieve 100% by 2020, which was raised from the lower target of 50% in September 2010.[3] The majority of this was expected to come from wind power.[4] Renewables produced the equivalent of 113% of Scotland's electricity consumption in 2022, mostly from wind.[5]

The target for 2030, made in 2023, was for 11GW of offshore wind by 2030. This would represent an increase of 400% in offshore wind and a 60% increase in total wind generated power[6] and form part of the 50GW ofoffshore wind planned by the UK by 2030.[7] The EUNorth Seas Energy Cooperation group plans on having 76GW in the North Sea by 2030.[8]

In January 2026, the target for offshore wind in Scotland was increased to 40 GW by 2040. This was announced by the Cabinet Secretary for Climate Action and Energy,Gillian Martin at the Scottish Renewables Offshore Wind Conference in Glasgow.[9]

Historical installations

[edit]

Thewind turbine was invented byJames Blyth and installed at his home inMarykirk in theMearns, in 1887, leading to a second being installed at the Montrose Lunatic Asylum in 1895 at theSunnyside Royal Hospital.

The first recorded public electricity system was installed onWormit hill to supply the houses built by Alexander Stewart who built much of the village[10] This initially consisted of a "windmill" on Wormit Hill and backup steam generator before replacement with a diesel generator in the 1930s.

Contribution to the Scottish power grid

[edit]

On Sunday 7 August 2016, a combination of high wind and low consumption caused more wind power generation (106%) than consumption in Scotland. Scottish wind turbines provided 39,545 MWh during the 24 hours of that date, while consumption was 37,202 MWh. It was the first time that measurements were available to confirm that fact. Renewables produced the equivalent of 97.4% of Scotland's electricity consumption in 2020, mostly from wind.[11] In 2020, 3.6 TWh of Scottish wind power wascurtailed.[12]

In 2004, wind power produced nearly 850 GWh of electricity in Scotland, around 1.7% of all generation, and by 2010,this had increased to nearly 4.9 TWh (9.9%). In 2017, wind generated over a quarter (27%) of the electricity in Scotland. In 2020 it was 23.1 TWh (45%), although this dropped in 2021 to 19.9 TWh (42%). In 2022, wind generation in Scotland reached 28.8 TWh (55%). Over this period, the total annual electricity generation in Scotland has remained fairly constant, at around 50 TWh.[13]

Graph showing wind generation in Scotland increasing from 1.2TWh (2.6%) in 2005 to nearly 28TWh (55%) in 2022
Graph showing total (TWh, blue crosses, left axis) and share (%, green dots, right axis) of wind power generation in Scotland from 2005 to 2022.[13]

Large wind farms

[edit]

Black Law Wind Farm

[edit]
Two of the wind turbines at the Black Law Wind Farm

The 54-turbineBlack Law Wind Farm has a total capacity of 124 MW.[14] It is located near Forth in Lanarkshire and was built on oldopencast coalmine site, with an original capacity of 97 MW[15] from 42 turbines. It employs seven permanent staff on site and created 200 jobs during construction. A second phase saw the installation of a further 12 turbines. The project has received wide recognition for its contribution to environmental objectives.[15] Over the period April 2009 to March 2010, Black Law Wind Farm produced 19.19% of its rated capacity.[16]

Braes of Doune Wind Farm

[edit]

TheBraes of Doune Wind Farm opened in 2007 and is located close toStirling. The wind farm has 36Vestas 2 MW wind turbines. The farm was built and is run byAirtricity.[17]

Clyde Wind Farm

[edit]
Clyde Wind Farm

TheClyde Wind Farm is a 522 MW wind farm nearAbington inSouth Lanarkshire, Scotland. The 152-turbine project byScottish and Southern Energy,[18] which was approved by theScottish Parliament in July 2008, is capable of powering 300,000 homes.[19] Turbines have been built either side of theM74 motorway.[20] Construction of the wind farm, which is budgeted for £600 million, started in early 2009 and finished in 2012.[21] The farm was opened at a ceremonial ribbon cutting by First Minister of ScotlandAlex Salmond in September 2012.[22]

Crystal Rig Wind Farm

[edit]

Crystal Rig Wind Farm is an operational onshore wind farm located on theLammermuir Hills in theScottish Borders region of Scotland. When it was completed in May 2004 it was the largest wind farm in Scotland. As a result of 3 extensions it is currently the 2nd largest wind farm in the UK, both in terms of nameplate capacity and number of turbines. The whole site has 85 turbines and a nameplate capacity of 200.5 MW.

Farr Wind Farm

[edit]

Farr Wind Farm is located some 10 miles south ofInverness, and comprises 40 wind turbines with a total installed capacity of 92 MW. Every year the wind farm generates enough clean electricity to meet the average annual needs of some 54,000 homes.[23]

Hadyard Hill Wind Farm

[edit]
Hadyard Hill wind farm. Located on the B734 between Old Dailly and Barr.

Hadyard Hill Wind Farm, owned and operated byScottish and Southern Energy (SSE), became the first wind farm in the UK with a capacity of over 100 MW. The 120 MW, 52-turbine wind farm in South Ayrshire cost £85 million and in a year generates enough electricity to power 80,000 homes, sufficient to supply every household in a city the size of York. The production of zero carbon electricity at the wind farm is expected to reduce emissions of carbon dioxide by almost 300,000 tonnes a year, equivalent to taking 70,000 cars off the road.[24]

Novar Wind Farm

[edit]

Novar Wind Farm is a 50 turbine, 53.8MW wind farm located in the Scottish Highlands. Constructed in 1997, Novar was of the earlier developments of Scottish on-shore wind generation. It provided a significant contribution to the local economy during construction and through its Community Benefit Fund. In 2010 an additional 16 turbines were constructed taking the yearly generation capacity to 53.8MW.

Viking Wind Farm

[edit]

TheViking Wind Farm in the Shetland Islands was first proposed as a 600 MW 150 turbine project in 2009. After reduction in scope due to environmental concerns about effects of wildlife andpeat bog carbon release during construction, as well as potential interference with equipment atScatsta Airport the scheme was approved in 2012 as a 103 turbine scheme of 370 MW.[25][26][27] The scheme is expected to achieve highcapacity factors due to wind conditions in Shetland, as the Burradale has a capacity factor just over 50%.[28] A high-voltage cable was laid to link Shetland to the UK electricity grid. The subsea cable and 103 turbine scheme capable of generating 443 MW was completed in August 2024.[29]

Whitelee Wind Farm

[edit]

Whitelee Wind Farm, near Eaglesham,East Renfrewshire is the largest on-shorewind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 MW.[30]

There are many other large onshorewind farms in Scotland, at various stages of development, including some that are incommunity ownership.

A panoramic view of the Whitelee wind farm with Lochgoin Reservoir in the foreground.

Under construction or proposed

[edit]

Whitelaw Brae Wind Farm

[edit]

Whitelaw Brae windfarm is located approximately 3 miles south of Tweedsmuir in the Scottish Borders. It is planned to commence generation in winter 2026/27. The windfarm is funded using a co-operative model by Ripple Energy,[31] allowing for small investments from individuals based on offsetting their own annual electricity consumption. According to project developers BayWa r.e.[32] Whitelaw Brae Wind Farm will feature up to 14 turbines with an expected generating capacity of up to 57 MW, which is enough energy to supply approximately 43,000 homes.

Lethans Wind Farm

[edit]

Lethans Wind Farm, east of New Cumnock was approved in 2020 as the tallest wind farm at 220m with 22 turbines with a capacity of 105MW.[33]

Offshore wind farms

[edit]
This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(May 2024)
REpower 5 MW wind turbine under construction at Nigg fabrication yard on theCromarty Firth

Scotland is the home to two offshore wind demonstration projects: The two turbine, 10 MWBeatrice Demonstrator Project located in theMoray Firth, and the single turbine, 7 MW Fife Energy Park Offshore Demonstration Wind Turbine in theFirth of Forth. There are also several other commercial-scale and demonstration projects in the planning stages.[34]

Scotland's first offshore wind turbine was placed near the Beatrice Oil Field, 24 km (15 mi; 13 nmi) off the east coast in the Moray Firth,North Sea, in August 2006. This was the world's largest wind turbine at the time, anREpower 5M, with a maximum output of 5 MW. A second identical turbine joined it and the wind farm began supplying electricity in August 2007.[35] As of February 2010,Beatrice Wind Farm is the deepest and northernmost offshore wind installation in the world.[36]

This was the first time such large offshore wind turbines had been tested, and the first time any wind turbine generators have been assembled in such deep (44 metres) water.[37] Such large wind turbine generators are ideally suited to the offshore environment due to high consistent wind speeds and minimal turbulence. According to historical measures of wind speeds at the Beatrice offshore location, it is expected that the turbines will run 96% of the time (8440 hours per year), and at 10 MW full power 38% of the time (3300 hours per year).[37]

In January 2010 contracts were awarded for a major expansion of offshore wind power in the seas around Scotland. Moray Offshore Renewables will develop offshore wind power in theMoray Firth, and SeaGreen Wind Energy will develop offshore wind in theFirth of Forth. These developments could lead to 1,000 new wind turbines generating nearly 5,000 MW of power. Jobs "could also be created in manufacturing, research, engineering, installation, operation and services".[38] In July 2016,RSPB challenged development in the Firth of Forth andFirth of Tay.[39][40]

ScotWind leasing round

[edit]

In January 2022, results of the ScotWind leasing round were announced byCrown Estate Scotland who manage the seabed off the coast of Scotland. Seventeen projects totalling around 25 GW were awarded option agreements, which could raise £700m in option fees. While noting offshore wind has a role to plan in addressing climate change, RSPB Scotland criticised the projects, claiming they could kill hundreds of seabird.[41] In August 2022, a further 2.8 GW from three three floating wind projects to the east ofShetland were awarded in the clearing process.[42] The Scottish Government faced some criticism it was undervaluing the seabed, initially setting the option agreements at up to £10k per km2 although this was revised to £100k per km2 before the auction. Crown Estate Scotland expects that the rent paid by projects that get built, at £1.07 per MWh produced would be more than the £756m in option fees.[43]

INTOG leasing round

[edit]

In 2022, Crown Estate Scotland announced a further leasing round for Innovation and Targeted Oil & Gas (INTOG) projects. Rather than just supplying electricity to the National Grid, these were to help decarbonise North Sea hydrocarbon production. This offered two "pots", firstly for small (less than 100 MW) innovative deep water wind arrays, the "IN" part of INTOG. Secondly, larger Targeted Oil & Gas (TOG) farms supplying power to existing offshore infrastructure.[44][45]

Thirteen projects were offered exclusivity agreements in March 2023.[45] All five small scale innovation (IN) projects with a total capacity of 449 MW signed these by May 2023.[46] In November, seven of the eight TOG projects signed the exclusivity agreements.[47] These projects can now progress with the planning and design stages.

List of INTOG offshore wind projects under development[48][49]
Project namePotential power (MW)Lead developerIN/TOGLocation
Aspen1,008Cerulean WindsTOG
Beech1,008TOG
Cedar1,008TOG
Cenos1,350Flotation EnergyTOG
Culzean3TotalEnergiesTOG
Flora50BP Alternative Energy InvestmentsINEast ofPeterhead
Green Volt560Flotation EnergyTOG
Judy15Harbour EnergyTOG
Malin Sea Wind100ESB GroupINBetweenIslay andPortrush.[50]
Salamander100Simply Blue EnergyINEast ofFraserburgh
Scaraben99.45BlueFloat Energy/Renantis partnershipIN47 km (29 mi) north of Fraserburgh.[51]
Sinclair99.45IN

List of offshore wind farms

[edit]
See also:List of offshore wind farms in the United Kingdom

The complete list of sites including power updates and developer name changes:

Wind farms in Scottish waters
Site NamePotential
power (MW)
DeveloperNotes
Robin Rigg Wind Farm180StatoilSited at Robin Rigg, a sandbank midway between theGalloway andCumbrian coasts in theSolway Firth.
60 Vestas V90-3MW wind turbines[52]
Beatrice588SSE Renewables plc andTalisman EnergySSE owns 40%,Copenhagen Infrastructure Partners (CIP) (35%) and SDIC Power (25%). Application approved by Marine Scotland in March 2014, Construction to begin early 2017.[53] Fully operational in June 2019[54]
Inch Cape(1000)Repsol Nuevas Energias SA
EDP Renewables
Repsol owns 51%, EDPR owns 49%. Application approved by Marine Scotland in October 2014.
72 V236-15.0 MW turbines.
Hywind Scotland30Statoilfloating wind farm 15 miles (24 km) offPeterhead Constructed between July and September 2017, power generation started in October 2017.[55][56][57][58] As of 2021[update], it has averaged acapacity factor in excess of 50%.[59]
Seagreen Offshore Wind Farm1,075SSE Renewables114 Vestas V164-10.0 MW turbines
27km off the Angus coast in the North Sea’s Firth of Forth
Operational from October 2023[60]
Neart Na Gaoithe(450)Mainstream Renewable Power LtdApplication approved by Marine Scotland in October 2014. Scheduled for 2024[61]
Moray East950Ocean Winds,KEPCO,Mitsubishi CorporationOperational as of 2021[62]
Moray West(882)Scheduled for 2025[63]
IslaySSE RenewablesNo further investment from SSE into the project for the foreseeable future.[64]
Solway FirthE.ON Climate & Renewables UK DevelopmentsDormant – Unsuitable for development
Wigtown BayDONG Wind (UK)Dormant – Unsuitable for development
KintyreAirtricity Holdings (UK) LtdCancelled due to proximity to local communities andCampbeltown Airport[65]
Forth ArrayFred. Olsen Renewables LtdCancelled. Fred. Olsen pulled out to concentrate on its onshore developments[66]
Bell RockAirtricity Holdings (UK) Ltd
Fluor Ltd
Cancelled due to radar services in the area.[67]
Argyll ArrayScottishPower RenewablesCancelled due to ground conditions and presence of basking sharks[68]
Total2,200

Community ownership of wind farms

[edit]
See also:Community wind energy andLocal Energy Scotland
The wind turbines at Findhorn, which make the Ecovillage a net exporter of electricity.

Community-owned schemes in Scotland include one on theIsle of Gigha. The Heritage Trust set up Gigha Renewable Energy to buy and operate threeVestas V27wind turbines, known locally asThe Dancing Ladies orCreideas, Dòchas is Carthannas (Gaelic forFaith, Hope and Charity).[69] They were commissioned on 21 January 2005 and are capable of generating up to 675 kW of power. Revenue is produced by selling the electricity to the grid via an intermediary called Green Energy UK. Gigha residents control the whole project and profits are reinvested in the community.[70]

Findhorn Ecovillage has four Vestas wind turbines which can generate up to 750 kW. These make the community net exporters of renewably generated electricity. Most of the generation is used on-site with any surplus exported to theNational Grid.[71]

Boyndie Wind Farm Co-operative is part of theEnergy4All group, which promotes community ownership.[72] A number of other schemes supported byCommunity Energy Scotland are in the pipeline.

Debate

[edit]

The siting of turbines is often an issue, but multiple surveys have shown high local community acceptance for wind power in Scotland.[73][74][75] Existing public policy with regard to wind power has become a topic of debate in recent years.

Public opinion surveys

[edit]
Which should be increased in Scotland?[76]

In 2003,MORI Scotland was commissioned by theScottish Executive to undertake a study examining the attitudes of people living close to Scottish wind farms. The survey showed that people living near Scotland's ten largest wind farms strongly support more of Scotland's energy needs being produced by the wind. 82% wanted an increase in electricity generated from wind power, whilst more than 50% supported an increase in the number of wind turbines at their local wind farm. 20% say their local wind farm has had a broadly positive impact on the area, as opposed to a negative impact (7%).[74]

A survey conducted in 2005, and commissioned by the renewable energy industry, showed that 74% of people in Scotland agree that wind farms are necessary to meet current and future energy needs. When people were asked the same question in a Scottish Renewables study conducted in 2010, 78% agreed. The increase is significant as there were twice as many wind farms in 2010 as there were in 2005. The 2010 survey also showed that 52% disagreed with the statement that wind farms are "ugly and a blot on the landscape". 59% agreed that wind farms were necessary and that how they looked was unimportant. The 2010 study suggests that the majority of people in Scotland are in support ofsustainable energy. However this survey has been widely criticised for its methodology, in that it used a weighting scale such that the opinion those who lived nearer windfarms was rated as of lesser importance.[73][77][78]

In 2013, a YouGov energy survey concluded that:

New YouGov research for Scottish Renewables shows Scots are twice as likely to favour wind power over nuclear or shale gas Over six in ten (62%) people in Scotland say they would support large scale wind projects in their local area, more than double the number who said they would be generally for shale gas (24%) and almost twice as much as nuclear (32%). Hydro power is the most popular energy source for large scale projects in Scotland, with an overwhelming majority (80%) being in favour.[79]

In 2022, an official survey found that 80% of Scots approve of offshore wind farms.[80]

Aesthetics and environmental issues

[edit]
TheArdrossan Wind Farm

Siting of wind turbines has sometimes been an issue, as most people are concerned about the value of natural landscapes. TheJohn Muir Trust has stated that "the best renewable energy options around wild land are small-scale, sensitively sited and adjacent to the communities directly benefiting from them".[81][82] A small-scale scheme proposed byNorth Harris development trust has been supported by the John Muir Trust.[83] A 2013 poll carried out by the John Muir Trust, suggests that 75% of Scots would like to see their wild areas protected from further development.[84][85] Wind farm developers sometimes offer "community benefit funds" to help address any disadvantages faced by those living adjacent to wind farms.[86][87][88]

TheArdrossan Wind Farm on the west coast of Scotland has been "overwhelmingly accepted by local people".[89] Instead of spoiling the landscape, local people believe it has enhanced the area. According to one of the town's councillors: "The turbines are impressive looking, bring a calming effect to the town and, contrary to the belief that they would be noisy, we have found them to be silent workhorses".[89]

The £90 millionBlack Law Wind Farm is located nearForth in Lanarkshire and has been built on an oldopencast coalmine site which was completely restored to shallow wetlands during the construction programme. It employs seven permanent staff on site and created 200 jobs during construction.[15]

However, concerns over inappropriate siting of turbines has been voiced by groups in Fife, in particular, where the number of planning applications for turbines has risen sharply.[90] This also is true ofBerwickshire, which is home to the second largest windfarm in the UK,Crystal Rig Wind Farm, and where hundreds more turbines are due to be situated, contrary to the wishes of many residents of the county, and theJohn Muir Trust.[91][92][93]

Also, the siting of turbines in environmentally sensitive areas has led to the deaths of migratory and native birds, such as onHarris where a rare visitor to Scotland, awhite-throated needletail was witnessed being killed by a turbine.[94]

Inevitably carbon emissions are produced during construction and transport. Manufacturers typically state that carbon emissions are 'paid back' within 3–18 months of production, but recent research claims that turbines located onpeat bogs create incidental emissions that may increase this to 8 years or more.[95] A 2013 financial analysis of utility companies such as theSSE (formerly Scottish and Southern Electricity) concluded that utilities were haemorrhaging cash. Construction of wind farms by the electrical generating industry lead to duplication of existing power plants which were still needed as backup without increasing the utilities customer base or their output.[96]

Scottish Natural Heritage has stated that the decommissioning of ageing turbine structures in the future would be more deleterious to the environment than leaving the bases in place, thus littering Scotland's wild land with concrete which though they could be covered with topsoil, could lead to "oxidising and subsequent staining/contamination" and would lead to irreversible damage to the sensitivepeatlands on which many are built. Alternatively, new wind farms could be built on the same site, minimising overall damage.[97]

Tourism impacts

[edit]
[icon]
This sectionneeds expansion. You can help byadding missing information.(July 2012)
See also:Wind turbines on public display

Some Scottish wind farms have become tourist attractions. According to a 2002 poll carried out by MORI Scotland, "nine out of ten tourists visiting some of Scotland's top beauty spots say the presence of wind farms makes no difference to the enjoyment of their holiday, and twice as many people would return to an area because of the presence of a wind farm than would stay away". The Whitelee Wind Farm Visitor Centre has an exhibition room, a learning hub, a café with a viewing deck and also a shop. It is run by theGlasgow Science Centre.[98]

Economic impact studies have also been undertaken that looked at the impact of the development of onshore wind on the local tourism sector.[99] This found that wind farms did not harm the employment in the tourism sector in the areas surrounding wind farm and in fact, in the majority of the case studies the tourism sector in the immediate local area performed better than in the wider local authority.

A 2016 study found no connection between tourism and wind power.[100]

Wind variability

[edit]
Main article:Wind Power variability

Most turbines in the European Union produce electricity at an average of 25% of their rated maximum power due to thevariability of wind resources,[101] but Scotland's wind regime provides averagecapacity factor of 31% or higher on the west and northern coasts. The load factor recorded for the onshore North Rhins windfarm near Stranraer was 40%, which is typical for well-sited mainland windfarms. A small wind farm inShetland with fiveVestas V47 660 kW turbines recently achieved a world record of 58% capacity over the course of a year. This record is claimed by Burradale windfarm, located just outside Lerwick and operated by Shetland Aerogenerators Ltd. Since opening in 2000, the turbines at this wind farm have had an average capacity factor of 52% and, according to this report, in 2005 averaged a world record 57.9%.[28][102] However, a Scottish opposition group found 124 separate occasions from 2008 to 2010 when the nation's wind output fell to less than 2% of installed capacity.[103] On the west and northern coasts Scotland's wind regime can provide an average of 40% or higher.

Potential

[edit]

It is estimated that 11.5 GW of onshore wind potential exists, enough to provide about 45 TWh of energy in a year, allowing for wind variability. More than double this amount exists on offshore sites[104] where mean wind speeds are greater than on land.[105] The total offshore potential is estimated at 25 GW, and although more expensive to install could be enough to provide almost half the total energy used in Scotland.[104]

According to a recent report, the world's wind market offers many opportunities for Scottish companies, with total global revenue over the next five years estimated at £35 billion and continued growth forecast until at least 2025.[106]

See also

[edit]

References

[edit]
  1. ^"Energy Statistics for Scotland - Q2 2025. Renewable Electricity Capacity".gov.scot. Retrieved2 February 2026.
  2. ^Snieckus, Darius (18 October 2017)."World's first floating wind farm powers up off Scotland".rechargenews.com. Aberdeen. Retrieved30 November 2024.
  3. ^"Target for renewable energy now 80 per cent". Scottish Government. 23 September 2010. Archived fromthe original on 10 May 2013. Retrieved15 November 2010.
  4. ^Europe's Largest Onshore Wind Farm Is Switched on in ScotlandArchived 11 September 2014 at theWayback MachineRenewable Energy World, 20 May 2009.
  5. ^"Record renewable energy output".www.gov.scot. Retrieved2 March 2025.
  6. ^"Ministers downgrade Scottish offshore energy projection".BBC News. 13 November 2023.
  7. ^"Offshore wind". Retrieved14 November 2023.
  8. ^"The North Seas Energy Cooperation". Retrieved14 November 2023.
  9. ^"Scottish Government commits to 40GW of new offshore wind capacity".www.scottishrenewables.com. 28 January 2026. Retrieved1 February 2026.
  10. ^"Wormit from the Gazetteer for Scotland".Archived from the original on 14 November 2020. Retrieved13 November 2020.
  11. ^"Renewables met 97% of Scotland's electricity demand in 2020". BBC News. 25 March 2021.Archived from the original on 3 June 2021. Retrieved31 March 2021.
  12. ^Lempriere, Molly (25 June 2021)."Drax to expand pumped storage hydro station Hollow Mountain".Solar Power Portal.Archived from the original on 25 June 2021.
  13. ^ab"Energy Trends: December 2023, special feature article - Electricity generation and supply in Scotland, Wales, Northern Ireland and England, 2018 to 2022".GOV.UK. 21 December 2023. Retrieved1 December 2024.
  14. ^"Press Releases".scottishpowerrenewables.com.Archived from the original on 21 October 2019. Retrieved29 May 2018.
  15. ^abc"UK's most powerful wind farm could power Paisley".bwea.com.Archived from the original on 20 January 2012. Retrieved4 July 2007.
  16. ^"UK Renewable Energy Generation - Summary April 2009 to March 2010"(PDF).clowd.org.uk. Archived fromthe original(PDF) on 4 March 2011. Retrieved6 January 2011.
  17. ^"Braes of Doune".airtricity.com.Archived from the original on 21 November 2008. Retrieved10 March 2009.
  18. ^"SSE Clyde Wind Farm website". Archived fromthe original on 10 April 2018. Retrieved16 July 2015.
  19. ^Haworth, Jenny (22 July 2008)."Wind farms: now we've got the biggest in Europe".Archived from the original on 8 June 2011. Retrieved22 July 2008.
  20. ^Johnson, Simon (21 July 2008)."Europe's largest onshore wind farm is to be built in Scotland costing £600m".The Daily Telegraph. London. Retrieved22 July 2008.[dead link]
  21. ^"Green light for massive wind farm". BBC News. 21 July 2008.Archived from the original on 20 February 2009. Retrieved22 July 2008.
  22. ^"Salmond opens SSE's Clyde wind farm".Archived from the original on 8 October 2012. Retrieved8 June 2013.
  23. ^AG, RWE."RWE Group - Corporate Website".npower-renewables.com. Archived fromthe original on 3 October 2009. Retrieved10 March 2009.
  24. ^"Hadyard Hill becomes the first wind farm in the UK to generate over 100 MW of power".bwea.com.Archived from the original on 20 November 2010. Retrieved5 July 2007.
  25. ^"Viking wind farm approved". The Government of Scotland. 4 April 2012.Archived from the original on 7 April 2012. Retrieved8 April 2012.
  26. ^"Shetland wind farm plans by Viking Energy approved by Scottish government". BBC News. 4 April 2012.Archived from the original on 6 April 2012. Retrieved8 April 2012.
  27. ^Carrell, Severin (4 April 2012)."Shetland Islands to host 'world's most productive' windfarm".The Guardian. London.Archived from the original on 3 December 2013. Retrieved8 April 2012.
  28. ^ab"Burradale Wind Farm Shetland Islands - REUK.co.uk".reuk.co.uk.Archived from the original on 10 February 2007. Retrieved23 May 2007.
  29. ^"New Shetland windfarm could power nearly 500,000 homes".BBC News. 28 August 2024. Retrieved24 November 2024.
  30. ^http://www.whiteleewindfarm.co.uk/about_windfarm?navArchived 27 February 2014 at theWayback Machine Whitelee Windfarm
  31. ^"Ripple Energy | Whitelaw Brae Wind Farm".
  32. ^"Whitelaw Brae Wind Farm | About the Project | BayWa r.e."
  33. ^"Scotland's tallest wind farm given green light in East Ayrshire". Scottish Construction Now. 20 October 2020.Archived from the original on 1 November 2020. Retrieved30 November 2020.
  34. ^Scottish Government (8 December 2009)."Current Marine Renewable Energy Projects".gov.scot.Archived from the original on 15 July 2015. Retrieved15 July 2015.
  35. ^"beatricewind.co.uk - beatricewind Resources and Information".beatricewind.co.uk. Archived fromthe original on 8 November 2019. Retrieved8 February 2010.
  36. ^"Beatrice is currently the northernmost and deepest offshore wind farm in the world".myiris.com.Archived from the original on 14 July 2011. Retrieved24 November 2021.
  37. ^ab"Worlds Largest Wind Turbine Generator - REUK.co.uk".reuk.co.uk.Archived from the original on 11 June 2007. Retrieved23 May 2007.
  38. ^New offshore wind farm contracts announced BBC News, 8 January 2010.
  39. ^"Wind farm legal challenge victory". BBC News. 19 July 2016.Archived from the original on 29 October 2018. Retrieved20 June 2018.
  40. ^"Scots offshore wind 'pretty much dead'". BBC News. 20 July 2016.Archived from the original on 11 November 2018. Retrieved20 June 2018.
  41. ^"ScotWind offshore auction raises £700m".BBC News. 17 January 2022. Retrieved24 November 2024.
  42. ^Tisheva, Plamena (22 August 2022)."ScotWind leasing round awards further 2.8 GW via clearing".Renewables Now. Retrieved24 November 2024.
  43. ^"What is ScotWind and why was it controversial?".theferret.scot. 2 February 2024. Retrieved24 November 2024.
  44. ^Snieckus, Darius (10 August 2022)."Scotland leaves harbour on world's first auction for floating wind-fuelled oil & gas projects".rechargenews.com. Retrieved30 November 2024.
  45. ^ab"Offshore wind farm leasing round expected to raise £260m".BBC News. 24 March 2023. Retrieved30 November 2024.
  46. ^Buljan, Adrijana (22 May 2023)."Scottish INTOG Innovation Projects Clear First Stage with Crown Estate Scotland".Offshore Wind. Retrieved30 November 2024.
  47. ^Memija, Adnan (29 November 2023)."Seven INTOG Offshore Wind Projects Ink Exclusivity Agreements".Offshore Wind. Retrieved30 November 2024.
  48. ^"INTOG Map and Applicant Listing"(PDF).Crown Estate Scotland. November 2023. Retrieved30 November 2024.
  49. ^"Offshore wind - UK offshore wind farm projects from leasing rounds through to operational phases".The Crown Estate. 30 September 2024. Retrieved30 November 2024.
  50. ^"Project Information".Malin Sea Offshore Wind. Retrieved30 November 2024.
  51. ^"BlueFloat Energy | Renantis Partnership Signs Exclusivity Agreements to Develop Its Sinclair and Scaraben 'INTOG' Projects".www.bluefloat.com. 19 May 2023. Retrieved30 November 2024.
  52. ^"Robin Rigg Wind Farm website".Archived from the original on 16 July 2015. Retrieved16 July 2015.
  53. ^"Major boost to far north economy as Nigg is awarded Beatrice contract – and Helmsdale may benefit too".northern-times.co.uk. Archived fromthe original on 20 December 2016. Retrieved28 June 2016.
  54. ^"Beatrice Offshore Windfarm Ltd".beatricewind.com.
  55. ^Harrabin, Roger (23 July 2017)."World's first floating wind farm emerges off coast of Scotland". BBC News.Archived from the original on 6 August 2018. Retrieved23 July 2017.
  56. ^"Nå starter monteringen av Statoils flytende vindmøller".SYSLA. 17 February 2017. Archived fromthe original on 21 February 2017. Retrieved20 February 2017.
  57. ^"Floating turbines deliver first electricity". BBC News. 18 October 2017.Archived from the original on 21 August 2019. Retrieved18 October 2017.
  58. ^Geuss, Megan (18 October 2017)."First floating wind farm, built by offshore oil company, delivers electricity". Ars Technica.Archived from the original on 18 October 2017. Retrieved18 October 2017.
  59. ^"UK offshore wind capacity factors – Energy Numbers".energynumbers.info. 1 March 2021.Archived from the original on 23 May 2021.
  60. ^"Scotland's largest offshore wind farm now fully operational". 17 October 2023.
  61. ^EDF Renewables."About Neart Na Gaoithe".nngoffshorewind.com. Retrieved9 February 2021.
  62. ^"Moray East Offshore Wind Farm Achieves Full Output".Offshore Engineer Magazine. 7 April 2022.Archived from the original on 9 May 2022.
  63. ^renews.bix (3 October 2023)."Installation works kick off at Moray West".
  64. ^"Review of offshore wind farm development".sse.com. Archived fromthe original on 12 January 2015. Retrieved9 June 2015.
  65. ^BBC News report-SSE ditches plans for Kintyre offshore wind farm. BBC.co.uk (1 March 2011).
  66. ^Fred.Olsen Forth Array NewsArchived 11 July 2011 at theWayback Machine. Fortharray.com.
  67. ^Staff Writer."Bell Rock Offshore Wind Farm".4C Offshore. Retrieved26 January 2023.
  68. ^"Welcome".argyllarray.com. 29 April 2015. Retrieved9 June 2015.
  69. ^"Let's Talk Renewables"(PDF). HIE. Archived from the original on 7 April 2008. Retrieved6 January 2008.
  70. ^"Green Energy press release". greenenergy.uk.com. 26 January 2005.Archived from the original on 21 December 2006. Retrieved1 February 2007.
  71. ^"Ecovillage Findhorn".ecovillagefindhorn.com.Archived from the original on 18 October 2019. Retrieved6 July 2007.
  72. ^Boyndie Co-operativeArchived 10 October 2012 at theWayback Machine Retrieved 6 July 2007.
  73. ^ab"Rise in Scots wind farm support". BBC News. 18 October 2010.Archived from the original on 18 September 2018. Retrieved20 June 2018.
  74. ^abScottish Government (2003)."Public Attitudes to Windfarms: A Survey of Local Residents in Scotland".Archived from the original on 4 October 2012. Retrieved13 July 2012.
  75. ^Scottish Renewables (22 October 2010)."Scots support wind farms".Sustainable Scotland.Archived from the original on 19 January 2013. Retrieved31 March 2012.
  76. ^Braunholtz, Simon (2003)Public Attitudes to WindfarmsArchived 24 January 2013 at theWayback Machine. Scottish Executive Social Research.
  77. ^"Scots support wind farms".Sustainable Scotland. 22 October 2010.Archived from the original on 19 January 2013. Retrieved31 March 2012.
  78. ^"Public Perceptions ✭ - WAG - Windfarm Action Group - the growing blight on the good earth ☯".windfarmaction.com.Archived from the original on 4 March 2016. Retrieved22 August 2012.
  79. ^Cordelia Nelson (20 March 2013)."Scots support renewable energy".YouGov.Archived from the original on 25 April 2013. Retrieved22 June 2013.
  80. ^Buljan, Adrijana (10 August 2022)."Scots Overwhelmingly Pro-Offshore Wind".Offshore Wind.
  81. ^"What's Your View on Wild Land?". Pitlochry: John Muir Trust. 2006.Archived from the original on 18 May 2007. Retrieved13 November 2007.
  82. ^John Muir Trust."Renewable Energy Policy".Archived from the original on 16 May 2008. Retrieved20 April 2008.
  83. ^"North Harris Community Wind Farm Approved". John Muir Trust. 18 February 2008.Archived from the original on 6 January 2011. Retrieved21 April 2008.
  84. ^"Public 'backs wild land turbine ban'". BBC News. 26 June 2013.Archived from the original on 16 July 2018. Retrieved20 June 2018.
  85. ^"Scotsman. Retrieved 27 June 2013".Archived from the original on 30 June 2013. Retrieved27 June 2013.
  86. ^"Wind farm community benefits".berwickshirenews.co.uk.Archived from the original on 10 June 2013. Retrieved19 September 2012.
  87. ^"Residents 'devastated' at wind farm decision".berwickshirenews.co.uk. Archived fromthe original on 10 June 2013. Retrieved19 September 2012.
  88. ^"Uproar over wind farm vote".berwickshirenews.co.uk. Archived fromthe original on 10 June 2013. Retrieved19 September 2012.
  89. ^abGourlay, Simon (11 August 2008)."Response: Wind farms are not only beautiful, they're absolutely necessary".The Guardian.Archived from the original on 5 October 2013. Retrieved13 December 2016.
  90. ^"Eftag - Collection of Chair Design Ideas".Eftag.Archived from the original on 26 February 2021. Retrieved24 November 2021.
  91. ^"Petition to protect the country's wild lands".berwickshirenews.co.uk.Archived from the original on 13 December 2012. Retrieved1 July 2012.
  92. ^"Fallago Rig wind farm development sold". BBC News. 2 February 2012.Archived from the original on 12 November 2018. Retrieved20 June 2018.
  93. ^"Scottish Borders Council windfarm applications up to 1 July 2012".scotborders.gov.uk. Archived fromthe original on 4 October 2013. Retrieved1 July 2012.
  94. ^"Twitchers see rare bird hit turbine". BBC News. 27 June 2013.Archived from the original on 28 October 2018. Retrieved20 June 2018.
  95. ^Douglas E. (8 July 2006) "Gone with the Wind". London. New Scientist.
  96. ^Evans, Richard (4 May 2013)Experts warn of threat to utility shares' incomeArchived 22 July 2018 at theWayback Machine The Telegraph. Retrieved 7 May 2013
  97. ^Johnson, Simon (25 June 2013)."Old wind farms bases 'could be left in countryside'".The Daily Telegraph.Archived from the original on 30 May 2018. Retrieved2 April 2018.
  98. ^"Whitelee Windfarm".Scottish Power Renewables.Archived from the original on 2 March 2012. Retrieved9 March 2012.
  99. ^BiGGAR Economics (26 July 2016)."Onshore Wind Energy and Tourism in Scotland". BiGGAR Economics.Archived from the original on 7 August 2016. Retrieved2 August 2016.
  100. ^"Onshore Wind Energy & Tourism in Scotland". Biggar Economics. 26 July 2016.Archived from the original on 7 August 2016. Retrieved10 August 2016.ReportArchived 12 July 2017 at theWayback Machine
  101. ^"ECN report on Renewables"(PDF).Archived(PDF) from the original on 8 November 2006. Retrieved4 February 2007.
  102. ^Severin Carrell (20 May 2009),"Shetland stirred by giant Viking wind farm plan",The Guardian, London,archived from the original on 12 December 2013, retrieved8 April 2012
  103. ^"Analysis of UK Wind Generation"Archived 16 January 2017 at theWayback Machine 2011
  104. ^abRSPB Scotland, WWF Scotland and FOE Scotland (February 2006)The Power of Scotland: Cutting Carbon with Scotland's Renewable Energy.
  105. ^"Global wind power at 80 m".stanford.edu.Archived from the original on 25 May 2008. Retrieved23 May 2007.
  106. ^"Huge potential growth forecast for Scottish wind industry".scottish-enterprise.com. Archived fromthe original on 4 March 2016. Retrieved23 May 2007.

External links

[edit]
Wikimedia Commons has media related toWind power in Scotland.
Companies
Onshore wind farms
Active
Offshore wind farms
Active
Proposed
Cancelled
Installation vessels
Other
Sectors
Companies and
organisations
Current
Defunct
Active power
stations
Hydro
Nuclear
Oil and gas
Tidal
Wind
Other
Deactivated
stations
Coal
Nuclear
Oil and gas
Other
Coal
Oil and
gas
Integrated
Exploration
and production
Supply
Support
Utilities
Integrated
Generation
and supply
Generation
Supply
Distribution
Electricity
Gas
Transmission
Electricity
Gas
Other
Companies with headquarters and/or registered office in the UK but no applicable energy operations within the country shown initalics1Ultimate parent company is not UK-based2Integrated in the United States, no generation or supply activities in the UK
Energy sources
Coal
Electricity
Nuclear
Oil and gas
Renewables
Biofuels
Geothermal
Hydroelectricity
Solar power
 
Wind power
Government and regulation
Organisations
Historic organisations
Legislation and initiatives
Non-governmental organisations
Charities and
pressure groups
Industry bodies
Research
Issues
Projects & technologies
Private sector
Public sector
Communities & individuals
Intermediaries, partnerships & politics
Legislation
Public sector
Overview
Africa
Asia
Europe
North America
Oceania
South America
Portals:
Retrieved from "https://en.wikipedia.org/w/index.php?title=Wind_power_in_Scotland&oldid=1336260474"
Category:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp