| Tren de Gran Canaria | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Map of the proposed route of the Gran Canaria railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | Unknown (probably suspended) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Owner | Cabildo insular | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Locale | Gran Canaria | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stations | 11 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Services | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operator(s) | Autoridad Única del Transporte | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Planned opening | Unknown | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 57 km (35 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,668 mm (5 ft 5+21⁄32 in)Iberian gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operating speed | 160 km/h (99 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tren de Gran Canaria (TGC, the Train of Gran Canaria) is a proposed railway on the island ofGran Canaria inSpain. It is planned to run from the island's capital,Las Palmas along the eastern coast of the island, servingGran Canaria Airport and terminating inMaspalomas. First announced in 2004, construction on the line has not yet commenced due to funding difficulties.[1]
Between 1893 and 1944 steam trams ran between Las Palmas andPuerto de La Luz. The line was electrified in 1910, although the line reverted to steam traction in 1944, when trams were hauled by a steam locomotive known asLa Pepa. A reproduction of this locomotive is now on display in theElder Museum in Las Palmas.[2]
A plan to build a north–south rail link began with the building of an experimentaltren vertebrado ("vertebrate train") track in Las Palmas between 1972 and 1974. The transit system, designed by Basque engineerAlejandro Goicoechea, consisted of an unusual low-profile train running on elevated concrete tracks through Las Palmas. The project was unsuccessful and was dismantled within a year.[3]
Plans to develop arapid transit railway line on Gran Canaria linking the capital withSan Bartolomé de Tirajana in the south were put forward in the early 21st century by theGran Canaria Cabildo. The line would run along the eastern coast and connect Las Palmas with the airport.[4] In 2004 the Spanish Ministry of Development put a contract out to competitive tender for a feasibility study on a 50 km (31 mi) railway line from Las Palmas to Maspalomas.[1]
Originally, it was planned to construct the railway in phases, with an initial phase consisting of a line running between San Telmo Park in Las Palmas and El Veril Beach on the edge ofPlaya del Inglés.In future phases the line could be extended northwards into central Las Palmas, with a terminus at Santa Catalina park, and at the southern end the line would be extended throughMaspalomas to terminate atMeloneras. In 2008 the Cabildo announced its intention to construct the full route from Las Palmas to Meloneras in a single phase.[4]
In 2009 the plans were approved by theAutonomous Government of the Canary Islands, and a planned operational date was given as 2015. The Cabildo'sAutoridad Única del Transporte de Gran Canaria formed a public company calledFerrocarriles de Gran Canaria to manage the construction project.[5] The total cost of the scheme was estimated at €1,500 million.[6]
The Cabildo applied to Spain's central Government for funding for the project, but the scheme did not progress due to budgetary constraints.[7]
In June 2019, the local government announced that it had completed drafting the projects for the route, and the cost of the scheme was estimated at €1,650 million. 85% of the needed funds were planned to be received from theEuropean Regional Development Fund (ERDF), while the remaining 15% would come from local and regional government funding and private finance.[8] However, that money was never received.
Between 2009 and 2023, the Spanish Ministry of Development and the Cabildo spent €32 million on preparatory work for the new railway line.[9]
In 2024, the Cabildo announced that it had decided to prioritize the construction of the section betweenAeropuerto andVecindario. This first phase will cost €390 million and will include train depots and workshops (in Vecindario), as well as a wind farm to generate energy for the trains. It is expected that €190 million will be provided by the Connecting Europe Facility, with the remaining €200 million coming from state and local governments.[10] In June 2024, it was announced that the local government hopes that construction of the train will begin before the end of 2027.[11]
The planned 57-kilometre (35 mi) railway line would run between Las Palmas in the north and Meloneras in the south of the island. The line is planned to have 11 stations, including an underground station at Gran Canaria Airport. Much of the line is planned to run in tunnels, with the section in the capital running entirely underground as far as the suburb of Jinámar.[5][12]
According to plans published by the Cabildo, stations are planned in Santa Catalina Park, San Telmo Park, theisland Hospital, Jinámar,Telde,Gran Canaria Airport, Carrizal, Arinaga,Vecindario,Playa del Inglés andMeloneras. An additional station at Juan Grande has been proposed by the mayor of San Bartolome de Tirajana. Journey times between Las Palmas and Meloneras would be 25–30 minutes.[4]


The trains that will to operate on the Gran Canaria railway are planned to be a hybrid of acommuter train and ahigh speed train. Initially, ten 100-metre (330 ft) units of five carriages will operate on the line with a maximum speed of 160 kilometres per hour (99 mph), each capable of carrying 500 passengers. Eventually, 13 units will operate on the line.[13]
In 2009, a full-scalemockup of the proposed Gran Canaria train was put on public display in San Telmo park, Las Palmas.[6]