Toddington | |||||
|---|---|---|---|---|---|
Platform 1 in 2008. | |||||
| General information | |||||
| Location | Toddington,Tewkesbury England | ||||
| Coordinates | 51°59′21″N1°55′41″W / 51.98910°N 1.92813°W /51.98910; -1.92813 | ||||
| Grid reference | SP050323 | ||||
| System | Station onheritage railway | ||||
| Operated by | Gloucestershire Warwickshire Railway | ||||
| Platforms | 2 | ||||
| History | |||||
| Original company | Great Western Railway | ||||
| Post-grouping | Great Western Railway Western Region of British Railways | ||||
| Key dates | |||||
| 1 December 1904 | Opened | ||||
| 7 March 1960 | Closed to passengers | ||||
| 2 January 1967 | Goods facilities withdrawn | ||||
| 22 April 1984 | Reopened | ||||
| |||||
Toddington railway station serves the village ofToddington inGloucestershire,England. Since 1984 it has been the main base of operations for theheritageGloucestershire Warwickshire Railway.
The station is located on theHoneybourne Line which linkedCheltenham andStratford-upon-Avon and which was opened by theGreat Western Railway in 1906. The station was a centre of fruit and milk traffic, but receipts dwindled after a railwaymen's strike in 1955. The station closed to passengers in 1960, although the line itself remained open for freight and diversionary use until 1976; the track was lifted in 1979-80.


On 9 July 1859, theOxford, Worcester and Wolverhampton Railway opened a line fromStratford-upon-Avon toHoneybourne.[1][2] The OW&W became theWest Midland Railway in 1860 and was acquired byGreat Western Railway in 1883 with a view to combining it with theBirmingham to Stratford Line to create a high-speed route from theMidlands to theSouth West.[3][4] The GWR obtained authorisation in 1899 for the construction of a double-track line between Honeybourne andCheltenham and this was completed in stages by 1908.[5]
Toddington station was opened on 1 December 1904.[6] It was built as a railhead for fruit traffic, with a fruit packing shed being provided in thegoods yard in addition to thegoods shed.[7] The shed was 60 ft (18 m) long and comprised a 0 long tons 30 cwt 0 qr 0 lb (3,360 lb or 1.524 t)goods crane.[8][9] The goods yard was the largest on the line and accommodated three mainsidings which were each capable of holding 30 wagons.[10] Two more sidings led into the fruit shed.[10] The fruit was processed in a nearby trading estate established by T W Beach & Sons in 1883, where it was put into tins and shipped out again; coffee was also dealt with in a similar way.[9]

A temporary 29-leversignal box was brought into service to welcome the first train, the 06.43 fromHoneybourne which arrived at 07.10.[11] This was replaced in January 1905 at a cost of £236 (or £32,010 in 2023[a]) for the extension of the line toWinchcombe.[12] A footbridge was provided in 1912 to link the two 400 ft (120 m) platforms;[11][8] the main station building stood on the up platform, behind which was a dock from which large quantities of milk were dispatched.[13] Opposite the main building on the down platform was a small passenger waiting shelter and a largewater tank which drew its supply from the Stanway Estate.[14][9] The station was lit byacetylene gas lamps until 1917 whencalcium carbide became difficult to obtain.[8][15]
The first through passenger excursions to call at Toddington began in August 1906 following the opening of the line through toCheltenham.[12] Initially, they were a Mondays-only service fromSwansea toLeamington Spa andWolverhampton toTintern, but became more regular following the opening of theNorth Warwickshire Line in July 1908.[12] NearbyStanway House, the residence of theEarl of Wemyss, attracted a number of visitors by rail, one of the most famous of whom beingJ. M. Barrie.[16] Passenger tickets sold at Toddington fell from 11,580 in 1913 to 6,050 in 1933; during the same period goods forwarded and received dropped from 5414 tons to 1802 tons.[10] Fruit traffic was badly affected by a 1954 strike by railwaymen,[17][9] which turned fruit growers towards road transport.[14]
Toddington closed to passenger traffic on 7 March 1960,[6] leaving the goods yard in use until 2 September 1967[18] after which the weigh house and fruit packing shed were demolished.[19] With the line remaining open to goods and diversionary traffic, the platforms were cut away by April 1968 to facilitate the out-of-gauge loads which used the route.[20] Closure of the line along with the signal box at Toddington came on 22 October 1976 and the track was lifted in 1979-80.[20]
| Preceding station | Following station | |||
|---|---|---|---|---|
| Hayles Abbey Halt towardsCheltenham Race Course | Gloucestershire Warwickshire Railway | Broadway Terminus | ||
| Historical railways | ||||
| Hayles Abbey Halt Line open, station open | Great Western Railway Honeybourne Line | Laverton Halt Line open, station closed | ||

TheGloucestershire Warwickshire Railway took a lease of Toddington yard from 24 March 1981, with the first working party on site on 28 March.[25] After site clearance, the first track was laid and a compound was built alongside the goods shed which was used by a small business.[25] The signal box was included in the compound, although itslever frame had been purchased and removed by theGwili Railway a few days earlier just as the lease negotiations were being finalised.[25][26]
Toddington's first locomotive, aHudswell Clarke D6150-6-0diesel shunter, was delivered on 30 May 1981, to be followed byGWR 2800 Class 2807 fromWoodham Brothers on 20 June 1981.[27] During the next four years, the station site was transformed with the thorough refurbishment of the station building, reinstatement of the platform and restoration of the signal box with a new frame fromEarlswood Lakes.[28] Double track was laid through the station towardsStanway Viaduct to the north and extensive sidings were laid to accommodate a large collection of locomotives androlling stock.[28] The goods shed was taken over and converted into a workshop and office,[28] whilst awater tower was brought in fromAshford.[29]

The station was inspected by Major Rose ofHer Majesty's Railway Inspectorate on 21 March 1984 and authorisation was given for operation of a 2-coachpush and pull train over a ¼-mile section of track as far as Didbrook Bridge.[30] The official reopening of the station took place on 22 April 1984 whenNicholas Ridley, the localMP, cut the tape onEaster Sunday.[31][32] By 2003, the line had been extended south toCheltenham Racecourse.[33] In late-2005/early-2006, a start was made to relay track north towardsBroadway,[34] and the first 2 miles (3.2 km) of this section, as far asLaverton Halt, re-opened in March 2011.[35]