Wind power in New Hampshire began in 1980, with the installation of the world's firstwind farm atCrotched Mountain, consisting of 20 30 kW wind turbines, although it closed decades ago.[1] As of 2020, fivewind power projects are operating in the state ofNew Hampshire – Lempster Mountain, which opened in 2008,Granite Reliable Wind Farm, which opened in late 2011,Groton Wind, which opened in 2012, Jericho Mountain, which opened in 2015, and Antrim Wind, which opened in 2020.
Granite Reliable has 33Vestas three-megawattwind turbines on mountains in thePhillips Brook area.[2][3][4]
Groton Wind consists of 24Gamesa G87 2.0 MW turbines, and are located along two ridges west ofPlymouth, in the town ofGroton. Although there is a high voltage power line to the west of the wind farm, the power is transmitted to a new substation at theCampton–Holderness town line.[5][6] Turbines are 286 feet (87 m) tall and the blades are 139 feet (42 m) long.
A wind farm inAntrim opened in 2020.[7] It had been expected to begin construction in 2014, but on February 7, 2013, New Hampshire's Site Evaluation Committee rejected the proposal by a 6 to 3 vote, the first time the SEC has turned down a wind project.[8] The primary reason for the rejection was stated as the visual and aesthetic impact the proposed turbines would have had on the Audubon Society of New Hampshire'sWillard Pond Sanctuary and the region in general. The project was eventually approved with 9 turbines, one fewer than originally proposed.
New Hampshire is a net power producer, generating more than is consumed. The output ofGroton Wind is going toNStar, in Boston, and 55% of Granite is going toVermont.[9] In 2010 New Hampshire produced 22 million MWh, and used 7.7 million MWh.[10]
A 2009 regulation requires state approval of any energy facility of over 30 MW, and transmission lines over 100 kV.[11]
| Name | Capacity (MW) | Energy (GW·hr/yr) | Location (county) | Status |
|---|---|---|---|---|
| Lempster Mountain | 24 | 70[12] | Sullivan | Operating |
| Granite | 99[13] | 224[14] | Coos | Operating[15] |
| Groton Wind | 48 | 144-158[16] | Grafton | Operating[17][18][19] |
| Jericho Mountain | 5 | 14 | Coos | Operating[20] |
| Antrim Wind | 9 | 29 | Sullivan | Operating[21] |
![]() |
| Megawatts of Wind Capacity[22] |