Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Train on Train

From Wikipedia, the free encyclopedia
Japanese concept for train piggybacking

This article'sfactual accuracy may be compromised due to out-of-date information. Please help update this article to reflect recent events or newly available information.(October 2020)
A "Train on Train" experimental mockup at Naebo Works, October 2008
Mock-up wagons at Naebo Works, April 2007

"Train on Train" (トレイン・オン・トレイン,Torein on Torein) is a term used in Japanese rail transport. It refers to the concept ofpiggybacking, carryingnarrow-gauge wagons on broader-gaugeflat wagons. "Train on Train" uses a similar concept toTransporter wagons andRollbocks.

The need for "Train on Train" arose when Japan'sHokkaido Railway Company (JR Hokkaido) was planning forstandard-gaugeHokkaido Shinkansen high-speed trains to operate in the underseaSeikan Tunnel from 2016. The problem was that narrow-gauge freight trains did not operate at high speeds. Since the tunnel is 53.85 km (33.46 mi) long, incorporating the slower narrow-gauge trains into the timetable would significantly disrupt the planned high-speed services. It was also considered technically difficult to build new freight train shelters within the Seikan Tunnel. JR Hokkaido would investigate a solution of mounting narrow-gauge freight trains on to faster standard-gauge freight trains.[1] JR Hokkaido applied for a patent for train-on-train on February 22, 2006, and has continued research and development to realize a Shinkansen freight train since then.[2] The development of "Train on Train" was effectively frozen in 2015. The Hokkaido Shinkansen opened on March 26, 2016, without "Train on Train" being put into use.

Development

[edit]

When theHokkaido Shinkansen opened betweenShin-Aomori andShin-Hakodate in 2016, high-speed Shinkansen trains shared thedual gauge tracks through theSeikan Tunnel which links the main island ofHonshu withHokkaido. While in the tunnel, freight trains on the narrow-gauge1,067 mm (3 ft 6 in) rails are limited to 110 km/h (70 mph). The "Train on Train" concept involved loading narrow-gauge KoKi 100 container wagons on to specially built standard-gauge wagons to allow operation at speeds of up to 200 km/h (120 mph).[1] The speeds in the Seikan Tunnel were reported as having been increased to 160 km/h (99 mph) after extensive testing in 2014.[3]

Piggyback by Trainload concept
Piggyback by Trainload concept

The "Train on Train" concept was announced in 2006[4] and a full-size mockup vehicle was built and demonstrated atNaebo Works [ja] in 2007. While the next phase was to build a prototype train for actual operation this plan was never followed through on.[1][5] beginning in 2010,JR Freight started developing a new Electric Locomotive, theClass EH800 to run on 20/25 kV AC to operate through the Seikan Tunnel.[6] These locomotives would have hauled "Train on Train" services through the tunnel. A "Forum 2050" presentation by JR Hokkaido in 2010 stated that using a "double traverser" arrangement would allow an entire train to be transferred to and from the '"Train on Train" wagons in approximately 10 minutes.[7][8] As of October 2024, the concept of "Train on Train" has not been implemented.

See also

[edit]

References

[edit]
  1. ^abc独自の研究開発 人と物流 高速化に活路 [Own R&D leading to increased speed].Hokkaido Shimbun (in Japanese). Japan: The Hokkaido Shimbun Press. 20 December 2008. Retrieved30 September 2009.
  2. ^"開発は凍結状態 貨車を新幹線に積む「トレイン・オン・トレイン」 - タタールのくにびき -蝦夷前鉄道趣味日誌-".ishikari210.blog.fc2.com. Retrieved8 October 2024.
  3. ^"東京―新函館4時間10分 北海道新幹線、16年春開業".日本経済新聞 (in Japanese). 16 April 2014. Retrieved8 October 2024.
  4. ^JR北海道坂本会長 在来線使い、札幌経由で [JR Hokkaido chairman Sakamoto: Using conventional lines via Sapporo].Tokachi Mainichi Newspaper (in Japanese). Japan. 26 April 2006. Archived fromthe original on 5 July 2009. Retrieved30 September 2009.
  5. ^"開発は凍結状態 貨車を新幹線に積む「トレイン・オン・トレイン」 - タタールのくにびき -蝦夷前鉄道趣味日誌-".ishikari210.blog.fc2.com. Retrieved8 October 2024.
  6. ^JR Hokkaido.整備新幹線小委員会ヒアリング資料(PDF) (in Japanese).
  7. ^在来線貨車を10分で新幹線に積み替え可能 [Narrow-gauge wagons to be transferred to shinkansen in 10 minutes].Hokkaido Shimbun (in Japanese). Japan: The Hokkaido Shimbun Press. 1 February 2010. Archived fromthe original on 4 February 2010. Retrieved2 February 2010.
  8. ^"JR貨物 新幹線との供用走行専用の新型機関車を導入" [JR Freight to introduce new locomotives for inter-running with shinkansen].Tetsudō Daiya Jōhō Magazine. Vol. 41, no. 337. Japan: Kōtsū Shimbun. May 2012. p. 70.

External links

[edit]
Wikimedia Commons has media related toTrain on Train.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Train_on_Train&oldid=1320073655"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp