Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Titlagarh Junction railway station

Coordinates:20°17′06″N83°09′17″E / 20.2849°N 83.1547°E /20.2849; 83.1547
From Wikipedia, the free encyclopedia
Railway station in Odisha, India

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Titilagarh Junction
Titilagarh railway station
General information
LocationTitilagarh,Balangir District,Odisha
India
Coordinates20°17′06″N83°09′17″E / 20.2849°N 83.1547°E /20.2849; 83.1547
Elevation215 m (705 ft)
SystemIndian Railwaysjunction station
Owned byIndian Railways
Operated byEast Coast Railways
LinesJharsuguda–Vizianagaram line,
Raipur–Vizianagaram line
Platforms5
Tracks75 ft 6 in (1,676 mm)broad gauge
Construction
Structure typeStandard (on-ground station)
ParkingAvailable
Other information
StatusFunctioning
Station codeTIG
Zone(s)East Coast Railway zone
Division(s)Sambalpur
History
Opened1931
ElectrifiedYes
Previous namesBengal Nagpur Railway
Passengers
84000
Services
Preceding stationIndian RailwaysFollowing station
Kesinga
towards ?
East Coast Railway zoneRahenbata
towards ?
TerminusEast Coast Railway zoneSikir
towards ?
Location
Titilagarh Junction is located in Odisha
Titilagarh Junction
Titilagarh Junction
Location in Odisha
Show map of Odisha
Titilagarh Junction is located in India
Titilagarh Junction
Titilagarh Junction
Location in India
Show map of India

Titilagarh Junction railway station (station code:TIG) is a major railway junction inOdisha, India, serving the town of Titilagarh inBalangir district. It is a key transportation hub for residents of nearby villages, includingSindhekela, Kholan, Naren, Parasara, Chandotara, Turla, Ghodar, Udepur, Kansil, and others.

History

[edit]

The Vizianagaram–Parvatipuram line, spanning 79 km (49 mi), was opened in 1908–09, followed by the completion of the Parvatipuram–Raipur line in 1931.[1] In 1960, Indian Railways initiated three major projects: the Kottavalasa–Koraput–Jeypore–Kirandaul line, the Titilagarh–Bolangir–Jharsuguda Project, and the Rourkela–Kiriburu Project. Collectively known as theDandakaranya Project or the DNK Project, these projects aimed to enhance rail infrastructure in the region.[2]

The Sambalpur–Titilagarh Railway line was part of this initiative, designed to support the export of two million tons of ore annually through the Vragapattam Port. This project resulted from a tripartite agreement involving the United States, Japan, and India, with the U.S. providing a $20 million loan and Japan contributing an equivalent amount in yen. Negotiations were managed by the Ministry of Finance.

Construction of the 114 km railway line, sanctioned on April 24, 1959, was estimated to cost Rs. 14.58 crores. Additional funds were needed for the import of diesel locomotives, with the U.S. loan anticipated to cover these costs.[3] The Sambalpur–Titilagarh line was opened to traffic in 1963.[1]

Railway reorganisation

[edit]

TheBengal Nagpur Railway was nationalized in 1944.[4]Eastern Railway was established on 14 April 1952, incorporating the eastern section of theEast Indian Railway Company and the Bengal Nagpur Railway.[5] In 1955,South Eastern Railway was created from Eastern Railway, taking over lines previously managed by Bengal Nagpur Railway.[5][6] In April 2003, theEast Coast Railway andSouth East Central Railway zones were formed from South Eastern Railway.[5]

Electrification

[edit]

Electrification of the Titilagarh–Sambalpur–Jharsuguda line was completed in 2018. As of December 2019, Titilagarh Junction is connected to Raipur,Visakhapatnam, andSambalpur via electrified lines. The Titilagarh–Sambalpur double line is under construction, with double-line operations already initiated in the BLSN–MSMD and MSMD–ARN sections.[7] Recent reports confirm that the electrification and doubling of the Titilagarh–Rayagada line have been completed.

Amenities

[edit]

Titilagarh railway station has a six-bedded dormitory.[8] Other amenities at the railway station include computerised reservation offices, telephone booth, cloak room, waiting room, vegetarian refreshment room and book stall.[9]

Passenger movement

[edit]

Titilagarh railway station serves approximately 84,000 passengers daily.[10]

References

[edit]
  1. ^ab"Major Events in the Formation of S.E. Railway". South Eastern Railway. Archived fromthe original on 1 April 2013. Retrieved10 November 2012.
  2. ^Baral, Chitta."History of Indian Railways in Orissa"(PDF). Retrieved27 November 2012.
  3. ^https://eparlib.nic.in/bitstream/123456789/1750/1/lsd_02_07_06-05-1959.pdf page 15
  4. ^"IR History: Part – III (1900–1947)". IRFCA. Retrieved21 November 2012.
  5. ^abc"Geography – Railway Zones". IRFCA. Retrieved21 November 2012.
  6. ^"IR History: Part – IV (1947–1970)". IRFCA. Retrieved21 November 2012.
  7. ^"What is new in Railway Budget 2012–13".The Times of India. 14 March 2012. Retrieved10 November 2012.
  8. ^"East Coast Railway Amenities at Stations (as in 2008)". 2 July 2008. Retrieved13 July 2013.
  9. ^"Titlagarh railway station (TIG)". Make my trip. Retrieved13 July 2013.
  10. ^"Titlagarh (TIG)". Indian Rail Enquiry. Retrieved13 July 2013.
ECoRTooltip East Coast Railway zone
Khurda Road
Sambalpur
Waltair
SERTooltip South Eastern Railway zone
Chakradharpur
Kharagpur
SECRTooltip South East Central Railway zone
Bilaspur
Retrieved from "https://en.wikipedia.org/w/index.php?title=Titlagarh_Junction_railway_station&oldid=1265823024"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp