Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Wendelstein 7-X

Coordinates:54°04′23″N13°25′26″E / 54.073°N 13.424°E /54.073; 13.424
From Wikipedia, the free encyclopedia
Modern stellarator for plasma fusion experiments

Wendelstein 7-X
W7-X in 2011
Device typeStellarator
LocationGreifswald,Germany
AffiliationMax Planck Institute for Plasma Physics
Technical specifications
Major radius5.5 m (18 ft)
Minor radius0.53 m (1 ft 9 in)
Plasma volume30 m3
Magnetic field3 T (30,000 G)
Heating power14 MW
Plasma temperature(6–13)×107 K
History
Year(s) of operation2015–present
Preceded byWendelstein 7-AS
Links
Websitehttps://www.ipp.mpg.de/w7x
Stellarator schema - coil system (blue), plasma (yellow), a magnetic field line (green) on the plasma surface.
Wendelstein 7-X research complex in Greifswald, experiment hall on the left.
Superconducting feed lines being attached to the superconducting planar coils, 2008
Construction in May 2012. Visible are the torus, offset in the test cell, and the large overhead crane. Note the workers for scale.
Wide-angle view inside thestellarator, showing the stainless cover plates and the water-cooled copper backing plates which will eventually be covered by graphite tiles and function as armor to protect against plasma/wall interactions.

TheWendelstein 7-X (abbreviatedW7-X) reactor is an experimentalstellarator built inGreifswald,Germany, by theMax Planck Institute for Plasma Physics (IPP), and completed in October 2015.[1][2] Its purpose is to advancestellarator technology: though this experimental reactor will not produce electricity, it is used to evaluate the main components of a futurefusion power plant; it was developed based on the predecessorWendelstein 7-AS experimental reactor.

As of 2023[update], the Wendelstein 7-X reactor is the world's largest stellarator device.[3] After two successful operation phases ending in October 2018, the reactor was taken offline for upgrades.[4][5] The upgrade was completed in 2022. New fusion experiments in February 2023 demonstrated longer confinement and increased power.[6] The goal of this phase is to gradually increase power and duration for up to 30 minutes of continuous plasma discharge, thus demonstrating an essential feature of a future fusion power plant: continuous operation.[7][8]

The name of the project, referring to the mountainWendelstein inBavaria, was decided at the end of the 1950s, referencing the preceding project fromPrinceton University under the nameProject Matterhorn.[9]

The research facility is an independent partner project of theMax Planck Institute for Plasma Physics with theUniversity of Greifswald.

Design and main components

[edit]

The Wendelstein 7-X device is based on a five-field-periodHelias configuration. It is mainly atoroid, consisting of 50 non-planar and 20 planarsuperconductingmagneticcoils, 3.5 m high, which induce amagnetic field that prevents theplasma from colliding with the reactor walls. The 50 non-planar coils are used for adjusting the magnetic field. It aims for aplasma density of 3×1020 particles per cubic metre, and aplasma temperature of 60–130 megakelvins (MK).[1]

The W7-X is optimised along thequasi-isodynamic principle.[10]

The main components are the magnetic coils,cryostat, plasma vessel,divertor and heating systems.[11]

The coils (NbTi in aluminium[11]) are arranged around a heat insulating cladding with a diameter of 16 metres, called the cryostat. A cooling device produces enough liquid helium to cool down the magnets and their enclosure (about 425 metric tons of "cold mass") tosuperconductivity temperature (4 K[12]). The coils will carry 12.8 kA current and create a field of up to 3 teslas.[12]

The plasma vessel, built of 20 parts, is on the inside adjusted to the complex shape of the magnetic field. It has 254 ports (holes) for plasma heating and observation diagnostics. The whole plant is built of five nearly identical modules, which were assembled in the experiment hall.[11]

The heating system[13] includes high powergyrotrons forelectron cyclotron resonance heating (ECRH), which will deliver up to 15 MW of heating to the plasma.[14] For operational phase 2 (OP-2), after completion of the full armor/water-cooling, up to 8 megawatts ofneutral beam injection will also be available for 10 seconds.[15] Anion cyclotron resonance heating (ICRH) system will become available for physics operation in OP1.2.[16]

A system ofsensors and probes based on a variety of complementary technologies will measure key properties of the plasma, including the profiles of the electron density and of the electron and ion temperature, as well as the profiles of important plasma impurities and of the radial electric field resulting from electron and ion particle transport.[17]

History

[edit]

The German funding arrangement for the project was negotiated in 1994, establishing the Greifswald Branch Institute of the IPP in the north-eastern corner of the recently integratedEast Germany. Its new building was completed in 2000. Construction of the stellarator was originally expected to reach completion in 2006. Assembly began in April 2005. Problems with the coils took about 3 years to fix.[11] The schedule slipped into late 2015.[11][18][19]

A three-laboratory American consortium (Princeton, Oak Ridge, and Los Alamos) became a partner in the project, paying €6.8 million of the eventual total cost of €1.06 billion.[20] In 2012, Princeton University and the Max Planck Society announced a new joint research center in plasma physics,[21] to include research on W7-X.

The end of the construction phase, which required more than 1 million assembly hours,[22] was officially marked by an inauguration ceremony on 20 May 2014.[23] After a period of vessel leak-checking, beginning in the summer of 2014, the cryostat wasevacuated, and magnet testing was completed in July 2015.[12]

The aim for operation phase 1 (OP 1.1), beginning 10 December 2015, was to conduct integrated testing of the most important systems as quickly as possible and to gain first experience with the physics of the machine.[24][25] On that first day, the reactor successfully produced helium plasma (with temperatures of about 1 MK) for about 0.1s. For this initial test with about 1 mg ofhelium gas injected into the evacuated plasma vessel, microwave heating was applied for a short 1.3 MW pulse.[26]

More than 300 discharges with helium were done in December and January with gradually increasing temperatures finally reaching six million degrees Celsius, to clean the vacuum vessel walls and test the plasma diagnostic systems. Then, on 3 February 2016, production of the first hydrogen plasma initiated the science program. The highest temperature plasmas were produced by four-megawatt microwave heater pulses lasting one second; plasma electron temperatures reached 100 MK, while ion temperatures reached 10 MK. More than 2,000 pulses were conducted before shutdown.[27]

Five poloidal graphite limiters served as the main plasma-facing components during this first campaign (instead of the divertor modules). Experimental observations confirmed 3D modeling predictions that showed heat and particle flux deposition patterns on the limiters in clear correlation with the lengths of the open magnetic field lines in the plasma boundary.[28][29]

Such tests were planned to continue for about a month, followed by a scheduled shut-down to open the vacuum vessel and line it with protective carbon tiles and install a "divertor" for removing impurities and heat from the plasma. The science program continued while gradually increasing discharge power and duration.[30] The special magnetic field topology was confirmed in 2016.[31][32]

Operational phase 1 (OP 1.1) concluded 10 March 2016[24][33] and an upgrade phase began.

Operational phase 1 continued (OP 1.2) in 2017[34] to test the (uncooled) divertor.[35][24][36]

Wendelstein 7-X during OP1.2b

In June 2018 a record ion temperature of about 40 million degrees, a density of 0.8 × 1020 particles/m3, and a confinement time of 0.2 second yielded a record fusion product of 6 × 1026 degree-seconds per cubic metre.[37]

During the last experiments of 2018, the density reached 2 × 1020 particles/m3 at a temperature of 20 million degrees. With good plasma values, long-lasting plasmas with long discharge times of 100 seconds were obtained. Energy content exceeded 1 megajoule.[38][39][40][41]

In 2021 an analysis of X-ray imaging crystal spectrometer data collected in the 2018 experiment substantially reduced troublingneoclassical transport heat loss. Collisions between heated particles cause some to escape the magnetic field. This was due to magnetic field cage optimization that was essential in achieving the record results.[42][43]

In 2025 a fuel injector that combined continuous refueling with pulsed heating was tested. Over 43 seconds, 90 hydrogen pellets fired into the plasma at up to 800 metres (2,600 feet) per second heated it to a peak temperature of 30 million C. Energy turnover increased to 1.8 gigajoules over a six-minute run, exceeding the 1.3 gigajoules produced in February 2023. It exceeded the record achieved by theExperimental Advanced Superconducting Tokamak (EAST) in China in 2025.[44][45]

Timeline

[edit]
DateEvent
1980Planning initiated[46][47]
1994Project initiated
2005Assembly began
2014Inaugurated
December 2015Begin operational phase OP1.1
2015Successful helium plasma test at 1 MK for ~0.1 s
2016Hydrogen plasma at 80 MK for 0.25 s
March 2016End OP1.1, begin upgrade phase[24][48]
June 2017Begin operational phase OP1.2
June 2018Fusiontriple product of 6 × 1026 degree-second/m3[49]
November 2018End OP1.2, begin upgrade phase
August 2022[50]Final assembly step with water-coolers finished
February 2023[6]Start of OP2, demonstrated steady-state operation at higher power levels
September 2024[51]OP2.2: September 2024 – December 2024 increase plasma parameters
February 2025[51]OP2.3: February 2025 – May 2025 increase plasma parameters, world record triple product for long duration discharge[52]
June 2025[51]Maintenance: June 2025 – August 2026
August 2026[51]OP2.4: August 2026 – December 2026
February 2027[51]OP2.5: February 2027 – May 2027

Financing

[edit]

Financial support for the project is about 80% from Germany and about 20% from the European Union. 90% of German funding comes from the federal government and 10% from the state government ofMecklenburg-Vorpommern. The total investment for the stellarator itself over 1997–2014 amounted to €370 million, while the total cost for the IPP site inGreifswald including investment plus operating costs (personnel and material resources) amounted to €1.06 billion for that 18-year period. This exceeded the original budget estimate, mainly because the initial development phase was longer than expected, doubling the personnel costs.[53]

In July 2011, the President of theMax Planck Society,Peter Gruss, announced that the United States would contribute $7.5 million under the program "Innovative Approaches to Fusion" of theUnited States Department of Energy.[54]

Collaborating institutes

[edit]

European Union

[edit]

United States

[edit]

Japan

[edit]

See also

[edit]

References

[edit]
  1. ^abIntroduction – the Wendelstein 7-X stellarator Retrieved 5 November 2014.
  2. ^Clery, Daniel (21 October 2015)."The bizarre reactor that might save nuclear fusion".sciencemag.org. Science Magazine. Retrieved25 October 2015.
  3. ^"Wendelstein 7-X achieves world record".Max Planck Institute for Plasma Physics. Retrieved27 December 2022.
  4. ^"The second experimentation phase".Max Planck Institute for Plasma Physics. Retrieved26 September 2022.
  5. ^Milch, Isabella."Wendelstein 7-X fusion device at Greifswald to be upgraded".Max Planck Institute for Plasma Physics. Retrieved26 September 2022.
  6. ^ab"Wendelstein 7-X reaches milestone: Power plasma with gigajoule energy turnover generated for eight minutes". 22 February 2023.
  7. ^idw-online.de: Federal Research Minister Stark-Watzinger and Minister Martin visit IPP Greifswald,backup: Citat: "...After two successful initial operation phases, the Wendelstein 7-X fusion device has been further expanded. This final step, which upgrades the machine to demonstrate plasma pulses of up to 30 minutes with increased heating power, has now been completed and Wendelstein 7-X is finished. A water-cooled inner cladding and the new centrepiece, a water-cooled divertor, complete the device. In autumn 2022, Wendelstein 7-X will go back into operation..."
  8. ^ipp.mpg.de: Wendelstein 7-X on the verge of new peak performance: Citat: "...From autumn 2022 onwards, an international team of scientists will once again drive W7-X to new heights of performance. "With the improved equipment, we want to be able to keep high-performance plasmas with up to 18 gigajoules of energy turnover stable for half an hour in a few years," [...] approaching this goal step-by-step and learning more about plasma operation at higher energies without putting too much stress on the machine too quickly,[...]"
  9. ^WI-A, WI-B, WII-A, WII-B, W7-A:G. Grieger; H. Renner; H. Wobig (1985), "Wendelstein stellarators",Nuclear Fusion (in German), vol. 25, no. 9, p. 1231,doi:10.1088/0029-5515/25/9/040,S2CID 250832456
  10. ^"Physics, Technologies, and Status of the Wendelstein 7-X Device"(PDF).
  11. ^abcdeKlinger, Thomas (14 April 2011)."Stellarators difficult to build? The construction of Wendelstein 7-X"(PDF). Retrieved13 June 2011. 53 slides - many photos
  12. ^abc"Magnet tests on Wendelstein 7-X successfully completed". 7 July 2015. Archived fromthe original on 16 July 2015.
  13. ^"Stellarator Heating and Optimization". Retrieved10 December 2015.
  14. ^"Microwave heating – ECRH". Retrieved10 December 2015.
  15. ^"Neutral Beam Injection Heating (NBI)". Retrieved10 December 2015.
  16. ^"Ion Cyclotron Resonance Heating (ICRH)". Retrieved10 December 2015.
  17. ^"Profile Diagnostics". Retrieved10 December 2015.
  18. ^Arnoux, Robert (15 April 2011)."The stellarator renaissance". Retrieved13 June 2011.
  19. ^Jeffrey, Colin (25 October 2015)."Wendelstein 7-x stellarator puts new twist on nuclear fusion power".www.gizmag.com. Retrieved27 October 2015.
  20. ^"US narrows fusion research focus, joins German stellarator". 1 September 2011. Archived fromthe original on 19 August 2013.
  21. ^"Princeton, Max Planck Society launch new research center plasma physics". 29 March 2012. Archived fromthe original on 4 March 2016. Retrieved19 August 2013.
  22. ^"Start of scientific experimentation at the Wendelstein 7-X fusion device".phys.org. 7 June 2016. Retrieved11 October 2016.
  23. ^Milch, Isabella (12 May 2014)."Preparations for operation of Wendelstein 7-X starting". Retrieved16 May 2014.
  24. ^abcd"Wendelstein 7-X Newsletter No. 13 / April 2017"(PDF).
  25. ^Sunn Pedersen, T.; Andreeva, T.; Bosch, H. -S; Bozhenkov, S.; Effenberg, F.; Endler, M.; Feng, Y.; Gates, D. A.; Geiger, J.; Hartmann, D.; Hölbe, H.; Jakubowski, M.; König, R.; Laqua, H. P.; Lazerson, S.; Otte, M.; Preynas, M.; Schmitz, O.; Stange, T.; Turkin, Y. (November 2015)."Plans for the first plasma operation of Wendelstein 7-X".Nuclear Fusion.55 (12) 126001.Bibcode:2015NucFu..55l6001P.doi:10.1088/0029-5515/55/12/126001.hdl:11858/00-001M-0000-0029-04EB-D.S2CID 67798335.
  26. ^"The first plasma: the Wendelstein 7-X fusion device is now in operation". Max Planck Institute for Plasma Physics. 10 December 2015. Retrieved10 December 2015.
  27. ^"Wendelstein 7-X: Upgrading after successful first round of experiments".phys.org. 11 July 2016. Retrieved11 October 2016.
  28. ^Effenberg, F.; Feng, Y.; Schmitz, O.; Frerichs, H.; Bozhenkov, S.A.; Hölbe, H.; König, R.; Krychowiak, M.; Pedersen, T. Sunn; Reiter, D.; Stephey, L. (2017)."Numerical investigation of plasma edge transport and limiter heat fluxes in Wendelstein 7-X startup plasmas with EMC3-EIRENE"(PDF).Nuclear Fusion.57 (3).doi:10.1088/1741-4326/aa4f83.hdl:11584/213558.
  29. ^"G.A. Wurden et al 2017 Nucl. Fusion 57 056036".Nuclear Fusion.doi:10.1088/1741-4326/aa6609.hdl:11584/213558.S2CID 126252486.
  30. ^"Wendelstein 7-X fusion device produces its first hydrogen plasma". Max Planck Institute for Plasma Physics. 3 February 2016. Retrieved4 February 2016.
  31. ^Pedersen, T. Sunn; Otte, M.; Lazerson, S.; Helander, P.; Bozhenkov, S.; Biedermann, C.; Klinger, T.; Wolf, R. C.; Bosch, H. -S.; Abramovic, Ivana; Äkäslompolo, Simppa; Aleynikov, Pavel; Aleynikova, Ksenia; Ali, Adnan; Alonso, Arturo; Anda, Gabor; Andreeva, Tamara; Ascasibar, Enrique; Baldzuhn, Jürgen; Banduch, Martin; Barbui, Tullio; Beidler, Craig; Benndorf, Andree; Beurskens, Marc; Biel, Wolfgang; Birus, Dietrich; Blackwell, Boyd; Blanco, Emilio; Blatzheim, Marko; et al. (2016)."Confirmation of the topology of the Wendelstein 7-X magnetic field to better than 1:100,000".Nature Communications.7 13493.Bibcode:2016NatCo...713493P.doi:10.1038/ncomms13493.PMC 5141350.PMID 27901043.
  32. ^"Tests confirm that Germany's massive nuclear fusion machine really works".ScienceAlert. 6 December 2016. Retrieved7 December 2016.
  33. ^Wolf, R. C.; et al. (27 July 2017)."R.C. Wolf et al 2017 Nucl. Fusion 57 102020".Nuclear Fusion.57 (10): 102020.doi:10.1088/1741-4326/aa770d.hdl:2434/616000.S2CID 1986901.
  34. ^"Wendelstein 7-X: Zweite Experimentierrunde hat begonnen".www.ipp.mpg.de.
  35. ^Wolf, R. C.; Alonso, A.; Äkäslompolo, S.; Baldzuhn, J.; Beurskens, M.; Beidler, C. D.; Biedermann, C.; Bosch, H.-S.; Bozhenkov, S.; Brakel, R.; Braune, H.; Brezinsek, S.; Brunner, K.-J.; Damm, H.; Dinklage, A.; Drewelow, P.; Effenberg, F.; Feng, Y.; Ford, O.; Fuchert, G.; Gao, Y.; Geiger, J.; Grulke, O.; Harder, N.; Hartmann, D.; Helander, P.; Heinemann, B.; Hirsch, M.; Höfel, U.; Hopf, C.; Ida, K.; Isobe, M.; Jakubowski, M. W.; Kazakov, Y. O.; Killer, C.; Klinger, T.; Knauer, J.; König, R.; Krychowiak, M.; Langenberg, A.; Laqua, H. P.; Lazerson, S.; McNeely, P.; Marsen, S.; Marushchenko, N.; Nocentini, R.; Ogawa, K.; Orozco, G.; Osakabe, M.; Otte, M.; Pablant, N.; Pasch, E.; Pavone, A.; Porkolab, M.; Puig Sitjes, A.; Rahbarnia, K.; Riedl, R.; Rust, N.; Scott, E.; Schilling, J.; Schroeder, R.; Stange, T.; von Stechow, A.; Strumberger, E.; Sunn Pedersen, T.; Svensson, J.; Thomson, H.; Turkin, Y.; Vano, L.; Wauters, T.; Wurden, G.; Yoshinuma, M.; Zanini, M.; Zhang, D. (1 August 2019)."Performance of Wendelstein 7-X stellarator plasmas during the first divertor operation phase".Physics of Plasmas.26 (8): 082504.Bibcode:2019PhPl...26h2504W.doi:10.1063/1.5098761.hdl:1721.1/130063.S2CID 202127809.
  36. ^"S. BrezƖnsek et al 2022 Nucl. Fusion 62 016006".Nuclear Fusion.doi:10.1088/1741-4326/ac3508.S2CID 240484560.
  37. ^"Wendelstein 7-X achieves world record for fusion product" Phys.org, 25 June 2018
  38. ^"Successful second round of experiments with Wendelstein 7-X".www.ipp.mpg.de. Retrieved22 March 2019.
  39. ^Lavars, Nick (26 November 2018)."Wendelstein 7-X fusion reactor keeps its cool en route to record-breaking results".newatlas.com. Retrieved1 December 2018.
  40. ^"T. Klinger et al 2019 Nucl. Fusion 59 112004".Nuclear Fusion.doi:10.1088/1741-4326/ab03a7.hdl:2434/653115.S2CID 128140454.
  41. ^Sunn Pedersen, Thomas; et al. (April 2022)."Thomas Sunn Pedersen et al 2022 Nucl. Fusion 62 042022".Nuclear Fusion.62 (4): 042022.doi:10.1088/1741-4326/ac2cf5.hdl:1721.1/147631.S2CID 234338848.
  42. ^Beidler, C. D.; Smith, H. M.; Alonso, A.; Andreeva, T.; Baldzuhn, J.; Beurskens, M. N. A.; Borchardt, M.; Bozhenkov, S. A.; Brunner, K. J.; Damm, H.; Drevlak, M. (11 August 2021)."Demonstration of reduced neoclassical energy transport in Wendelstein 7-X".Nature.596 (7871):221–226.Bibcode:2021Natur.596..221B.doi:10.1038/s41586-021-03687-w.ISSN 1476-4687.PMC 8357633.PMID 34381232.
  43. ^Lavars, Nick (1 September 2021)."Wendelstein 7-X fusion reactor on path to plasma twice as hot as the Sun".New Atlas. Retrieved2 September 2021.
  44. ^Atkinson, Victoria (5 June 2025)."Nuclear fusion record smashed as German scientists take 'a significant step forward' to near-limitless clean energy".Live Science. Retrieved7 June 2025.
  45. ^"Wendelstein 7-X sets new performance records in fusion research".Max Planck Institute for Plasma Physics. 3 June 2025. Retrieved9 June 2025.
  46. ^"Milestones".www.ipp.mpg.de.
  47. ^Grieger, G.; Renner, H.; Wobig, H. (1985). "Wendelstein stellarators".Nuclear Fusion.25 (9):1231–1242.doi:10.1088/0029-5515/25/9/040.ISSN 0029-5515.S2CID 250832456.
  48. ^Hathiramani, D.; et al. (2018)."Upgrades of edge, divertor and scrape-off layer diagnostics of W7-X for OP1.2"(PDF).Fusion Engineering and Design.136:304–308.Bibcode:2018FusED.136..304H.doi:10.1016/j.fusengdes.2018.02.013.
  49. ^"Wendelstein 7-X achieves world record".www.ipp.mpg.de. Retrieved30 June 2018.
  50. ^Julia Sieber (9 August 2022)."Expansion of the Wendelstein 7-X fusion device completed / Experiments to start in autumn".
  51. ^abcdeFrank Fleschner (9 September 2024)."Wendelstein 7-X starts new experimental campaign".
  52. ^Frank Fleschner (3 June 2025)."Wendelstein 7-X sets new performance records in fusion research [UPDATE]".
  53. ^FAZ: Start frei für deutschen SonnenofenArchived 7 November 2015 at theWayback Machine vom 20. Mai 2014
  54. ^Isabella Milch (7 July 2011)."USA joining the Wendelstein 7-X fusion project". Max Planck Institute of Plasma Physics. Retrieved4 February 2016.

External links

[edit]
Wikimedia Commons has media related toWendelstein 7-X.
Fusion power, processes and devices
Core topics
Nuclear fusion
Processes,
methods
Confinement
type
Gravitational
Magnetic
Magneto-inertial
Inertial
Electrostatic
Other forms
Devices,
experiments
Magnetic
confinement
Tokamak
International
Americas
Asia,
Oceania
Europe
Stellarator
Americas
Asia,
Oceania
Europe
Levitated dipole
Pinch
RFP
Field-reversed
configuration
Colliding
Mirror
Magneto-inertial
Inertial
confinement
Laser
Americas
Asia
Europe
Non-laser
Divisions
Institutions
Independent partners
Miscellaneous
Categories, lists
Reactors
closed
opposition

54°04′23″N13°25′26″E / 54.073°N 13.424°E /54.073; 13.424

Authority control databasesEdit this at Wikidata
Retrieved from "https://en.wikipedia.org/w/index.php?title=Wendelstein_7-X&oldid=1332588147"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp