USSTidewater in 1965 | |
| Class overview | |
|---|---|
| Operators | |
| Preceded by | Klondike class |
| Succeeded by | Samuel Gompers class |
| Planned | 9 |
| Completed | 6 |
| Cancelled | 3 |
| Retired | 6 |
| General characteristics | |
| Type | Destroyer tender |
| Displacement | 11,755long tons (11,944 t) |
| Length | 492 ft (150 m) |
| Beam | 69 ft (21 m) |
| Draft | 27 ft 3 in (8.31 m) |
| Speed | 18knots (33 km/h; 21 mph) |
| Complement | 1,035 |
| Armament | • 2 × 5"/38 caliber guns • 8 × 40 mm AA guns • 22 × 20 mm AA guns |
TheShenandoah-class destroyer tenders were a class ofdestroyer tenders built for theUnited States Navy that served from 1945 to 1984.
TheShenandoah-class destroyer tenders were modifiedUnited States Maritime CommissionType C3-class ships. None of the ships saw service duringWorld War II,Isle Royal andBryce Canyon directly entered theReserve Fleet, finally being commissioned in 1950 and in 1962.Great Lakes,Canopus andArrowhead were cancelled in 1945.Grand Canyon was redesignated as a repair ship in 1971.Tidewater was transferred toIndonesia in 1971 and served there until 1984.[1]
| Ship Name | Hull No. | Builder | Laid down | Launched | Commissioned | Decommissioned | Fate | DANFS | NVR |
|---|---|---|---|---|---|---|---|---|---|
| Shenandoah | AD-26 | Seattle-Tacoma Shipbuilding Corporation, Tacoma Yard | 16 September 1944 | 29 March 1945 | 13 August 1945 | 1 April 1980 | Sold for scrap 1 March 1982 | [1] | [2] |
| Yellowstone | AD-27 | 16 October 1944 | 12 April 1945 | 16 January 1946 | 11 September 1974 | Sold for scrap, September 1975 | [3] | [4] | |
| Grand Canyon | AD-28 | 16 November 1944 | 27 April 1945 | 5 April 1946 | 1 September 1978 | AR-28 1971; sold for scrap, June 1980 | [5] | [6] | |
| Isle Royale | AD-29 | Seattle-Tacoma Shipbuilding Corporation, Seattle Yard | 16 December 1944 | 19 September 1945 | 9 June 1962 | 11 March 1970 | Sold for scrap 1 December 1977 | [7] | [8] |
| Great Lakes | AD-30 | 16 April 1945 | — | Cancelled, 7 January 1946 | [9] | — | |||
| Tidewater | AD-31 | Charleston Navy Yard | 27 November 1944 | 30 June 1945 | 19 February 1946 | 20 February 1971 and 1984 | To Indonesia 1971, scrapped 1984. | [10] | [11] |
| Canopus | AD-33 | Mare Island Naval Shipyard | 15 March 1945 | — | Cancelled on 12 August 1945[2] | [12] | — | ||
| Arrowhead | AD-35 | Puget Sound Naval Shipyard | 1 December 1944 | — | Cancelled on 11 August 1945[3] | [13] | [14] | ||
| Bryce Canyon | AD-36 | Charleston Navy Yard | 7 July 1945 | 7 March 1946 | 15 September 1950 | 30 June 1981 | Sold for scrap 1 April 1982. | [15] | [16] |